LEED-2009 Green Building Rating System. New Construction & Major Renovations

Similar documents
LEED Credits. How FieldTurf Can Contribute To Obtaining

LEED NC Green Building Rating System For New Construction & Major Renovations. Version 2.2

or

Petersen Aluminum Leadership in Energy and Environmental Design (LEED ) Guidelines

BERRIDGE MANUFACTURING COMPANY

Donald G. Kirby Manager, Product Marketing

Fiberglass Storage Tanks for Green Building Applications

Information on acquiring LEED credits on green friendly projects: Porcelain Tile, Ceramic Tile, and Natural Stones

Product LEED Guide Vexcon Chemicals, Inc. 1

Impact Barrier QT LEED Sheet

University of Hawaii Law School Honolulu, HI. Preliminary LEED Goals Report 10/4/2007

Balco, Inc. Type EV, Exterior Vertical Expansion Joint Covers

Balco, Inc. Elastomeric Expansion Joint Covers

INDUSTRY TECHNICAL NOTE

Impacts From Development

Balco, Inc. Stair Nosings

Green Building KPIs. Fermacell PE INTERNATIONAL. from BREEAM and LEED that are relevant for selected fire protection and building board products

Learning to LEED: Day 2 Water Efficiency Quiz

ONSITE WASTEWATER SYSTEMS

A. IEMA ten day notification for demolition provisions as necessary. C. IEPA Uncontaminated Soil Certification LPC 663

Carboline Fireproofing Products

WE Credit NRDC 158 NRDC. 159 Zentox Corporation. 160 Cahill Associates. 161 ZGF Partnership. 162 [none] 163 Keen Engineering Inc.

and Green Infrastructure

HPBS [ HIGH PERFORMANCE BUILDING STANDARD]

LEED BUDGET IMPACTS. LEED Architectural Credits

DOHA GREEN TRAINING WORKSHOP

Learning to LEED: Day 2 Materials & Resources Quiz

Topic #8: LEED Materials & Resources

VICOSTONE QUARTZ SURFACES & LEED CERTIFICATION

MATERIALS AND RESOURCES

Chapter 3 Dispersion BMPs

CONSTRUCTION WASTE MANAGEMENT PLAN

ICPI TECH SPEC NUMBER 16

IV. ENVIRONMENTAL IMPACT ANALYSIS G. HYDROLOGY/WATER QUALITY

DUKE UNIVERSITY CONSTRUCTION & DESIGN STANDARDS

CONTENTS. 71 Section 01352, #7 (Life Cycle Cost and Life Cycle Assessment) 2/1/12 Modified entire section 72 Section 01352, #8 (Sustainability

anchorblock.com commercial paving systems

Dow Roofing Systems, LEED and Sustainable Roof Assemblies

Green Building Rating System For Commercial Interiors

WEST WINDSOR TOWNSHIP GREEN DEVELOPMENT PRACTICES CHECKLIST

ATTACHMENT N LEED PROJECT PROCEDURES

The Application of LEED Green Building Rating System in Indonesia

Stormwater Management Practices and Design Manual. Clemson University

6.13 Utilities and Service Systems

LEED 2009 Green Building Rating Systems Information Sheet 06/03/2009

Bim Kendall House, Haub School of Environment and Natural Resources

NCMA TEK CONCRETE MASONRY & HARDSCAPE PRODUCTS IN LEED 2009 TEK 6-9C

15A NCAC 02B.0281 FALLS WATER SUPPLY NUTRIENT STRATEGY: STORMWATER REQUIREMENTS FOR STATE AND FEDERAL ENTITIES The following is the stormwater

Balco, Inc. PC Series Partition Closure Systems

CE Option 1 and 2 - Provide the pre-development site run -off rate (cfs) CE Option 1 and 2 - Provide the pre-development site run -off quantity (cf)

Whitewater River Region SWMP. APPENDIX L BMPs for Fire Fighting Agency Activities

Exemplary Performance

Memorandum Neighborhood Development Services Office of the City Engineer City Hall Annex, 610 East Market St., Charlottesville

Memorandum Neighborhood Development Services Office of the City Engineer City Hall Annex, 610 East Market St., Charlottesville

Figure 19 Rendering of New Rooftop

Whitewater River Region SWMP Appendix L

Balco, Inc. Aluminum Expansion Joint Covers

BERRIDGE LEED v4 INFORMATION. What is LEED?

