BRADDOCK ROAD YOUTH CLUB

Similar documents
PREPARING RESIDENTIAL PROPERTY FORTHE HOUSING HABITABILITY INSPECTION

Typical Finished Basement Details

Permit Posting and Inspection Procedures

Fairfax County, Virginia

TOWNSHIP OF LOGAN 125 MAIN STREET, PO BOX 314 BRIDGEPORT, NJ FAX

RENTAL INSPECTION CHECKLIST. Helpful Definitions: Egress: the free and unobstructed access to the exterior of a habitable space.

BASEMENT FINISH CONSTRUCTION PLANS REFERENCE: 2015 INTERNATIONAL RESIDENTIAL CODE. PERMITS

Pulaski County, Virginia

Inspection Report. Property Address:

Missouri Housing Development Commission HeRO Inspection Form Revised 07/01/2015

PENNSYLVANIA HOUSING FINANCE AGENCY Homeownership Programs Division 211 North Front Street, Harrisburg, PA

HOUSING QUALITY STANDARDS (HQS) INSPECTIONS

Commercial Remodel Permit

The Inspector. Property Inspection Report

RESIDENTIAL BUILDING REQUIREMENTS

ANNEX A.1 TECHNICAL SPECIFICATIONS. Open Call for Tender. No F/SE/10/05. Provision of Building Inspection, Maintenance, Alteration and Repair services

Timberglen Recreation Center Summary

T H E T O W N O F G U I L F O R D V E R M O N T

Applications for building permits will not be reviewed until all of the required information has been submitted.

Equine Barn LLC 213 Crescent Moon Way Canton, Ga Proposal

1.0 Total Points % 2.1 Building Exterior Elements % 2.2 Accessibility % 2.3 Structural %

Alabama Home Inspections

CERTIFICATE OF INSPECTION

Work Order (Bid Form) Upper East Tennessee Human Development Agency

LANSING HOUSING COMMISSION NOTICE OF REQUEST FOR PROPOSALS RFP No

Homeowner electrical wiring guide. Including the 2015 Canadian Electrical Code amendments

CITY OF TACOMA RESIDENTIAL RENTAL INSPECTION FORM AND CERTIFICATE OF INSPECTION

PHYSICAL EDUCATION February 3, 2014

Walnut Creek Mutual Seventy

BUILDING INSPECTION DIVISION Vacant Property Notice Exterior & Interior Inspection Checklist

RESIDENTIAL BASEMENT ALTERATIONS GUIDE

HARPER WOODS BUILDING DEPARTMENT PROCEDURES FOR OBTAINING CERTIFICATE OF OCCUPANCY

Lake Highlands North Recreation Center Summary

City of Edwardsville Safe Housing Program Rental Property Registration and Inspection. Rental Property Guide

CITY OF ANDERSON BUILDING AND CODES 601 South Main Street

General Summary. inspectorroy.com Lake Austin Blvd #10104 Austin, TX Customer Jason Woosley

Rental Inspection Checklist

2008 NEC Guide Lines for Home Owner Doing Electrical Work on their Property

Building Regulations; Construction 11

Gramercy Place Condo Association, Inc.

FRAMING INSPECTION GENERAL

PHYSICAL EDUCATION September 30, 2010

Deficiency ID Qty UoM Priority. K Play Area Requires Impact Resistant Material Ea. 2

Scope of Work Items Needed: Interior:

TEXAS DEPARTMENT OF HOUSING AND COMMUNITY AFFAIRS OFFICE OF COLONIA INITIATIVES TEXAS BOOTSTRAP LOAN PROGRAM. Form 15 Work Write-Up

11/1/2016. Smoke detectors will be furnished by MHA and installed by contractor.

Kelly Village Apartments 3118 Green Houston, Texas 77020

Building Inspection Report

Dear Home Owner: Certificate Holder: Mr. xxxxxx Unit yyyyyy 3410 N. Lake Shore Drive Chicago, IL ADDITIONAL INSURED LANGUAGE:

Sample Home Inspection

City of Santa Monica Building and Safety Division

FINISHED BASEMENT REQUIREMENT GUIDE

Inspection Report. Prepared for: Gil Turiel. Property Address: 545 Briar Run Court Loganville, GA Date: July 17, 2011

Deficiency ID Qty UoM Priority. Concrete Walks Are Damaged And Require Replacement ,000 SF 3

Rental Registration & Safety Inspection Program City of Bellingham

City of Guntersville Residential Building Permit

Columbia County Health Care Center Added Amenities

$ Plan Review Fee when Permit Application is submitted BASEMENT REMODEL BUILDING PERMIT APPLICATION. Status Sticker OFFICIAL USE ONLY

SECTION TEMPORARY FACILITIES AND CONTROLS

Work Write Up / Specification of Repairs HUD DIVISION 1. MASONRY HUD DIVISION 2. SIDING. Toll Free

