The principal Law for Geothermal Resource Development in Kenya. Florah Mwawughanga

Similar documents
2018 SA ELECTION ENVIRONMENTAL LAW REFORM PRIORITIES PAPER

LAW OF MONGOLIA ON ENERGY CHAPTER ONE GENERAL PROVISIONS. Article 1. The Purpose of the Law

FORESTRY AND LAND MANAGEMENT (SCOTLAND) BILL

SUBSIDIARY LEGISLATION BOREHOLE DRILLING AND EXCAVATION WORKS WITHIN THE SATURATED ZONE REGULATIONS

Register of Legal and Other Requirements United Kingdom

KENYA GAZETTE SUPPLEMENT

REPUBLIC OF LITHUANIA

ICC Regulatory Framework for Renewable Energy Sources. Matthew L. Harvey Office of General Counsel Illinois Commerce Commission August 9, 2010

TRANSMISSION COMPLIANCE MONITORING FRAMEWORK FOR THE SOUTH AFRICAN ELECTRICITY INDUSTRY

A Short Guide to. The Safety, Health and Welfare at Work Act, 2005

Legal Alert? August 2011? Oil and Gas Local Content Act

KENYA GAZETTE SUPPLEMENT

CONTROL OF ON-SITE WASTEWATER DISPOSAL SYSTEMS

Public Water Supply and Sewerage Act

NATIONAL ENVIRONMENT MANAGEMENT AUTHORITY

TITLE. Prepared by: 2.3 FMA 1967 & EQA 1974

4. Environmental Legislation. Mr. S. P. Deshmukh, Watumull Institute

NEW POLICY FOR POWER GENERATION FROM NON-CONVENTIONAL SOURCES OF ENERGY -2008

Electricity Law (Draft) 2013, Pyidaungsu Hluttaw Law No. ( - ) 1375 M.E, Month, Day 2013, Month, Day

ENVIRONMENTAL IMPACT ASSESSMENT

Climate Change Legislation. Overview of Legislation

Managing Country. Aboriginal Communities. Overview. Last updated: March 2013

Chhattisgarh State Electricity Regulatory Commission

Source of requirement EBRD. - Each six months during construction - Annually during operation. Best practice EBRD PR 1

OSH LEGISLATION LAW AND REGULATION TO CONSTRUCTION SAFETY LAW AND REGULATION TO CONSTRUCTION SAFETY 20/2/2013

ARROW BOWEN PIPELINE PROJECT

Management POLLUTION Inspectorate Frances Craigie

LEGAL REQUIREMENTS FOR GEOTHERMAL DEVELOPMENT IN KENYA

FEDERAL REPUBLIC OF BRAZIL (Framework) Act No , August The President of the Republic

1 Status Fiji ratified the Montreal Protocol on October 23, 1989 and the London Amendment on December It is an Article 5 country.

Chapter 18. Sewers and Sewage Disposal

PRIVATE INVESTMENT IN PRACTICE HOW KPLC WORKED WITH RABAI POWER LTD TO MOVE A POWER INVESTMENT FROM THE FEASIBILITY STAGE TO FINANCIAL CLOSURE

Labour Standards. Hours of Work: Issues affecting RMS 11/02/2013. Workshop topics. Basic labour standards rules. Minimum wage

This Chapter contains rules managing land uses in the Main Rural Zone. The boundaries of this zone are shown on the Planning Maps.

FORESTRY AND LAND MANAGEMENT (SCOTLAND) BILL

BYLAW NO.09/036 BEING A BYLAW OF THE REGIONAL MUNICIPALITY OF WOOD BUFFALO TO ESTABLISH A MUNICIPAL EMERGENCY MANAGEMENT AGENCY

HOUSE BILL No. UTILITY METER FREEDOM OF CHOICE AMENDMENT. A bill to amend Chapter 460 Michigan Public Act 3 of 1939, entitled

Narodne novine Official Gazette of the Republic of Croatia issue no. 68 of 27 July 2001 page 2174

Club Green Environment Manual

Climate Change Act 2010

ENVIRONMENTAL AND PLANNING REGULATION

REPORT FORM. TERMINATION OF EMPLOYMENT CONVENTION, 1982 (No. 158)

Public Consultation Guidelines - Electricity, Gas & Water Licences and Electricity & Gas Standard Form Contracts

