Facility and Equipment Maintenance

Similar documents
MD Anderson Cancer Center Department of Blood and Marrow Transplantation Cell Therapy Laboratory

Details: Approval: Distribution & Storage:

Prepared by Date Adopted Supersedes Procedure # Adapted from HPTN Policy. Review Date Revision Date Signature

Basic Good Laboratory Practice. Christopher Jerome, B.Vet.Med., Ph.D

JMSCR Vol 05 Issue 01 Page January 2017

SECTION L QUALITY ASSURANCE. 1) designating and managing quality control functions, including:

GENERIC CHECKLIST FOR GLP/GXP INSPECTIONS/AUDITS

Infor EAM for Life Sciences

USP Chapter 823 USP 32 (old) vs. USP 35 (new)

SPECIALIZING IN: Validation Calibration Preventive Maintenance Installation EQUIPMENT AND INSTRUMENT SERVICES

5. METHOD 5.1. CRITICAL SYSTEMS The SSF critical systems and applicable rooms and requisite activities have been defined and are listed below:

PERFORMANCE QUALIFICATION PROTOCOL HVAC SYSTEM

+ IQ/OQ Protocol Installation Qualification/ Operation Qualification

Establishing Quality Control Target Values and Standard Deviations for Hematology Instrumentation

Miltenyi Biotec CryMACS Freezing Bag Validation

EDUCATIONAL COMMENTARY INVENTORY MANAGEMENT: MANAGING REAGENTS AND CONSUMABLES IN THE LABORATORY

Good Laboratory Practice Facilities: Building and Equipment Hedwig Beernaert

TITLE: LIVE/DEAD VIABILITY FOR CLINICAL SAMPLES

Contents. Contents (13) 1 Production (23)

Stem Cell Laboratory 8/F, Li Ka Shing Institute of Health Sciences

Managing Validation. Paperless Recorders

The procurement, qualification and calibration of lab instruments: An Overview

How to Successfully Relocate a Blood Bank

Strategies for Ensuring Integrity for Medical Tissues and Devices

Cold-Chain & Logistical Challenges of Cell Therapeutics in Clinical Trials

Global Integrated Solutions. Advanced Therapy Clinical Development and Commercialization

Laboratory Instrument Evaluation Verification And Maintenance Manual

All equipment and instruments will be ordered by the Special Agent In Charge.

According to USP <1058>

CELLULAR THERAPY SOLUTION. Streamline Your Program s Data Management from Start to Finish with Title21 Cellular Therapy Solution

for IND and RDRC Regulated PET Compounding

Using Empower SystemsQT Qualification Tool

Conducting Supplier Audits: Ensure Validation Compliance

+ IQ/OQ Protocol Installation Qualification/ Operation Qualification

Supplementary Training Modules on Good Manufacturing Practice. Validation. WHO Technical Report Series, No. 937, Annex 4.

Quality Management. Carlos Bachier, MD

Good manufacturing practices

SOP SMPS BaltimorePM supersite Version 2 November 20, 2000 Page 1 of 1. SEAS Chemistry

SJÖGREN S INTERNATIONAL COLLABORATIVE CLINICAL ALLIANCE (SICCA) APPENDIX B: QUALITY ASSURANCE AND QUALITY CONTROL OF SPECIMENS

Establishing Chemistry QC Ranges

VALIDATION AS A KEY TOOL IN SUCCESSFUL TRANSFER OR ESTABLISHMENT OF A MEDICAL DEVICE COMPANY IN A NEW FACILITY

Procedure for Biomedical Equipment Calibration and Maintenance

Inspections, Compliance, Enforcement, and Criminal Investigations

Certification program "Quality Mark TMT" Checklist initial surveillance inspection

AQUALAB 4TE, 4TEV, 4TE DUO, 4TEV DUO BENCHTOP WATER ACTIVITY

CUSTOMER AND SUPPLIER ROLES AND RESPONSIBILITIES FOR 21 CFR 11 COMPLIANCE ASSESSMENT. 21 CFR Part 11 FAQ. (Frequently Asked Questions)

FACT Common Standards for Cellular Therapies, Second Edition. Summary of Changes

Validation Master Plan

Fish Health Laboratory Quality Assurance Process Basic Requirements for Tier I Prequalification

Laboratory Accreditation Test Validation: A Brave New World for Anatomic Pathology

INVESTIGATIONAL DRUG MANAGEMENT OVERVIEW

Adopted by GCP Inspectors Working Group (GCP IWG) 29 November 2017

Storing medicines at the correct temperature: a policy for all acute and community locations. Contents

9125-QE Managing Equipment in the Blood Bank Laboratory 10/9/2010 2:00 PM - 3:30 PM

