Chapter 1. FHWA Guidance & Policies Traffic Analysis

Similar documents
8.0 Chapter 8 Alternatives Analysis

Exit 73 I-29 Interchange Modification Justification Study

PROCEDURES FOR NEW OR REVISED FREEWAY ACCESS IN ARKANSAS

Route 7 Connector Ramp MODIF IE D I N T ER C H A N G E M OD IFICATIO N R E PO RT TRA N S F O R M I : I N S ID E THE BE LTWAY

Advanced CORSIM Training Manual

Advanced CORSIM Training Manual

NCHRP Report 687 Guidelines for Ramp and Interchange Spacing

Applying Micro-simulation i tools for Project Development- University of Florida Traffic Seminar Jaimison Sloboden, PE RS&H

CORSIM Modeling Guidelines

LOCATION AND DESIGN DIVISION

NCHRP 3-88 Guidelines for Ramp and Interchange Spacing

COMPARISON OF SPUI & TUDI INTERCHANGE ALTERNATIVES WITH COMPUTER SIMULATION MODELING

Conclusions & Lessons Learned

OPTIMIZING RAMP METERING STRATEGIES

I-70 East ROD 1: Phase 1 (Central 70 Project) Air Quality Conformity Technical Report

CHAPTER 2: MODELING METHODOLOGY

Highway and Freight Current Investment Direction and Plan. TAC August 2, 2017

The Secrets to HCM Consistency Using Simulation Models

on Access Management Howard Preston CH2M HILL 7 th Annual Conference

This IJR demonstrates that modified access to Blaine meets the FHWA policy points, specifically:

Interchange Design. Nick Hoernke, Bill Roth and Eric Sorensen

PROGRAM EXTENSION & SCOPE CHANGE REQUEST FOR SP IMPROVEMENTS AT THE INTERSECTION OF CSAH 10/TH 10/CR H IN MOUNDS VIEW

I 95 EXPRESS LANES SOUTHERN TERMINUS EXTENSION TRAFFIC OPERATIONS AND SAFETY ANALYSIS REPORT

EXHIBIT A SCOPE OF SERVICES INTERCHANGE JUSTIFICATION REPORT (IJR) FOR INTERSTATE 75 AT OVERPASS ROAD

INTERCHANGE MODIFICATION REPORT

Interchange. Resource Guidebook. March 2007

Principal Arterial Intersection Conversion Study

The New Highway Capacity Manual 6 th Edition It s Not Your Father s HCM

Presented to : I 710 Project Committee June 30, 2011

Construction Alternative Screening with Regional Travel Demand Model

The TIS is to be signed and sealed by a Florida Registered Professional Engineer.

Summary. Preliminary Alternative Development and Screening. DEIS July 23, 2018

Charlotte Region HOV/HOT/Managed Lanes Analysis. Technical Memorandum Task 1.3 EVALUATION CRITERIA

500 Interchange Design

A three-stage process was implemented in order to develop and evaluate the project concepts and provide recommendations for the project.

6.0 CONGESTION HOT SPOT PROBLEM AND IMPROVEMENT TRAVEL DEMAND MODEL ANALYSIS

Past, Present, and Future

Project Title: Using Truck GPS Data for Freight Performance Analysis in the Twin Cities Metro Area Prepared by: Chen-Fu Liao (PI) Task Due: 12/31/2013

Chapter GRADE SEPARATIONS & INTERCHANGES

Alternatives Evaluation Report. Appendix C. Alternatives Evaluation Report

Appendix D Functional Classification Criteria and Characteristics, and MnDOT Access Guidance

FOR INTERSTATE 81 AND ROUTE 37 INTERCHANGE FREDERICK COUNTY, VIRGINIA MILEPOST 310

I-95 Corridor Study Phase II Highway Element

Multi-Resolution Traffic Modeling for Transform 66 Inside the Beltway Projects. Prepared by George Lu, Shankar Natarajan

South Dakota Department of Transportation. Interchange Modification Justification Report. Interstate 90 Exit 44 (Bethlehem Road - Piedmont)

USING A SIMULATION ENVIRONMENT FOR DYNAMIC TOLL ANALYSIS

FLORIDA DEPARTMENT OF TRANSPORTATION Planning and Environmental Management Office INTERCHANGE MODIFICATION REPORT

Appendix D: Functional Classification Criteria and Characteristics, and MnDOT Access Guidance

INSIDE THIS ISSUE. mctrans.ce.ufl.edu VOLUME 64 \\ OCTOBER Streets Heat Map Freeways Animation HSM Supplement

Analysis of Freeway Reconstruction Alternatives Using Traffic Simulation

Jacobs Engineering Group Inc. 319 E. Warm Springs Road, Suite 200 Las Vegas, NV 89119

