Sewage Collection System and Treatment Facility in Brgy.Sabang, Puerto Galera. A project of the Municipality of Puerto Galera

Similar documents
An Opportunity to Invest in Puerto Galera, Mindoro Oriental Sabang Sewerage System and Wastewater Treatment Facility

WOMEN IN ILBM : THE PHILIPPINES EXPERIENCE

National Water Demand Management Policy

Keywords separate, combined, Manila Water Company, sewerage service, Metro Manila

State of Florida Department of Community Affairs Areas of Critical State Concern Implementation Status Report Apalachicola Bay Area

INCENTIVES FOR MARINE PROTECTED AREA MANAGEMENT IN THE PHILIPPINES: RATING, INFORMATION AND USER FEES

National Dialogue on Water Environment partnership in Asia

CDIA SAM SON CITY. Pre-feasibility Studies: Sam Son Water Supply and Wastewater Treatment facilities

LAGUNA LAKE DEVELOPMENT AUTHORITY. Introduction to

Context Laguna de Bay Region and LLDA Environmental Challenges and Climate Change Impacts Laguna de Bay Spatial Development Master Plan Sample Menu

Figure 1. Danang coastal use zoning scheme with ten functional zones, including a tourism development zone. east sea. Han r iver. Cau Bien river ^ ; ;

Surface Water Improvement and Management (SWIM) Plan Development

THE MANILA BAY EXPERIENCE

Environmental and Social Considerations in Detailed Planning Survey. (Technical Cooperation for Development Planning)

COUNTRY REPORT: PHILIPPINES

VILLAGE OF BELLEDUNE

Englishman River Program Status Update Prepared For: Drinking Water and Watershed Protection Technical Advisory Committee February 14, 2012

PROPOSAL. Strengthening Compliance Assistance Efforts through Established Environmental Compliance Assistance Centers

Water Recycling Facility Project

SECTOR ASSESSMENT: WATER AND SANITATION. 1. Sector Performance, Problems, and Opportunities

COMPLIMENTARITY OF SENSOR-BASED MEASUREMENTS AND COMMUNITY PERCEPTION FOR MONITORING AND MANAGEMENT OF SEAWATER QUALITY

Palawan State University, Puerto Princesa City, Philippines 2. Eastern Visayas State University, Leyte, Philippines 3

Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Report No.

Regulatory Requirements

FACT SHEET Barangay Cagsao, Municipality of Calabanga, Camarines Sur Date updated: October 10, 2014

Waste Water Treatment Plant Location Options. Presented by: Ben Greenough, Superintendent of Public Works Date: April 3, 2017 In Camera Meeting

Planada Community Services District Municipal Service Review

SANITARY SEWER OVERFLOWS AND THE TEXAS COMMISSION ON ENVIRONMENTAL

Project Name Turkey-Cesme-Alacati Water Supply and Sewerage project (

1. Philippines Coastal & Marine Resources: An Introduction

East Asia Urban Sanitation Review

Wastewater Management in Metro Vancouver. Margaret Morales 14 March 2011 PLAN 597

Estimating the Delaware Inland Bays Watershed Seasonal Population Using Wastewater Flows. By: Brittany Kiessling

Wastewater Audit Follow-up

Ms. Lynette T. Laroya. Department of Environment and Natural Resources

Philippine PPP Program SDG-6 (Water & Sanitation) and SDG-11 (Sustainable Cities)

Wastewater Collection. (Sewer Alternatives)

Small System Project Planning

SECTOR ASSESSMENT (SUMMARY): WATER SUPPLY AND OTHER MUNICIPAL INFRASTRUCTURE AND SERVICES (WATER AND WASTEWATER)

UV Disinfection for a Municipal Wastewater Lagoon Effluent No Prior Filtration Needed? Wayne Wong, M.A.Sc., P.Eng., PMP

The Laguna de Bay and Its Tributaries Water Quality Problems, Issues and Responses

City of Ottawa Water, Wastewater and Stormwater Rate Structure Review

Additional Information Requirements for Wastewater Treatment Projects

SECTOR ASSESSMENT (SUMMARY): WATER SUPPLY AND OTHER MUNICIPAL INFRASTRUCTURE AND SERVICES

ESTIMATION OF THE TOTAL ECONOMIC VALUE OF IMPROVING WATER QUALITY IN URBAN AREA (CASE STUDY ON METRO MANILA WATERBODIES)

Modernizing sewers and wastewater systems with new technologies

Case Study UNDERGROUND SEWERAGE SYSTEM ALANDUR. Sewerage

Recovering a Failed Sand Filter Wastewater Treatment System

Value Proposition & Investment Opportunities

Restoring the Long Island Sound While Saving Money

Incorporating Ecosystem Services into Coastal and Watershed Management

Implementing an Ecosystem Approach to Fisheries in Small Scale Tropical Marine Fisheries in the Philippines