Installation Qualification/Operational Qualification Protocols and Instructions

Lucia M. Berte Laboratories Made Better! P.C. Broomfield, Colorado, USA

Common Deficiencies

Vaccine Management Plan

Effective Management and Operations of GXP Laboratories

GMPs: Distribution Centers

A24 CALA Checklist for Microbiology Revision 4.1 February 16, 2018

Vaccine Storage and Handling Protocol, 2018

Introduction and Background

Enhanced calibration High quality services from your global instrumentation partner

Oklahoma Checklist (OK)

Risk Management in IVD Producer Relation between manufacturer and user. S.M.Boutorabi DCLS, PhD

Common Issues in Qualification and Validation of Analytical Procedures

Temperature Monitoring (Clinical Trials)

Appendix B: Decommissioning Checklist for Lab Move

Installation Qualification Equipment (Reference SOP: )

Preparing Your Aseptic Processing Facility for an FDA Inspection. Valerie Welter, Director Quality Bayer HealthCare March 10, 2014

Standard Operating Procedures for HTA samples

FACT Inspector Standards Review Questions 5 th Edition Cord Blood Standards

Inspections, Compliance, Enforcement, and Criminal Investigations

Plan Subject Index Number Section Subsection Category Contact Last Revised References Applicable To Detail PRINCIPLE:

Qualification and Delivery of All Things Pharmaceutical. Blaik C Jensen Associate Quality Engineering Consultant

SECTION QUALITY REQUIREMENTS

Fully Automated EIA System. True open flexibility.

Air Monitoring Plan for Ground Intrusive Activities at the Various PPG Hexavalent Chromium Sites in New Jersey

Dr. D. S. Rathore Rajasthan Pharmacy College

National Shellfish Sanitation Program (NSSP) Guide for the Control of Molluscan Shellfish: 2017 Revision

MICROBIOLOGICAL ANALYSIS OF FOOD & FOOD PRODUCTS

Medtronic XOMED. Top Level Procedure for Handling, Storage, Preservation and Movement of Inventory

A PROCESS VALIDATION GUIDE FOR COLD CHAIN LOGISTICS: ENSURING COMPLIANCE GLOBALLY

Human Tissue Intended for Transplantation Skin, corneas, sclera, bone, heart valves, blood vessels, pericardium, tendons, cartilage, fascia

PERFUSION TECHNOLOFISTS OF GREATER CHICAGO, INC. POLICY AND PROCEDURE MEDTRONIC HEMOTEC ACTIVATED CLOTTING TIME (ACT) OPERATING PROCEDURE

General European OMCL Network (GEON) QUALITY MANAGEMENT DOCUMENT

BioSpace Lab Policies and Practices. Corefacilties Unit

What is? An Overview of Operational Processes

Optimizing Performance Bench Scale Service Checklist

HCT/P Deviations & Reporting. 13 th ANNUAL FDA & The Changing Paradigm for HCT/P Regulation February 13-15, 2017

Audit Validation Programs Like a Champ (When your time is limited!!) Cathelene Compton 12 October 2017

Procedure for Equipment Calibration and Maintenance

On behalf of Pharmacy Department Name: Position:

Losing Everything: Is a Chart Recorder Enough to Protect Critical Assets? we prove it. - Reliable - Flexible - Compliant

NPDES Lab Compliance Inspections General Lab Criteria (GLC)

Issue Date: Effective Date:

Collecting Blood and Isolating PBMCs

Approval Block. Prepared by: Signature Date. Margaret Crouse 18 JUN Reviewed by: Signature Date. Brian Flynn 18 JUN 2014

Vaccine Storage and Handling Protocol, 2014

Transcription:

Facility and Equipment Maintenance Deborah L. Griffin Manager, Quality Assurance for Cellular Therapies Hillman Cancer Center University of Pittsburgh Cancer Institute University of Pittsburgh Medical Center

Overview Facility Maintenance Equipment Maintenance

Facility Specifications Drawing on our design talk from earlier If possible: documentation of construction Correspondence with architects, their plans & specifications, construction agreements Correspondence with FDA, if applicable Correspondence with internal facilities management

Facility Specifications During construction: Monitoring of: Materials used in construction Design changes Damage occurring during construction General inspections Continued correspondence and progress reports

Facility Specifications Upon completion of construction Documentation of: Final walk-thru checklist Resolution of checklist items Qualification/Validation of critical items: Air handling system Temperature and humidity controls Card key access system Automated LN2 delivery system Alarm systems Emergency power and back-up systems Final hand-off of new laboratory: date of start-up of operations

Facility Operations Once in production Documentation of critical systems Quality Control semi-annually Air handling system Emergency power and back-up systems Alarm systems Quality Control more frequently than1x/month Temperature and humidity controls Viable and non-viable particle counts Air pressure differentials Automated LN 2 delivery system Ongoing monitoring of the physical condition of the laboratory

Facility Operations Preventative maintenance and deviation management: Documentation!!! Preventative maintenance Any servicing performed on the facility such as replacement of HEPA filters or temperature checks or adjustments Safety inspections Electrical checks Deviation Management Any repairs due to facility damage or failure such as air handling vents needing to be replaced Sticking doors, cracks in wall due to settling of foundation, etc! Ask for documentation of everything!

