Benefit sharing in hydropower development. Initiative on Sustainable Hydropower

Similar documents
Case Presentation: Law for Benefit sharing on hydropower projects in Viet Nam - & - Linking national benefit sharing to Transboundary benefit sharing

Mekong River Commission

Mekon. River Commission. Regional Action Plan for Sustainable Transport of Dangerous Goods along the Mekong River

Mekong River Commission

SUMMARY 2013 EDITION

Meeting in Yichang China 25 Oct 2008 By Lawrence Haas Independent Consultant, UK

Impacts of climate change and development on Mekong flow regimes: First assessment 2009

Cumulative Impact Assessment Key Findings Report

Conference on New Thinking on Water Governance 2-3 July 2009 Lee Kuan Yew School of Public Policy National University of Singapore

Mekong Water Dialogues

The Role of the Mekong River Commission (MRC) in Conflict Management. SATIT PHIROMCHAI Mekong River Commission Secretariat

No. RFQ May Request for Quotations

TRANSBOUNDARY DIALOGUE

The First Mekong River Commission Summit 2010

STAKEHOLDER PARTICIPATION and MEKONG RIVER COMMISSION

Mekong River Commission

MRC's role in relation to planning and implementation of mainstream dams and its strategic assessment framework

Siem Reap Declaration

ACTION PLAN TOWARD EFFECTIVE FLOOD HAZARD MAPPING IN CAMBODIA

Project leaflet. A project implemented by RECOFTC - The Center for People and Forests and partners. Project is co-funded by The European Union

Siem Reap Declaration

Siem Reap Declaration

Nam Theun 2. TNC workshop April 2014

Procedures for Notification, Prior Consultation and Agreement

Regional Action Plan

NATIONAL INDICATIVE PLAN

Associated Event : SDG 6 on Water and Sanitation

2 nd Meeting of JWG on Water Resources of Mekong-Lancang Cooperation 1 st 2 nd March, 2018 in Chiang Rai, Thailand.

PROMOTING A FAIR BALANCE ON MEKONG S SHARED WATER. Te Navuth (Mr.) Secretary General, Cambodia National Mekong Committee

GUIDELINES FOR THE EVALUATION OF HYDROPOWER AND MULTI- PURPOSE PROJECT PORTFOLIOS ANNEX 3 HYDROPOWER PLANNING SUPPORT TOOL USER MANUAL

Trends and long-term outlook for the Mekong region

Promotional Report on Identified Joint Projects in the Lower Mekong Basin

Geopolitical benefits of transboundary water cooperation. The Mekong River Basin Case

Guidelines and Recommendations for Mitigation of Hydrological and Flow Impacts Kees Sloff and Jenny Pronker

From Upstream to Downstream:

Key features and development challenges for the Mekong River Basin

THE FIRST MEKONG RIVER COMMISSION SUMMIT Hua Hin, Thailand

ICEM and MRC - SEA of hydropower on mainstream Mekong River 1

The Mekong River Commission s state of knowledge and state of governance with respect to Mekong mainstream dams

Review and Update Sustainable Hydropower

MRC Navigation Programme

RIVER HEALTH, ENVIRONMENTAL FLOWS AND CASCADE MANAGEMENT IN LAO PDR

PNPCA Commentary from the PNPCA Lessons Learnt

Concept of WSM Country Status on Watershed Management Planning Institution and Legislation relevant to WSM in Laos Application of Watershed Management

ENVIRONMENT ASSESSMENT TOOLS FOR IMPROVING THE SUSTAINABILITY OF DEVELOPMENT IN THE MEKONG REGION

Basin-wide Strategy for Sustainable Hydropower Development for the Lower Mekong Basin

Asian Development Bank TA-4689 (VIE)

National Policy on Environmental and Social Sustainability of the Hydropower Sector in Lao PDR

Overview of the Social Impact Monitoring and Vulnerability Assessment (SIMVA) : Introduction, Approach, Indicators

Mrs. Singkham KHONGSAVANH Vice Governor, Vientiane Province, Lao PDR

ESTABLISHING A COORDINATED INTERAGENCY COST- COUNTERPARTING MECHANISM: Nam Theun-Nam Kading River Basin Management Pilot Project, Lao PDR

2011 Annual Water Quality Data Assessment Report

Economic, Environmental and Social Impacts of Hydropower Development in the Lower Mekong Basin

ICEM and MRC - SEA of hydropower on mainstream Mekong River 1

~,,^ 21.M..MO. E wtto63(yno68. n. fuienff^inmyu^n) furl ij ^^^ futtufi5<jiviinvtii-j^wf8/3inty^i^4m^n8nn5^u^tififl8 i^ivi l

