PORTA-FAB Cleanroom Ceiling Systems

Similar documents
PORTA-FAB Cleanroom Wall Systems

MAC-T Ceiling Grid System 2 Heavy Duty for Cleanroom OPERATION & MAINTENANCE MANUAL. ENVIRCO Technical Support:

INSTALLATION INSTRUCTIONS FOR PLASCORE L2550 LINER WALL

DETAIL INSTRUCTION No. 1

CEILING & WALL SYSTEMS

C.R. LAURENCE CO., INC. Intelli-Track SPS. Phase One - Installation Instructions

Field Connector for simple installation. Floating Perimeter detail. Field Connector. Perimeter & XL Connector

GORDON-INC.COM FAX GASKETED GRIDS. CANTRELL DRUG Little Rock, AR

Tate Grid. Aluminium Structural Grid System for Data Centres. Metric Edition

AXIOM Building Perimeter System Assembly and Installation Instructions

AXIOM Direct Light Coves Assembly and Installation Instructions

ECONO 200 INPLANT OFFICE

Revision Date: April 01, Premier Vinyl Enclosure

OmniFlex 300 Plus Installation Instructions

Structural Ceiling Grid. Continuous Threaded Slot for Maximum Flexibility

Expansion Joint Covers

PRESTON HEALTH SERVICES ARCHITECT'S NO. 2700

Nortrax Section David Manchester Road, Ottawa NON-STRUCTURAL METAL FRAMING 16 May 2014 Page 1

Expansion Joint Covers (079513)

AXIOM Indirect Field Light Coves

Installation Instructions

Axiom Building Perimeter System

SECTION NON-STRUCTURAL METAL FRAMING

AXIOM Building Perimeter System

SECTION ALUMINUM HANDRAIL SYSTEMS

Guardian Wall Panel Installation Manual

A. Flat corner wall-to-wall See page 8. C. Outside corner wall-to-wall See page 8. B. Inside corner kit wall-to-wall See page 7

SECTION STAINLESS STEEL WALL PANELS

G.W.B. (BY OTHERS) DRYWALL SETBACK

INSTALLATION, OPERATION AND MAINTENANCE MANUAL. Nano-T

Inigo Console Table INSTALLATION INSTRUCTIONS P74300, P A Page 1 of 5

SECTION EZ-SLIDE 80 AND 180 HEAVY GLASS TOP HUNG SLIDING DOOR SYSTEMS

SECTION CRL70 HEAVY GLASS TOP HUNG SLIDING DOOR SYSTEMS

SECTION GYPSUM BOARD ASSEMBLIES

PRELUDE. 24 MAX TM Suspension System Data Centre Ceiling Solutions. Assembly and Installation Instructions

SECTION (09512) - ACOUSTICAL TILE CEILINGS

STANDARD PRODUCTS - CUSTOM LOOK

Tate Strut. Steel Structural Ceiling Grid System for Data Centres. Metric Edition

SECTION LIGHT DUTY SLIDING AND STACKING GLASS DOOR SYSTEMS

THIS SECTION IS BASED ON ROCKFON S CURVGRID ONE-DIRECTIONAL CURVED METAL CEILING PANELS.

Union County Vocational - Technical Schools Scotch Plains, New Jersey

SECTION CRL50 AND CRL51 HEAVY GLASS TOP HUNG SLIDING DOOR SYSTEMS

Home Depot Page 1 of 5 HDPB Humacao, PR 10/19/09

***************************************************************************************************************

Suspension System Data Center Ceiling Solutions

ALL-ALUMINUM DOOR & WINDOW FRAMING

SECTION ACOUSTICAL PANEL CEILINGS

A. This Section includes acoustical panel ceilings installed with exposed suspension systems.

HydroCycle Vertical NFT Lettuce & Herb Systems

YOW 250 T Window System

Impression Graphic panels

A. ASTM C635, Standard Specifications for Metal Suspension Systems. B. ASTM C636, Recommended Practice for Installation of Metal Suspension System

Banyan Air Service November 18, 2011 AVE Aviation and Commerce Center Building 1 Miami, FL

