THE CONSTRUCTION SUPERVISOR

Similar documents
INSPECTION TIMING CHECKLIST FOR RESIDENTIAL FRAME BUILDING PRIOR TO INSPECTION REQUEST

City Of Mendota Construction Procedures

OWNER-BUILDER? A HOMEOWNER S GUIDE TO BUILDING PERMITS AND INSPECTIONS FOR PROJECTS IN ARROYO GRANDE, CALIFORNIA

Town of Falmouth FEMA Cost Breakdown Worksheet For Substantial Improvement / Damage COSTS FOR SUBSTANTIAL IMPROVEMENTS / REPAIR OF SUBSTANTIAL DAMAGE:

C ITY OF D ARIEN Community Development Department 1702 Plainfield Road Phone: (630) Fax: (630)

City of San Pablo Community Development Department Building Inspection Division Plan Review & Permit Requirements

City of Treasure Island FEMA Cost Breakdown Worksheet For Substantial Improvement / Damage

City of Treasure Island FEMA Cost Breakdown Worksheet For Substantial Improvement / Damage

Residential Construction Minimum Required Inspections

COMMERCIAL SUBMITTAL PACKET

Single Family Residential Building Permit. Application Guidelines. August 2000

MINIMUM PLAN INFORMATION REQUIRED FOR A BUILDING PERMIT

HOMEOWNER S GUIDE Construction and Inspection Procedures for Single Family Dwelling Alterations/Additions/Decks

A UCC Building permit is not required for the exceptions listed below for COMMERCIAL application: (403.42): Building construction for the following:

INSPECTION REQUIREMENTS Page 1 of 5. JOB SITE ADDRESS posted during entire construction process.

RESIDENTIAL BUILDING PERMIT GUIDE FOR MULTI-FAMILY DWELLINGS

REQUIREMENTS FOR SUBSTANTIALLY DAMAGED AND SUBSTANTIALLY IMPROVED STRUCTURES

BUILDING PERMIT APPLICATION CITY OF SIDNEY BUILDING INSPECTION DEPARTMENT

City of Westerville Guide to Commercial Inspections

CITY OF OAK CREEK SINGLE FAMILY & TWO-FAMILY CONSTRUCTION/PERMIT REQUIREMENTS

Uniform Construction Code

City of Rohnert Park Building Department Inspection Descriptions

SUBSTANTIAL IMPROVEMENT OR SUBSTANTIAL DAMAGE Information and Required Forms for Structures in Flood Zones AE & VE

CITY OF RICHMOND HEIGHTS DEPARTMENT OF BUILDING ZONING AND HOUSING STANDARDS AND REGULATIONS

Commercial Submittal Packet

Permit Requirements: Building Codes: The City of Clanton has adopted the following codes which are enforced by the Building Department:

PERMIT SUBMITTAL GUIDE FOR COMMERCIAL PROJECTS

Inspection of New One- and Two- Family Dwellings

Inspection requests submitted by 2:30pm will be scheduled for the following business day unless otherwise requested.

Basement Renovation Guide For Residential Dwellings

BUILDING A NEW HOME. Construction Permit Tips For Home Owners

ADDENDUM NO Refer to Specifications Section Alternates. Clarifications to alternate descriptions are as follows:

BUILDING CONSTRUCTION

RESIDENTIAL GUIDELINES

CONSTRUCTION COST BREAKDOWN THIS IS FORM CCB

Alabama Home Inspections

NAAHB Workgroup Index General Ledger Account

Development Services Department. Building Division Handout San Pablo, CA Ph: (510)

TOWN OF FRANCESTOWN BUILDING/CODE ENFORCEMENT 27 MAIN STREET P.O. BOX 5 FRANCESTOWN, NEW HAMPSHIRE Building Permit Application Guide

Successful Home Contracting

Citizens Guide to Residential Building Permits

Residential Building Plans

BUILDING CODES & DESIGN CRITERIA

Residential Miscellaneous Permits

1. Complete Building Permit Application forms on page 2. Include septic system design approval from the Washington County Health Department.

