TROJAN DECOMMISSIONING STATUS. OPUC Meeting March 8, 2005 (draft)

Similar documents
WM2013 Conference, February 24 28, 2013, Phoenix, Arizona USA. Factors Impacting Decommissioning Costs 13576

ICFD Session 2, Cost Estimation Stockholm, Sweden - 21 September 2016 Michael Lackey P.E. Vice President - Nuclear Operations

State of the Nuclear Industry Decontamination & Decommissioning Are We Ready. April 25, Presented by: Michael Frediani

Power Reactor Decommissioning: U.S. Perspective on Regulatory Insights and Challenges

Humboldt Bay Power Plant Decommissioning Progress Update

RANCHO SECO TRANSITION TO FULL DECOMMISSIONING. Dennis E. Gardiner, Decommissioning Project Manager, SMUD John M. Newey, CHP, President, NewRad, Inc.

Zion Project Overview S. Chris Baker VP EH&S

Two Approaches to Reactor Decommissioning: 10 CFR Part 50 License Termination and License Amendment, Lessons Learned from the Regulatory Perspective

Perspective of Decommissioning Worldwide in View of Metrological Needs

DECOMMISSIONING LESSONS LEARNED AT YANKEE ROWE. M. S. Terrell, D. McGee, Duke Engineering and Services (USA)

U.S. NUCLEAR POWER PLANT DECOMMISSIONING

Spent Nuclear Fuel, Low Level Radioactive Waste and Decommissioning

Remediation and Decommissioning Technology

W R I T T E N S T A T E M E N T O F R U S S E L L A

SOLUTIONS. Role of Radioactive Waste Management in D&D. Colin Austin (Senior Vice President, International Business)

WM2015 Conference, March 15 19, 2015, Phoenix, Arizona, USA

2014 Decommissioning Cost Analysis of the San Onofre Nuclear Generating Station Units 2 & 3

Comparison of estimated and actual decommissioning cost of José Cabrera NPP

San Onofre Unit 1 Decommissioning

Current Status of Shutdown Sites Activities. San Onofre Nuclear Generating Station (SONGS) Site Visit

WM2016 Conference, March 6 10, 2016, Phoenix, Arizona, USA. Preliminary Evaluation of Removing Used Nuclear Fuel from Shutdown Sites An Update 16057

Nuclear Energy. Nuclear Fuels Storage and Transportation Planning Project Transportation System Development Overview. Matt Feldman

Testimony On 2016 SONGS 1 Decommissioning Cost Estimate

Maria Taranger Foto: Kävlinge Municipality

S z5a MPC&D July 31, U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D. C

Lessons Learned from EPRI Decommissioning Program Decommissioning Pre-Planning Overview

BRIEF HISTORY OF THE RETS [RADIOLOGICAL EFFLUENT TECHNICAL SPECIFICATIONS]

DECOMMISSIONING LICENSING PROCESS OF NUCLEAR INSTALLATIONS IN SPAIN

PLANNING FOR THE EARLY RETIREMENT OF THE OYSTER CREEK NUCLEAR GENERATING STATION ENGINEERING ISSUES

Activities of the NRC s Division of Spent Fuel Management: An Overview

Spent Power Reactor Fuel:

Your Partner for Successful D&D PROVEN PROGRAMS EFFECTIVE TRANSITION WORLD-CLASS PERFORMANCE

RESUME of SCOTT ATWATER

Community Engagement Panel ISFSI Location and Technology Option Update July 17, For internal use only

Status of Decommissioning Preparation for Kori #1

NuScale SMR Technology

Waste Management for Decommissioning of Nuclear Power Plants An EPRI Decommissioning Project Report

CGoEd. June 1, U. S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, DC 20555

Spent Fuel Storage: Defining the Problem. Commissioner Tim Echols Georgia Public Service Commission

Salem/Hope Creek License Renewal Presentation to the NRC March 16, 2009

RANCHO SECO DECOMMISSIONING UPDATE

CONNECTICUT YANKEE ATOMIC POWER COMPANY

Strategy for the Management and Disposal of Used Nuclear Fuel and High-Level Radioactive Waste

Decommissioning Worldwide and NEA Activities

S T A T E O F M I C H I G A N BEFORE THE MICHIGAN PUBLIC SERVICE COMMISSION DIRECT TESTIMONY THOMAS S. LAGUARDIA ON BEHALF OF CONSUMERS ENERGY COMPANY

