Italy: developments in the new legislation and progress in the remediation of contaminated sites F. Quercia, APAT

Similar documents
REMEDIATION OF CONTAMINATED SITES IN ITALY AND

Italy country presentation F. Quercia

Application of Human-health Risk Assessment in Italy: Regulatory aspects and technical guidelines

RNDr. Želmíra Greifová

101 5 IUCNAEL EJournal

Eligibility Requirements and Procedures for Risk-Based Remediation of Industrial Sites Pursuant to N.C.G.S. 130A to

European Commission - DG Environment Unit B.1: Water, the Marine and Soil EC Perspective on the WFD and Daughter Directive Groundwater

The EU Groundwater Directive (2006) (GWD) and the Groundwater Regulations (2010)

Common Questions and Answers Inactive Hazardous Sites Branch Registered Environmental Consultant Program

COASTAL AQUIFERS MANAGEMENT IN CROATIA

Proposed MCP Amendments

Order of Magnitude Guidance (Updated August 10, 2009 * )

Vapor Intrusion in Massachusetts Gerard Martin

CITY OF HARBOR SPRINGS WELLHEAD PROTECTION PROGRAM PLAN September 2004

Technical Impracticability Determinations

The Austrian Contaminated Sites Policy Financial Issues

The Contaminated Land Policy in Flanders.

Vlasta Jánová Ministry of Environment of the Slovak Republic, Slovakia. International Conference CONTAMINATED SITES 2016 Bratislava,

Human Health Risk Assessment and Brownfield Redevelopment. Louise Burden

An Introduction to the EU legislation on water. Title

FACTS. Highlights of Legislation and Regulations ON CONTAMINATED SITES

LAND RECYCLING & BROWNFIELDS REDEVELOPMENT LEGAL & REGULATORY FRAMEWORK. April 2016 El Centro CA

Proposal for the implementation of the authorised representative under Directive 2012/19/EU ( WEEE2 ) July 2013

Risk Based Corrective Action Approach. Managing Change and Superfund Delisting

Installation Restoration Program Framework: Introduction to CERCLA

Possible Amendments. Environmental Management Act Contaminated Sites Regulation. Dr. John E.H. Ward

UK Legislative Approach: Contaminated Land

Ministry of Environment and Sustainable Development of Argentina

Contaminated Sites: How many are there, where are they, and what is being done about them? AWMA Meeting Victoria September 25, 2012

VRP Act Brings Risk-based Corrective Action (RBCA) Features. In VRP, RBCA principles incorporated but RBCA not defined

RCRA Corrective Action Workshop On Results-Based Project Management: Fact Sheet Series

Saskatchewan Environmental Code Quick Reference Guide

Small Drinking-water Supplies Preparing a water safety plan

Protecting groundwater from the ground possible approaches. Dr John Heathcote John Heathcote Consulting Ltd

Instruments of environmental policy

EU Groundwater Directive 2006/118/EC on the protection of groundwater against pollution and deterioration

GROUNDWATER QUALITY AND THE DIRECTIVES : CURRENT AND POTENTIAL FUTURE IMPLEMENTATION

SWOT ANALYSIS FOR THE PILOT RIVER BASIN: Irminio River Basin

REPUBLIC OF LITHUANIA

Title 26 DEPARTMENT OF THE ENVIRONMENT Subtitle 14 Hazardous Substances Response Plan. Notice of Proposed Action

ENVIRONMENTAL LEGISLATION ANNUAL REPORT SPAIN. (March 2013) Prof. Blanca LOZANO and Diana COGILNICEANU

EUROPEAN ECONOMIC AREA

ROSNEFT DIVIDEND POLICY

Lessons learned after 20 years of soil remediation policy in Flanders

The Itema 231 Project 1

UK Technical Advisory Group (UKTAG) on the Water Framework Directive

Renewable and Alternative Energy Sources and Biofuels Act. Renewable and Alternative Energy Sources and Biofuels Act

Contaminated Lands Country Profile Slovakia

New Approach to Agricultural Water Management

Overview of the Drainage Act

A positive, collaborative airport-wide approach is essential to minimise pollution. Heathrow Pollution Prevention Code of Practice

COMPLIANCE WITH THE NEW LEGAL REQUIREMENTS ON THE DEMONSTRATION OF SAFETY MANAGEMENT SYSTEMS IN THE SAFETY REPORT

Enhance Workshop. «Environmental Inspections and the role of the EMAS verifier»

Please find below the report on the implementation of Article 7 of the Energy Efficiency Directive.