Our Eastern Shore Groundwater Part IV Groundwater Quality on the Eastern Shore: How safe is our groundwater and are there ways we can protect it?

Post-Development Stormwater Runoff Performance Standards

TECHNICAL GUIDANCE DOCUMENT APPENDICES

STC MANUFACTURER STEEL DOOR WITH PLYWOOD 3/4

ETERNO IVICA CREDIT STATEMENT PEDESTAL INTRODUCTION. LEED Certification

10. LEED RATING EVALUATION

Introduction to Integrated Sustainable Design

ENERGY AND ENVIRONMENT DESIGN AND CONSTRUCTION STANDARDS ENERGY AND ENVIRONMENT

SUBSURFACE INFILTRATION SYSTEM DESCRIPTION. Alternative Names: Sump, Drywell, Infiltration Trench, Infiltration Galleries, Leach Fields

12-SW General Permit

The Evolution of Stormwater and Rainwater Harvesting in Minnesota. The Minnesota Stormwater Manual Updates and Examples

LaGyp TM Gypsum Boards

Vertima record number: FVERT In effect since: August 2013 Last update: December 2014 Technical Data documented and validated by:

1. Division 01 Section General Requirements Temporary Facilities and Controls.

CAMP BLANDING JOINT TRAINING CENTER CONSTRUCTION AND FACILITY MANAGEMENT OFFICE ARCHITECT S PROJECT # CFMO PROJECT #

MASTERSPEC TECHNICAL SPECIFICATIONS DIVISION 01 GENERAL REQUIREMENTS SECTION CONSTRUCTION WASTE MANAGEMENT AND DISPOSAL

STORM WATER MANAGEMENT STANDARDS DRAFT

E nvi r o nm e nt a l Paving Solu tion s

St. Monica Food Pantry Construction Waste Management and Disposal SBA-13105

Chapter 7: Utilities and Stormwater Management

SECTION SUSTAINABILITY CERTIFICATION REQUIREMENTS LEED NC V3

INFRASTRUCTURE ELEMENT

A PRACTICAL GUIDE TO SAN FRANCISCO'S GREEN BUILDING ORDINANCE

ENGINEERED SOLUTIONS. low impact development application guide

Innovation In Stormwater Management

DEMOLITION WASTE MANAGEMENT PLANNING

SECTION CONSTRUCTION WASTE MANAGEMENT. 1. Section Sustainable Project Requirements. 2. Section Temporary Facilities and Controls.

IV.E. HYDROLOGY AND WATER QUALITY

Mauritius Green Building Handbook. Water. Introduction. Water and buildings. Llewellyn van Wyk Principal Researcher Built Environment CSIR

LEED Basics. Presented by. Jeremy Knoll PGAV Architects

Homeowner Incentive Program

STORMWATER RUNOFF AND WATER QUALITY IMPACT REVIEW

LEED 2012 Rainwater Management

Rating System & Addendum. for New Construction & Major Renovations LEED Canada-NC Version 1.0

APPENDIX G Fire BMPs

Vertima record number: FVERT In effect since: December 2014 Last update: December 2014 Technical Data documented and validated by:

Storm Water Resource Plan Criteria and Metrics Checklist

Stormwater Harvesting in the Bronx 2013 SESWA Annual Conference Charlotte, NC October 24, 2013

INFRASTRUCTURE ELEMENT Goal, Objectives and Policies

Green Building Rating System For Commercial Interiors. Version 2

Answers. LEED for Neighborhood Development (LEED ND) Quiz #4 Green Infrastructure and Buildings (GIB)

Xone. Xone Contributions to LEED

Transcription:

LEED-2009 Green Building Rating System New Construction & Major Renovations 1

The following pages are designed to assist Engineers acquire LEED Credits in the design of Green Sustainable building utilizing ABT Inc s Polydrain, Trench Former, and First Flush product lines. Contents List of Potential Credits for ABT Inc Products SS Credit 6.1: Stormwater Design: Quantity Control...2 SS Credit 6.2: Stormwater Design: Quality Control...4 WE Credit 1: (Option 1)Water Efficient Landscaping: Reduce by 50%...4 WE Credit 1: (Option 2)Water Efficient Landscaping: No Potable Water Use or No Irrigation...6 WE Credit 2: Innovative Wastewater Technologies...7 MR Credit 2: Construction Waste Management...8 MR Credit 4.1: Recycled Content...9 MR Credit 5: Regional Materials... 10 ID Credit 1 1.4: Innovation in Design... 11 2

