BIM V.1 Tables A1

Similar documents
BIM PROJECT EXECUTION PLAN FOR [PROJECT TITLE]

BIM Execution Plan Template. CPG-DGN-PLN-085 Revision 0 08/08/2016

ADDENDUM TO USC BIM GUIDELINES VS.

Building Information Modeling (BIM) Execution Plan

Saurabh Gangwar 2018 Project Management Symposium

PROJECT NAME. Duke University. Architect (Specify Design Vs. AOR If Multiple) Construction Manager. Civil Engineer. Structural Engineer

BIM: BIM uses BIM Uses extracting values from your model

BIM Execution Plan. Copyright 2009 Rights Reserved - The Trustees of Indiana University and SHP

BIM Design & Construction Requirements Indiana University

Overview of the BIM Execution Plan... 1

ACEC CAD AND BIM FOR SENIOR FIRM LEADERS

Indiana University. Vice President for Capital Planning and Facilities

Building Information Modeling to Facilities Information Management and Beyond

BIM Design & Construction Requirements. Follow-up Seminar. September 10,

1. PROJECT BIM BRIEF BIM 1.1 GENERAL. Cross references. 1.2 Application of this Project BIM Brief. 1.3 BIM Project Team

Alberta Infrastructure. Digital Project Delivery Building Information Modelling Design-Builder Requirements

Alberta Infrastructure. Digital Project Delivery Building Information Modelling Consultant Requirements

BIM EXECUTION PLAN PROJECT INFORMATION PROJECT NUMBER

Erie County Medical Center Corporation. Addendum Number 1 to RFP # 21728

BU21079 Building Information Modeling to Facilities Information Management and Beyond

W205 BIM Best Practices December 9, 2008 Kurt D. Maldovan

1.0 ABOUT THE NU GUIDELINES

Attachment 04 Substantial and Final Completion Approval Form. Project Description Project # Date of Completion Permit # Project Manager Phone #

BIM Standard and Specifications for San Mateo County. Project Development Unit

APPENDIX D CONSTRUCTION PHASE CRITERIA

Owner has determined that this project is a Major Capital Renovation project as that term is defined herein.

MIT Design Standards. BIM Execution Plan v6.0

APPLICABILITY/ACCOUNTABILITY:

Construction Administration Process

6/10/2018. Building Information Modeling Overview. Pirtle s History with Building Information Modeling (BIM)

Request for Proposals for: Construction Management Services For The ADDISON PUBLIC LIBRARY INTERIOR RENOVATION

INTEGRATED LIFECYCLE MANAGEMENT BIM/VDC REQUIREMENTS IMPLEMENTATION PLAN

ADDENDUM. Ocean County College Purchasing Department. MEP & Envelope Commissioning Services Ocean County College Bid # 16/17 Q-12

Delivering Building Information to Owners Birgitta Foster Vice President, Facilities Integration VDCO Tech, Inc.

Sylvia Kendra Associate Director Facilities Knowledge Management. January 11, 2017

MANAGING THE CONSTRUCTION OF A NEW TXDOT FACILITY

APPENDICES DESIGN REQUIREMENTS. Appendix A. Performance Criteria for Design Projects

Attachment 8 Statement of Work (SOW)

Instructions for Submission of Contractor's State, ment of Qualifications (SOQ) UF Bid Number ITB17KO-107 Whitney Research Village

Office of Physical Plant Case Study

RECITALS. 1. District and Consultant previously entered into the Contract.

HYBRID COLLABORATIVE DELIVERY TEAM/ INTEGRATED PROJECT DELIVERY DOCUMENTS SUBMITTAL PROCESS

Building Information Modeling (BIM) Project Delivery Standards (PDS)

Increasing efficiency through the project lifecycle by applying BIM

Strategic Revit MEP Object Organization From BIM to Asset Management

PROJECT DESIGN GUIDE A02 DESIGN RESPONSIBILITY MATRIX

Introduction. Definition Benefits Applications Costs/ROI Getting Started Examples Resources

PLAN SUBMITTAL GUIDELINES FOR THE HYBRID COLLABORATIVE DELIVERY TEAM

Facility Basics for Bond Project Communications

VIRTUAL DESIGN AND CONSTRUCTION SERVICES

Commissioning Guide. Transportation and Works Building Design and Construction Division