SMART Standard Design Approval inspection result July. 4 th

SYSTEMATIC APPROACH FOR DECOMMISSIONING PLANNING AND ESTIMATING

San Onofre Nuclear Generating Station Units 2 and 3 Post-Shutdown Decommissioning Activities Report

Post Shutdown Decommissioning Activities Report Vermont Yankee Nuclear Power Station Docket No License No. DPR-28

Nuclear Energy. Consolidated Interim Storage Facility Design Concepts In the United States. Nuclear Fuels Storage and Transportation Planning Project

RANCHO SECO PLANNING FOR LARGE COMPONENTS

The Electric Power Research Institute (EPRI) is the

Interim Storage of Used Nuclear Fuel. The Nuclear Energy Institute

Best practices for preparing vessel internals segmentation projects

FIG. 1. Fort St. Vrain Nuclear Generation Station.

Spent Nuclear Fuel and Low Level Radioactive Waste: Current and Future Storage Options

WM2014 Conference, March 2 6, 2014, Phoenix, Arizona, USA

IMPACT OF LACK OF CONSISTENT FREE RELEASE STANDARDS ON DECOMMISSIONING PROJECTS AND COSTS

ROMANIA National Commission for Nuclear Activities Control (CNCAN) Report. on in Decommissioning Activities. Dr. Lucian BIRO Director General

Decommissioning of Nuclear Installations

EDF DECOMMISSIONING PROGRAMME - A PREREQUISITE FOR THE ERECTION OF NEW NUCLEAR POWER PLANTS IN FRANCE

Introduction. Status of Worldwide Nuclear Power Plants*

Supplemental Testimony of Southern California Edison and San Diego Gas & Electric Regarding Updates to the Milestone Framework

REPORT ON THE DECOMMISSIONING OF THE JOSÉ CABRERA NPP

Safety and Licensing for Decommissioning

THE ROLE OF THE WORLD'S LARGEST INTERIM STORAGE FOR WASTE AND FUEL WITHIN THE DECOM PROJECT OF 6 WWER REACTORS IN GREIFSWALD AND RHEINSBERG (GERMANY)

NUCLEAR REGULATORY COMMISSION. [Docket Nos and ; NRC ] Entergy Nuclear Indian Point Unit 2, LLC

Spent Power Reactor Fuel:

TABLE OF ACRONYMS / ABBREVIATIONS

ICEM DEVELOPMENT OF THE ENVI SIMULATOR TO ESTIMATE KOREAN SNF FLOW AND ITS COST

CHARACTERISTICS AND COMMON VULNERABILITIES INFRASTRUCTURE CATEGORY: NUCLEAR SPENT FUEL STORAGE FACILITIES

Ignalina NPP. Ignalina NPP decommissioning activities are co-financed by European Union

The Question of Queue: Implications for Best Practice in Cross-country Transport of Commercial Spent Nuclear Fuel 9402

The Question of Queue: Implications for Best Practice in Cross-country Transport of Commercial Spent Nuclear Fuel 9402

Watts Bar Nuclear Plant Unit 2 Completion Project

Applicability of EPRI Decommissioning Pre-Planning Manual to International Decommissioning Projects

Plant Life Management in Transition from Operation to Decommissioning of Nuclear Power Plants. National experience, Finland.

Decommissioning three main strategies: Immediate dismantling, Safe enclosure (Deferred dismantling), Entombment

15 April 2015 Nuclear Regulation Authority, Japan. 1. Overview

WM2013 Conference, February 24 28, 2013, Phoenix, Arizona USA. Progress in Decommissioning the Humboldt Bay Power Plant 13604

NDT AUDIT Z LLC. An EnergySoluitons Company. Audit Status. Interviewed 3 Finalist. Close to Awarding the Audit

Considerations for Disposition of Dry Cask Storage System Materials at End of Storage System Life

LLC An EnergySolutions Company. ZCAP Update

Risks of long term irradiated. on site at nuclear power plants

The Social and Economic Impacts of Nuclear Power Plant Closures Jonathan Cooper & Jen Stromsten Institute for Nuclear Host Communities

Spanish strategy for the management of Spent Nuclear Fuel ATC Project. IAEA, Vienna, June 2015

CONNECTICUT YANKEE UPDATE. February 20, 2002 DECOMMISSIONING UPDATE. Decommissioning Activities:

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C SAFETY EVALUATION REPORT

Waste Management Nuclear Project Management Training course, Managing Risks in Projects, Dr. Jas Devgun

Economic Analysis of the Modular Pebble Bed Reactor

Decommissioning Pilgrim What is Decommissioning, and What Should be Done to Protect our Communities?