REGIONAL ECONOMIC INTEGRATION THROUGH IMPROVED MEKONG NAVIGATION 4 TH WWF MEXICO, MARCH 2006

TERM OF REFERENCE DRAFT

Mekong Climate Change and Adaptation Initiative and the Mekong River Commission

The Mekong River Commission s Initiative for Sustainable Hydropower. Oslo, Norway 4-6 September Presented by: Voradeth Phonekeo

ANNUAL REPORT Version 2.0

Broad aims of the SEA. SEA SUMMARY OVERVIEW REGIONAL MITIGATION ASSESSMENT WORKSHOP Ho Chi Minh City June The context for the SEA

Draft Concept Note Agriculture and Irrigation Programme (AIP) ( )

Approach and methodology for social impact assessment of development scenarios

2013 LOWER MEKONG REGIONAL WATER QUALITY MONITORING REPORT

MRC stakeholder engagement

Chapter 2.3: National Legislation 1

Development of Gender Analysis and Gender Action Plan for the MRCS. Duration: A maximum of 30 working days tentatively during April-May 2017

EXECUTIVE SUMMARY RISK ANALYSIS (VOLUME 1)

Comparing alternative PDPs for the Greater Mekong Subregion

The Mekong River Report Card on Water Quality ( )

Promoting Cooperation on Ecosystem-based Approaches in the Greater Mekong Subregion (GMS)

The Mekong River Commission

Chapter 4. Cambodia Country Report. September 2016

Identifying and Valuing the Benefits: the Experience of Mekong River Basin

Transboundary Water Resources Management Issues

Direction And Experience In Water Sector Apex Body Development 1

UNIDO and Selected Bioenergy Projects. Sooksiri Chamsuk UNIDO Regional Office in Thailand

Presentation Transboundary water cooperation in Mekong Countries, key issues, challenges and intervention to address

BACK TO FUTURE PAST? Cooperation Challenges and Opportunities in Hydropower and Water Resources Development in the Mekong

Joint Environmental Monitoring (JEM)

The Living Mekong Programme Goal :

Energy Policy in Lao PDR

Negotiating Flows in the Mekong

Profiles of 12 proposed Mainstream developments in the LMB

Mekong River Commission. Approach and methodology for economic impact assessment of development scenarios

The ADB/ World Bank/ MRC Mekong Water Resources Assistance Strategy (MWRAS): Justifying large water infrastructure with transboundary impacts

Mekong River Commission

Statistical Capacity Building Initiatives ADB

Session: For more information:

Regional Office Vientiane, c/o Mekong River Commission Secretariat P.O. Box: 3802, Vientiane Capital, Lao PDR, Tel/Fax: (856 21) ext 4402

Report of the Mekong River Commission **

1'11tJ 6'\'111n'nWb61'U1Gnl"aflru~m"a&.J1Gnl"abb;JJ11'U\l (Mekong River Commission

LAO BUSINESS FORUM BRIEF

The LMB Sustainable Hydropower Development Strategy. Regional Power Trade Coordination Committee 24 Nay Pyi Taw, 20 June 2018

MEKONG RIVER COMMISSION. Concept Note Final Draft Version

MRC Fisheries Programme On-going study:

MEKONG RIVER COMMISSION

Mekong River Commission

Climate change adaptation from small and medium scale hydropower plants: A case study for Lao Cai province

OXFAM IN ASIA. Asia Regional Water Governance Program. FAIR SHARing OF NATURAL RESOURCES

Transcription:

Benefit sharing in hydropower development Initiative on Sustainable Hydropower

Benefit sharing Hydropower projects can tap into the Mekong River s natural source of energy and contribute to economic growth and energy security in the region. Conversely, they can also affect the environment and residents of the river basin who may lose access to water and other related resources. To make up for the losses and spread the benefits expected from hydropower development, benefit sharing mechanisms (BSM) are an important element of these projects planning. Although most hydropower projects include some measures of compensation for the people resettled from the project sites, these constitute the bare minimum and are usually a one-off package covered under the costs of the project financed by the developer. In contrast, benefit sharing consists of a range of long-term mechanisms that governments apply based on an agreed regulatory framework.