Student Services & Classroom Addition

SECTION ALUMINUM WINDOWS

Make Waves. Topo 3-Dimensional System

AXIOM Indirect Light Coves

SECTION EXTERIOR GRILLS AND SCREENS

HDCR Series HEAVY DUTY WELDED CEILING SYSTEMS

Sheet Metal Flashing and Trim

Install Instructions. Helix Z1. Important Information. Important:

SUPERIOR ROOF SYSTEMS

INSTALLATION AND MAINTENANCE GUIDE SECTION 3 HANDRAIL DECK LIGHTS

Store No MAY 13 Addendum No. 1 SECTION ACOUSTICAL PANEL CEILINGS

Note: Installation and Glazing Manuals are product specific. FOR REVIEW ONLY! FEBRUARY 2012

SECTION ORNAMENTAL ALUMINUM RAILING

SECTION ORNAMENTAL ALUMINUM FENCING

This Addendum forms part of the Tender Documents and amends the Tender Documents as described below.

METALWorkS. RH200 Custom Hook-on Panels. General Installation Instructions. Ceiling 1.0 GENERAL Site Conditions Product Description

Construction Standards PAGE

SECTION RADIO FREQUENCY SHIELDING ENCLOSURE RF Modular Pan System

A. Division 01: Administrative, procedural, and temporary work requirements apply to this section.

In-Wall Slide-out OEM INSTALLATION MANUAL

MODELS FWF/FWFC-300/500 & FWS/FWSC-200/400 INSTALLATION INSTRUCTIONS

SECTION HEAVY GLASS TOP HUNG SLIDING BI-FOLD DOOR SYSTEMS

SECTION DRYWALL GRID LINEAR LIGHTING INTEGRATION

SECTION Axiom Roller Shade Integration

SECTION ACOUSTICAL PANEL CEILINGS PART 1 - GENERAL

A. Product Data: Submit manufacturer's descriptive literature, and recommendations and instructions for installation.

SECTION ALUMINUM-FRAMED ENTRANCES AND STOREFRONTS

SECTION HANGERS AND SUPPORTS FOR ELECTRICAL SYSTEMS

Panel Clip with (2) ¼ 14 x 2 Fasteners at Each Panel Joint. Base Angle. Fasteners to Concrete 24 O/C Base Z Flashing

SECTION COMPOSITE WALL PANELS PART 1 GENERAL 1.01 SECTION INCLUDES

SUBSTITUTION REQUEST (After the Bidding/Negotiating Phase)


SECTION ALUMINUM WALKWAY COVERS. A. The requirements of Division 1 specifications shall apply to work specified in the section.

GRID SYSTEM ECOPLUS SYSTEMS TWO-WAY EXPOSED SUSPENDED CEILING GRID SYSTEM

OCALA INTERNATIONAL AIRPORT MBI PN: GENERAL AVIATION TERMINAL JANUARY 16, 2018 ADDENDUM-ISSUE

SECTION EXTERIOR SUN SHADES

SECTION COMPOSITE CORE ACOUSTICAL PANEL CEILINGS. Sound-Rite Inc. #9, rd Avenue NE Calgary, AB T2A 7P3

INSTALLATION MANUAL KOCH

Wall Protection Installation Guidelines

ENGINEERING SPECIFICATION FIBERGRATE 1 INCH DEEP MICRO-MESH MOLDED GRATING SECTION 06610

1. Acoustical panels. 2. Exposed suspension systems for ceilings. 3. Wire hangers, fasteners, main runners, cross tees, and wall angle moldings.

EXTERIOR PLANK SERIES SPECIFICATION DATA

SECTION Metal Studs, Lath, Suspension Ceilings, Plaster, and Stucco Ceramic Tile.

SERIES SA30 STEEL/ALUMINUM FIXED DETENTION WINDOWS SECTION 08651

SECTION TERRA COTTA CLAY TILE RAINSCREEN SYSTEM

H50. DYNAMIC BARRIER Bench Fume Hood. Fume Hoods. Installation Instructions. 48"- 60"- 72"- 96" long

SECTION GYPSUM BOARD ASSEMBLIES

Transcription:

PORTA-FAB Cleanroom Ceiling Systems FABLINE 2 GASKET SEAL GRID INSTALLATION INSTRUCTIONS IMPORTANT Porta-Fab Advises A Thorough Reading of These Instructions Before Beginning Installation.