Boss Inspection Inc Wisconsin Uniform Dwelling Code Inspection and Code Enforcement

Nassau County Building Department

Village of Corrales Planning and Zoning Department

Beaumont Lot Grading Guidelines

ORDINANCE. APPROVED EMERGENCY: (Yes) (No) VETOED: Date

APPLICATION FOR NON-SUBSTANTIAL DAMAGE / IMPROVEMENT REVIEW

Fiddler's Marsh Cove

GENERAL BUILDING PERMIT INFORMATION FOR: RESIDENTIAL ALTERATIONS & ADDITIONS

PRE-ACCEPTANCE INSPECTION CHECKLIST

SAVE YOURSELF TIME AND MONEY! PLEASE READ THE FOLLOWING INFORMATION:

COUNTY OF NEVADA BUILDING DEPARTMENT POLICIES

Rebuilding your Home after the storm? Adding on, renovating, or remodeling your home? Here's information YOU need to know about the 50% Rule.

FIELD COPY ATTACHMENT

COMMERCIAL BUILDING HANDBOOK 2015 International Building Code (IBC)

APPLICATION FOR BUILDING PLAN APPROVAL AND PERMIT

CITY OF VINE GROVE BUILDING PERMIT APPLICATION

COMMERCIAL TENANT IMPROVEMENT PERMIT APPLICATION

APPLICATION AND CERTIFICATE FOR PAYMENT

BUILDING PERMIT INFORMATION GUIDE FOR THE HOMEOWNER

The Inspection Process. Waxhaw N.C.

COMMERCIAL Submittal Packet

Building Permits A Guide for Homeowners

ROUTT COUNTY REGIONAL BUILDING DEPARTMENT 136 * P.O.

Lonsdale Building Inspections Department 415 Central Street W. PO Box 357 Lonsdale, MN (507) fax (507)

BUILDING PERMIT APPLICATION

TOWN OF ROTTERDAM RESIDENTIAL BUILDING PERMIT APPLICATION Ext. 395 Needed to Obtain Permit:

G703 Continuation Sheet Minimum Schedule of Values Please use the breakdown listed below when submitting your billing for the project

Plan Submittal Checklist 2015 I-Codes

TOWNSHIP OF LOGAN 125 MAIN STREET, PO BOX 314 BRIDGEPORT, NJ FAX

ACCESSORY BUILDING. Building Permit Requirements: (must be completed before submitting application)

ONE AND TWO FAMILY DWELLING PERMIT APPLICATION REQUIREMENTS

City of Jacksonville Development Guide Building Permits

An Applicant s Guide to Residential Building Permits.

Commercial and Residential Projects (after appropriate Board approvals have been made if necessary):

Residential Building Inspections

INSPECTION REQUIREMENTS: FOUNDATIONS

A Summary of the Basic Duties of Maintenance, Repair and Replacement for CARRIAGE PARK CONDOMINIUM ASSOCIATION

Davis Frame Co., Inc. Construction Budget Considerations

Basic Information for Obtaining Permits, Submitting Plans, Scheduling Inspections, etc.

HOME OWNERS GUIDE PERMIT & INSPECTIONS FOR OWNER OCCUPIED SINGLE FAMILY DWELLINGS

BUILDING PERMIT APPLICATION

An Applicants Guide to Residential Building Permits City of Galt Building Department

Proud of its Heritage, Preparing for its Future

B. RESIDENTIAL MASTER PLUMBER $ $ $

City of Rohnert Park When Permits are Required

RESIDENTIAL BUILDING PERMIT PROCEDURES

HOUSE REPAIRS & RENOVATIONS BUILDING PERMIT REQUIREMENTS

California Residential Code (CRC) Summary of Town of Tiburon Amendments

COMMERCIAL SUBMITTAL PACKET

Work Write Up / Specification of Repairs HUD DIVISION 1. MASONRY HUD DIVISION 2. SIDING. Toll Free

Contractor/Owner initials are verification that items #1 and #2 and items (a) thru (g) above are included in the submitted plan/drawing.

Permit Posting and Inspection Procedures

Osceola County Growth Management Division 1 Courthouse Square, Suite 1400 Kissimmee, FL

2012 Ontario Building Code Requirements for New Construction. Bradford West Gwillimbury Building Division March 5, 2012

C. Type of Selective Demolition Work: Demolition requires the selective removal and subsequent off-site disposal of:

Transcription:

City of Aurora Building Inspections 15151 E Alameda Pkwy Aurora, CO 80012 (303) 739-7420 THE CONSTRUCTION SUPERVISOR When a building permit has been issued for any construction within the City, the Supervisor listed on the permit becomes the link between the Building Inspection Division and the Owner/Contractor. How he handles the coordination of work and inspections will determine the workflow to a successful completion and the issuance of a Certificate of Occupancy (CO) or release for use of the structure. General and specific requirements are listed below: A. GENERAL: The Construction Supervisor for the general contractor on a project has the overall responsibility for ensuring that all facets of the project conform to the applicable regulations and Code provisions of the City of Aurora. The overall responsibility includes the following: 1. Confining all trash and debris to the project site and retrieving any trash and/or debris attributed to the project from adjacent properties. 2. Keeping the public streets clean and free from dirt or mud tracked from the project. 3. Ensuring that before an inspection is requested that all requirements have been met. In this regard, flagrant abuse of the inspection process by using it to punch list or manage the job could lead to the suspension or revocation of the Supervisor s Certificate of Qualification. 4. Ensuring that Fire Department equipment access to the project over all-weather surfaced roads is maintained continuously, commencing with the first combustible construction on it. B. PERMITS: 1. General: Although the Construction Supervisor is not normally directly involved in obtaining permits for the project, he is responsible for ensuring that all required permits have been issued and validated before construction commences. He is also responsible for ensuring that all sub-contractors employed on the project have current City of Aurora Licenses enabling them to do the work for which they have sub-contracted.

Page 2 2. Separate Permits Required: a. The following required permits are issued by the Building Inspection Division: (1) Building (2) Mechanical (3) Electrical (4) Plumbing (5) Fire Protection (6) Swimming Pool (7) Underground Fuel Tank (8) Elevator b. The following required permits are issued by the Public Works Department and/or Planning Department, Zoning Division. (1) Grading (2) Retaining Wall (3) Water and Sewer Private Mains and Service Lines (4) All street related construction both Private and Public (5) Parking Lots (6) Fences (7) Signs 3. Special Prerequisites for Building Permit: The Construction Supervisor should be aware of the procedures governing the issuance of a building permit even though he normally does not participate in the extremely important phase of the overall project. No structure may be issued a building permit by the Building Inspection Division until the plans have been reviewed and approved by not only the Building Inspection Division but also by Zoning and Code Enforcement Division of the Neighborhood Services Department; traffic, Drainage engineering and Right-of-Way Divisions of the Public Works Department; Water and Waste Water Divisions of the Utilities Department; and Forestry Division of the Parks Department (for single family residences only). C. INSPECTION: When the permit has been issued, the main function of the Construction Supervisor begins. It is his task to ensure that the building is ready for inspection at the time the inspection is requested. Types of inspections with requirement follow:

Page 3 1. Preconstruction Inspection: Required when the site has already been developed with streets, sidewalk, curb and gutter. The Public Improvement Inspection Division of Public Works Department (303) 739-7350 will make this inspection to determine if there are any existing problems (such as cracked sidewalks, broken curbs, etc.) and will record them. The Builder will not be held responsible for these problems but will be responsible for the correction of any new ones caused during construction. 2. Footing, Post Tension Slab or Caisson: a. Post Tension Slab and Caisson Inspection: Special Inspection by Colorado Registered Professional Engineer required. An original stamp and signed inspection report must be furnished at the rough frame inspection before the damproofing inspection will be made. b. Footing Inspection: May be made by either the Building Inspector or by a Colorado Registered Professional Engineer. If done by a Professional Engineer, inspection report must be furnished before the foundation and Damproofing Inspection will be made. 3. Concrete Reinforcing: When Foundation wall or grade beam reinforcement is in place and ready for concrete pour, this inspection is accomplished in the same manner as those in item 2. 4. Foundation, Waterproofing and Survey. This inspection is done by the Building Inspector. All basements or areas below the backfill area must have all defects grouted and damproofed. Crawl spaces must have defects grouted and inspected prior to backfill. A signed copy of the survey is required to compare with the original plot plan. 5. Rough Plumbing: The ground plumbing, drain, waste, vent and water piping may be inspected individually, the responsibility for requesting this inspection lies with the Plumbing Contractor. 6. Gas Pipe: This inspection, which includes an air test, is requested by the installer before the concealed gas lines are covered. This inspection must be made before Excel Engergy company will install the meter. Also, in the case of concealed gas lines, the Rough Heating inspection cannot be made until the gas piping is inspected. 7. Rough Heating: When all duct work, flues, hot water lines and refrigeration lines are installed and before they are covered or concealed. The installing contractor requests the inspection. All electrical and plumbing are required to be installed prior to this inspection.

