Serpentine Gallery Pavilion 2014

Similar documents
For the Tate Modern Extension they are proposing to build a brick ziggurat looming behind the Turbine Hall.

Cumbrian Stone. Natural Stone Specialists

WIP Kenniskwartier. Amsterdam, Netherlands PROJECT NAME CHALLENGE: STRATEGY: PROJECT LOCATION: TEAM: RESULTS/IMPACT: OFFICE:

The Butler Gallery at the Evans Home CONSERVATION REPORT. McCullough Mulvin Architects. September 2016

Factsheet no. 2: SEGRO warehouse, Slough, UK

SQUAMISH ADVENTURE CENTRE

1.01 SITE / CONTEXT ANALYSIS + STRATEGY SITE HISTORY

SCREW PILE APPLICATION SHEETS

10 The Masdar Institute s GRC Residential Facade

Passive House Project documentation

Lattice Plate Flooring

Modcrete. Modcrete OVERVIEW COMPONENTS COMPONENTS

Good ideas. for your new building. BUILDINGS. Ideas become reality

Insulated Concrete Formwork (ICF)

YOUTUBE BEACH PROJECT CANNES LIONS 2017

THE LABAN DANCE CENTRE DEPTFORD, LONDON, UK

Tru-lift. The self lifting, core forming system from Forming Concepts Inc

DOUBLE SLIDE RAIL INSTALLATION METHOD. Double Slide Rail August

MOBIE Campus design challenge STUDENT TEAM BRIEF

MODERN CONSTRUCTION ROOFS ANDREW WATTS

Petrarch.

Petrarch Petrarch the natural choice

Demountable buildings - a new design strategy? P. S. Westbury Euro Happold, Camden Mill, Lower Bristol Road, Bath,

THE SKYLINE GROUP. Knife Plates and New Products. Skyline Engineered Systems. Skyline Engineered Aluminum

Wonder. Honoured Aga Khan Awards Hangzhou Zhongshuge. Tropical Bar Botanique. HK$80 RMB80 US$11

DINING HALL REDEVELOPMENT PROJECT TRINITY COLLEGE. Trinity College Board Presentation - 26 JULY 2011

Traci Peterson Option: Structural Faculty Consultant: Memari. Executive Summary

LAPEYRE STAIR PRODUCT LINE

RED T H E L I T T L E STEEL AND REINFORCING PRODUCTS FOR THE CONSTRUCTION INDUSTRY

Technical Report 1. Hakuna Resort Swift Water, Pennsylvania. Image Courtesy of LMN Development LLC

The windows are coming! I need a helicopter!

D E S I G N G U I D E L I N E S

Carpentry, Timber and Metal Construction We Build to Suit Your Needs

* The use of these areas can vary from car park space, where little waterproofing is required through to store rooms or plant rooms where a high

Frame fixing SXS-F US

The high-performance frame fixing with SX-technology VERSIONS. zinc-plated steel stainless steel BUILDING MATERIALS

AIA 2009 BIM AWARDS. Category B: Design/Delivery Process Innovation Using BIM

Miller Collective Safety at Height Solutions EPIC ULTRA Barrier System EPIC Post-N-Barrier System EPIC Basic Barrier System

BETTER IDEAS FOR MODULAR HOUSES

INNOVATIVE OFF-SITE MANUFACTURING

STRUCTURAL DESIGN OF UNPRECEDENTED LARGE RM REINFORCED MASONRY) STRUCTURE IN JAPAN

INTERNATIONAL PROJECTS

Open-Web Truss Long Span Installation Guidelines

Personal CrossFit Gym. Detached dwelling

Installation Manual For Conical Tanks. INSTALLATION and MAINTENANCE INSTRUCTIONS FOR CONICAL TANKS

SOLAR GREENHOUSES Calling a greenhouse solar is somewhat redundant, since all greenhouses are solar heated to some extent. The greenhouse itself

A Close-up Look at Jewel Changi Airport s Façade Installation

BUILDING THE MERSEY GATEWAY a step by step guide

RISK ASSESSMENT As exhibitions and events are deemed as hazardous environments, it is a legal requirement that all exhibitors and contractors

RJD Engineering Company Hellaby Industrial Estate. Hellaby Lane. Rotherham. South Yorkshire. S66 8HN

POINT. Making the. The highlights of High Point University s newest academic building are comprised of open volumes, and steel makes them happen.

