Information Request 37

Similar documents
Information Request 11

Prosperity Gold-Copper Project MOE (Kym Keogh) Final Comments

CITY OF NEW WESTMINSTER. Bylaw No. 7033, 2005 RIPARIAN AREAS PROTECTION BYLAW

RIPARIAN AREAS REGULATION

Tsilhqot in National Government Closing Remarks

July 31, 2012

Implementation Plan and FAQs for the Guide to Water Act Authorizations Required for Dugouts, Borrow Pits and other types of Pits/Excavations

GENERAL SPECIFICATION FOR ENVIRONMENTAL PROTECTION FOR CONSTRUCTION IN WATERBODIES AND ON WATERBODY BANKS

Draft Mine Closure Plan. 17 October 2018 Longlac & Geraldton

Main Regulatory Agencies

Conclusion. The environmental effects assessment approach used in this assessment involves the following four steps.

NICO COBALT-GOLD-BISMUTH-COPPER PROJECT Community Scoping Session Environmental Overview

Groundwater Management Challenges. Jason Moeckel Minnesota DNR Division of Ecological and Water Resources

Transport Canada Navigable Waters Protection Act & Canadian Environmental Assessment Act John Mackie and Linda Sullivan

SCHEDULE A DOCUMENTATION AND CORRESPONDENCE FOR THE PROSPERITY GOLD-COPPER PROJECT (Project) Produced by or for Taseko Mines Limited March 17, 2009 Ap

Prepared for: Tsilhqot'in National Government for the New Prosperity Panel Hearings Williams Lake, July Prepared July 22, 2013, by:

A. INSTRUCTIONS (Please print or type all answers)

Appendix E : Guidelines for Riparian Buffer Areas

Fish Habitat Protection Development Permit Area

Karen Hurley, M.Sc. PhD. Environmental Planner/EcoFutures Specialist. July 23, 2013

Highway 11 Realignment

Decision Memo for Juniper Ridge Opal Mine

COMPREHENSIVE ENVIRONMENTAL IMPACT STUDY & MANAGEMENT PLAN South Albion Bolton Community Plan Employment Needs & North Hill Commercial Lands Study

EIS Submission: Tom s Gully Underground Project

COTTON CREEK CULVERT REPLACMENT

WASTE TREATMENT LAGOON

Independent Expert Engineering Investigation and Review Panel. Report on Mount Polley Tailings Storage Facility Breach. Appendix G: Water Balance

Black Butte Copper Project Mine Operating Permit Application (Revision 3) Water Management During Construction and Operations

Manitoba s Submission Guidelines for Peatland Management Plans

December 12, 2014

Prosperity EA Review. Taseko Mines Limited Responses to June 24, 2009 Federal Review Panel Prosperity Gold-Copper Mine Project Deficiency Statement

FINAL TERMS OF REFERENCE ENVIRONMENTAL IMPACT ASSESSMENT REPORT FOR THE PROPOSED

REASONS FOR DECISION MINISTERIAL APPROVAL PURSUANT TO SECTION 15(1)(a) THE ENVIRONMENTAL ASSESSMENT ACT

STATE ENVIRONMENTAL POLICY ACT MITIGATED DETERMINATION OF NONSIGNIFICANCE

Natural Systems Planning Primer

February 15, Mr. Kyle Stanfield Prodigy Gold Incorporated Box 209, 3 Dree Road Dubreuilville, ON P05 1BO

Magino Project Environmental Impact Statement. Technical Support Document Water Management Plan

Star Orion South Diamond Project ENVIRONMENTAL IMPACT STATEMENT SUMMARY

September 2016 ID Competency Statement Type

BACKGROUND INFORMATION. for the INITIAL FEDERAL PUBLIC COMMENT PERIOD. on the

Responses to Comments from State Agencies

The Clean Water Act. Clarifies protection under the Clean Water Act for streams and wetlands

GUIDE TO THE DEVELOPMENT OF A MINING AND RECLAMATION PLAN IN NEW BRUNSWICK

Information Requirements Table for Liquid Waste

Public Notice: Application for Permit

Thanks for your interest in the Prosperity Mine and I apologize for the delay in responding. I have been rather busy of late.

February Reference Section in Supplemental. Reference Section in Consultants Reports. Reference Section in Application. TOR No.