SS Credit 6.1: Stormwater Design: Quantity Control : Limit disruption of natural water hydrology by reducing impervious cover, increasing on- site infiltration, reducing or eliminating pollution from stormwater runoff, and eliminating contaminants. CASE 1 EXISTING IMPERVIOUSNESS IS LESS THAN OR EQUAL TO 50% Option 1 Implement a stormwater management plan that prevents the post-development peak discharge rate and quantity from exceeding the pre-development peak discharge rate and quantity for the one- and two-year 24-hour design storms. OR Option 2 Implement a stormwater management plan that protects receiving stream channels from excessive erosion by implementing a stream channel protection strategy and quantity control strategies. CASE 2 EXISTING IMPERVIOUSNESS IS GREATER THAN 50% Implement a stormwater management plan that results in a 25% decrease in the volume of stormwater runoff from the two-year 24-hour design storm. ABT Inc. manufactures trench drain systems that can be implemented into the stormwater management plan to prevent the post-development peak discharge rate and quantity from exceeding the pre-development peak discharge rate and quantity for the one and two-year 24- hour design storms. ABT Inc s trench drain systems can also be used to channel stormwater for reuse in many nonpotable water applications. ABT Inc s FirstFlush systems can be used for onsite filtration. Trench Drains: All PolyDrain and TrenchFormer Systems. FirstFlush: all models will reduce pollution from stormwater runoff. 3

SS Credit 6.2: Stormwater Design: Quality Control Water Efficiency Limit disruption and pollution of natural water flows by managing stormwater runoff. Implement a stormwater management plan that reduces impervious cover, promotes infiltration, and captures and treats the stormwater runoff from 90% of the average annual rainfall using acceptable best management practices (BMPs). BMPs used to treat runoff must be capable of removing 80% of the average annual post development total suspended solids (TSS) load based on existing monitoring reports. BMPs are considered to meet these criteria if they are designed in accordance with standards and specifications from a state or local program that has adopted these performance standards, or there exists in-field performance monitoring data demonstrating compliance with the criteria. Data must conform to accepted protocol (e.g., Technology Acceptance Reciprocity Partnership [TARP], Washington State Department of Ecology) for BMP monitoring. ABT Inc s FirstFlush systems are ideal for onsite filtration and can be used in conjunction with trench drain systems to develop acceptable BMP s. FirstFlush: all models will reduce pollution from stormwater runoff. Trench Drains: All PolyDrain and TrenchFormer Systems. 4

WE Credit 1: Water Efficient Landscaping Option 1 Limit or eliminate the use of potable water, or other natural surface or subsurface water resources available on or near the project site, for landscape irrigation. Option 1. Reduce potable water consumption for irrigation by 50% from a calculated mid-summer baseline case. Reductions shall be attributed to any combination of the following items: Plant species, density and microclimate factor Irrigation efficiency Use of captured rainwater Use of recycled wastewater Use of water treated and conveyed by a public agency specifically for non-potable uses ABT Inc s Trench Drain Systems can be used for capture and conveyance of stormwater in conjunction with an onsite storage system. All trench drain systems: PolyDrain and TrenchFormer Systems. 5

WE Credit 1: Water Efficient Landscaping: No Potable Water Use or No Irrigation Option 2: Eliminate the use of potable water, or other natural surface or subsurface water resources available on or near the project site, for landscape irrigation. Option 2 Meet the requirements for Option 1 Use only captured rainwater, recycled wastewater, recycled greywater, or water treated and conveyed by a public agency specifically for non-potable uses for irrigation. OR Install landscaping that does not require permanent irrigation systems. Temporary irrigation systems used for plant establishment are allowed only if removed within one year of installation. ABT Inc s Trench Drain Systems can be used for capture and conveyance of stormwater in conjunction with an onsite storage system. All trench drain systems: PolyDrain and TrenchFormer Systems. 6

