b~êíüèì~âé=éêçåé= ÄìáäÇáåÖ=éçäáÅó=

Similar documents
POLICY EARTHQUAKE PRONE DANGEROUS & INSANITARY BUILDINGS

EARTHQUAKE PRONE BUILDINGS POLICY

Earthquake-Prone Buildings Policy

Earthquake-prone, Dangerous and Insanitary Buildings Policy 2011

MASTERTON DISTRICT COUNCIL EARTHQUAKE PRONE BUILDINGS POLICY

EARTHQUAKE- PRONE BUILDINGS POLICY

Strengthening Buildings for Earthquake Implementing New Zealand Legislation David C Hopkins 1 Mike Stannard 1 Graeme Lawrance 1 Ian Brewer 1 1

Guidance for Territorial Authorities and Property Owners on Initial Seismic Assessments. New Zealand Society for Earthquake Engineering

Mayor and Councillors. Community Services Manager

Animal Control Administration Team Dog Pound Portacom Detailed Engineering Evaluation BU EQ2 Qualitative Report

Guidance for Territorial Authorities and Property Owners on Initial Seismic Assessments

Christchurch City Council. PRK_3575_BLDG_001 Port Levy Fire Shed Detailed Engineering Evaulation Report

SEISMIC ASSESSMENT OF BUILDINGS IN WELLINGTON: EXPERIENCES AND CHALLENGES

Hagley Park North Rugby Club Toilet Shelter

CHRISTCHURCH CITY COUNCIL PRK_1385_BLDG_005 EQ2 Bexley Park Underground Bunker 194 Bexley Road, Bexley

REGULATORY ISSUES IN THE PROPOSED CHANGES TO THE NEW ZEALAND BUILDING ACT 1991

PRK 3742 BLDG 001 EQ2

Spencer Park Paddling Pool Tank Qualitative Engineering Evaluation

BUILDING, RESOURCES AND MARKETS GROUP. Regulatory Charter. Building regulatory system

Redwood Plunket PRK 2179 BLDG 003B Detailed Engineering Evaluation Quantitative Assessment Report

HISTORICAL REVIEW OF MASONRY STANDARDS IN NEW ZEALAND

Sheldon Park - Cricket Shed Qualitative Engineering Evaluation

Victoria Park Toilets (Disabled) Qualitative Engineering Evaluation

Tulett Park Toilet Qualitative Engineering Evaluation

Englefield Reserve Toilet Qualitative Engineering Evaluation

Jura Courts Housing Complex PRO 0840 Detailed Engineering Evaluation Quantitative Assessment Report

Gisborne District Council

Veronica Place Housing Complex PRO 0317 Detailed Engineering Evaluation Quantitative Assessment Report

Toilet Rimu Park PRK 1645 BLDG 001 Detailed Engineering Evaluation Qualitative Report Version Final. Buchanans Rd

Seafield Park Multi-Aviary Building Qualitative Engineering Evaluation

CHRISTCHURCH CITY COUNCIL PRK_0894_BLDG_002 EQ2 Cypress Garden Reserve Toilet 41 Keighleys Rd, Bromley QUALITATIVE ASSESSMENT REPORT FINAL

CHRISTCHURCH CITY COUNCIL PRK_0895_BLDG_007 EQ2 Ruru Lawn Cemetery Toilets Raymond Road, Bromley QUALITATIVE ASSESSMENT REPORT FINAL

Practice Advisory 14. Long span steel roof trusses: welding and section checks needed for some

Detailed Seismic Assessment Report. Islington Substation August 2011

BEFORE THE CHRISTCHURCH REPLACEMENT DISTRICT PLAN INDEPENDENT HEARINGS PANEL

ResQ: An Earthquake Risk Prioritisation Tool

Project: Council Revision: 1. Room. Evaluationn. Functional Location ID:

CHRISTCHURCH CITY COUNCIL PRK_2347_BLDG_007 EQ2 Travis Wetland Cottage 280 Beach Road, Burwood QUALITATIVE ASSESSMENT REPORT FINAL

Rawhiti Golf Course Implement Shed Qualitative Engineering Evaluation

Christchurch City Council PRK_2204_BLDG_001 EQ2 Washington Reserve - Toilet Washington Way/ Waltham Rd QUALITATIVE ASSESSMENT REPORT FINAL

WELLINGTON REGION S RESERVOIR SEISMIC UPGRADE STANDARDS

Detailed Engineering Evaluation. Quantitative Assessment Report Buller X-Ray Building

Qualitative Engineering Evaluation

Mapping active faults and mitigating surface rupture hazard in the Kapiti Coast District, New Zealand

Practice Advisory 14: Long span steel roof trusses - welding and section checks

Luggate Hall Initial Seismic Assessment. 51 Main Road Luggate. Luggate Hall ISA March