BIG ROCK POINT DECOMMISSIONING. Ken Powers, site general manager Tim Petrosky, public affairs director

Fukushima Accident Summary(4) 2011-August-02, Ritsuo Yoshioka

Decommissioning in Germany: Greifswald NPPs. Bernd Rehs Federal Office for Radiation Protection (BfS)

RADIOACTIVE WASTE AND MANAGEMENT PROGRAMMES IN OECD/NEA MEMBER COUNTRIES SWEDEN [2010] NATIONAL NUCLEAR ENERGY CONTEXT

DESIGNING DECOMMISSIONING INTO NEW REACTOR DESIGNS 1

Safety and Security of Spent Fuel Storage in the United States Edwin Lyman Senior Scientist Union of Concerned Scientists

A Liquidation Strategy of Fukushima Daiichi Nuclear Power Plant: A new In-Situ Entombment Plan proposed

June 28, 2013 TM CFR CFR 50.82

Licensing a Centralized Spent Fuel Storage Facility

Transcription:

TROJAN DECOMMISSIONING STATUS OPUC Meeting March 8, 2005 (draft) 1

Meeting Agenda Trojan Decommissioning Overview History Major Projects Overall Performance Remaining Major Activities Current Issues USDOE Fuel Storage Non-radiological Building Demolition Regulatory Preview 2

Decommissioning History Permanent Shutdown Jan 1993 Large Component Removal Nov 1995 Decommissioning Plan NRC Approval Apr 1996 Reactor Vessel Removal Aug 1999 Containment Building Concrete Removal Jan 2001 ISFSI Fully Loaded Sep 2003 Major Radiological Bldg Remediation Cp Jul 2004 All Radiological Remediation Complete Sep 2004 Final Survey Data Collection Complete Nov 2004 All Final Survey Reports Submitted to NRC Dec 2004 3

Trojan Site Layout 4

Trojan Structures 5

Large Component Removal 6

Large Component Removal 7

Large Component Removal 8

Reactor Vessel and Internals Removal Project (RVAIR) 9

RVAIR Project 10

RVAIR Project 2000 Project Management Institute (PMI) International Project of the Year 11

Containment Concrete Removal 12

Containment Concrete Removal 13

Containment Building Pre/Post 2001 1976 14

Refueling Water Storage Tank 15

Independent Spent Fuel Storage Installation (ISFSI) Fuel Loading 16

Multi-Purpose Canister (MPC) Operations 17

Moving the Multi-Purpose Canister 18

ISFSI Pad with Loaded Casks 19

Spent Fuel Pool Before After Spent Fuel Pool Cask Load Pit 20

Radwaste Evaporator Room Before After 21

Main Steam Support Structure A Cubicle - 59 level Before After 22

Miscellaneous Buildings Warehouse Maintenance Building 23

Turbine Building 24

Trojan Visitors Center 25

Final Radiological Survey Plant divided into 9 survey groups Containment MSSS/EPA/SGBD (between Containment, Turbine, and Control Bldgs.) Turbine and Control Buildings Embedded Pipe Auxiliary Building Fuel Building Support Facilities and Site Grounds Spent Fuel Pool Impacted Areas Plant Systems Key Statistics 250,000 Square meters of surface area surveyed 26,000 Surveyor hours to collect data 62,000 Survey measurements collected NRC Confirmation Surveys NRC Review and Evaluation of Final Reports 26

Decom. Cost Estimate Comparison ($1997) Category TDF Update TDF Update TDF Update UE-102 Dec 99 Dec. 04 DECON 236.1 235.4 211.7 Non-Rad. Decom. 53.7 44.8 40.2 ISFSI Const./Fuel Load 62.9 66.7 82.0 ISFSI Long Term Ops 70.9 67.0 60.1 Financing 11.6 8.7 0.0 Subtotal 435.2 422.6 397.8 Project Reserve 0.0 7.1 35.7 Total 435.2 429.7 429.7 27