World Small Hydropower Development Report 2013

Efficiencies in the Environmental Restoration Operations at Sandia National Laboratories, New Mexico

Implementation of the Water Framework Directive in the Czech Republic

3.12 CONTAMINATED SITES

THE ENERGY DEVELOPMENT CYCLE

NATIONAL REPORT OF TUNISIA

official translation CONCERNING CONTROL OF IMPORT, TRANSIT AND EXPORT OF STRATEGIC GOODS AND TECHNOLOGIES July 5,1995. No.

SUBCHAPTER 02S RULES AND CRITERIA FOR THE ADMINISTRATION OF THE DRY- CLEANING SOLVENT CLEANUP FUND SECTION.0100 GENERAL CONSIDERATIONS

Public tendering and legal aspects of project business in Romania

Legal, Institutional and Regulatory Infrastructure

REPUBLIC OF LITHUANIA

Legal Framework for the Transportation of Dangerous Goods in Kosovo

Legal Basis of Water Management in Austria

SOCIALIST REPUBLIC OF VIETNAM Independence - Freedom - Happiness No.: 19/2015/ND-CP Hanoi, 14 February 2015 DECREE

Specific issues and challenges regarding the development of RBMP s in the EU: Example from the Netherlands

SEPA Guidance on Revoking Authorisations and Cancelling Registrations Granted under the Radioactive Substances Act 1993 Part I: Principles and

POLICY BREIF Ferbuary, Water sector: Current institutional arrangement and regulatory mechanisms. Summary

ICCL / Common Forum networks

Feasibility Study Addendum: Executive Summary

WATER SUPPLY WELLS - REQUIREMENTS AND BEST MANAGEMENT PRACTICES

Private Party CERCLA Cost Recovery

ESTABLISHMENT OF THE NATIONAL SERVICE OF CIVIL PROTECTION Section 1

Chapter 18 Environment Regulating Landfills 1.0 MAIN POINTS

Progress in solving the problem of contaminated sites in Slovakia

Brownfields Prevention Transformed. Deborah Orr August 2008

D Summary report on EU legislation and policies, best practices regarding the direct use of deep geothermal energy

Central Plateau Inner Area Cleanup Principles

RESPONSIBLE AND SAFE MANAGEMENT OF SPENT FUEL AND RADIOACTIVE WASTE REGULATIONS

Application of FIDIC CC for EU- Funded Projects in Bulgaria

IMPLEMENTATION OF ARTICLE 33 and ARTICLE 41 OF DIRECTIVE 2009/73/EC regarding Gas Storage

Grzegorz (Greg) MALINA

EU Offshore Safety Directive Implementation and Implications for Environmental Regulation

May 14, 2013 ORGANIZATION OF OPERATION AND POSSIBILITIES FOR STAFFING THE BELENE NPP

Dear precious client :

COMMISSION OF THE EUROPEAN COMMUNITIES COMMISSION STAFF WORKING DOCUMENT. Annex to the

Avv. Maurizio Iorio. WEEE 2 regulations: obligations for Producers who introduce EEE on markets other than those in which they are established

Balancing the Costs of Short-Term Cleanup and Long-Term Stewardship During Remedial Planning

REPUBLIC OF ARMENIA LAW ON PLANT PROTECTION AND PLANT QUARANTINE

5. Contaminated Sites

Public Consultation On the Review of Annexes I and II of the Groundwater Directive

The current note, which was approved by the county Commission on March 20, 2018, restricts the plat as follows:

Search Bills Here: Page 1

1. SOURCES OF NATIONAL LEGISLATION (PRIMARY AND SECONDARY LEGISLATION)

Site Profile and Soil Relocation Discussion Papers

PERFORMANCE MEASURE DESCRIPTION (please do not fill in the shaded or colored fields) FUNCTION: TYPE: PROGRAM:

Guideline for the Implementation of Canada-wide Standards for Emissions of Mercury and of Dioxins and Furans. and

Transcription:

Italy: developments in the new legislation and progress in the remediation of contaminated sites F. Quercia, APAT Tour de Table NATO CCMS Pilot Study Meeting 17-22 June 2007, Ljubljana, Slovenija

Legal references Old Environment Ministry Decree, D.M. 471/1999 ( Technical regulation for the management of contaminated sites, after Waste Act) Established thresholds (generic limit concentration values in soil and gw) for the identification of contaminated sites and as cleanup goals. Limited space to risk-based solutions. No distinction between historic/new contamination and dismissed/operating sites. New Government Decree, D. Lgs. 152/2006 (Environmental norms), Part IV, Title V: Remediation of contaminated sites Establishes risk-based and site-specific criteria for the management of contaminated soil and gw to be integrated with (screening) generic criteria. Flexible criteria for management of contamination at active sites. One step only remediation project needed. No distinction new/historic.