Equipment Overview Purchase Installation Qualification Validation Maintenance Retirement Document control

Equipment Purchase When purchasing equipment, think of long-term use. Compare products. Ask trusted colleague for advice. Buy a clinical product if available

Receipt of Equipment Documentation of: Date of receipt and initials of accepting tech entered into ordering log book or other inventory system Inspection of packaging Any evidence of visible physical damage

Unpacking equipment Assistance of factory vendor representative, if major equipment Documentation of: Correct equipment shipped All accessories present Inspection of equipment Any evidence of visible physical damage

Internal Asset Control Notify Clinical Engineering Perform electrical and safety testing Asset management Computerized equipment inventory Preventive maintenance schedule Control tag placed on instrument indicating it has passed inspection

Documentation Type of Equipment: Equipment Manufacturer Model number Vendor Date ordered Tech: *Attach copy of Purchase Req. Receipt Date of Receipt: Time of Receipt: Carrier: Inspection of Packaging Acceptable Unacceptable (see F42) Tech: Entered into Inventory Log Book Tech: Installation Unpacking performed by: Factory Vendor/Service Rep present: No Yes, Name Inspection of Equipment Acceptable Unacceptable (see F42) Tech: Inspection of Accessories Acceptable Unacceptable (see F42) Tech: Clinical Engineering Clinical Engineering contacted: Date: Time: Tech: Electrical and Safety Assessment Acceptable Unacceptable (see F42) Tech: Asset Management Inventory Number PM Due Signature of Tech Completing Form: Date: Director Analysis: Initial Installation Acceptable Unacceptable (see F42) Director Comments: Laboratory or Medical Director Signature: Date:

Installation of Equipment Position in logical area Plug into dedicated circuits or emergency power if necessary Install according to manufacturer's instructions Assure proper start up and general operation

Priority of Equipment Determine priority level or Critical piece of equipment One of many Priority Equipment A Cytometer A Hematology Analyzer A Scientific Balance A Biological Safety Cabinets A Floor model Centrifuge A Cell washer A LN2 Transport Container A LN2 Vial Vessel A Cryogenic Control Management & Fill System A LN2 Vessels (1 -> 5) A Cell Separator A Control Rate Freezers A Heat Sealer A Active Blood Bank Refrigerator A Sterile Connecting Device A Transplant Water Baths A Particle Monitor A Centrifuge inserts for CBUs B Serofuge B Dry Shipper B Fluorescent Microscope B Brightfield Microscope B Pipettors B Quarantine Blood Bank Refrigerator B Vial Coolers C CO 2 Incubator C -70 Freezer C Clean Room Fridge C Clean Room Freezer C Stopwatches and Timers C Thermometers

Equipment Qualification Lab rules (SOP) Laboratory equipment that is to be used for assay validation must be qualified according to a pre-approved protocol prior to the start of method validation. A document of the instrument qualification is to accompany any resulting method validation report.

Qualification Plan The Qualification Plan must be documented prior to performing any tests Principle Goal Reagents and Supplies Procedure Manufacturer s Tests Internal Tests Target Values/Acceptance standards Result Reporting Quality Control References and Appendices

Manufacturer s Tests Determine manufacturer s tests prior to instrument release Examples: Electrical testing Calibration Reproducibility Carryover

Internal Tests Determine required tests prior to lab instrument release, document in Qualification Plan, prepared specifically for each new piece of equipment, and depends on critical nature of equipment Examples: Linearity Accuracy and Precision Stability Cross-validation

Qualification Testing Qualification: Testing performed according to specifications. Record test results in a spreadsheet or database, as appropriate. When critical equipment: Run in parallel on other qualified machinery in lab (if replacement or an additional unit). Run in parallel with other certified laboratories (when a new piece of equipment).

Documentation Review Review of Qualification Plan and specified parameters Compilation of test results Statistical analysis of test results Summary of test results Report prepared by technologist detailing the results of the qualification Laboratory Director reviews all documents and signs off on Qualification, specifying an implementation date. The Equipment Qualification Report is placed into the appropriate Equipment Binder.

Equipment Binder Each Binder contains five sections and is specific to equipment type. (e.g. Centrifuges, Microscopes, Refrigerators) Procedures (QC, maintenance, cleaning, calibration) QC Results PM Documentation Deviation Management (failures, malfunctions, accidents, service calls) Validations (qualifications, method validations and manufacturer s manuals) At this point we meet as a group to discuss Method Validation and required QC Procedures with the Laboratory Director. These documents will also be filed in the Equipment binder once complete and approved.