Deepings School, Market Deeping

CHAPTER 3: Modern Methods of Construction (MMC)

Building an Architecture of Low-Impact Materials The 3R Pavilion. Reduce, Reuse and Recycle - using a combination of these three

9.0 TECHNICAL ANALYSIS

Introduction. A publication by Aquamor

Modular System Advantages

productive architecture Kiss + Cathcart, Architects 44 COURT ST. TOWER C, BROOKLYN, NY t f

CCTV HEADQUARTERS. ARCH 631 Spring 2018 Daniel Edith Mckenzie Rafael

Figure 10-1 Elevated Mechanical Mezzanine Room Location

ON CHICAGO S NORTH SIDE, A. By Norman B. Golinkin, S.E.

Hi-Point TM off-site roof system

MOUNTAIN STATE BLUE CROSS BLUE SHIELD HEADQUARTERS

Press release 23 May 2008

In good hands. LAWECO - Europe s leading manufacturer of individual lifting solutions

FULL SERVICE EXHIBITIONS & EVENTS

In order to get the maximum comfort out of a radiant system, it is paramount to go through a precise design phase (ref. UNI EN 1264).

Alfresco Floors Hard Landscaping, Made Easy

ECOHOUSES - 21 st Century Ideal Buildings Minimal Imported Energy Safe in Extreme Climates Low running Costs

CORPORATE HEADQUARTERS

The Formwork Experts. Capability in highrise construction. The safe way to great heights.

Structural Steel. Production and Applications. GWP Engineering Limited

Detailed information on the Proposed Wilberforce House Development

Creative Façade Solutions Small and Medium Formats

SHARP. Focus. AESS serves as the focal point of a small eye-care office in Austin. BY BRIAN SAYRE, P.E., AND K. MARK MERRYMAN, P.E.

Dallas City Performance Hall: Building Information Modeling as a Decision-Making Tool

The courthouse exterior. Courtesy of NLA/HLM Architects. United States. Courthouse Sacramento, Robert D. McCartney, S.E.

practice Fondation Louis Vuitton TEKLA SOFTWARE Solutions

Crown Hall on Structure and Proportions / Jorge Serra

Single family low energy house, Herselt, Belgium

Halfen systems for the support and restraint of brickwork

Structural Breadth Work

T U B U L A R S T R U C T U R E S c a t e g o r y n o m i n a t i o n s

Construction Scheme "Sapphire-Libeskind"

STEEL Building Value. The Merits of Structural Steelwork for Your Building Solution. ASI Head Office Tel:

Anaheim Regional Transportation Intermodal Center (ARTIC) 2014 AIA TAP / BIM Awards

Silverwood Park Visitor Center

Dura Composite Interlocking Decking Patio Tiles

Arup. FinnforestMerk. Plaza Mayor in Seville with the Metropol Parasol

CREATIVE SPACES INFORMATION PACK TWO WHAT IS DESIGN?

Planning permission and building regulations

Installation Manual. Orion. TL-3 Steel Barrier. VHD (v2)

Drexel University Race Street Dormitory REVISED THESIS PROPOSAL Doug Tower Structural Advisor: Kevin Parfitt 2/7/07

Taylor Maxwell is an independent façade solutions provider.

Analysis of Non Composite and Composite Space Frame for Varying Support Condition

Built to host soccer matches

Drawings shown within this brochure is the Preston CarPark Innovation Concept and patents filed in August 2018.

lindab we simplify construction LindabSandwichPanels Installation instructions Mineral Wool Panels

WH Williams. Where decades of experience meet cutting edge technology

Chuck Brooks, P.E., P.Eng. C&S Engineers

Transcription:

Serpentine Gallery Pavilion 2014 A futuristic design that looks like it has come from the Stone Age Julia Peyton-Jones Image 2014 Iwan Baan. Smiljan Radic s Pavilion The annual Serpentine Gallery pavilion is an established highlight of both the London art scene and the global architectural calendar. The commission provides a unique showcase for contemporary architectural practice as well as a venue for a series of events throughout the summer months. Each pavilion is constructed on the lawn outside the Serpentine Gallery in London s Kensington Gardens and is open all summer before being dismantled and relocated in the autumn. Embracing both the ancient and the contemporary, Smiljan Radic s 2014 pavilion came with a deliberate sense of strangeness. The Chilean architect s structure was described by Serpentine Co-Director, Julia-Peyton Jones as A futuristic design that looks like it has come from the Stone Age, a theme that was reflected in the materials chosen for its construction: huge stone plinths, steel and delicate translucent GRP panels. We worked with Radic from his appointment as pavilion designer late in 2013, helping to devise prototype panels and the complex steel frame necessary to realise his extraordinary and beautiful design.