15. Building management

Building Adjacent to Active Faults: A Risk-based Approach

CHRISTCHURCH CITY COUNCIL PRK_2347_BLDG_006 EQ2 Travis Wetland Plant Nurseries 280 Beach Road, Burwood QUALITATIVE ASSESSMENT REPORT FINAL

Hagley Park North Band Rotunda Quantitative Engineering Evaluation

Bruce Terrace Cottages Housing Complex PRO 3652 Detailed Engineering Evaluation Quantitative Assessment Report

Establishing the resilience of timber framed school buildings in New Zealand

The natural hazard types that have been identified within the City include the following:

CHRISTCHURCH CITY COUNCIL PRK_0895_BLDG_001 EQ2 Ruru Lawn Cemetery Toilets Raymond Road, Bromley

North Hagley Park Pavilion Qualitative Engineering Evaluation

Earthquake-prone Building Programme

City Care Milton Street Depot Vehicle Garage / Bitumen Sprayer Detailed Engineering Evaluation PRO_1141_010 EQ2 Quantitative Report

Ka Wahine Trust Halfway House PRO 2538 Detailed Engineering Evaluation Quantitative Assessment Report

Potential benefits of strengthening earthquake-prone buildings

A final RIS, incorporating the outcome of the public consultation, will be developed before any policy decisions are made.

Determination 2007/67. Retaining wall at 71 Beach Road, Waihi Beach, Western Bay of Plenty. 1 The matter to be determined

Figure 1: Section through retaining wall to adjacent property (not to scale)

Communities-at-Risk. Housing and Long-term Recovery Challenges. Laurie A Johnson PhD FAICP

Building Consent / PIM Application

Progress toward identifying potentially earthquake-prone buildings: November 2018

Building Management in Emergencies: An Update on New Zealand Arrangements Dave Brunsdon, Mike Stannard and Ken Elwood

Chorus Seismic Policy and Standards Review

Building consent application Pack 3 Solid fuel heating appliance

Sockburn Depot North East End Store BU EQ2 Detailed Engineering Evaluation Quantitative Assessment Report CHRISTCHURCH CITY COUNCIL

MacKenzie Courts Housing Complex PRO 0921 Detailed Engineering Evaluation Quantitative Assessment Report

Quantifying Seismic Strengthening in Wellington s Commercial Building Stock

Quantifying Seismic Strengthening in Wellington s Commercial Building Stock

Southland Museum & Art Gallery

Christchurch City Council

Building (Earthquake-prone buildings) Amendment Bill Interim Report

Akaroa Court House PRO Detailed Engineering Evaluation Quantitative Assessment Report

Determination 2014/011

Briefing for the Minister of Civil Defence

Practical Implications of Increased Liquefaction Vulnerability

Invercargill City Council. Building Consents Guide NOVEMBER building consents 1

Regulatory impact statement. Building investigation powers for the building regulator

THE CHURCH AND BUILDING LAW

Patron: Dame Anne Salmond, DBR, FRSNZ, FBA 2013 New Zealander of the Year

4 September 2010 and 22 February 2011 Christchurch Earthquakes from a Transmission Grid Infrastructure Perspective

Information for building owners & building practitioners: Building work that does not require a building consent. Council discretionary exemptions

Christchurch City Council Environmental Policy & Approvals Unit. Memorandum. STEVE McCARTHY (Environmental Policy & Approvals Manager)

Performance of Unreinforced Masonry Structures in the 2010/2011 Canterbury Earthquake Sequence

Parklands Community Centre Qualitative Engineering Evaluation

Pavilion/Toilet Buckleys Road / Bromley Park PRK_0766_BLDG_001 EQ2 Detailed Engineering Evaluation Qualitative Report Version Final

Seismic Assessment of 91 Willow Street Campus Buildings

REPORT STAGE 2 REPORT. Earthquake Commission. Darfield Earthquake 4 September 2010 Geotechnical Land Damage Assessment & Reinstatement Report

19 RELOCATED BUILDINGS AND TEMPORARY ACTIVITIES

Quantitative Assessment Report THE ROSE CHAPEL 866 COLOMBO STREET

Act : Notice 6380 dated 23 February 2016, issued to the applicants Notice 6348 dated 15 February 2016, issued to the neighbour.

