Industrial Solid Waste Landfill Daily Log of Operations {as required by O.A.C (E)(10)} Yearly Cover Sheet (Form 1)

Similar documents
Solid Waste Transfer Facility Daily Log of Operations {as required by OAC Rule } Yearly Cover Sheet (Form 1)

Construction & Demolition Debris Facility Daily Log of Operations {as required by O.A.C. Rules (B)(9)&(10)} Yearly Cover Sheet Form 1

Composting Facility Log of Operations Index Each form represents an individual tab in the binder that houses the Log of Operations

License Summary 10/7/15 11/30/15 1/7/16 2/24/16 10/16/15 12/8/15 1/12/16 3/16/16 11/12/15 12/14/15 1/29/16 3/23/16 11/20/15 2/11/16

November 22, The Honorable Ron Daniell Clark County Judge Courthouse Square 401 Clay Street Arkadelphia, AR 71923

October 20, Mr. Kevin Nolan Environmental Coordinator Weyerhaeuser Mountain Pine Mill P.O. Box 7 Mountain Pine, AR 71956

August 30, The Honorable Ron Daniell Clark County Judge Courthouse Square 401 Clay Street Arkadelphia, AR 71923

Mr. Wayne Mangum, District Manager Two Pines Landfill 100 Two Pines Drive North Little Rock, AR

April 10, Mr. Randy Melton, Site Manager Ozark Ridge Landfill, Inc Ozark Ridge Access Lane Danville, AR 72833

FLORIDA DEPARTMENT OF ENVIRONMENTAL PROTECTION INSPECTION CHECKLIST

NC2 ASH DISPOSAL AREA

Operational criteria for a sanitary landfill facility. (A) Applicability.

RE: Quarterly Inspection; AFIN ; Permit Number 0307-S4

Quarterly Inspection; AFIN ; Permit Number 0254-S1-R4.

OHIO ENVIRONMENTAL PROTECTION AGENCY L PE RMIT-TO4 N STALL t

Certified Mail # Return Receipt Requested. November 20, 2018

POST CLOSURE PLAN. CCR (d) GERS Conesville Residual Waste Landfill. Conesville Plant Conesville, Ohio.

November 26, The Honorable Ron Daniell Clark County Judge Courthouse Square 401 Clay Street Arkadelphia, AR 71923

Quarterly Inspection; AFIN ; Permit Number 0254-S1-R4.

STORMWATER OPERATION AND MAINTENANCE AGREEMENT

AEP GENERATION RESOURCES

Operation and Maintenance Plan

AEP GENERATION RESOURCES

Florida Department of Environmental Protection Inspection Checklist

Florida Department of Environmental Protection Inspection Checklist

Florida Department of Environmental Protection Inspection Checklist

KENTUCKY POWER COMPANY

APPALACHIAN POWER COMPANY

Pleasants Power Station Landfill Coal Combustion Residual 2017 Annual Report

2017 Annual Landfill Inspection Report

Texas Commission on Environmental Quality

This annual inspection report has been prepared to meet the requirements of 40 CFR (b).

SANITARY LANDFILL INSPECTION CHECKLIST

2016 LANDFILL INSPECTION REPORT CARDINAL PLANT BRILLIANT, OHIO

2017 Annual Landfill Inspection

SANITARY LANDFILL INSPECTION CHECKLIST

POST CLOSURE PLAN. CFR (d) GERS CCR Landfill. Flint Creek Plant Gentry, Arkansas. September, 2016

Written Post-Closure Plan. Pawnee Station - Active CCR Landfill Public Service Company of Colorado Denver Colorado

Annual CCR Fugitive Dust Control Report

Class III Composting Facility Requirements

Jim Bridger Power Plant

KENTUCKY POWER COMPANY

AEP INDIANA MICHIGAN POWER COMPANY

REGULATED MEDICAL WASTE FACILITY INSPECTION CHECKLIST

REGULATED MEDICAL WASTE FACILITY INSPECTION CHECKLIST

CLOSURE PLAN. CFR (b) Fly Ash Reservoir 1 Landfill Cardinal Plant Brilliant, Ohio. September, 2016

SOUTHWESTERN ELECTRIC POWER COMPANY

RE: Quarterly Inspection; AFIN Permit Number 0289-S3T-R3

St. Charles County Government

If I can be of any further assistance, feel free to contact me at (501) or

Florida Department of Environmental Protection Inspection Checklist 1659 NORTHWEST 10TH STREET

Application For Waste Regulation (Check all that apply)