South Coast Water District

City of Wimberley. Public Hearing January 8, Proposed Central Wastewater Project Modifications

The Philippines Boracay Environmental Infrastructure Project

Doheny Desalination Project. Technical Studies. October 31, 2017

Decentralized waste-toenergy project in Naga City

City of Medora, ND Wastewater Infrastructure Needs Assessment November 2012

Japanese ODA Loan. Ex-Ante evaluation

Enhancing Asset Management and Customer Relationship with Geospatial Technology

The Laguna Lake Basin. 8 th NARBO IWRM Training Programme MAS Fabric Park, Thulhiriya, Sri Lanka 4 December 2013

SOUTH COAST MARINE PARK

Public Sewer System Informational Meeting

SUMMARY OF COMMENTS/RECOMMENDATIONS

Energy Use and Climate Action Overview

Rehoboth Beach Effluent Disposal Study. Evaluation of Wastewater Discharge Alternatives. Center for the Inland Bays STAC Meeting January 13, 2006

2018 Water and Wastewater Budget Summary

Thames Water Catchment Management Trial

UPGRADING GAZA WASTEWATER TREATMENT PLANT. Gaza City is populated with 550,000 inhabitants and it forms 45% of the Gaza strip population.

2019 Annual Review of Sewer Rates and Environmental Updates Under the Sewer & Watercourse By-law

Strengthening Governance Partnerships at the Local Level and Improving Fisheries Management: Case Study from Northern Mindanao, Philippines

QUARTERLY OPERATIONS REPORT 3 rd Quarter, January March 2018 WASTEWATER PERMIT COMPLIANCE. Page 1 EFFLUENT MONTHLY AVERAGE INFLUENT MONTHLY AVERAGE

Decentralized & Onsite Wastewater Solutions

Alexandria Coastal Zone Management Project

City of Crosby, ND Municipal Infrastructure Needs Assessment September 2012

What is a stormwater utility fee?

Opportunities in Fecal Sludge Management for Cities in Developing Countries: Experiences from the Philippines

ECONOMIC ANALYSIS: PROJECT LOAN

Appendix 3: Documentation of Expenditure Functions - Wastewater

Introduce Market Mechanism into Urban Water Management Establish Public-Private Partnership

Review of on-site and communal water and sanitation systems for remote communities

Greater Dublin Drainage Project

czc= r&:ob ;0_ City of Richmond Report to Committee J2f J2( ""'"::::>

CERTIFICATION AND FINANCING PROPOSAL

Baltimore City Department of Public Works

Figure 1: map of East Asia showing land masses and water bodies. Source: PEMSEA

Combined Sewer Overflows July 2012-December 2013

QUARTERLY OPERATIONS REPORT 4 th Quarter, April June 2018 WASTEWATER PERMIT COMPLIANCE. Page 1 INFLUENT MONTHLY AVERAGE EFFLUENT MONTHLY AVERAGE

ON-SITE WASTEWATER MANAGEMENT POLICY

CHAPTER 8 UTILITIES WATER SYSTEM. Summary & Recommendations

APPENDIX C. Public Consultation Centre (PCC) Displays. Appendix C1 PCC#1 Appendix C2 PCC#2 Appendix C3 PCC#3

Local Water Supply Planning - North Carolina Division of Water Resources

2011 SEWAGE TREATMENT PLANT ANNUAL REPORT

Greening Growth Through HRD Interventions

Wastewater Collection System

CARTAGENA, COLOMBIA. Case Study (Water) Project Summary:

1. SOURCES OF NATIONAL LEGISLATION (PRIMARY AND SECONDARY LEGISLATION)

DESIGNING LAGOON-BASED WWTP FOR <1 MG/ L AMMONIA (AND TN) IN <34 F WATER. Nick Janous Regional Manager

Surface Water Improvement and Management (SWIM) Plan Development

Sewerage and Wastewater Management in Cambodia

Transcription:

Sewage Collection System and Treatment Facility in Brgy.Sabang, Puerto Galera A project of the Municipality of Puerto Galera

Why do we need a sewage system? Brgy. SABANG, PUERTO GALERA, 2006 FECAL COLIFORM GEOMEAN RQ Seashore Resort 883.69 4.42 Near Sabang Inn 10,945.93 54.73 Pavillon Floating bar 2,504.30 12.52 Triton Diver 48,929.66 244.65 Mabuhay Resort 174.64 0.87 La Laguna Beach Club 59.91 0.30 Source: Department of Environment and Natural Resources Water Quality Monitoring

