IFB B Attachment 3 Page 112-1

Similar documents
UTILITIES CHECKLIST CITY OF CHESAPEAKE DEPARTMENT OF PUBLIC WORKS SUBDIVISION NAME: A/C & TAX MAP PARCEL NOS (13 DIGITS) DEVELOPER:

CONSTRUCTION SURVEY. Construction survey includes personnel, equipment, and supplies required for, but not limited to, the following:

SECTION MEASUREMENT AND PAYMENT

SECTION CONSTRUCTION SERVICES

INSPECTION AND ACCEPTANCE FOR MAINTENANCE

Engineer s Packet. Water and Sewer

TOWN OF MANCHESTER PLANNING AND ZONING COMMISSION Subdivision Application Minimum Submission Requirements

CONSTRUCTION PROCEDURE

TECHNICAL SPECIAL PROVISION FOR FINANCIAL PROJECT ID:

Construction Documents Checklist

EXHIBIT A FEE SCHEDULE

CITY OF ASTORIA PUBLIC WORKS ENGINEERING DIVISION ENGINEERING DESIGN STANDARDS FOR IN-FILL DEVELOPMENT

Division IV Section 4100 Measurement and Payment PUBLIC WORKS DEPARTMENT

CITY OF PANAMA CITY BEACH Utilities Administration & Engineering Offices 116 South Arnold Road Panama City Beach, FL 32413

GENERAL INFORMATION AND REQUIREMENTS

PUBLIC WORKS DEPARTMENT GENERAL NOTES

CONSTRUCTION PLAN REVIEW CHECKLIST FOR PRIVATE DEVELOPMENT

SECTION 2 Design Manual

COMMISSIONERS OF PUBLIC WORKS of the CITY OF CHARLESTON, SOUTH CAROLINA

Index. Composition and Order of Plan Set. Utility Plan... 5

T a b l e o f C o n t e n t s

**RESPONSES TO COMMENTS MUST BE RETURNED WITH REVISED PLANS FOR FINAL PLAN APPROVAL.** Approved as submitted X Needs attention N/A Non-Applicable

Town of Huntertown Lima Road * PO Box 95 * Huntertown, IN Phone (260) * * Fax (260)

CITY OF MELISSA MANUAL FOR THE DESIGN OF WATER AND SANITARY SEWER LINES

SECTION VI POTABLE WATER, RECYCLED WATER, AND SANITARY SEWER SYSTEM FACILITY CONSTRUCTION

CHAPTER 5 WATER SYSTEM DESIGN STANDARDS

SECTION WATER DISTRIBUTION SYSTEM

West Energy Sanitary Sewer in Columbia, SC State Project # H27-Z185-CP Prepared For. Chao & Associates, Inc.

Improvement Plan Cost Estimate

CITY OF TAMPA WASTEWATER DEPARTMENT TECHNICAL STANDARDS GUIDELINE. FOR CONSTRUCTION OF WASTEWATER FACILITIES July 2014 Version 6

CHAPTER 12 INSTALLATION OF UTILITIES AND OTHER SYSTEMS TABLE OF CONTENTS

SECTION UNIT PRICES. A. This Section specifies administrative and procedural requirements for the unit prices.

This is only a general checklist; please refer to the CVWD Development Design Manual (DDM) for all requirements and regulations.

APPENDIX B STANDARD CONSTRUCTION DRAWING NOTES

CONSTRUCTION PLANS FOR ENTERPRISE RENTAL CAR

GRADING & DRAINAGE PERMIT SOIL EROSION AND SEDIMENTATION CONTROL PERMIT PROGRAM OVERVIEW

20 North Main Alpine, UT (Phone) (Fax) SITE PLAN

CITY OF ALBANY Public Works Department ADDENDUM #1 ST , MAIN STREET REHABILITATION

PLANNING AND ZONING COMMISSION APPLICATION FOR IMPROVEMENT PLAT APPROVAL

In general, the City will not approve a development which cannot be served by extensions to the City s wastewater collection system.

DESIGN CRITERIA AND STANDARD DRAWINGS FOR WATER AND SEWER FACILITIES

SECTION TV1 TELEVISION INSPECTION OF SEWERS AND DRAINS GENERAL

F. Provide at least 2 feet of vertical separation between a water line and any utility or stormdrain crossing it.


SECTION 13 WATER SYSTEMS

CONDITIONS EXISTING EXISTING CONDITIONS SURVEY PROVIDED BY EGAN, FIELD & NOWAK ON FEBRUARY 20, PRELIMINARY - NOT FOR CONSTRUCTION

Division 33. Utilities

PLANS. All plans shall be submitted on 24 x 36 sheets

3.9 times the average 3.8 times the average 3.6 times the average

CHECKLIST FOR STREETS, INLETS, AND STORM SEWER DESIGN

7.00 INTRODUCTION... 1

CITY OF ANAHEIM SEWER DESIGN MANUAL

APPLICATION FOR RIGHT OF WAY PERMIT

NOTE: 1) PRIOR TO BEGINNING WORK TRANSFER RIM ELEV. FROM MH K1 TO A TEMPORARY BENCH MARK FOR USE AS CONTROL DURING CONSTRUCTION. 2) CONTRACTOR TO INST