Thurgood Marshall Recreation Center Summary

EXHIBIT B TO AGREEMENT BETWEEN PENSACOLA HABITAT FOR HUMANITY AND SUBCONTRACTOR. Scope of Work. Plumbing. Division 055 Plumbing Rough

RESIDENTIAL BUILDING PERMIT GUIDE FOR MULTI-FAMILY DWELLINGS

Mills Elementary School Site Summary

KITCHEN REMODELS CITY OF MISSION VIEJO BUILDING SERVICES DIVISON 200 CIVIC CENTER, MISSION VIEJO, CA (949)

COMMERCIAL TENANT IMPROVEMENT PERMIT APPLICATION

DESIGN DEVELOPMENT REVIEW PACKAGE CHECKLIST

IMPORTANT NOTICE- CERTIFICATE OF OCCUPANCY

Inspection Report. Prepared for: Yossi Berg. Property Address: 4925 Diggers Way Sugar Hill, GA. Date: July 20, 2011

Exterior structures (fences, sheds, decks, retaining walls, detached garages) in good condition, no evidence of termite damage or rotted wood

Town of Chili. building department 3333 chili avenue, Rochester, ny (585) fax: (585)

+ IQ/OQ Protocol Installation Qualification/ Operation Qualification

Building Permit Application

City Of Mendota Construction Procedures

ITB-DOT-17/ ER EXHIBIT A Scope of Work Remodeling of the Restrooms at Fort Myers Operations Center

AllSpec Services, LLC Ronneby Road NE, Foley, MN (320) Nancy Scott (320) fax

BUILDING DIVISION 120 Malabar Road, S.E., Palm Bay, FL Phone: (321) Fax: (321)

Basic Requirements for Residential Electrical Installations

Property Inspection Report

FAIRA TRANSPARENCY REPORTS Robert Wayne Dr, Pasco, WA July 18 th, 2017

PHASE I ACADEMIC BUILDING CORE RENOVATIONS RCNJ Project No C

A UCC Building permit is not required for the exceptions listed below for COMMERCIAL application: (403.42): Building construction for the following:

APPLICATION FOR FINISHED BASEMENT PERMIT

1.0 Total Points % 2.1 Building Exterior Elements % 2.2 Accessibility % 2.3 Structural %

Inspection Report. Prepared for: Tonia Mann. Property Address: 2557 Briar Valley Way Dacula, GA Date: March 01, 2012

Homes Across Nebraska Are Being Built to the Latest National Energy Standards Is Yours?

Residential Basement Finish Guide

Sonoma County Energy Independence Program APPENDIX A ELIGIBLE IMPROVEMENTS

REO Client Safety Hazard Requirements

Property Condition Assessment

Basement Build-Out Guidelines

INFORMATIONAL HANDOUT FOR FINISHING A BASEMENT

Inspect Hawaii. Property Inspection Report

3D Home Improvement and Inspection Services, Inc

Property Inspection Checklist

Basement Finish/Remodel Permit Information Revised 10/2/18

Basement Finish/Remodel Permit Information Revised 10/2/18

Inspection Report. Prepared for: Tonia Mann. Property Address: 56 Riverview Place Douglasville, GA Date: September 19, 2012

FINISHED BASEMENT REQUIREMENT GUIDE

Continuing Certificate of Occupancy Pre-Inspection Checklist

Transcription:

BRADDOCK ROAD YOUTH CLUB P.O. Box 2084 Fairfax Virginia 22031 July 25. 2015 Re: Request for Proposals for Kings Park Shopping Center Community Center Dear Prospective Contractor: Braddock Road Youth Club (BRYC) requests interested parties submit priced bid proposals for electrical, plumbing, and habitability work at the Kings Park Community Center, 8940 Burke Lake Rd, Springfield, VA 22151. BRYC is a non-profit charitable organization and is exempt from federal tax under the Internal Revenue Code 501(C)(3) effective August 1966. Donors may deduct contributions to BRYC under section 150 of the Code. As such, responses to this RFP may include prices to be paid by BRYC and value of work and material donated to BRYC. Advance payments for labor or materials will not be made by BRYC. BRYC will make partial payments for material properly receipted and received on-site (Community Center), within 15 days after receiving and approving an invoice for material. The successful bidders (contractors) shall obtain permits as required by Fairfax County. Originals of Building Permits shall be displayed on the premise and 1 copy of each permit shall be provided to BRYC. All work shall be complete, including final inspection by the County, as stated in the Scope of Work. Bidders may propose to complete one, more than one, or all of the items described in the RFP. Each successful bidder (contractor) shall provide all labor and material to complete the requirements of the Scope of Work. Bid offers shall include estimated cost of material and estimated cost of labor to perform each scope of work items. BRYC may choose to purchase materials and provide them to the bidder. Soccer Football Softball Volleyball Lacrosse Cheer Basketball Rugby

BRYC retains the right to cancel any scope of work item. Point of contact for this project is Craig Willett at 703-980-7820 or via email at jcwillett@verizon.net. Sincerely, Craig Willett Project Manager Braddock Road Youth Club