Page 4 8. Rough Electrical: When all outlet boxes (lights, single or duplex, switches, etc.) and the wire connections are installed. This inspection is requested by the Electrical Contractor. 9. Rough Frame: This is probably the most important inspection to the Construction Supervisor. Prior to requesting this inspection he should personally make a complete and detailed walk-through of the entire building (or portion of the building to be inspected) to ensure that all of the following items have been completed and that the building is in fact ready for inspection: a. The roof is on and the building is weathered-in (siding, exterior covering, etc. in place). b. Interior partitions or other framing, floor framing and flooring, stairs, windows, etc. are completed and interior ready to be covered. c. Completed repair of any modifications, made by other trades, which do not meet code (holes to close to the edge of studs, cuts or holes in sill place, excessive notching of joists or studs, etc.). d. Building as constructed agrees with approved plans. 10. Insulation Inspection: This inspection should be called following the completed rough frame inspection, when insulation product installation is complete. 11. Lath/Gypboard: There are times when this inspection may precede the rough frame inspection, i.e. party walls or single family-attached units where the double wall must have gypboard installed when put into position. Single family-detached residences as a general practice have no separate inspection. The inspection of the one-hour requirement for the attached garage may be inspected at the time of the final frame. Miscellaneous Inspections: Roofing Inspection: This inspection can be done at the frame rough. A tile roof must have a midroof inspection. Wall-tie Inspection: This inspection is required for masonry. Stucco Lath: Inspection required. 12. Final Plumbing, Heating and Electrical Inspections: These may be requested in any sequence by the subcontractor involved, however the appropriate meter must be installed before requesting a final inspection. Responsibility for the request rest with the applicable sub-contractor.

Page 5 13. Fire Protection Inspection: On single-family detached or attached residences this inspection is done by the framing inspector or at the time of final frame inspection. On apartments or condominiums, or shell or complete commercial building, and on commercial tenant finish/alterations this inspection is done by the Life Safety Inspector (Building Inspection Division). This inspection may be requested by the Fire Protection sub-contractor if the structure has a fire sprinkler or fire alarm system, but usually this inspection should be requested at the time of final frame inspection by the Construction Supervisor. Life safety inspections must be made for specific installations. (i.e. alarm, sprinkler, exit signs, hood, etc) prior to calling for the final life safety inspection. 14. Final Engineering (Public Improvements) and Grade: These inspections should be requested from the Public Improvements Division at the same time the final frame inspection is requested on all single family, multi family and commercial buildings. At this time the sidewalk, curb and gutter, streets or grading away from the buildings are inspected by the Public Improvement Inspector. An inspection for conformance with the City approved final drainage plan (if applicable) is also performed. Any problems noted on pre-construction inspection are not required to be corrected the owner/builder. Any new problems with Public Improvements or Grade become the responsibility of the construction supervisor to see that they are corrected by the proper sub-contractors. All reinspection requests must be made to the Public Improvements Division at, (303) 739-7420. 15. Final Frame: This inspection should be the last one requested but may be requested prior to the other final inspections i.e. Plumbing, Heating, Electrical. There are some items which do not have to be completed for final frame approval for a Certificate of Occupancy (CO), i.e. interior/exterior painting, shelving, carpeting, cabinets, and counter tops (except where a sink is involved). A final walk through by the construction Supervisor should preclude reinspections. 16. Zoning: This inspection is requested at the time of the final frame inspection, by the Construction supervisor. All landscaping, parking, exterior lighting and any other items shown on the PBC or PUB are inspected by the Zoning Inspector. All reinspection requests must be made to the Administration/Inspection control Section, (303) 739-7420.

Page 6 D. Certificate of Occupancy: The Certificate of Occupancy (CO), either temporary or final, must be issued prior to occupancy of any structure. Move-in of furniture or equipment may be authorized prior to issuance of a CO, but the Chief Building Official is the only person who may authorize this. No CO may be issued until the requirements of all inspection agencies involved (i.e. Building, Fire, Zoning or Public Improvements) are satisfied. Temporary CO s are authorized only when occupancy will not be detrimental to the safety, health or welfare of the occupants. Because of the processing time required to assemble all approvals and complete the paperwork, an interval of three (3) working days between completion of the last required inspection and the issuance of the CO should be anticipated. NOTE: Occupancy without the CO can be detrimental to the livelihood of the Construction Supervisor. If a Construction Supervisor allows occupancy for any reason without a CO, the Certificate of Qualification of the Construction supervisor and the contractor s license of his employer may be suspended or revoked. As noted throughout the above, the most important person in the construction process is: THE CONSTRUCTION SUPERVISOR.