Mitigation Framework for Seismic Prone Zone

Form 2: Application for PIM and/or Building Consent

Time history analysis of asymmetric three: Dimensional building frames structure

For Council Use. Building Category R1 R2 R3. Approving Officer. Note: PIM (Appln vetted and lodged) Water Services Add Inspect *

GUIDANCE. Securing parapets and facades on unreinforced masonry buildings. Advice for building owners, councils and engineers

S25 Risk Assessment & Safe Systems of Work - 1 / 5

Transcription:

b~êíüèì~âé=éêçåé= ÄìáäÇáåÖ=éçäáÅó= adopted 2007

1. Introduction and Background Section 131 of The Building Act 2004 requires territorial authorities (TAs) to adopt a policy on earthquake-prone buildings. The meaning of earthquake-prone building is set out in section 122 of the Building Act 2004 which states: 122 Meaning of earthquake-prone building (1) A building is earth-quake prone for the purposes of this Act if, having regard to its condition and to the ground on which it is built, and because of its construction, the building (a) will have its ultimate capacity exceeded in a moderate earthquake (as defined in the regulations); and (b) would be likely to collapse causing (i) injury or death to persons in the building or to persons on another property; or (ii) damage to another property. (2) Subsection (1) does not apply to a building that is used wholly or mainly for residential purposes unless the building - (a) comprises 2 or more storeys; and (b) contains 3 or more household units A moderate earthquake is defined in the Regulations to the Building Act 2004 as: For the purposes of Section 122 (meaning of earthquake prone buildings) of the Act, moderate earthquake means, in relation to a building, an earthquake that would generate shaking at the site of the building that is of the same duration as, but is one third as strong as, the earthquake shaking (determined by normal measures of acceleration, velocity, and displacement) that would be used to design a new building at that site. This document sets out the policy adopted by the Central Otago District Council in accordance with the requirements of the Building Act 2004. The policy is required to state: 1. The approach that the Council will take in performing its functions under the Building Act 2004 2. Council s priorities in performing those functions 3. How the policy will apply to heritage buildings In developing and adopting its earthquake-prone buildings policy Council has followed the consultative procedure set out in section 83 of the Local Government Act 2002. Section 132 of the Building Act 2004 requires the policy to be reviewed within five years of being adopted and then at five yearly intervals with any replacement or amendment being subject to the consultative procedures for the Local Government Act 2002. Council has made extensive use of the Department of Building and Housing s guidance document and, for ease of reference, the policy has been set out in a format similar to the policy template provided in that document. Earthquake Prone Building Policy 2007

2. Policy Approach 2.1 Policy Principles Council has noted that provisions of the Building Act in regard to earthquake-prone buildings reflect the government s broader concern with the life safety of the public in buildings and, more particularly, the need to address life safety in earthquakes. Council has also noted that the development of an Earthquake Prone Building (EPB) policy is up to each Territorial Authority and has responded accordingly. This policy has been developed after consultation with council ratepayers and stakeholders in accordance with section 83 of the Local Government Act 2002. 2.2 Overall Approach Central Otago District lies in a medium earthquake risk zone. There is a risk of severe damage to buildings caused by a rupture of the Alpine Fault or several other potentially active faults throughout Otago such as the Dunstan Fault. An estimated magnitude of 8 on the Modified Mercalli scale could result from a rupture of the Alpine Fault. The recurrence interval for earthquakes of this magnitude along the Alpine Fault is 300 years. The last event date was in approximately 1717. Council s EPB policy under the Building Act 2004 reflects its determination to reduce earthquake risk over time in a way that is acceptable in social and economic terms to its ratepayers. Council will undertake an initial desktop review of Council files to assess which buildings could be earthquake prone and follow this with a brief inspection of each building where necessary. Building owners would be advised of possible earthquake prone status and encouraged to have an independent assessment of structural performance of the building undertaken in order for structural works to be undertaken. 2.3 Identifying EPBs Council will: undertake an initial desktop review of Council files to assess which buildings could be earthquake-prone buildings as defined in The Building Act; follow this with a brief inspection of each building where deemed necessary; advise building owners of possible earthquake prone status, and encourage them to complete a detailed assessment on buildings; compile a register of earthquake-prone buildings according to the results of the desktop exercise and any detailed assessments; categorise the earthquake-prone buildings according to the following: (a) Buildings with special post-disaster functions as defined in AS/NZS 1170.0:2002, Importance Level 4. (b) Buildings that contain people in crowds or contents of high value to the community as defined in AS/NZ 1170.0:2002, Importance Level 3. (c) Buildings with a Heritage Classification of I or II otherwise listed in the Council register of heritage buildings in the Central Otago District Plan, or built before 1900.