NATIONAL ENVIRONMENTAL MANAGEMENT: WASTE ACT NO. 59 OF 2008

CHAPTER 3 POLICY, LEGAL AND ADMINISTRATIVE FRAMEWORK

THE CORPORATION OF THE CITY OF PORT COQUITLAM BYLAW NO. 3876

A Guide to the Health and

Københavns Universitet. Denmark Anker, Helle Tegner; Olsen, Birgitte Egelund; Rønne, Anita. Publication date: 2012

South Australian Public Health (Wastewater) Regulations 2013

The California Environmental Quality Act

Manningham Works Code of Practice

Chapter 60 BUILDING CONSTRUCTION AND FIRE PREVENTION ADMINISTRATION

COMMISSION STAFF WORKING PAPER

Schedule No. 9 to By-law No

APPLICATION FOR COMPLYING DEVELOPMENT CERTIFICATE

ROLE OF THE NATIONAL ENERGY REGULATOR (SOUTH AFRICA) Lambert du Plessis: Senior Regulatory Specialist

(No. 12 of 2006) In exercise of the powers conferred by section 102 of the Energy Act, 2006 the Minister for Energy makes the following regulations:-

STATUTORY AUTHORITY: ACT no. 50 of 29 June 1990, section 7-6

REPUBLIC OF LITHUANIA LAW ON ELECTRICITY 20 July, 2000, No. VIII 1881 as amended by 26 June, 2001, No. IX-408 Vilnius CHAPTER ONE GENERAL PROVISIONS

Native Title Act 1993

Environmental Health Legislation, Law 12 of 1995

RANCHI MUNICIPAL CORPORATION

ARTICLE X LANDSCAPE AND TREE PRESERVATION REGULATIONS OVERVIEW

GENERAL ASSEMBLY OF NORTH CAROLINA SESSION 1999 SESSION LAW HOUSE BILL 1602

Policy Statement No. 1. QFC Firms Doing Business in the. State

CHAPTER MANUFACTURED HOME PARKS

ON THERMAL ENERGY. Based on Article 65 (1) of the Constitution of the Republic of Kosovo, LAW ON THERMAL ENERGY CHAPTER I GENERAL PROVISIONS

CITY OF EDMONTON BYLAW EMERGENCY MANAGEMENT BYLAW (CONSOLIDATED ON NOVEMBER 14, 2012)

Environmental Permitting Guidance Note Activity C.3

Improvement District Conversion Guide

EMERGENCY MEASURES ACT

5. Summary of pesticide regulation in South Australia

ORDINANCE NO. VI-III A WIND ENERGY DEVICE ORDINANCE EMMET COUNTY, IOWA AN ORDINANCE ADDRESSING STANDARDS, CONDITIONS, APPLICATION, REVIEW AND

Fire limits--designated. All of that territory within the Village, described as follows:

CIH briefing on the Localism Bill. January 2011

LAWS OF THE REPUBLIC OF VANUATU CONSOLIDATION EDITION 2006 CHAPTER 265 FORESTRY RIGHTS REGISTRATION AND TIMBER HARVEST GUARANTEE

NATIONAL ENVIRONMENTAL MANAGEMENT: WASTE ACT 59 OF 2008

The Role of National Biosafety Authority and Regulatory Framework for Biosafety in Kenya. Willy K. Tonui, PhD, RBP Chief Executive Officer

Law of the Republic of Kazakhstan dated July 15, 1997 N on Environmental Protection (amended)

Drainage By-law. WM-4 Consolidated as of April 18, 2011

REGIONAL STUDY ON PACIFIC ISLANDS FORESTRY LEGISLATION

4 ADMINISTRATIVE FRAMEWORK 4.1 INTRODUCTION

CHAPTER 4. Solid Waste Management

GUIDELINES FOR ACCESSING GENETIC RESOURCES AND BENEFIT SHARING IN UGANDA NATIONAL ENVIRONMENT MANAGEMENT AUTHORITY MINISTRY OF WATER AND ENVIRONMENT

AN OVERVIEW OF DRAFT ENVIRONMENTAL MANAGEMENT AND COORDINATION (STRATEGIC ASSESSMENT, INTEGRATED IMPACT ASSESSMENT AND AUDIT) REGULATIONS, 2018

REBUILDING AFTER THE TSUNAMI: keeping it legal

DIVISION 7. WATER QUALITY [ ] (Division 7 repealed and added by Stats. 1969, Ch. 482.)