FINDINGS OF FACT and CONCLUSIONS

TRB WEBINAR PROGRAM Planning and Preliminary Engineering Applications Guide to the Highway Capacity Manual: Contents

TRANSPORTATION PROJECT REPORT DRAFT CONCEPTUAL ACCESS MODIFICATION PROPOSAL OCTOBER 2002

TRANSPORTATION IMPACT ANALYSISGUIDELINES

Ramp Reversal Research. Roy Parikh, P.E. TxDOT Fort Worth District

3 INTERSTATES. The Carolina Crossroads Project Team Welcomes You

Highway and Freight Current Investment Direction and Plan. TAB September 20, 2017

SHRP II R-11 Strategic Approaches at the Corridor and Network Levels to Minimize Disruptions From the Renewal Process. June 10, 2014 Webinar

LOCATION AND DESIGN DIVISION

CHAPTER 5 PARALLEL PARKWAY CORRIDOR IMPROVEMENTS

National Governors Association

HCM2010 Chapter 10 Freeway Facilities User s Guide to FREEVAL2010

Vicinity Map. Interstate 605 (I-605) and State Route 91 (SR-91) in Los Angeles County

INTERACTIVE HIGHWAY SAFETY DESIGN MODEL (IHSDM)

Active Direction to Managing Transportation ATDM: Ohio s Perspective

Operations in the 21st Century DOT Meeting Customers Needs and Expectations

500 Interchange Design

Military Highway Interchange

TRAFFIC ANALYSES TO SUPPORT NEPA STUDIES

PROJECT STUDY REPORT. Cal Poly Pomona Senior Project

PROGRAMMATIC AGREEMENT FOR APPROVAL OF CERTAIN CATEGORICAL EXCLUSIONS

Project Prioritization for Urban and Rural Projects TEAM CONFERENCE March 7, 2018

MEMORANDUM. Date: July 14, 2006 Project #: To: US 97 & US 20 Refinement Plan Steering Committee

FLORIDA DEPARTMENT OF TRANSPORTATION PROCEDURE DEVELOPMENT OF THE

DRAFT. SR-60 7 th Avenue Intersection Control Evaluation (ICE) I-605 Corridor Improvement Project (CIP) I-605/SR-60 EA# 3101U0

Thank you for the August , Technical Memorandumfor interchangejh.s~;fi~.a#()ii-tor. the proposed US I OllRainier A venue Interchange.

APPENDIX B. Public Works and Development Engineering Services Division Guidelines for Traffic Impact Studies

35 Moving Forward. O p t i m i z a t i o n P l a n E x e c u t i v e S u m m a r y. Project # KA Johnson and Wyandotte Counties

Appendix A Transportation Technical Analysis Methodology

1000 Performance Based Project Development (PBPD)

Estimating Work Zone Performance Measures on Signalized Arterial Arterials

Article 16 Traffic Impact Analysis

FHWA Sustainability and Resilience

EXHIBIT A SCOPE OF SERVICES FOR FINANCIAL PROJECT ID TRANSPORTATION SYSTEM MANAGEMENT & OPERATIONS (TSM&O) GENERAL CONSULTANT SERVICES

BCEO TRAFFIC IMPACT STUDY GUIDELINES

APPENDIX A TIER 1 ANALYSIS

Freeway Management/Managed Lanes - New Publications/Resources:

TRAFFIC DIVERSION RESULTING FROM RAMP METERING

Access Operations Study: Analysis of Traffic Signal Spacing on Four Lane Arterials

Transportation Committee

TABLE OF CONTENTS. 3.0 ALTERNATIVES CSAH 14 Reconstruction Alternatives Regional Access Scenario Alternatives...

Oklahoma Department of Transportation Environmental Programs Division Office Fax

VISSIM PROTOCOL FOR SIMULATION ON FREEWAYS

Coalition for America s Gateways and Trade Corridors

Bow Concord I-93 Improvements City of Concord Transportation Policy Advisory Committee

Minnesota Statewide Freight Bottlenecks

CHAPTER 4 GRADE SEPARATIONS AND INTERCHANGES

A Probabilistic Approach to Defining Freeway Capacity and Breakdown

Transcription:

Chapter 1 FHWA Guidance & Policies Traffic Analysis Microsimulation as a Design Tool James P. McCarthy Federal Highway Administration James.mccarthy@fhwa.dot.gov 651-291-6112

Traffic Analysis in Design? Estimate or Predict Traffic Performance For a Design Assess Capacity and Level of Service of a Transportation Facility

What s the Problem? Speed A B C D LOS F Noncongested Flow Forced Flow Volume LOS E: V =1 C

What is FHWA Policy Does FHWA Require Microsimulation FHWA Does Require That the Project Development Process and Design is Built on Good Traffic Engineering If Microsimulation is Needed FHWA Will Not be Able to Approve Projects Such as Interstate Access Without It.