(d) Buildings with an Importance Level less than 3 as defined in AS/NZ 1170.0:2002 (Note: residential buildings are excluded unless they are multi storeyed or contain more than three residential dwelling units). 3. Assessment Criteria The definition of earthquake prone building is given in section 122 of the Building Act 2004 and the definition of moderate earthquake is given in Regulation 2005/32. NZSEE Recommendations is to be used as the basis for defining technical requirements and criteria. These recommendations are designed to be used in conjunction with AS/NS 1170 Loadings Standards, NZS 3101 Concrete Structures Standard, NZS 3404 Steel Structures Standard and other materials standards. 4. Trigger Points for Upgrading Earthquake-Prone Buildings when undertaking Building Work Section 112 Alteration to existing buildings. On receipt of an application for building consent for a significant alteration, Council would require the owner to carry out a structural assessment as recommended by NZSEE. If the assessment report showed the building to be less than 33% of the current design code, then Council would issue a notice requiring that the danger be removed or reduced to a level where the design demonstrates compliance to at least 33%. Some flexibility may be applied to heritage buildings giving consideration to importance levels contained in AS/NZS1170.0:2002 and the proposed use of the building. Section 114 (Change of use, extension of life and subdivision of buildings), and Section 115 (Code Compliance requirements change of use). On receipt of an application for building consent for a change of use, extension of life, or subdivision the Council will require the owner to upgrade the building to current code standards or as nearly as is reasonably practicable. In such cases, the Council will require: a) An assessment from an appropriately qualified structural engineer. b) A copy of the engineer s assessment report be submitted to the Council. c) If the assessment report showed the building to be less than 33% of the current design code, then Council would issue a notice requiring that the danger be removed or reduced to a the level where the building be upgraded as far as is reasonably practicable to meet current performance standards (the minimum requirement being 33% of the current design code). Financial assistance may be provided by Council for the structural assessment carried out on the building in terms with Section 1.4 of the policy. 5. Recording a Building s EPB Status Council will keep a register of earthquake prone buildings, noting the status of requirements for improvement or the details of any improvements made as applicable.

The following information will be placed on any Land Information Memorandum or Project Information Memorandum for any property containing a possible earthquake prone building as identified in the desktop analysis, or as identified in a detailed assessment: Address and legal description of land and building; Statement that the building is on the Council register of earthquake prone building, as a possible earthquake prone building identified in the desktop exercise, or confirmed by way of detailed assessment; Statement that further details are available from the Council to those who can demonstrate a genuine interest in the property. 6. Economic Impact of Policy The economic impact is not able to be assessed until Council has carried out the review of the files to establish which buildings are potentially earthquake prone. Council acknowledges the financial costs on owners in undertaking a structural assessment of a building, and may assist by contributing a maximum amount (yet to be determined) towards a structural assessment undertaken in accordance with Section 1.4 of the policy. Buildings which are used wholly or mainly for residential purposes which comprise less than 2 storeys and less than 3 household units do not fall within the meaning of earthquake prone buildings. 7. Priorities Earthquake prone buildings have been prioritised in terms of the importance levels contained in AS/NZS 1170.0:2002. Council will encourage owners to strengthen buildings to eliminate danger to the public or other property, or to demolish buildings where appropriate. A passive approach is adopted requiring that any upgrading will occur at application for building consent for an alteration, change of use or subdivision. Specific times will be assigned for action according to the assessment of structural performance and the nature of the concerns. Category A Buildings with special post-disaster functions as defined in AS/NZS 1170.0:2002, Importance Level 4. Category B Buildings that contain people in crowds or contents of high value to the community as defined in AS/NZS 1170.0:2002, Importance Level 3. Category C Buildings with a Classification of I or II in the Council s Register of Heritage Buildings. Category D Buildings with an Importance Level of less than 3 as defined in AS/NZS 1170.0:2002. 8. Heritage buildings For the purposes of the policy a heritage building is defined as: any building registered with NZ Historic Places Trust Category I or II classification; any building listed in Part A of Schedule 19.4 of the Central Otago District Plan;

any building that is subject to a heritage order, heritage covenant or any other protective covenant any building pre 1900. Central Otago District believes it is important that its heritage buildings have a good chance of surviving a major earthquake. However, Council does not wish to see the intrinsic heritage values of these buildings adversely affected by structural improvements. Owners of heritage buildings will be encouraged to undertake as assessment in the same way as owners of other potentially earthquake prone buildings and discussions will be held with the owners and the Historic Places Trust to identify a mutually acceptable way forward. Council acknowledges there will be a financial burden on owners required to structurally improve heritage buildings. Council will therefore consider waiving building consent fees (not including DBH or BRANZ levies) for the strengthening of buildings listed in the Register of Heritage Buildings classification I and II in the Central Otago District Council District Plan or built before 1900 where: 1. the improvements to the structure are designed by a registered chartered engineer with the approval of the historic places trust, and 2. the strengthening work meets or exceeds 33% of the current performance standard, or as near as reasonably practicable having regard to the importance level contained in AS/NZS 1171.1:2002, and the proposed use of the building. Council will also assist building owners by advising on methods for seeking funding from external sources, to assist with strengthening of heritage buildings.