How to avoid getting bogged down by the Nova Scotia Wetland Conservation Policy

Summary of Relief Sought by Transpower New Zealand Limited

STATE ENVIRONMENTAL POLICY ACT MITIGATED DETERMINATION OF NONSIGNIFICANCE

City of Mississauga Environmental Impact Studies Terms of Reference 2002

CEAA ENVIRONMENTAL ENVIRONMENTAL IMPACT ASSESSMENT AMBASSADOR BRIDGE ENHANCEMENT PROJECT. Replacement Span and Plaza Expansion APPENDIX E

Wetland Water Balance Linking hydrogeological processes to ecological effect

ENVIRONMENT ACT TERMS OF REFERENCE NOVA SCOTIA DEPARTMENT OF TRANSPORTATION AND PUBLIC WORKS. Beaver Bank Bypass

Labrador Iron Mines Holdings Limited

Magino Project Environmental Impact Statement. Technical Support Document Draft Fish Habitat Compensation Plan

Ditches in North Carolina

Unify efforts to address water resources for the Big Sky area and surrounding zone of influence in three co-equal water resources focus areas:

GENERAL SPECIFICATION FOR TEMPORARY FLOW CONTROL FOR CONSTRUCTION IN WATERBODIES

Appendix X: Non-Point Source Pollution

Warren Wagon Road Improvement Project McCall Ranger District, Payette National Forest Project Description

Sustainable Natural Environment Fish Habitat

VEGETATIVE, WATER, FISH AND WILDLIFE RESOURCES POLICIES

Community Services and Utilities & Environmental Protection Report to UE The SPC on Utilities and Environment Page 1 of April 25

Fort McKay Specific Assessment

CONSERVATION OF ENVIRONMENT ENACTMENT 1996 CONSERVATION OF ENVIRONMENT (PRESCRIBED ACTIVITIES) ORDER 1999

Review of ML/ARD Geochemistry & Water Quality Predictions

Public Notice ISSUED: 11 February 2019 EXPIRES: 13 March 2019

Assessment of Landfill Footprint Alternatives West Carleton Environmental Centre. Option #4 Impact on Agriculture

Why the Plan is more appropriate than relying on voluntary actions

Advice to decision maker on coal mining project

Detour Lake Gold Mine Project Follow-up Program

Resource Roads and Wetlands. Challenges and Solutions? Mark Partington, R.P.F., M.Sc., EP. Location: Date:

AND WHEREAS the Minister is satisfied that all the requirements of the Act have been met, including those required of Premier Tech;

Responsible Mining in the Lake Superior Basin Dec. 2013

NDDOT Erosion & Sediment Control Construction Course

Santoy 8 Satellite Mine at the Seabee Gold Mine. Technical Review Comments. on the. Environmental Impact Statement.

Ajax Mine Project Report on Final Environmental Assessment Public Comment Period

TERMS OF REFERENCE. Notes for NEPA for Generic Terms of Reference

ORIGINAL EFFECTIVE DATE

Activities that may Require Permit/Approval. Permit/Approval Required Electrical Safety Authority. Approval (CAA) process.

AGRICULTURAL BUILDING SETBACKS FROM WATERCOURSES IN FARMING AREAS

STREAM RESTORATION PURPOSE, PRACTICE, AND METHODS. By Marcus Rubenstein, CPESC

The following potential environmental receptors and impacts form the basis of TRCA s review under Ontario Regulation 166/06 and the Fisheries Act:

Municipal Stormwater Management Plan Prepared For The Borough of Cape May Point By Van Note-Harvey Associates VNH File No.

Hydrologic Regime; Past and Present and Water Quality Implications

ENVIRONMENTAL IMPACT STUDY GUIDELINES

APPENDIX P EL DORADO COUNTY GENERAL PLAN: APPLICABLE SECTIONS FROM CONSERVATION AND OPEN SPACE ELEMENT

Background. Literature Review

s. w. Wolff T.A. Wesche W.A. Hubert

Cutblock (Lot 450) Inspection Powell River. - Island TimberLands-

WATERSHED. Maitland Valley. Report Card 201

CONSTRUCTION SPECIFICATION FOR DEWATERING

Lake Elmo, MN Code of Ordinances STORM WATER AND EROSION AND SEDIMENT CONTROL

The following potential environmental receptors and impacts form the basis of TRCA s review under Ontario Regulation 166/06 and the Fisheries Act:

Chapter 10 Summary of Project Effects

April 10, Ms. Violet Camsell-Blondin Chair Wek èezhìi Land and Water Board #1, th Street Yellowknife, NT, CA, X1A 2P6

APPENDIX O COMPREHENSIVE ALTERNATIVES ASSESSMENT TABLES. RAINY RIVER PROJECT Final Environmental Assessment Report

Manitoba s Submission Guidelines for Peatland Recovery Plans

Audit of Forest Planning and Practices. West Fraser Mills Ltd. Skeena Sawmills Division Tree Farm Licence 41

Transcription:

Information Request 37 Information Request 37 37-1 Response to Information Request 37 Response to Information Requests 37a Response to Information Requests 37b 37-3 37-5

Federal Review Panel Information Request 37 IR 37 Wildlife Maximum Disturbance Area References: EIS Guidelines, Section 2.3.6 EIS, Sections 2.7; 2.7.2.7, and 2.7.2.8 Related Comments: CEAR # 276 (BC Ministry of Forests, Lands and Natural Resources Operations) Rationale: In Section 2.3.6 (p. 22), the EIS Guidelines require the Proponent to define new local and regional boundaries for those aspects of the Project that have changed or are new from the previous project proposal. The Guidelines state that these boundaries shall be based on the extent of the potential effects of the Project. In the EIS (Section 2.7 p. 1067), the Proponent indicates that the wildlife MDA is the same as the 2012 vegetation mine site local study area (LSA), except that the boundary has been modified to exclude Fish Lake and Wasp Lake which will not be physically disturbed. The BC Ministry of Forestry, Lands and Natural Resources Operations noted that some potentially impacted wildlife habitat had been excluded from the study area. These areas include the habitat contiguous with the Fish Creek drainage between the north end of Fish Lake and the main embankment of the TSF as well as a portion of all of the Beece Creek drainage. The Proponent has also excluded the area between the TSF and the existing road on the east valley wall. It was also noted that Middle Fish Creek habitat would be impacted by the potential post-closure scenarios identified after the 2009 EIS was submitted. The Ministry stated that wildlife using habitats of Beece Creek and its wetlands (including the margins of Wasp Lake) may be impacted and modeled changes to water quality as a result of planned discharge have not been discussed with respect to wildlife. It was also noted that the wildlife and vegetation habitats excluded from the analysis may be impacted by removing the seepage and stream drainage inputs as a result of constructing the ditch adjacent to the road. 37-1

Federal Review Panel Information Request 37 Information Requested: With regards to the assessment of effects of the Project on wildlife and their habitats, the Panel requests that Taseko: a. Complete, for the areas discussed above, complete an assessment on wildlife and their habitats, with a focus on the possible impacts identified such as impacts from changes to water quality as a result of planned discharge and the removal of seepage and stream drainage inputs as a result of constructing the ditch adjacent to the road. b. Complete an assessment on Middle Fish Creek habitat that may be impacted by the potential post-closure scenarios. 37-2

Taseko Mines Limited Response to Information Request 37a Information Request #37a With regards to the assessment of effects of the Project on wildlife and their habitats, the Panel requests that Taseko: Complete, for the areas discussed above, complete an assessment on wildlife and their habitats, with a focus on the possible impacts identified such as impacts from changes to water quality as a result of planned discharge and the removal of seepage and stream drainage inputs as a result of constructing the ditch adjacent to the road. Response Effect of planned discharge of mine water from the south seepage collection pond on wildlife and wildlife habitat in Beece Creek and Wasp Lake No adverse effects on wildlife, wildlife health or wildlife habitat are predicted as the result of any planned discharges from the South Embankment (SE) Seepage Collection Pond. During operations the SE Seepage Collection Pond is pumped back to the TSF (Pages 597 and 599 [2012 EIS]). At closure (Year 21) a channel will be constructed to discharge water from the SE Seepage Collection Pond to Wasp Lake and from there to Beece Creek (Page 1444 [2012 EIS]); however, this planned discharge will only occur if and when water quality is suitable for release (Page 79 [2012 EIS]). Specifically the following mitigation measure from Table 2.7.2.4B-40 (Page 796 [2012 EIS]) applies: To the extent possible, seepage from the TSF will be collected in seepage collection ponds and in groundwater wells. All seepage water collected will be pumped back into the TSF or into the open pit, depending on the phase. The Proponent has committed to ensuring that the water quality in the adjacent streams and rivers will meet either generic WQ guidelines or site-specific WQ objectives that may be developed. Alert and action levels for water quality will be developed and, through monitoring outlined in the adaptive management plan (AMP), will identify if levels are changing. In the event that monitoring indicates predicted action levels are reached, mitigation in the form of active water treatment will be implemented. No adverse residual effects are anticipated following the implementation of the proposed adaptive management plan. Effect of removing seepage and stream drainage on wildlife and wildlife habitat downslope of the 4500 road No adverse effects on wildlife, wildlife health or wildlife habitat are predicted as the result of removing seepage and stream drainage inputs downslope of the 4500 Road. Figure 2.7.2.4A-1 (Page 598 [2012 EIS]) shows the area of the concern identified in this IR it is the white area adjacent to the east side of the TSF and downslope of the 4500 Road (which 37-3