Scope of Work Facility Description: The Community Center is located on the second floor of Kings Park Shopping Center, 8940 Burke Lake Rd, Springfield, VA 22151, between Zinga and Hunan West. The Center is accessed through a six-foot wide stairwell, with double entrance doors at street level and double doors at the top of the stairs. The Center contains roughly 2200 square feet of area (figure 1), including a 9 x11 entrance vestibule, a mens and ladies bathroom, each occupying 9 x 9.5, a kitchen occupying 8 by 12, a storage room occupying 9 x 15 and a main hall occupying 44 x 39. The bathrooms have two toilet stalls, and two sinks. The men s bathroom also has rough-in plumbing for 1 urinal. The kitchen includes a refrigerator, and cabinets along the back wall with sink, oven and range hood. The main circuit panel is located in the kitchen. The storage area contains an electric hot water heater, supplying bathrooms and kitchen with hot water service. A second exit is provided through a single door at the back of the main hall, a small foyer, and a metal stairs open to the weather to ground level. Engineering Drawings: Complete no later than 14 August 2015 1. Provide is/was markups on customer provided facility drawing of all electrical equipment and services modifications, fire and safety equipment and services modifications, and plumbing equipment and services modifications. Electrical: Complete no later than 14 August 2015 1. Electrical circuits being worked shall have main panel circuit breaker shut off and breaker tagged out with visible warning to leave off. 2. Inspect and replace circuit breakers as needed. 3. Replace nine (9) 120 VAC duplex receptacles with new 120vac, 15 amp, duplex receptacle and new nylon cover plate in assembly room. Test each receptacle for correct continuity and grounding. Replace two (2) 120 VAC duplex receptacles in kitchen, one (1) over sink and one (1) on side wall, with two (2) 120 VAC, duplex, Ground Fault Interrupt (GFI) and nylon cover plate. Install identification label on GFI receptacle body. 4. Install one (1) new 120V AC circuit from circuit panel to office/storage room on wall adjoining kitchen, along with two (2) 120vac, 15 amp, duplex receptacles and new nylon cover plates. 5. Remove and replace three (3) ceiling-mounted ventilation fans: kitchen (1), men s bathroom (1), ladies bathroom (1). 6. Remove six (6) lighted EXIT signs and turn over to BRYC. Install six (6) lighted exit signs with battery backup in similar location, including three (3) lighted exit signs with emergency lighting with battery backup. The EXIT signs with emergency lighting shall be

installed, 1 each at the front and back entrance doors, and 1 at the top to the internal stairwell, illuminating the stairwell. 7. Remove the 15 fluorescent lighting fixtures in the main hall, three globe incandescent fixtures in the foyer, and two ceiling fixtures in the office/storage room. Provide at least 500 lumens of illumination throughout the main hall, foyer, and office/storage room using 2 x4 recessed, 4-bulb fluorescent lighting fixtures, with soft cool white illumination, and diffuser covers, mounted into the dropped ceiling frame. In the assembly room, connect each new lighting panel to the existing power supplies and existing 3-gang wall switch, such that the back third, middle third and,front third of the lights are controlled by one the three existing wall switches. Install the foyer and office/storage room lighting panels to existing power sources and wall switches. 8. Receive final County Inspection for electrical work items (1) through (7). Plumbing: Complete no later than 14 August 2015 1. Identify location of permanent clog in main drain pipe. Replace pipe as needed to ensure adequate flow from kitchen and bathroom fixtures. This task requires coordination with Zinga restaurant and must be performed when the restaurant is not open. 2. Shut off water supply to urinal service. Provide means to catch any water that may leak on bathroom floor to prevent water seepage into ceiling of first floor business. Provide and install one (1) commercial quality urinal in men bathroom. Install a shut off valve to existing water service between service and urinal. Test all water connections and drains for tightness and leave in an operational condition. Contractor shall be responsible (at own cost) for any damage to commercial spaces on first floor caused during urinal installation. 3. Receive final County inspection. Habitability: Complete no later than 28 August 2015 1. Provide and install reflective film to the inside of twenty (20) windows. Each window has a single glass pane without mullions. Sixteen (16) windows are nominally 35 wide and 37 high. Four (4) windows are nominally 44 wide and 37 high. Glass shall be cleaned, free from all foreign material. Installed reflective film shall be adhered flush to the glass pane, frame to frame, without wrinkles or air bubbles. For all tasks: 1. Community Center shall be cleaned free of construction debris daily, and tools removed and unused material stacked in back of foyer. Plumbing fixtures that are not operational shall be tagged not in service with a sign visible and obvious to a user.

2. At completion of installation work Community Center shall be made free of work debris, and made ready for inspection. After final inspection the Community Center shall have all ceiling panels in place, water service operational, not in service signs removed and otherwise made ready for customer occupancy. Labor hours to be submitted with offer: 1. Provide a cost per labor hour for electrical work and plumbing work that will be used as a basis for negotiating change orders work labor cost. 2. Provide cost escalation percentage over purchase price for new material needed in a change work order.