Current Situation

Current Situation

Current Situation

What are some of the risks of doing nothing about sewage pollution? Increased health risk (e.g., diarrhea; typhoid; polio; hepatitis) Further deterioration in river water and coastal water quality (e.g., reduced oxygen; algae build-up; odor; transparency) Further deterioration in quality of habitats (e.g., corals, seagrass) Decline in fisheries HIGH

What are the costs of doing nothing about sewage pollution? Loss of income due to illness/death Doctors/drugs/hospital costs Tourists go elsewhere tourist industry declines Tourism-related livelihoods and jobs decline Fishers income reduced Standard of living reduced HIGH COST

Puerto Galera is an Important Model a small municipality, classified as third class with residents of around 28,035, with limited resources to deal with the issues of marine pollution and solid waste Yet - is a significant contributor to the country s tourism industry. Strategically located in the world center of marine biodiversity A world-class diving haven with 37 dive sites Puerto Galera Bay is one of the world s most beautiful bays and the first in Asia Annually hosts a million local and foreign tourists CONCERN FOR THE ENVIRONMENT

Goal To protect the coastal and marine environment and natural resources of Puerto Galera from land-based pollution

The Sewerage Project Objective Consistent with the vision of the CRMP 2006-2010, to provide excellent sewerage infrastructure supporting high quality tourism and abundant fisheries, in an integrated manner

ROAD MAP Study Tour and site visit of Mayor - Jan Study tour/site visit of SP members - Feb Action Planning April 2006 2007 MOA March Willingness to Pay Survey, Jul Project Study August Site Identification and Legal Due Diligence, Feb PENRO/ CENRO Site Visit and Validation March Meeting with DENR Sec March CRMB Meeting Project Presentation March MOA April/ Sept Stakeholder Consultation EUF Ordinance Development, Aug 06 Jan 07 SB -EUF Ordinance Feb SP Committee Hearing- EUF Ordinance -Mar CRMB Meetings EUF IRR Drafting, Feb? S t a k e h o l d e r I n f o r m a t i o n, E d u c a t i o n a n d C o m m u n I c a t i o n

Conclusions 1. The tourism industry is vital to the economic growth of the municipality, as such it is ECOTOURISM based; 2. Thus, a comprehensive approach is required to address sustainable development program for tourism in Puerto Galera; 3. And, the proposed sewage collection and treatment project is a critical component of the required environmental infrastructure;

Conclusions 5. No single sector or source of funding in Puerto Galera is capable of financing the entire investment and operating cost of the project; 6. For the project to be viable and affordable, a combination of revenue sources need to be tapped, including the central budget of the municipal government, the (potential) users of the sewage services, the tourists who benefit from improved environmental quality, and others; 7. A public-private partnership arrangement offers the opportunity to tap the technical and management skills of the private sector, while gaining access to financing at market-rate.

The Sewage Collection System and Treatment Facility Project Project Coverage 124 tourist resorts (95%) 550 commercial establishments (88%) 2,349 households (53%) 14,100 population (53%) 49.5 km 2 land area (20%) Three Hotspots - Three individual sewerage systems

Estimated Costs Capital Costs: Sewage Collection and Treatment Zone 1 Sabang/Sinandigan (55% of the tourists): PhP 107.1M* Zone 2 San Isidro/Aninuan (37% of the tourists): PhP 77 M Zone 3 Sto Nino/Poblacion (3% of the tourists): PhP 33 M Total Capital Cost : PhP 217.1M *includes cost of the land

Estimated O&M Costs Annual Operation and Maintenance Costs Zone 1 Sabang/Sinandigan (55% of the tourists): Zone 2 San Isidro/Aninuan (37% of the tourists): Zone 3 Sto. Nino/Poblacion (3% of the tourists): Total O&M Cost (year 1): PhP12.7 million PhP8.9 million PhP3.6 million PhP25.2M

Public-Private Partnership Arrangement PPP Objectives Access to innovative technologies, management and operating arrangements Access to capital Reduced risk in cost overruns and time delays design and construction Reduced risk in operating facilities, including operating costs, and violation of required effluent standards Opportunity to build a Corporate Structure with a private partner Ownership of facilities Control over tariff structure and fee collection

Sewage Collection System and Treatment Facility: The Sabang System Attracting Private Sector Participation

Fast Facts on the Sabang System Area Covered Estimated Volume of Sewage Barangay Sabang, Big Lalaguna, Small Lalaguna 3,500 m 3 /day (peak tourist season) Length of Sewer Site of treatment facility Total Investment Cost 4,683 meters, with 4 pumping stations Sitio Big Lalaguna, Sabang PhP 107.1 million

Treatment Facility Site 3,000 sqm undeveloped area in Sitio Big Lalaguna, Sabang a perenially flooded requiring use of some low cost options such as lagoons, polishing ponds and engineered reed beds approximately 10 meter in elevation from the shoreline, representing the needed lift in hydraulic slope for resorts close to the shore.