Florida Department of Environmental Protection Inspection Checklist

Performance Standards Compliance Checklist

Southwestern Electric Power Company

Annual CCR Fugitive Dust Control Report

Southwestern Electric Power Company

Florida Department of Environmental Protection Inspection Checklist

St. Charles County Government

FUGITIVE DUST CONTROL PLAN

Florida Department of Environmental Protection Inspection Checklist 8510 NW GAINESVILLE ROAD

SPECIAL WASTE CLEARANCE ACCEPTANCE POLICY

Facility Annual Operational Report for 2010

Project Information. Check all that are applicable to the construction project site: RIPDES CGP (construction) RIPDES RGP (dewatering)

Florida Department of Environmental Protection Inspection Checklist 8510 NW GAINESVILLE ROAD

Eric Grambo, Operations Manager Republic Services 2500 State Road 60 W Bartow, FL

Florida Department of Environmental Protection Inspection Checklist

HOLLOW ROCK FACILITY 2016 ANNUAL LANDFILL INSPECTION REPORT FOR COAL COMBUSTION RESIDUALS (CCR) EXISTING LANDFILL

EMISSIONS ACTIVITY CATEGORY FORM LANDFILLS

NEW CASTLE CONSERVATION DISTRICT. through. (Name of Municipality) PLAN REVIEW APPLICATION DRAINAGE, STORMWATER MANAGEMENT, EROSION & SEDIMENT CONTROL

Landfill Layout and Operation

2015 ANNUAL ENGINEERING INSPECTION REPORT ENTERGY INDEPENDENCE PLANT CLASS 3N LANDFILL PERMIT NO S3N-R2 AFIN:

Erosion and Sediment Control Plan for a Timber Harvesting Operation

Green CCR Landfill. Disposal of Coal Combustion Residuals (CCR) from Electric Utilities Final Rule CCR Landfill 2017 Annual Inspection Report

2015 LANDFILL INSPECTION REPORT CARDINAL PLANT BRILLIANT, OHIO

Jim Bridger Plant Document Type: PLANT POLICIES & PROCEDURES Document ID Number: ENV-CCR001

Green CCR Landfill. Disposal of Coal Combustion Residuals (CCR) from Electric Utilities Final Rule CCR Landfill 2016 Annual Inspection Report

Construction Best Management Practices Handbook BEST MANAGEMENT PRACTICES

PUBLIC SERVICE COMPANY OF OKLAHOMA (PSO)

VISUAL SITE INSPECTION REPORT 2018

POST CLOSURE PLAN. CFR (d) GERS Landfill. Mitchell Power Plant Marshall County, West Virginia. October, 2016

(Instructions and explanations of bid items and sources of unit costs are provided on the back of this page.)

ORDER OF THE MINISTER OF ENVIRONMENT ENVIRONMENTAL MANAGEMENT ACT SECTION 79 AMENDED SPILL PREVENTION ORDER: MO1701

ORDER OF THE MINISTER OF ENVIRONMENT ENVIRONMENTAL MANAGEMENT ACT SECTION 79 AMENDED SPILL PREVENTION ORDER: MO1701

Annual CCR Fugitive Dust Control Report

Annual CCR Fugitive Dust Control Report

LANDFILL POST-CLOSURE PLAN ENTERGY ARKANSAS, INC. INDEPENDENCE PLANT CLASS 3N CCR LANDFILL PERMIT NO S3N-R2 AFIN

RE: Quarterly Inspection; AFIN ; Permit Number 0102-S3N-R4

Coal Combustion Residuals (CCR) Run-on and Run-off Control System Plan

ANNUAL INSPECTION REPORT EXISTING COAL COMBUSTION RESIDUE (CCR) LANDFILL MUSCATINE POWER & WATER

ES Inspection and Maintenance of MS4 Structural Controls* Document Identification Number Date: March 14, 2018

SOUTHWESTERN ELECTRIC POWER COMPANY

SOUTHWESTERN ELECTRIC POWER COMPANY

ST. TAMMANY PARISH PATRICIA P. BRISTER PARISH PRESIDENT

2017 ANNUAL ENGINEERING INSPECTION REPORT ENTERGY INDEPENDENCE PLANT CLASS 3N LANDFILL PERMIT NO S3N-R2 AFIN:

Appalachian Power Company Clinch River Plant. Coal Combustion Residuals Fugitive Dust Control Plan

POST CLOSURE PLAN. CFR (d) GERS CCR Landfill. Turk Plant Fulton, Arkansas. September, 2016

Inspection Report. David Burton, Facility Manager (NRG Indian River Generating Station)

2014 Capital Improvement Project Contract Concrete Paving & Utilities Oshkosh, Wisconsin

POST CLOSURE PLAN. CFR (d) Pond 1. Clinch Power Plant Russell County, West Virginia. November Prepared for: Appalachian Power Company