In-house Diversity This was the sixth Serpentine Gallery pavilion that we ve manufactured and installed. Each commission has drawn on very different manufacturing techniques as well as a hugely varied palette of materials. Continued investment in our workshops over the last decade has enabled us to undertake the in-house manufacture of all aspects for each of these incredibly diverse structures - from the composite panels of the 2009 SAANA pavilion to the intricate steelwork of Sou Fujimoto s 2013 structure via the subterranean cork-lined pavilion by Herzog Du Mueron and Ai Weiwei. With each commission subject to such tight timelines, a thorough yet adaptable approach helps ensure that the artistic intent remains uncompromised and that the deadline is met. 2014 Smljan Radic 2013 Sou Fulimoto 2009 SAANA 2010 Jean Nouvel 2011 Peter Zumthor 2012 Herzog & de Meuron and Ai Weiwei

Complex Simplicity Helping to create simplicity can be a disproportionately complex process. Smiljan Radic s pavilion consisted of various manufactured component parts: the steel frame, GRP panels and sections of handrail. Each individual component, however, was a one-off with no two sections of frame, no two panels or even lengths of handrail being the same. This was not a problem for our workshops to deal with - creative manufacture is what we do and we are no strangers to realising complex one-off designs. Our site has plenty of space to accommodate the necessary storage and test builds. The Serpentine site in London, however, presents a very restricted working footprint where organisation and carefully sequenced deliveries become a particular priority. The experience of our crew at dealing with the strict designated delivery slots, as well as the extremely limited storage around the perimeter of the pavilion s footprint, has proven extremely valuable. The Installation Process The 61 tonnes of Yorkshire stone on which the structure rested originated from a quarry near Bradford and comprised six differently sized roughly hewn stones, the largest weighing in at 15 tonnes. We carried out the ground works and landscaping, including excavating a large hollow to create space underneath the pavilion and then positioned steel fixing plates on top of the concrete foundations. Using a 90 tonne crane, the core-drilled stones were positioned over steel legs and pinned at the base. On site: An experienced and responsive team are key

Strength in Fragility With a hand-made papier-mâché appearance, the torus structure of delicate GRP rested lightly on the huge stone plinths. From the outside, the shell-like pavilion looked opaque but once inside, the crude-looking panels appeared semitransparent, allowing the visitor to feel in touch with the landscape of the park beyond. We manufactured the 65 individual panels which varied not only in geometry, but also in thickness, ranging from 12mm to 22mm depending on the variations in load distribution throughout the structure. It was so quick the producers were so fast and so intelligent. They made a lot of things on site. And made good decisions on site. It is not a very precise construction process, but you have to take care with how much [imprecision] you have. When you have something so precise you know where you have to go but in this case you have to look and actually see whether it is OK [once built]. It is more difficult to work in this way. Smiljan Radic in Architects Journal

Manufacturing the Panels and Frame The panels were created by constructing a vast plug formed from hundreds of huge polystyrene blocks. These were CNC d using one of our 5 axis machines to replicate the exact 3D geometry of the torus structure, providing an accurate mould around which the GRP panels were then laid up. Once on site, the panels were bonded together and also to the steel frame at the base. The 18 tonne steel base frame formed the floor and also provided a structure onto which the panels could be attached. Manufactured in around 30 sections, some of which weighed 3 or 4 tonnes each, the frame was a complex grid of awkward angles which had to be unloaded and manoeuvred into position by crane, a process that took 10 days. A Sense of Mystery Although the GRP shell was self-supporting, two pillars were installed as a precaution against the possibility of the roof lifting in the wind. A wooden floor was created from timbers laid in different directions, while a three-quarter tonne steel binnacle was bolted and bonded to the GRP creating a balconied window onto the park. We also manufactured and installed a 5m long steel bar for the café area and a steel frame for the LED strip lighting. As daylight faded, the lighting worked with the semi-transparent GRP skin to give out a gentle glow, adding to the sense that this pavilion had come from another word entirely. Contrsts: Huge stone plinths and translucent GRP Panels