INTRODUCTION Porta-Fab has fabricated this FabLine 2 Gasket Seal Grid Cleanroom Ceiling System with superior materials and provides a structural grid system with aluminum extrusions and connecting zinc alloy die-castings. Even though these materials were packaged with care, damage may have occurred during transit. Please inspect this shipment for damage and quantity before beginning installation. Please notify us promptly if you experience any problems at (800) 325-3781. CONTENTS Unpackaging, Inspection, and Inventory...3 FabLine Extrusion Guide...4 Installation of Wall Angle...5 Wall Angle at Corners...5 Installation of T-Bar...5 Installation of Gasket...7 Installation of Light Fixtures and Filters...7 Installation of Ceiling Blanks...7 Sealing Wall Angle...7 Maintenance...7 Installation Details...7 TOOLS We suggest the following tools to erect this system: Laser or Suitable Leveling Instrument 5/32 Hex Bit or Allen Wrench 7/16 Socket Head Drive Circular Saw with Fine Toothed Carbide Tip Blade (triple toothed, negative rake, aluminum blade) Miter Saw with Fine Toothed Carbide Tip Blade (triple toothed, negative rake, aluminum blade) The following information is provided by Porta-Fab Corporation as a general guideline for the installation of the FabLine 2 Gasket-Seal cleanroom ceiling grid system. This information should be reviewed prior to commencing installation. The intent is to be as specific as possible in detail for a typical project, yet general enough to be utilized by most installation teams. It is Porta-Fab's hope that the descriptions are helpful and as easy to understand as the wall system itself. Of course, if there are any questions, comments, or special considerations, please contact Porta-Fab. This narrative assumes that the job-site is clear and ready for the construction of cleanroom ceiling.

Uncrating, Inspection, and Inventory The Porta-Fab ceiling system is packaged in the factory in a manner to protect each part during normal shipping and handling. It is recommended by Porta-Fab that the original packaging remain intact as much as possible until the individual parts are needed. All extrusion components are typically packaged in boxes and between styrofoam packaging. As the skids are received at the job-site, they should be placed in a location near the installation area, where they will not become an obstacle, or require to be moved at a later time. The skids should then be opened, however leaving the internal packaging unchanged. Pieces can be removed on an as needed basis and the packaging discarded then. At this time, however, the components should be visually inspected for obvious damage and an inventory taken to confirm that all parts are received as expected. Notify Porta-Fab immediately of any discrepancies. Fasteners Not Provided By Porta-Fab Porta-Fab does not provide the attachment hardware for the existing structure or framework, due to installer preferences and local codes; the type of hardware shall not be discussed here. All hardware required from the turnbuckle to the existing support structure is not provided. Special Notes Due to expansion and contraction properties of aluminum, it is recommended that this system be installed in a temperature that is as close as possible to that which the finished room will operate. Stock T-bar or wall angle with a length of over 4 feet is cut with a tolerance of +/-.032. Stock cross-tees less than 4 feet is cut to +/-.016. The above stated tolerances are measured at a material temperature of from 60 to 90 F. All field cuts including perimeter miter cuts are to be performed by the installing contractor. Preliminary Identify various parts from reference drawings.