Taseko Mines Limited Response to Information Request 37a forms the boundary of the catchment area shown in pink). At baseline, the culverts along the existing road are already diverting some flow and some changes in site conditions may have already occurred in this area due to construction of this section of road. The drainages through this area eventually reach Fish Lake. During operations and Phase 1 of closure, these flows will be captured by a ditch and diverted to meet the water inlet requirements for Fish Lake. This diversion will occur for approximately 30 years. During the period when the ditch is in place, a 15% leakage is predicted; thus, not all flow to the downslope areas will cease and the area will continue to receive inputs from other sources (i.e., precipitation). The wetlands and riparian areas within the white area are limited in extent and diversity 1 (see Figures 2.7.2.7-8 [Page 1004] and 2.7.2.7-9 [Page 1017], respectively [2012 EIS]). In response to reduced flows during operations, wetland and riparian vegetation composition may shift and dry, no longer supporting hydrophytic vegetation. Given that some flows will persist and that the wetlands and riparian habitat is limited in extent and diversity in this area, the effect on wildlife is unlikely to be substantive. At closure, the ditch will be breached and the drainages will be allowed to resume their natural flow patterns downslope to the TSF. 1 Only fens are present within the white area (see Figure 2.7.2.7 8, Page 1004 [2012 EIS]) 37-4

Taseko Mines Limited Response to Information Request 37b Information Request #37b With regards to the assessment of effects of the Project on wildlife and their habitats, the Panel requests that Taseko: Complete an assessment on Middle Fish Creek habitat that may be impacted by the potential post-closure scenarios Response The location referred to as Middle Fish Creek in IR37b is not the same as the stream reach known as Middle Fish Creek in the fisheries assessment (Page 287 and Figure 2.6.1.5-1 [2012 EIS]). In CEAR #276 the BC Ministry of Forests, Lands and Natural Resource Operations refers to the aquatic, riparian and wetlands contiguous with the Fish Creek drainage between the north end of Fish Lake and the main embankment of the TSF as middle Fish Creek. The area identified as middle Fish Creek in this IR is the same as the area identified as Upper Fish Creek in the 2009 EIS and 2012 EIS; therefore, in order to address this information request, information is provided for Upper Fish Creek below the TSF. The effect of three potential post-closure scenarios on wildlife and wildlife habitat in Upper Fish Creek below the TSF is provided below. Changes in Water Quantity There will be increased flow (above baseline) to the Upper Fish Creek below the TSF area in all phases of the Project (see Table 2.7.2.4A-7 [2012 EIS]). This is true regardless of which of the three post-closure water management scenarios is in place at any given time. This increase in water quantity is not predicted to have an adverse effect on the aquatic, riparian and wetland habitats in the Upper Fish Creek below the TSF area; therefore, no adverse indirect effects on wildlife and wildlife habitat are anticipated. Changes in Water Quality The effect of potential changes in water quality in Upper Fish Creek below the TSF on wildlife and wildlife habitat is discussed in detail in Section 2.7.2.8 (Pages 1099 to 1106) of the 2012 EIS. At post-closure, if TSF water quality does not meet either generic WQ guidelines or sitespecific WQ objectives that may be developed, discharge will either be directed to the pit or treated before release to Fish Lake; therefore, no residual adverse effect on water quality in the middle Fish Creek area is predicted (See IR15a). 37-5