Transcription:

Division of Materials & Waste Management Industrial Solid Waste Landfill Daily Log of Operations {as required by O.A.C. 3745-29-19(E)(10)} Yearly Cover Sheet (Form 1) This daily log cover sheet should be completed at the beginning of each license year and should be kept on file at the beginning of the daily log file for that year. Attach amendments to this form as necessary. Annual Log for Year: License #: Phone #: Name of Facility: Mailing Address: (Street) (City) (State) (Zip) Location of Facility: _ (Street) (City) (State) (Zip) Owner of Facility: Licensee Name: Name of Site Manager: Method(s) of Measuring Amount of Incoming Materials: Scales Visual Estimate Capacity of Hauling Vehicle This form should be retained on file for inspection by the local health department, Ohio EPA, or an authorized representative. Failure to provide accurate daily operations information may be considered a violation of Ohio Revised Code 2921.13. ISW Log -Form 1 Revised: February 2016

Industrial Solid Waste Landfill Facility Daily Log of Operations - Form 2 Facility: {Log Required by OAC 3745-29-19(E)(10)} Date: Load # Amount of Waste (Tons or yd 3 ) Waste Origin (if direct hauled) OR Location of Transfer Facility (if transferred waste) Generator (for all but MSW) City/County State Total Amount of Waste for This Sheet: Cumulative Total From Previous Sheet: (Same Day) Cumulative Total Waste for This Day: Total Amount of Solid Waste (This Day) (a) (b) (c) (d) Totals This form should be retained on file for three years for inspection by the local health department, Ohio EPA, or an authorized representative. Failure to provide accurate daily operations information may be considered a violation of Ohio Revised Code 2921.13. Signature of Person Completing Form This is Sheet of used for this date. ISW Log -Form 2 Revised: February 2016 Print Name of Person Completing Form

Industrial Solid Waste Landfill Facility Daily Log of Operations - Form 3 {Log Required by OAC 3745-29-19(E)(10} Facility Name: Today's Date: Facility Opened Today at (time): Facility Closed Today at (time): List Equipment in Operation at the Facility Today: _ List Weather Conditions on this Day: The Facility Operator shall inspect the facility daily for compliance with the applicable regulations including but not limited to the following: Place an (X) on the line next to all aspects of facility operations which have been inspected today. Mark N/A if not applicable. 3745-29-19 Operation of a Facility (10)(a) Daily inspection of facility for ponding, (2)(a) Maintain all weather access (b) Limit access to non-employees (c) Exclude live domestic and farm animals (3)(a) Adequate fire equipment (b) Operable equipment (4) Improper salvaging (5) Trained employees (6) Preparation for inclement weather (7)(a) Leachate treatment/disposal (b) Phased operation (c) Confined unloading (d) Separation/control of flammable waste (e) Minimize dust generation (f) May accept nontoxic fly ash, bottom ash, spent nontoxic foundry sand (8) Shall not accept for disposal: (a) NESHAP reg. asbestos disposal (b) Liquids (c) Hazardous waste (d) PCBs (e) Low level radioactive waste (f) Semi-solid material w/free liquid (9) Keeping of daily logs erosion, leachate outbreaks (b) Inspect sed. ponds and sed. pond discharge structures weekly (11) Copy of PTI available at facility (12) No waste until area prepared (13) Sed. ponds completely cleaned (14) Financial assurance (F) Daily cover (G) Intermediate cover (H) Final cover (I) Scales (J)(1) Surface water diversion (2) Correct ponding and erosion (3) Surface water monitoring (K)(1) Leachate control (2) Lift station back-up pumps (3) Collection pipe network (inspection) (4) Temporary leachate storage (5) Leachate treatment and disposal (6) Leachate storage/disposal contingency plan (7) Surface water monitoring 3745-37-01 License (A) Valid license Corrective Actions Taken and Other Comments: _ Signature of Person Completing Form Print Name of Person Completing Form Date This form should be retained on file for three years for inspection by the local health department, Ohio EPA, or an authorized representative. Failure to provide accurate daily operations information may be considered a violation of Ohio Revised Code 2921.13. ISW Log -Form 3 Revised: February 2016