Project Completion Percentage Decommissioning Planning Large Component Removal RVAIR 100% 100% 100% Percent Complete thru 12/31/04 Aux/ Fuel/ Other Building Equipment Removal Containment Building Equipment Removal 100% 100% TDF Remaining Estimate as of 01/05 All Buildings - Floor Drains 100% All Buildings - Surface Decon Radioactive Waste Disposal 100% 100% Utility/ Contractor Staff 92% Corporate Overhead Undistributable Costs 95%. 96% Site Termination Survey 100% Non Radiological Decommissioning 63% Building Demolition 12% ISFSI Constr uction and Loading 100% ISFSI Decommiss ioning 0% ISFSI Long Ter m Oper ations 17% Decommissioning Financing 100% 0 10,000 20,000 30,000 40,000 50,000 60,000 70,000 80,000 90,000 $ x 1,000 28

Decommissioning Cost Estimate as of December 2004 ($1997) Category Actual to Date To Complete TDF Update DECON 205.3 6.4 211.7 Non-Rad Decom 3.8 36.4 40.2 ISFSI Const./Fuel Load 74.1 7.9 82.0 ISFSI Long Term Ops 7.0 53.1 60.1 Financing 0.0 0.0 0.0 Subtotal 290.2 103.8 394.0 Project Reserve 0.0 35.7 35.7 Total 290.2 139.5 429.7 29

Decommissioning Cost Comparison (all costs in millions '03 $'s) Big Rock 1 Yankee Rowe San Onofre 1 Facility Haddam Neck Maine Yankee 4 Rancho Average 3 Seco Trojan 2 (5 PWR's) Thermal Rating (MWt) 240 600 1,347 1,825 2,700 2,772 3,411 Total Cost NRC- Required Activities 5 331.1 484.8 420.4 477.6 437.6 399.8 270.2 444.1 NRC Funding Level Requirement (waste processors) 386.0 302.0 301.9 321.4 348.6 345.5 279.0 323.9 Cost of NRC- Required Activities v. NRC Funding Level Requirements (%) 86% 161% 139% 149% 126% 116% 97% 137% Cost Per Thermal Megawatt 1.38 0.81 0.31 0.26 0.16 0.14 0.08 0.45 Note 1: only BWR reactor in group Note 2: only PWR located in Northwest Compact in group Note 3: only PWR's not located in Northwest Compact Note 4: does not reflect a $44 million credit received from performance and payment bond settlement 30

Schedule, Staffing, Performance Overall Radiological Decommissioning Schedule Performance ISFSI Project delayed approx. 3.5 years Overall project delayed approx. 2.5 years Overall Radiological Decommissioning Cost Performance Approx. 8% under budget Awarded - 2000 Project Management Institute Project of the Year Staffing PGE and Contract Personnel January 2003 171 December 2004 50 Additional layoffs thru 2005 30 Staffing at the end of radiological decommissioning project ISFSI Long-term staff 31

Remaining Major Activities Complete Radiological Decom. June 2005 NRC Terminate Part 50 License June 2005 On-going Fuel Storage Operations thru 2018 Fuel Shipment 2003-2018 Based on Original Decom. Plan Building/ISFSI Demo. and Site Restoration 2018-2019 Based on Original Decom. Plan 32

Current Issues ISFSI operations will continue until 2023 (current projection) due to delays with the High Level Waste Repository USDOE scheduled to open repository in 2010 Significant uncertainty with this schedule Based on fuel shipment allotment, first PGE fuel ships in 2013 Final shipment projected in 2023 ISFSI Decommissioning in 2024 Prompt Building Demolition Proposal Complete major building demolition in 2005-2008 versus end of project. (Cooling Tower, Turbine Building, Control Building, Auxiliary Building, Fuel Building, and Containment) Currently obtaining co-owner approval of change Plan to proceed following management approval 33

Rationale for Prompt Demolition Advantages of Prompt Demolition Resolves uncertainty for a significant portion of remaining costs Uses Trojan experience-base while still available Shares resources for demolition and remaining radiological decom. Avoids out-year costs of inspections and maintenance Mitigates increase in out-year cost/risk from longer ISFSI storage Expresses PGE s environmental stewardship Provides jobs for near term regional economic health Risks of Stay-the-Course or Delayed Demolition: Increases in costs Demolition Regulation Inspection of remaining structures Maintenance of remaining structures Less costly and risky buildings will remain for later demolition. 34

Regulatory Preview Continued Updates with OPUC Commission and Staff Audits Staff Internal Re-evaluate NDT contribution with next General Rate Case Contribution continues through 2006 Update contribution with next general filing Review work yet to be completed Re-evaluate contribution for 2007 and beyond 35