WE Credit 2: Innovative Wastewater Technologies Reduce generation of wastewater and potable water demand, while increasing the local aquifer recharge. OPTION 1 Reduce potable water use for building sewage conveyance by 50% through the use of waterconserving fixtures (water closets, urinals) or non-potable water (captured rainwater, recycled greywater, and on-site or municipally treated wastewater). OR OPTION 2 Treat 50% of wastewater on-site to tertiary standards. Treated water must be infiltrated or used on-site. ABT Inc s Trench Drain Systems can be used for capture and conveyance of stormwater. ABT Inc s FirstFlush systems can be used for onsite filtration. Trench Drains: PolyDrain and TrenchFormer Systems. FirstFlush: all models will reduce pollution from stormwater runoff. 7

MR Credit 2: Construction Waste Management Divert construction, demolition and land-clearing debris from disposal in landfills and incinerators. Redirect recyclable recovered resources back to the manufacturing process. Redirect reusable materials to appropriate sites. Recycle and/or salvage non-hazardous construction and demolition debris. Develop and implement a construction waste management plan that, at a minimum, identifies the materials to be diverted from disposal and whether the materials will be sorted on-site or co-mingled. Excavated soil and land-clearing debris do not contribute to this credit. Calculations can be done by weight or volume, but must be consistent throughout. The minimum percentage debris to be recycled or salvaged for each point threshold is as follows: Recycled or Salvaged Points 50% 1 75% 2 Potential Product Application: Conventional hand-formed trench drains require extensive use of lumber in there construction which is disposed of after being deformed. Trench Former utilizes 100% recyclable EPS to form the trench drain, thus diverting almost all construction waste associated with the drain system from a landfill Using a precast modular system, such as the Polydrain products eliminates the issue all together. All TrenchFormer and PolyDrain Trench Systems. 8

MR Credit 4.1: Recycled Content Increase demand for building products that incorporate recycled content materials, thereby reducing impacts resulting from extraction and processing of virgin materials. Use materials with recycled content such that the sum of post-consumer recycled content plus one-half of the pre-consumer content constitutes at least 10% (based on cost) of the total value of the materials in the project. The minimum percentage materials recycled for each point threshold is as follows: Recycled Content Points 10% 1 20% 2 The recycled content value of a material assembly shall be determined by weight. The recycled fraction of the assembly is then multiplied by the cost of assembly to determine the recycled content value. Mechanical, electrical and plumbing components and specialty items such as elevators shall not be included in this calculation. Only include materials permanently installed in the project. Furniture may be included, providing it is included consistently in MR Credits 7 Certified Wood. ABT Inc s products are made of recyclable material or material that can be recycled. Examples include but are not limited to: Ductile Iron, EPS, Plastic, and Stainless Steel. ABT Inc also makes use of corrugated post-consumer cardboard when shipping products. Corrugated cardboard manufactured from recycled pulp uses around 75% of the energy used in the manufacture of corrugated cardboard made from virgin pulp. Construction sites may eliminate disposal fees by preparing the cardboard for hauler pickups or delivering it (drop-off) to a recycling facility. All of ABT Inc s products 9

MR Credit 5.1: Regional Materials : Increase demand for building materials and products that are extracted and manufactured within the region, thereby supporting the use of indigenous resources and reducing the environmental impacts resulting from transportation. Use building materials or products that have been extracted, harvested or recovered, as well as manufactured, within 500 miles of the project site for a minimum of 10% or 20%, based on cost, of the total materials value. If only a fraction of a product or material is extracted/harvested/recovered and manufactured locally, then only that percentage (by weight) shall contribute to the regional value. The minimum percentage regional material for each point threshold is as follows. Regional Material Points 10% 1 20% 2 Mechanical, electrical and plumbing components and specialty items such as elevators and equipment shall not be included in this calculation. Include only materials permanently installed in the project. Furniture may be included if it is included consistently in MR Credit 3: Material Reuse through MR Credit 7: Certified Wood. ABT Inc. has several manufacturing facilities around the United States thus allowing the product to be within 500 miles of many project sites. ABT Inc s Manufacturing Facilities: Troutman, NC / Statesville, NC 10

ID Credit 1 1.4: Innovation in Design : To provide design teams and projects, the opportunity to be awarded points for exceptional performance above the requirements set by the LEED- Green Building Rating System and/or innovative performance in Green Building categories not specifically addressed by the LEED-Green Building Rating System. Potential Product Application: ABT Inc s goal of providing for safe and sustainable Green buildings will help all Engineers and Architects with strategies, submittals, and drawings to help meet the Innovation in Design points. All of ABT Inc s products 11