Industrial Solid Waste Landfill Facility Daily Log of Operations - Form 4 - Weekly Sedimentation Pond and Discharge Structure Inspection - OAC Rule 3745-29-19(E)(10) Facility Name: Today's Date: List Weather Conditions on this Day: _ For any problems identified, locate and number on site map and explain. Document all corrective actions after deficiencies are corrected. Place an (X) on the line next to all aspects of facility operations which have been inspected today. Mark N/A if not applicable. Sedimentation Ponds Structural Integrity of Berms Vegetation Primary Spillway(s) Emergency Spillway(s) Water Quality Sediment Volume Discharges Ditches/Channels Vegetated Riprap Freeboard Scour Clogging Erosion Control Permanent Controls Temporary Controls Hillsides Vegetation Stability Checkdams Roadways Pipes/Culverts Structural Integrity Crushing Adequate Cover Clogging Head/Endwalls Description of Water Quality Samples Taken Description of Corrective Actions Taken and Other Comments Signature of Person Completing Form Print Name of Person Completing Form Date This form should be retained on file for three years for inspection by the local health department, Ohio EPA, or an authorized representative. Failure to provide accurate daily operations information may be considered a violation of Ohio Revised Code 2921.13. Revised: February 2016

Division of Materials & Waste Management Instructions for Completing Industrial Solid Waste Landfill Daily Log of Operations Form 1 - Cover Sheet Complete Form 1 at the beginning of each license year. If a section does not apply, indicate so with the notation N/A. If any of the information contained on Form 1 changes during the license year, attach an addendum to the form with the corrections and the date on which they occurred. Maintain Form 1 at the beginning of the complete Daily Log. Form 2 - Daily Log of Operations Form 2 is the actual record of waste received for disposal on a particular day. Enter the Date, Day of Week, and Facility Name in the appropriate spaces in the top right corner of the form at the beginning of each day. The body of the form contains several columns and rows. A separate, complete entry (row) must be made on the form for each individual load of waste received for disposal. As many copies of Form 2 as necessary to record all loads received for disposal may be used for each day. Column 1 Load # Column 2 - Amount of Waste: Each load of waste received at the facility for disposal must be measured. To avoid confusion, be sure to circle the appropriate unit of measure at the top of the column on each new page. When the facility closes for the day, or when all rows on a sheet have been completely filled (7 loads can be recorded on each sheet) total the amount of waste from all entries and place the figures in the "Total Amount of Waste for This Sheet" spaces at the bottom of the page. If only one sheet was used for a day, or for the first sheet in a day requiring multiple sheets, copy the "Total Amount of Waste for This Sheet" entries to the "Cumulative Total Waste for This Day" row at the bottom of the page. For subsequent sheets, copy the "Cumulative Total Waste for This Day" entry from the preceding page to the "Cumulative Total from Previous Sheet" row at the bottom of the page. The "Cumulative Total Waste for This Day" for that page is the sum of the "Total Amount of Waste for This Sheet" and "Cumulative Total From Previous Sheet" sections. As each sheet is competed for a given day, indicate the page number of the sheet in the space provided (note: you will not be able to indicate the total number of sheets used until the end of the day). For those facilities that use electronic daily log forms, the Cumulative Total box at the bottom of the page is optional. ISW Log -Instructions Page 1 of 2 Revised: February 2016

Column 3 - Waste Origin or Location of Transfer Facility: If the waste load is direct hauled, record the county and state where the waste load originated for each load received for disposal at the facility (the city can be entered as well, although it is optional). If the waste load was received from a transfer facility, record the county and state where the transfer facility is located for each load received for disposal at the facility (the city can be entered as well, although it is optional). Enter the appropriate information in this column. Column 4- Generator: If the waste is any type but MSW, the generator's name must be recorded. Signature: At the conclusion of each day, the person completing the form shall sign in the space provided at the bottom right of the final daily log sheet used. Print the name of the person completing the form in the space provided. Form 3 - OAC Rules Daily Inspection Checklist The facility must be inspected each day in order to determine compliance with OAC 3745-30-14 and OAC 3745-37-01. Form 3 is a check list for use while inspecting the facility as noted above. The facility must describe the corrective actions taken on the daily log form. The checklist should be completed, signed, and dated at the close of business each day. Place the completed checklist at the end of each daily log. Form 4 - Weekly Sedimentation Pond and Discharge Structure Inspection The facility must inspect sedimentation ponds and sedimentation pond discharge structures, including pipes, ditches, and culverts at least weekly for erosion, clogging, or failure and take prompt corrective action, if necessary. Place an (X) on the line next to all aspects of facility operations which have been inspected today. Written results of the inspections, including a discussion of any corrective actions taken and any water quality samples taken pursuant to OAC Rule 3745-27-19(E)(11), must be recorded in the space provided on Form 4 (use the back of the page or attach additional pages if necessary). The date and the weather conditions must also be noted in the appropriate places at the top of the form. ISW Log -Instructions Page 2 of 2 Revised: February 2016