New procedure, Decree 152/06 Prevention measures Preliminary investigation Generic CSCs listed for 2 soil uses and for groundwater Concentrations <CSC Concentrations >CSC Site potentially contaminated Site restoration Emergency safety measures Permits & timing: Prevention measures - implementation in 24 hours and notice to authorities Preliminary investigation results- notice in 48 hours Site characterization Project- proposed and approved in 2 months Risk Assessment results proposed and approved in 8 months Monitoring Project proposed and approved in 3 months Cleanup or safety measures Project - proposed and approved in 8 months Main resposible authorities for issuing permits: Region (except for sites of national interest) Province for issuing clean up completion certificate Site characterization Project Concentrations <CSR Monitoring Clean site Risk Assessment Concentrations >CSR Site contaminated Cleanup or operational/ permanent safety measures Site remediation

Other provisions in the new legislation Water protection - The new legislation allows for: discharging of extracted groundwater into surface water bodies according to emission limits reinjection of treated groundwater into same gw body provided that quality objectives in gw body are fulfilled compliance with risk-based gw objectives may be fulfilled at some distance from contaminant source Risk assessment same old limit values used now as screening values focused on human health and groundwater protection incremental lifetime cancer risk at 10-5 major exposure routes defined. Methodological reference: ASTM standards soil contamination to be referred to all grain size fractions < 2 cm. site characterization and conceptual model identification steps defined

Other issues Both the old and new law are included in the waste legislation. A time threshold between historic and new contamination has not been formally established. Both laws envisage polluter s obligations for immediate actions at (potentially) contaminated sites, regardless of when contamination occurred. Non responsible landowner or site manager, by prompt communication to competent authorities and for events occurred before legislation enforcement, may apply for including the site in a Regional Remediation Program. In this case remediation follows the priorities established in the Regional Program. The public administration carries out the clean-up if polluter cannot be identified or non liable site owner cannot bear the costs. However this condition represents a real burden on the property itself. Site owner shall refund the costs according to site market value after remediation.

What happens now Amendments to D.Lgs. 152/06 being proposed: Transient regime to projects started before may 2006: old DM 471/99 regime to be followed. Risk assessment criteria to be reviewed: no risk-based solutions for gw bodies (compliance with drinking gw standards required at site boundary); incremental lifetime cancer risk at 10-6. Move legislation on contaminated sites out of Waste legislation and into Liability (?). Implementation of EU Directives Many efforts in order to comply with and implement Liability, WFD, GWD and proposed SFD. Difficult to interpret the field of application of each of these directives with respect to the management of contaminated sites (new and old, soil and water..). Lack of integration creates problems. How to merge systematic planning for the management of historic contamination with obligations for immediate actions, that are main driver for remediation?

Progress in the management of contaminated sites (APAT, Env. data yearbook 2006) 15% 18% 42% 6% 19% Preliminary investigation completed 2018 Characterization plan approved 962 Preliminary remediation plan approved 318 Final remediation plan approved 903 Remediated 741 Total 4942 Identified potentially contaminated sites: 13,000 (estimated total 100,000)

Regional inventories Only few regions hold approved and operative inventories

54 sites of national interest Area covered on land: 639,000 ha (> 2% of national territory) Progress: investigation completed over 140,000 ha remediation projects approved over a number of sub-areas (properties) Estimated costs: 2.9 MM (0.2% GDP)

Technologies applied 3% 3% 3% 8% 5% Scavo e smaltimento Fitodepurazione Soil Vapor Extraction Landfarming Biopile Altro 78% 8% SOIL MOST URGENT REMEDIATION PROJECTS APPROVED FIRST TIME IS THE MOST RELEVANT FACTOR IN SELECTING A TECHNOLOGY GROUNDWATER PUMP AND TREAT MOSTLY APPLIED AS A SAFETY ACTION, NOT AS A PERMANENT SOLUTION 92% Pump&Treat Altro

Considerations Experience and knowledge has increased in the last 10 years both in puclic and in private bodies. APAT has developed manuals for site investigation and for risk assessment. Still more focus on risk assessment rather than on risk management and sustainable solutions. Legislation and guidelines need upgrade and better compliance with existing and forthcoming EU directives. Little funds to research available. Natonal research programs missing.