TWG Executive Order No. 13 Created the TWG-PPP (technical working group-public private partnerships) to study the project and the various procurement processes in order to make appropriate recommendations to the Local Chief Executive and the BAC Membership 2 Councilors from the SB Municipal Engineer Municipal Environment and Natural Resources Officer Municipal Planning and Development Officer Municipal Tourism Officer Municipal Health Officer Councilor from Bgy. Sabang Representatives from the Private Sector and Resort Establishment

Design Considerations Pumping stations Buffer area Total No. of manholes Total length of pipes Pipe sizes a. Main connection b. House connection Sewerage system operation Two (2) pumping stations in Sabang, One (1) in Big Lalaguna near the proposed treatment facility site, and One (1) in Small Lalaguna sufficient buffer area between the plant and the existing community 36 4,683 linear meters from 200mm to 450mm diameter house from 100mm to 150mm diameter combined conventional and modified sewer system based on the actual condition and terrain of the area

Estimated Costs Construction costs of the treatment facility Construction costs of Sewerage and Collection System including outfalls - O&M TOTAL P 52.6 M P 41.8 M P 94.4M P 12.7 M Cost of Land (LGU)

BIG LA LAGUNA SMALL LA LAGUNA EXISTING SEPTIC TANK UPGRADED TO PUMP STA. P1A SABANG Layout of the proposed sewerage system 1 S-01 ALTERNATIVE 4 SEWERAGE SYSTEM PLAN SCALE 1 : 2000 METERS.

Project Challenges 1. Capital funds to design and construct the system 2. Sources of revenue to operate the system 3. Project development and management capacity

Access to Capital Financing 1. Development banks (e.g., DBP; LandBank) or commercial bank (e.g., LGU-GC) 2. Private investor(s) (e.g., holding company) 3. Private partner (e.g., BOT, joint venture, etc.)

Financing and Investment Attractiveness A project of the Municipality of Puerto Galera

LGU Sources of Revenue For Repayment and O&M Costs 1. LGU: Central budget of the LGU 2. Users of Sewerage Services (Households and Establishments based on User/polluter WILL pay principle): thru - a. Connection Fee (one-time) b. Sewerage Fee (monthly) c. Tipping Fee (per discharge of siphoned wastes from septic tanks from other barangays 3. Tourists: Environmental users fee Other Options 4. Wastewater Users: fee from use of wastewater 5. Landowners: special taxes on land to finance infrastructure

Revenue Estimates 1. Local Government Support: Increase/commit revenues to cover a portion of the annual costs (i.e., the management costs of the proposed facility - PhP1.9 to 2.6 million/year for the first 10 years)

Revenue Estimates 2. User Fees for Sewerage Services: Users pay a fee, based on water usage, willingness and ability to pay The goal is to cover the annual O&M costs of the Sabang facility (i.e., PhP12.5 million in year 1) Simple Calculation* Households (15PhP/person/month): Tourist establishments (PhP12,500/month): Commercial (PhP1,500/month): Potential revenue (Year 1) PhP 0.43 million PhP 9.30 million PhP 4.3 million PhP14.03 million

3. Tourists/EUF: Revenue Estimates EUF reviewed annually to determine efficiency, effectiveness and reasonableness of the fee With EUF set @ Php50/tourist arrival, 280,000 tourists would generate the required Php14 million per year for the Sabang system

Project Development and Management 1. Technical skills to develop, plan and implement a sewage collection and treatment project 2. Development of a business plan/access the necessary capital 3. Experience in operating a sewage collection and treatment system in accordance with the national and local regulations and meeting the community s expectations 4. Experience in a corporate approach to managing a sewerage facility

Project Development and Management Forge a partnership with the private sector, to access experience and skills in planning, design, construction, operation and management of the facility Number of models (and risks) when working with the private sector: BOT DB + management contract (+ Joint venture) DBFO + Joint venture

Conclusions: The Way Forward 1. The local government, users of the sewerage service, and the tourists who will benefit from the service have a moral responsibility to pay; 2. A variety of fee schedules are possible, but due consideration to fairness (i.e., use of the services) and ability to pay is required; 3. By sharing the costs across the three sectors, the project is affordable and doable within a 10-year timeframe.

Conclusions: The Way Forward 4. The PPP approach provides the municipality with access to technical and management skills, experience and financing of the private sector to implement a cost-effective and efficient project; 5. The PPP process is transparent and interactive, and provides stakeholders with due diligence assessments of capital and operating costs, project risks, and roles and responsibilities for managing risks;

Examples Subic Bay

Examples Punta Fuego