8. Vertical Alignment (Profiles).

CHAPTER 13. New January 1, 2013 SUE. Subsurface Utility Engineering. Designation and Location. Chapter Contents

Private Development. Outline

PROCEDURE F-6-1 (formerly referenced by 08-02) Procedures to Govern Separation of Sewers and Watermains

Public Utilities Supplemental Specifications

2. SECTION MEASUREMENT AND PAYMENT:

ENGINEERING REVIEW CHECKLIST City of Mount Clemens

General Legend Details...100

NEWPORT NEWS WATERWORKS DISTRIBUTION DIVISION CONSTRUCTION SERVICES BRANCH. Table of Contents

SITE-UTILITY SYSTEMS

CITY OF BURLINGTON REGENT STREET ALLEY SEWER AND STREET IMPROVEMENTS

SECTION 8 SEPARATION OF LINES

PART II. - SPECIFICATIONS AND DESIGN STANDARDS TO CITY OF HEWITT, TEXAS SUBDIVISION ORDINANCE FOR PUBLIC WORKS CONSTRUCTION [TEXT]

ADDENDUM # 3 DATE: February 16, 2018

General Rules and Regulations

CUSTOM HOMES, ADDITIONS TAYLOR BUILDING & COMMERCIAL DESIGNS 63 KENSINGTON ROAD, SAN ANSELMO, CALIFORNIA SPIRIT LIVING GROUP APN

I. STREET CONSTRUCTION AND RECONSTRUCTION

BONDING REQUIREMENTS AND PROCEDURES

STP number: (internally assigned) Is Contractor s current insurance policy on file?

EL DORADO COLONIA STREET IMPROVEMENT PROJECT PHASE III IN THE CITY OF EL CENTRO ADDENDUM NO. 02

WASTEWATER REVIEW CHECKLIST. Project Number: Reviewed By: Telephone:

Water Main/Storm Sewer Separation

Addendum 1. Valve & Valve Vault Replacement. Issued June 13, 2018

TABLE OF CONTENTS PART III MINIMUM DESIGN STANDARDS Section 115 WATER DISTRIBUTION SYSTEM GENERAL SIZING LINES 115.

SECTION 3 STAKING REQUIREMENTS

SECTION 4 - DESIGN STANDARDS FOR WATER DISTRIBUTION FACILITIES

Contact the Jurisdictional Engineer for materials allowed by each jurisdiction.

Department of Building and Zoning Approaches and Sidewalks for ONE AND TWO FAMILY CONSTRUCTION

401 Sanitary Sewer System Design Criteria. The following additional design requirements shall also apply:

WATER AND SANITARY SEWER

MAIN EXTENSIONS: WATER & SEWER. 7.1 General Provisions

Changes for the. TOHOPEKALIGA WATER AUTHORITY Standards, Specifications and Details

DISTRICT OF HOPE SUPPLEMENTARY SPECIFICATIONS

ETOWAH WATER AND SEWER AUTHORITY ENGINEERING & CONSTRUCTION DEPARTMENT OCTOBER 2016 DEVELOPMENT GUIDELINES FOR WATER MAINS & SANITARY SEWER SYSTEMS

DESIGN CRITERIA FOR PUBLIC IMPROVEMENT PROJECTS


TERRADYN CONSULTANTS, LLC

SECTION 39 - MANHOLES TABLE OF CONTENTS 39-1 GENERAL PRECAST CONCRETE MANHOLES

Public Notice for Comment

LAKEHAVEN WATER & SEWER DISTRICT - WATER PLAN REVIEW CHECKLIST

A.1 WATER SYSTEM PLAN SUBMITTAL PROCEDURES AND GENERAL REQUIREMENTS

CITY OF ALBANY Public Works Department ADDENDUM #1 ST CROCKER LANE RECONSTRUCTION

PROCEDURES MANUAL INFRASTRUCTURE DEVELOPMENT

City of Elgin SUBDIVISION FINAL ENGINEERING Engineering Submittal Checklist

RESIDENTIAL FIRE SERVICE METERS Addendum #1

Section V WATER DISTRIBUTION SYSTEM DESIGN GUIDELINES

Transcription:

The purpose of these instructions is to provide direction and assistance in completing service connection finals and sewer and water main as-builts the Washington Suburban Sanitary Commission using Commission standards. As-built inmation enables our Customer Care Team and Infrastructure Systems Group to easily locate appurtenances such as water valves and manholes that over time may be covered by pavement or vegetation. If there are any questions concerning as-builts please contact Mr. Thomas Mayers @ 301-206-8797 at the Washington Suburban Sanitary Commission, 14501 Sweitzer Lane, Laurel Md. 20707-5902. As-builts and service connection finals are to be submitted by the Applicant or their designated representative. The as-built inmation package is to be submitted to the Contract Manager allowing 2 weeks review. Their approval is part of the WSSC requirements obtaining a Certificate of Substantial Completion and water meter release(s). I. SEWER AND WATER MAIN AS-BUILT A. The package will include: 1. Three (3) Green Line copies of Water As-built Drawings, showing the most current revisions to the Drawings and Profile, including connection permit numbers with the water survey final as-built data as specified below. 2. Three (3) Red Line copies of Sewer As-built Drawings, showing the most current revisions to the Drawings and Profile, including connection permit numbers with the sewer survey final as-built data as specified below. 3. Three (3) copies of Fire Hydrant Summary Sheet. 4. Three (3) copies of Sewer As-built Data Work Sheet. 5. One (1) copy of the water and sewer grade note sheets, including field notes. B. All field changes will be shown on as-built drawings. Manhole to manhole distances and swing tie measurements shall be carried to the nearest tenth. Manhole depths shall be carried to the nearest hundredth. The as-built inmation will be submitted on the most current, revised Drawings. A Registered Surveyor or Engineer will certify the as-built. C. Provide a table of as-built coordinates manholes, fire hydrants and water valves on the asbuilt drawing where space permits or on a separate sheet in accordance with NAD 83/91 datum. Coordinates may be placed on the profile view above each manhole, fire hydrant and water valve station in lieu of a table. D. Complete the as-built Data box on Sheet 1 of the Drawings: 1. Contract manager WSSC contract manager on the job 2. Contractor who installed 3. Inspector site inspector WSSC 4. L&G surveyor 5. Date started System Extension Permit Page 1 of 4 April 2012

6. Date completed substantial date per CM 7. Type of pipe W. water main type of pipe 8. Date Finaled 9. Finaled by name of the Survey company preparing the as-built E. SEWER MAIN AS-BUILT INFORMATION 1. The following inmation will be provided on the horizontal plan sheet in a tie box in RED type: a) Three swing ties to the center of each manhole cover (see Swing Tie Requirements). b) When manholes are built over an existing sewer, provide a distance from the center of the upstream and downstream manhole covers to the center of the built over manhole cover. 2. The following inmation will be shown on the profile in RED type: a) The profile view will be completed by placing a check next to those elevations and stations that were built per Drawings. Where they have changed, they will be crossed out with a single line and the as-built elevation and station will be written in red. b) Depth of the manhole (in vertical feet) from top of rim to channel centerline. c) Sewer line lengths (in linear feet) from centerline of manhole cover to centerline of manhole cover. d) Drop connection elevation at the centerline of manhole and inside wall of manhole. e) Manhole rim elevations. f) Percent of sewer line grade to be calculated from centerline of manhole to centerline of manhole except those lines built @.50% of grade or less. In those cases the lines are to be calculated and indicated on the as-built from the incoming invert at the inside manhole wall to the next upstream manhole s outgoing invert at the inside manhole wall. F. WATER MAIN AS-BUILT INFORMATION 1. Provide three swing ties to the center of each water fitting listed below (see Swing Tie Requirements) in a tie box on the horizontal plan using GREEN type: a) Caps/plugs (include depth in vertical feet) b) Valves c) Test stations System Extension Permit April 2012 Page 2 of 4

2. Provide the fire hydrant data listed below, in a tie box on the horizontal plan using GREEN type: a) Fire Hydrant station b) Street name c) Measurement from center of fire hydrant valve to fire hydrant d) Height (in vertical feet) of fire hydrant e) Fire Hydrant Manufacturer f) Operating nut (top of hydrant) elevation 3. Note all changes in Green on profile. a) If station on water main is the same put a check next to it b) 0+00 never changes II. SERVICE CONNECTION FINAL The Applicant is to supply two (2) copies of the Service Connection Certification m and two (2) complete sets of Drawings showing all revisions and connection permit numbers. A. The Service Connection Certification m will show the following inmation: 1. Lot, block and connection permit number. 2. Mainline sewer tee station when both water and sewer connections are in the same location, measuring from the downstream manhole. 3. Mainline water station when there are no sewer connections. 4. Linear footage of the service connections from the centerline of the main[s] to the property line. 5. Depth (in vertical feet) of each connection at the cleanout stack and/or curb stop. 6. Ties: Three swing ties from the green board and/or cleanout stack. When water service is in different trench than sewer service, three swing ties to the curb stop. Always provide three swing ties outside water meter even if water service is in same trench as sewer service. III. SWING TIE REQUIREMENTS A. Swing ties, preferably under 100-feet, are to be taken from above ground structures provided in the following order of preference and are to be labeled. 1. Manholes (sewer, water, storm drain) (taken at the center of the cover) 2. Telecommunications and electric manholes or structures (C&P, PEPCO, BG&E) with the location plotted on as-built drawings and the measurement taken at the center of the structure. 3. Fire hydrants System Extension Permit April 2012 Page 3 of 4

4. House or building corners 5. Valve Box 6. Telephone poles (pole number must be included on as-built drawings) 7. Curb box or cleanout stack, which are located on a different property. 8. Retaining wall corners. 9. Point on line from the downstream manhole to upstream manhole (use only one point on line tie per water main fitting). 10. Property corners, if nothing else exists. Note: Be sure that all structures used ties are clearly sketched and labeled on the as-built drawings. A tie to a feature not shown on the as- built drawings is not acceptable. System Extension Permit April 2012 Page 4 of 4