BIM-MEP AUS 2013 FORUM. Efficiencies Gained through BIM; from Design to Construction. Martin Howland

THE BIM-BASED INFORMATION INTEGRATION SPHERE FOR CONSTRUCTION PROJECTS

Manage Deliverables - Construction Step 6 February 2015

IV.E.8 - BIM Standards

Town of Burlington, MA Request for Qualifications Owner s Project Manager (OPM) Services for the Design and Construction of DPW Facilities

Framing the Issues on Construction Health & Safety & Safe-BIM TM

GUIDELINES FOR TERM PROJECT TERM PROJECT

Owners- How to contract for BIM deliverables and actually get what you want. Birgitta Foster & Cindy Baldwin

Introduction to the National BIM Guide for Owners

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 03/29/2017

How to Prepare a Request for Qualifications (RFQ) Response for A/E & CMR Solicitations

General Contractor Regulatory Agency. [Info] Construction budget is defined as all hard costs including overhead and profit

BIM Management Training Course One Day Course on the fundamentals of BIM Management. ciobacademy.org

Building Information Modeling (BIM) for operational management of facilities

TOWN OF WINTER PARK REQUEST FOR PROPOSAL FOR CONSTRUCTION MANAGER / GENERAL CONTRACTOR

AUGUST 1, 2017 VA BIM STANDARD BIM MANUAL V2.2

EL PASO WATER - PUBLIC SERVICE BOARD REQUEST FOR SUBMITTALS RFS June 27, 2017

The Sterling & Francine Clark Art Institute

Deliver higher value and maximize lifecycle building performance to support VA s mission to deliver excellent medical service.

BIM TECHNOLOGY THE IMPACT ON THE PLANNING AND UTILIZATION PHASE HDR TMK, all rights reserved.

Promoting better business outcomes through the use of BIM and digital technologies.

Measuring the Impact of BIM in Design-Bid-Build

Section 08 CONSTUCTION DOCUMENTS TABLE OF CONTENTS

Facilities Management

Program Lifecycle Methodology Version 1.7

UNIVERSITY OF CALIFORNIA, SAN DIEGO

Guidance for. Employers Information Requirements

TABLE OF CONTENTS. Appendix A DoDEA UFC High Performance Sustainable Building Compliance Checklist...9. Version 2.0 August2017 Page 2

CONSTRUCTION MANAGEMENT REQUEST FOR PROPOSAL EAST RUTHERFORD PUBLIC SCHOOLS

The BIM implementation in Hong Kong s construction industry by CIC is taking both:

The Sterling & Francine Clark Art Institute

Autodesk MEP Engineering Solutions. Engineer for energy efficiency.

APPENDIX J TABLE OF CONTENTS. Bidding Requirements, Contract Forms and Conditions of the Contract

ATTACHMENT D SCOPE OF SERVICES

Real Estate. Standard Version version 2.0

PROJECT DESIGN GUIDE D02 COMMUNICATION PLAN

Building Tomorrow Today: Spotlight on Autodesk Navisworks & BIM 360 Glue

Procedure Yes; No; greater than

Bronx Mental Health Redevelopment Project

A Guide On. Contractor Pay App & Consultant Invoice Process (PMT) Prepared by e-builder 7 th February 2018

This Addendum is directed to all prime Contract Bidders, and all others to whom Drawings and Specifications have been issued by the Architect.

GENERAL CONTRACTOR PRE-QUALIFICATION FORM

Request for Qualifications (Criteria Architect/Engineer, Architect/Engineer) State of Ohio Standard Forms and Documents

23/01/1438. Management of BIMProject: BIM Management Plan. Mohamed Mohsen Kamel. Prof. Dr. Emad Elbeltagi

Association of Energy Services Professionals (AESP) Request for Proposal Market Research Services

I. INTRODUCTION. Purpose: Design Guidelines Components: Introduction To Design Process and Standards

Absolute Energy Raters Commissioning Plan Outline Template

PLANON CONNECT FOR BIM. For the successful use of BIM data in Facility and Property Management

1.1 IT Requirement of Employer - MMRCL Digital Project management platform to be used for PMRCL

Transcription:

APPENDIX FORMS: Note: All forms to be completed by project Architect/Engineer in conjunction with Illinois State University. APPENDIX B1: PROJECT INFORMATION 1. Owner: Illinois State University 2. Name: 3. Location and Address: 4. Contract Type / Delivery Method: 5. Brief Description: 6. Existing Conditions: 7. Additional Information: Information ISU FP&C Number: Number ISU Number: AE Number: GC Number: Autodesk Software Version Current 8. General Schedule: Include BIM milestones, pre-design activities, major design reviews, stakeholder reviews, and any other major events which occur during the project lifecycle. See Professional Services Agreement for official project schedule. PROJECT PASE/ MILESTONE ESTIMATED START ESTIMATED COMPLETION PROJECT STAKEOLDERS INVOLVED PROGRAMING SCEMATIC DESIGN DESIGN DEVELOPMENT CONSTRUCTION DOCUMENTS CONSTRUCTION CLOSEOUT LIFECYCLE A1

APPENDIX B2: KEY PROJECT CONTACTS Contacts for this Role Organization Contact Name Location E-Mail Phone Manager Manager Manager AE Firm Contractor ISU BIM Coordinator ARC Owners Representative Commissioning APPENDIX D1: PROJECT GOALS / BIM USES Major BIM Goals & Objectives: Priority igh/med /Low M Goal Description Provide ISU a LOD 300 model including Arch,, and for construction Coordinate all disciplines through the design/construction process to reduce RFI s Reference all building components per the Illinois State University BIM guideline Deliver an As-constructed model for integration into future Lifecycle management Phase Lifecycle Lifecycle Improve visualization of design intent using BIM design principles Design A2

APPENDIX D2: Mandatory Uses of BIM Model for this project: X Plan X Design X Construct X Operate X Programming X Design Authoring Site Utilization Planning X Building Maintenance Schedule Site Analysis X Design Reviews X System Building System Analysis 3D 3D Asset Management Structural Analysis Digital Fabrication Space Management/Tracking Lighting Analysis 3D Control and Planning Disaster Planning Energy Analysis X Record Modeling Record Modeling Mechanical Analysis Sustainability (LEED) Code Validation X Cost Estimation X Cost Estimating X Cost Estimating Cost Estimating Scope and objectives should determine the proper application of modeling and weigh all factors including time, cost, and effort vs. net benefit. APPENDIX G1: BIM Meeting Procedures: MEETING TYPE PROJECT STAGE FREQUENCY PARTICIPANTS LOCATION BIM Requirements Kick- Off BIM Execution Plan Demonstration Programming Once ISU/AE/CONST ISU Programming Once Responsible Party ISU Design DD/SD/CD Bi-Weekly Responsible Party ISU Constructability Bi-Weekly Responsible Party ISU A3

APPENDIX G2: COLLABORATION PROCEDURES Model & Document Delivery Schedule of Information Exchange for Review,, Submission and Approval: INFORMATION EXCNAGE Design Intent * SENDER AE Firm GM/GC RECEIVER ONE-TIME or FREQUENC Y DUE or START MODEL MODEL SOFTWARE Bi-Weekly ARC Revit Bi-Weekly Revit TYPE Bi-Weekly Revit Bi-Weekly STRUC Revit Bi-Weekly CONST Navisworks.NWD 2D TYPE Bid Distribution Bid Bid CONST Revit.NWC As Required CONST ARC Revit.RVT As Required CONST Revit.RVT As Required CONST STRUC Revit.RVT Submittals As Required CONST NA NA * In addition to the BIM model file types, documents will be issued in 2D in PDF format. A4

APPENDIX N1 Model Element Author Table: 1. The Model Element Table indicates the LOD to which each Model Element shall be developed at each identified milestone and the Model Element Author. 2. Identify (1) the LOD required for each Model Element at each milestone, (2) the Model Element Author (MEA), and (3) references to any applicable notes. 3. Insert abbreviations for each MEA identified in the table below, such as A-Architect or C- Contractor. Model Element Author (MEA)Table Milestone 1 Milestone 2 Milestone 3 Milestone 4 Milestone 5 Milestone 6 Notes: Model Elements: LOD MEA Notes LOD MEA Notes LOD MEA Notes LOD MEA Notes LOD MEA Notes LOD MEA Notes A5