NAKURU Regional consultations report

POLLUTION INCIDENT RESPONSE MANAGEMENT PLAN (PIRMP)

WISCONSIN. Enforceable Provisions Applicable to Nonpoint Source Water Pollution DISCHARGE PROHIBITIONS

TOWN OF ECKVILLE BYLAW 638/02 BUILDING PERMIT BYLAW

CARLOW COUNTY COUNCIL GUIDANCE NOTE FOR APPLICANT AIR LICENCE

4) Construction. Any part or portion of the activity of installing, locating, siting, erecting or raising a building.

Supplier Code of Conduct

pages 1-3, and page 8

ETHIOPIAN GEOTHERMAL POLICY, LEGAL AND REGULATORY FRAMEWORK

Policy and Regulations Chiang Mai (Thailand)

Energy Efficiency Law

Dangerous Goods Act 1985 Dangerous Goods (Transport by Road or Rail) Regulations 2008 [Part 18]

AN ANALYSIS OF CONSTRUCTION LAW AND DISASTER MANAGEMENT LAW RELATING TO SUSTAINABLE DEVELOPMENT IN SRI LANKA

Transcription:

The principal Law for Geothermal Resource Development in Kenya By Florah Mwawughanga

Purpose Highlight the role of Geothermal Resources Act in geothermal development in Kenya. Give brief on role of supplementary laws Discussion and recommendations

Introduction Legal framework-vital in development, regulatory Geothermal Resources Act (GRA)-Principal Law Enactment of Geothermal Resources Act-1982. Regulations-1990. Supplementary Laws applied with GRA Electricity production began 1981, production expansion has been slow.

Provisions of the Act 1) Geothermal Resources Vested in the Government. 2) Declaration of GR area by Minister for Energy 3) Unauthorised use of GR without authority or licence. 4) Authority for search of geothermal resources given by the Minister. Survey, investigate, test, Measurements, sink bore and any related activity

Non compliance with Act, effect on other bores, public interest Authority is subject to : Cont Proper closure bore supervision, maintained safety, being bore left in lasting safety condition Authority Lasts for one yr and is not transferable Renewable for one yr Authority may be revoked due to:

Cont. 5) Conditions of granting of Geothermal Resources Licence By Minister Application in prescribed format For a period not > 30 yrs Renewable for period not > 5 yrs Not transferable without Minister s authority Annual rent paid 3 months prior to due date, failure attracts 10 %

Cont Forfeiture of licence may be due to: Cessation of wok continuously for 6 months without consent Breach of any of the provisions After licence expiry or forfeiture, licensee can apply to Minister within 90 days to enter land and remove machinery 6) Rights under the licence Enter land with geothermal resources

Cont. Drill and construct necessary bore hole & undertake any necessary associated activities. Construct and maintain buildings and machinery Utilise geothermal resources Construct and maintain roads and other communication means Use any water subject to Water Act

Cont. 7) Areas exempted include from licensing: Burial ground vicinity of churches, mosques, or sacred places of worship 1000m of aerodrome National park or nature reserve

Cont. Areas within 50 m in vicinity of a building in use or dam Any area within a municipality or town Any public road *Entry to areas above - subject to consent from competent authorities *Directional drilling is allowed in subsurface of exempted areas.

Cont. 8) Safety or compensation of persons in geothermal production areas- licensee s responsibility Compensation for damage to property or land - by licensee If one being compensated is dissatisfied, one may appeal to high court 9) Closure of geothermal bore - by Minister may be due to: Source of danger to persons or property nearby Affecting other bores for specified purposes

Cont. Bore is a nuisance or for public interest Bore is no longer necessary for operation as per approved plans For environmental protection, including ground water For conservation of geothermal resources

Other important (supplementary) Laws 1) Electric Power Act 2) Environmental Management and Co-ordination Act 3) Water Act 4) Local Government Act 5) Factories Act 6) Public Health Act 7) Wildlife (Conservation and Management) Act 8) Restrictive Trade, Practices, Monopolies & Price control Act 9) The Standards Act 10) Forests Act

Electric Power Act no. 11 of 1997 Principal law of the power sector. Establishes the Electricity Regulatory Board (ERB) -process & recommend issuing of licences to generate, transmit, supply electricity, enforce environmental & safety regulations, regulate tariffs Restructured the power sector to allow private sector participation in geothermal development.