Spreading the benefits The river basins are home to thousands of people who depend on the water for navigation, fishing, and other sources of food and income. Benefit sharing is especially important in basins with large rural populations where hydropower will affect their resources. For hydropower development, local benefit sharing should apply to communities living in the project impact zone, as identified in, for example, project environmental and social impact assessments. This would typically include individuals, households, entrepreneurs and local businesses based in the project area. The intention is to go beyond the resettlement community to recognise others in the reservoir area, upstream and downstream who may also be affected by the project. Monetary and non-monetary benefit sharing mechanisms may span the economic life of hydropower projects, from planning to operations. Unlike compensation, which is usually covered under the projects costs, benefit sharing typically takes a small percentage from the revenues generated by the project. Monetary benefit sharing may include revenue and equity sharing, taxes and royalties, and preferential electricity tariffs to local communities. These benefits are typically shared when the project starts generating revenue. Non-monetary forms range from facilitating access to natural resources and project-related development opportunities for riverine communities, to providing electricity connection and reliable electricity supply to communities in the project areas. Additional indirect benefits include investments on public infrastructures, human capacities and jobs.

The cost of benefit sharing Governments are normally responsible for managing the economic and financial gains from hydropower to spread the benefits and costs equitably. They do this by following their national policies and legal frameworks. Tapping into the revenue stream of hydropower projects is perhaps the most common, practical and straightforward way of sharing monetary benefits. Countries such as Nepal and China have laws that allocate an annual equivalent of one to three per cent of gross revenue from hydropower to revenue sharing. In other countries such as India, the percentage allocation ranges from 10 to 14 per cent. Based on the user-pay principle, revenue sharing can be reflected in electricity tariffs. Experiences so far have shown that the effect on electricity charges is typically modest. The general public, as the users, will support a reasonable increase in electricity tariffs if the money is used to fairly distribute the benefits within society, especially to poor rural areas where projects are built. In some cases, affected communities are not the first beneficiaries of the electricity generated by the projects, which can fuel resentment and social instability if there are no clear mechanisms to share the benefits. Without benefit sharing, hydropower projects may become more difficult to justify to society because of their cumulative environmental and social impacts. The positive benefits of hydropower development can be underlined by the creation of new and improved social and economic opportunities. The fair sharing of benefits would ensure that the rights and interests of the affected populations are recognised and respected.

Sharing the benefits in the Mekong region Mekong countries have experience with one or more forms of nationalto-local and project-level benefit sharing in the hydropower sector. In 2007, Thailand introduced the local Community Development Funds (CDFs) that were intended to improve the economic conditions and quality of life of people living in the vicinity of power projects. The challenge now for Thailand is to also implement the CDFs for hydropower projects. Since 2007, the Electricity Regulatory Authority of Viet Nam (ERAV) has been developing provisions of a draft Decree Law for BSM (Benefit Sharing Mechanisms) on hydropower with a multi-ministry Steering Group. In 2010, provisions of the law were pilot tested on a 210 MW project in Quang Nam Province in cooperation with the provincial authorities. The challenge for Viet Nam is now to finalise and implement the law on all hydropower projects. Lao PDR has experience with innovative approaches that target hydropower revenue to tackle poverty and raise the incomes of people affected by the projects. The country also has revenue-management provisions for projects supported by donors that contribute to programmes at the sub-national and national levels aimed at alleviating poverty. The challenge for Lao PDR, as well as Cambodia, is to implement benefit sharing mechanisms in all hydropower projects through the development of enabling legislation. China has laws that allocate a portion of revenue from hydropower projects to permanent local development and reconstruction funds in reservoir areas. The government also has measures for longerterm (20-year) compensation including hydropower projects in the Lancang- Mekong River cascade. Clear legislation ensures a consistent approach, especially when countries have several existing hydropower projects, plan to develop more, or have a mix of public and private investment. In this manner all stakeholders know the rules of the game, including existing hydropower operators, potential investors, local communities and authorities, and river basin organisations with a mandate to support the equitable sharing of benefits.

Supporting benefit sharing The Mekong River Commission s Initiative on Sustainable Hydropower (ISH) explores benefit sharing options and fosters dialogue on ways to introduce mechanisms in the region s hydropower sector. The ISH has helped to increase the level of awareness and understanding of the concepts and internationally accepted best practices among the staff at the National Mekong Committee Secretariats (NMCS) and multiple stakeholders in the four Member Countries. It has also presented effective mechanisms used in other parts of the world that may be adapted to the Mekong region. Mekong River Commission Cambodia Lao PDR Thailand Viet Nam For more information on the Environment Programme, visit www.mrcmekong.org Office of the Secretariat in Phnom Penh (OSP) 576 National Road, #2, Chak Angre Krom, P.O. Box 623, Phnom Penh, Cambodia Tel: (855-23) 425 353 Fax: (855-23) 425 363 Office of the Secretariat in Vientiane (OSV) Office of the Chief Executive Officer 184 Fa Ngoum Road, P.O. Box 6101, Vientiane, Lao PDR Tel: (856-21) 263 263 Fax: (856-21) 263 264