FabLine Extrusion Guide Part # Description Detail CG2MT144 Main Runner CG2CT46.5 Cross Tee CG2WA144 Wall Angle CGCAST4 4-Way Casting CGTB6 Turnbuckle

Installation of Wall Angle The first component to be installed is the wall angle. Attach lengths of wall angle to walls using appropriate fasteners for your type of existing wall. It is advisable to pick one wall as a starting point and begin attaching wall angle from the center of the wall towards the corners. A laser or other suitable leveling tool should be used to assure a consistently level finished product. Continue attaching wall angle around walls and columns, if any, until complete. The wall angle sections are connected at the intersections with a 2-way zinc alloy die-castings in which the cross configuration is formed by downwardly open channels that embrace the top extruded screw boss of the wall angle. The castings are bolted to the extrusion with ¼-20 x 1 gutter head cap screws. Only one (1) bolt per casting leg is required except for corner splice castings, which require two (2) screws. This is most easily done with a power drill or other such tool. Wall Angle at Corners The wall angle is to be miter cut at 45º in the field by the installation team to create corners. Installation of T-Bar Once the wall angle is completely installed, the rest of the grid installation can begin. The extruded aluminum sections are connected at the intersections with the cross shaped zinc alloy die castings in which the cross configuration is formed by downwardly open channels that embrace the top extruded screw boss of the main runners and cross bar sections. The castings are bolted to the extrusion with ¼-20 x 1 ¼ full threaded hex head cap screws (button head screws are used at perimeter intersections). Only one (1) bolt per casting leg is required except for corner splice castings, which require two (2) screws. This is most easily done with a power drill or other such tool. The grid is suspended with 3/8-16 threaded rod for which the castings are already tapped. The castings will accept a special right hand/left hand (RH-LH) threaded rod to allow for use with turnbuckles. The RH-LH threaded rod should be turned into the casting and bottom out on the main runner. Turnbuckles are not a requirement for secure suspension. However, in that case, some other means of leveling the grid system should be used.

There are two different ways of assembling the grid system: Method 1 Hang all of the threaded rods, turnbuckles and castings at the appropriate 2 x 4 or 4 x 4 centers (nominal) and then bolt main runners (12 ) lengths into place. The cross tees may then be bolted in using a 24 or 24 ½ on center configuration, depending on grid layout. Method 2 Partially install a small section of ceiling grid using main runners, cross tees and castings on the floor and raise it into place. The threaded rods are then attached to the castings and the next section is assembled and then raised into place.

Installation of Gasket The Porta-Fab provided 1/8 x 3/8 gasket tape is usually applied to the extruded grid members prior to installation. After unpacking the part, the surface of the extrusion is cleaned using a solution of isopropyl alcohol and water. The gasket tape is then applied with the adhesive side down, leaving approximately 1 to 1 ½ extra gasket material on each end of the cross tees to allow for a proper seal of the gaskets at the grid intersection. Installation of Light Fixtures and Filters Once the ceiling grid is installed, the module installation can begin. If lay in light fixtures are to be used, they should be installed first in order to make the wiring easier. Once the light fixtures are in place and wired, the filter modules can be installed. This done by pushing the filter module through the grid at an angle and then lowering them until they nest in place and so on. After all the filer modules are in place, the blank panels are installed. Porta-Fab UltraGuard fan filter modules are sealed at the factory. Installation of Ceiling Blanks Blank panels are placed in the grid opening after the gasket is in place. Special cuts can be made by measuring the centerline of the grid and deducting 7/8 from the dimension (see chart below). For example, a 24 x 48 grid centerline would take a blank 23 1/8 x 47 1/8 in size. If blank panel hold down clips are utilized, a minimum of six (6) clips per 2 x 4 blank panel are required. The clips are secured to the T-Grid extrusions utilizing a ¼ -20 bolt. Center Line of Grid Module Size 24 x 48 23 1/8 x 47 1/8 24 ½ x 48 ½ 23 5/8 x 47 5/8 Sealing Wall Angle This is a simple process utilizing an approved construction sealant. A bead of sealant is placed at the corner of the wall angle and existing wall on the room side. The sealant should be smoothed to assure an airtight seal. Maintenance Prior to completing the installation, a final inspection and wipe-down should take place. Wipe the panels and extrusions with an approved cleanroom alcohol wipe. If any chemicals are to be utilized, spot check with extra materials prior to use to insure that the finish of the wall system is not damaged. Cleaning of the Porta-Fab 2 gasket grid requires the use of non-shedding, cleanroom approved wipers and a solvent of isopropyl alcohol diluted with distilled water. Surfaced should be wiped in one direction, maximum of three (3) strokes.