Cont. licensing considerations -need for environmental protection, natural resource conservation, technical & financial capacity, community energy needs etc. Producer licence - term not exceeding 15 yrs, renewal application done 3 yrs before termination date. Power sale/transmission contracts between & among producers, suppliers & large retail consumers need Board approval (ERB)

Environmental Management and Co-ordination Act of 1999 Act provides legal framework for management of environment and natural resources. Act includes procedures on EIA, Environmental Audits,Monitoring &Environmental quality standards. Upon EIA completion -EIA licence issued for development. Electrical infrastructure & drilling to utilise underground water resources -requires EIA.

Cont. Administered by the National Environmental Council& implemented by the National Environmental Management Authority (NEMA). ERB - lead Agency to enforce the environmental & safety regulations in the power sub-sector. Other Licences required -effluent discharge licence, Emission licence for air pollutants, Waste disposal licence & noise exemption permits. Restoration - mandatory after project completion.

Factories Act (CAP 514) of 1972 Categorizes energy generating stations as factories. Labour commissioner- responsible for administration of Act. Provides for maintenance of health & safety through cleanliness, sanitary conveniences, fencing, protective clothing, workers welfare etc.

Water Act (CAP372) of 1972, repealed in 2000 Vests all water resources on the Government & establishes rules and procedures for water use. The Water Apportionment Board - regulates water use among other duties. Any waterworks - need a permit. The Minister, may declare an area a protection area & construction, water diversion or abstraction will require a special permit.

Public Health Act (CAP242) of 1986 Act is administered by Central Board of Health Empowers the Minister to make rules and enforcement in connection with: Inspection of dwellings, buildings, factories etc. in connection with cleanliness, security, drainage, lighting, ventilation & overcrowding prevention, nuisance & any danger (eg. Offensive smells, liquids). Construction of buildings & factories and prohibition of construction in unsuitable localities-pose health & safety risks. Inspection of lands & buildings - whether fit for habitation (certificate of fitness issued).

Local Government Act, CAP 265 Electric Power Act requires that any licence applicant liases with local authorities affected by proposed activities and obtain consents prior to submitting licence application to the Electricity Regulatory board

Forest Act (CAP 385) Act prohibits road construction, tree cutting, burning, erecting building etc. in a Forest area or unalienated Government land without the authority of the Director of Forests. For nature reserves, a licence is issued for conservation purposes only thus exploitation of geothermal resources may not be allowed. Already there are confirmed resources in some forest areas e.g. Eburu

Wildlife Conservation and Management Act (CAP 376) Act establishes the Kenya Wildlife Service (KWS) - mandated to manage National Parks and Reserves - conservation & management of all flora and fauna. Act prohibits introduction of any unauthorised flora and fauna into the park. Currently all geothermal developments -in the park. The Act, policies and agreement between KWS and Geothermal resource developers ensure harmony with the goals of KWS.

Restrictive Trade, Practices, Monopolies & Price control, CAP 504 The Act establishes a legal framework for competition. It is the principal law on competition though the EPA authorises ERB to ensure genuine competition in the power sub-sector.

The Standards Act, CAP 496 Under the Act, the Electricity Regulatory Board is empowered to enforce safety regulations and ensure electrical apparatus meet standards set by the Kenya Bureau of Standards(KEBS) or international standards approved by KEBS.

Discussion Geothermal energy is the source of power of the future for Kenya High potential, highly technically qualified personnel,its environmentally benign and indigenous and due to fact that most high potential hydropower sites are exhausted & risk of weather unpredictability. Expansion of geothermal industry has been slow, especially in the last 20 yrs or so, partly due to legal and regulatory framework issues. For long there was no clear policy on the sector.

Cont. But the Energy policy paper of 2004 addresses most factors that have inhibited rapid expansion of the sector. However, specific measures focusing on geothermal are required to speed up growth. The necessary legal framework to ensure effective implementation of the energy policy is yet to be realised (Bill).

Conclusions Has been long since the GRA was enacted. This needs review to accommodate changes that have occurred over the years. Likewise some of the supplementary laws (old) require repealing. There is need for specific policies and enactment of laws to provide incentives that may invigorate faster growth of the sector. Speedy enactment of the energy bill into law is needed for effective implementation of the energy policy. Establishment of a sustainable fund, backed by laws/policies, for exploratory studies which are expensive

Cont. Major incentives backed by legal framework/policies - needed to make geothermal energy development more attractive especially to the private sector. Establish mechanisms to cushion developers from risks where drilling may not yield steam. There is need to put in place a single body to deal with licensing on geothermal development.

Thank you for your attention