Consequences of Inappropriate Analysis Methods Unrealistic Results Incorrect Estimates of Traffic Performance Inappropriate Design of Control Strategies Wasted Resources Adverse Public Reaction to Changes

Microsimulation Features Analysis of a System Analysis of Over-Saturated Conditions Spillback Spillover Bottlenecks Weaves

Spillover Effects Excessive Left-Turn Queue Blocks Through Lane

Advantages of Simulation Perform System Analysis Current and Alternative Conditions Analyze Many What-If Scenarios Experiment Without Actual Traffic Disruption

Advantages of Simulation Eliminate Costly Mistakes and Inadequate Project Designs Implement Projects in Best Order Make Effective Use of Limited Gas Tax Revenue

Successful Applications Portray Network Verifiable, Reproducible and Traceable Supports Efficient Design/Analysis Validate Control Strategy/Design Encompass Future Needs

FHWA Regulation on Traffic Analysis FHWA Has No Specific Regulation on Traffic Analysis Methodology FHWA s 23 CFR States: The SHA (State Highway Administration) Must be Adequately Staffed and Equipped to Carry Out the Federal-Aid Highway Program

Typology of Models

TRAFFIC OPERATIONS AND DESIGN DELIVERY 0% 10% 30% 60% 95% 100% HCM Micro- Sim. PRE- DESIGN FINAL DESIGN 11

When is Simulation Needed? 1. For Most or All IARs in Metro Area 2. To Support Design/Project Layout For Major Reconstruction Projects 3. Changes in Operation HOT Lanes New Ramp Metering System

Current FHWA Interstate Policy Published in the Federal Register on February 11, 1998. The FHWA will continue to use the current edition of the Highway Capacity Manual (HCM), published by the TRB, in its review of proposed access points. Other traffic analysis methods including simulation programs may also be used in the access request report to aid in the decision-making process. However, if the access request report does not contain an HCM analysis, the data submitted with the report must be sufficiently detailed and compatible with the HCM procedures to..

New FHWA Interstate Policy January 2004 Use Appropriate Traffic Analysis Methodology and Software FHWA Prefers HCM or CORSIM For Interstate Access Other Simulation Programs?

FHWA Interstate Access Policy 1 A request for new or revised access must show that: 1) Existing interchanges and/or local roads and streets in the corridor can neither provide the necessary access nor be improved to satisfactorily accommodate the design-year traffic demands while at the same time providing the access intended by the proposal.

FHWA Interstate Access Policy 2 A request for new or revised access must show that: 2) All reasonable alternatives for design options, location and transportation system management type improvements (such as ramp metering, mass transit, and HOV facilities) have been assessed and provided for if currently justified, or provisions are included for accommodating such facilities if a future need is identified.

FHWA Interstate Access Policy 3 A request for new or revised access must show that: 3) The proposed access point does not have a significant adverse impact on the safety and operation of the Interstate facility based on an analysis of current and future traffic. The analysis for existing conditions shall include sections of Interstate to and including the first adjacent existing or proposed interchange on either side. Crossroads and other roads shall be included in the analysis to the extent necessary.

What is the Intent of Policy 3? Demonstrate That Traffic Operations Will be Adequate System-Wide (Not Just Where the New Access Point is Proposed) For Design Year Conditions Show That the Proposed Plan of Access Will be Designed to Meet or Exceed Interstate Design Criteria For Safe Operations

FHWA Interstate Access Policy 6 A request for new or revised access must show that: 6) In areas where the potential exists for future multiple interchange additions, all requests for new or revised access are supported by a comprehensive Interstate network study with recommendations that address all proposed and desired access within the context of a long term plan.

Interstate Access Analysis Requirements Today Existing No Build Build Opening Year Design Year

I-35W & Lake St. Case Study Can a New Access be Added? What Are the Problems? Is There a Viable Solution? Is It Acceptable? Does It Fit With Future Expansion or Corridor Plan? Future Mainline Lanes, HOV, HOT?

Understanding Safety With CORSIM

FHWA and MnDOT s Advanced CORSIM Guidelines To Support New Microsimulation Users Provide a Reference For Developing a Scope of Work To Support Accurate and Reusable Models ex. I-694 & Rice St. Reused

Approval Authority for IAR FHWA - Washington DC New Access - Metro New or Modified System Interchange FHWA - Minnesota Modify Service Interchange New Access Outstate