Introduction to Advances in Power Plant Chemistry

Similar documents
Copper Turbine Deposits

Complete Water Analysis for POWER GENERATION

Steam Cycle Chemistry in Air-Cooled Condensers. NV Energy ACC User s Group * November 12-13, 2009 Andrew Howell * Xcel Energy

GLIMPSES OF IMPROPER WATER CHEMISTRY IN A SUBCRITICAL PULVERIZED COAL FIRED BOILER AT A THERMAL POWER PLANT

Filmforming Amines General aspects and application in power plants today

ACC Chemistry and the Use of Amines Mike Caravaggio ACC Users Group Xi an, Shanxi October 2015

GENESEE GENERATING STATION UNITS 4 AND 5 WATER CONSUMPTION AND EFFLUENT DISCHARGE CHARACTERIZATION REPORT

Complete Water Analysis for POWER GENERATION

QUESTIONNAIRE FOR GENERAL WTP REQUESTED DATA FOR THE WATER TREATMENT PLANT (WTP) - Application : groundwater (well pit); urban wastewater;

Boiler Water Chemistry: Getting From the Source to the Boiler Colleen M. Layman, PE

RECOMMENDED SCOPE OF ACCREDITATION (For Testing Laboratories) * Test Method / Standard against which tests are performed

TSS The TSS analyser was operational during the reporting period. The composite sampler is in place to cover any shortfalls in the TSS analyser.

Complete Water Analysis for POWER GENERATION

GB/T Translated English of Chinese Standard: GB/T NATIONAL STANDARD

Guideline for Technical Regulation Volume 2

Chemical Analysis of Industrial Water TABLE OF CONTENTS

Boiler/Cooling Water Processes and Parameters

1. Scaling. H.O.: H-5/21, KRISHNA NAGAR, DELHI Tel.: , Fax:

BOILER WATER TREATMENT TECHNOLOGY. DSS HEAD OFFICE - SERPONG May 2008

Presented by: Jeff Freitag, The Water Guy Jon Tiegs, General Manager

Water Quality Assessment and Wastewater Management in Thermal Power Plants

Detroit Water and Sewerage Department Water Quality Division Laboratory Analysis of Water Samples Collected at Lake Huron Plant 6/9/2015

Non-Toxic, OEM Compliant Metal Protection. A Surface-Active Metal Passivation Technology For Low, Medium & High Pressure Boilers

Kogan Creek Power. Condenser. Contents. Update For ACC User Group. Kogan Creek Power Station and its Air

Bushy Park Industrial Complex Bushy Park, South Carolina

Carbohydrazide A Hydrazine Replacement: 10 Years of Utility Experience

Iron Monitoring with Non-Contact Nephelometry

CERTIFICATE OF ANALYSIS

Lake Huron Water Treatment Plant Mineral Report

9/20/2015. The Members of IAPWS are countries or neighbouring countries

Lake Huron Water Treatment Plant Mineral Report

Process water quality factors

Detroit Water and Sewerage Department Water Quality Division Laboratory Analysis of Water Samples Collected at Lake Huron Plant 10/14/2014

Acid conductivity basics and some experiences

KKB Micro Testing Labs Pvt. Ltd., , 2 nd Floor, Tarun Plaza, NFC Main Road, Krishna Nagar Colony, Moula Ali, Hyderabad, Telangana

performance of the ultrapure make-up system at Turkey Point Nuclear Power Plant

Chemistry and Corrosion Issues in Supercritical Water Reactors

Air Cooled Condenser Users Group: Corrosion Product Transport Monitoring

Reducing Energy & Water In Your Boiler House Charles Astbury Commercial Operations GE Water & Process Technologies

Chilled Ammonia Process Update. Richard Rhudy, EPRI Sean Black, ALSTOM CO 2 Capture Network May 24, 2007 Lyon, France

Chemistry and Corrosion Issues in Supercritical Water Reactors

Lecture 1: Introduction

In looking back at the history of boiler

Pre-owned 240 MW Combined Cycle Gas Turbine Power Plant

Chilled Ammonia Technology for CO 2 Capture. October, 2006

Water The Universal Solvent

TSS The TSS analyser was operational during the reporting period. The composite sampler is in place to cover any shortfalls in the TSS analyser.

Operation Optimization of Condensate Polisher and Effect Analysis. on Improving Quality and Efficiency in Dingzhou Power Plant

PRESENTATION OF CONDENSATE TREATMENT

Reducing Energy & Water In Your Boiler House Charles Astbury Commercial Operations GE Water & Process Technologies

Amines in Air Cooled Condensers San Diego Annual Conference September 24, Bill Stroman

Superintendence Company of India Private Limited, Plot Y-23, Block-EP, Sector-V, Salt Lake City, Kolkata, West Bengal

SOME ENERGY-EFFICIENT TECHNOLOGIES IN JAPAN

The Locomotive. A Copper-Plated Thief: The Problem of Copper Deposits in Turbines

BOILER FEED WATER AND ITS TREATMENTS

Discover the On-line Analyzers Suite on EnviroLyzer and TitriLyzer Series. The usual suspects. Product news: SulPhos.

Customized Water Quality Measurement Solutions

efficiency for industry

Concentration control of silica in water chemical regime for natural circulation high pressure drum boiler unit of thermal power station

Evaporative Condenser Passivation. Cameron Klein Strand Associates, Inc.

Heat Recovery Systems and Heat Exchangers in LNG Applications. Landon Tessmer LNG Technical Workshop 2014 Vancouver

PEMP RMD & Cycle Performance. M.S.Ramaiah School of Advanced Studies

Reclaimed Waste Water for Power Plant Cooling Tower Water & Boiler Feed Make-up. Richard Coniglio, Business Product Manager

Page 2. Introduction Page 3. Who should read this brochure? Page 3. Boiler water tests available Page 4

Appendix C Groundwater Quality

CHE-E-2003 Shift Chemist PERSONAL DATA EDUCATION LANGUAGES COMPUTER SKILLS TRAINING COURSES AND CERTIFICATIONS

Chemical Test Kits. Table of Contents Introduction Reference Table Single Parameter Test Kits Multiparameter Test Kits

ADVANTAGES MAIN FEATURES BENEFITS DUPLEX R-EVOLUTION 330/DCA

HI Multiparameter Photometers with up to 44 Measurement Methods. ISO 9001:2000 Certified

CHE-E : Lead Chemist PERSONAL DATA EDUCATION LANGUAGES COMPUTER SKILLS TRAINING COURSES AND CERTIFICATIONS

Combined Cycle Users Group: Trends in Power Plant Chemistry, Water, and Wastewater

Environmental Report - Status Week Ending: Thur 12 h May2006 Generated By: Siobhan Quinn/Mairtin Naughton/Sandra Barber Checked By: Leslie Finnegan

CONDENSATE-FEEDWATER-BOILER SYSTEM ON-LINE ANALYZERS. On-Line Analyzer Sample Point Alarm Points Comments

The data used for this reporting period was taken from the on-site meteorological station.

Application of Advanced Process Control systems in Enel Thermal Generation (Eleonora Porro, Giorgio Mazzola, Giordano Proietti Marini)

SUPERCRITICAL STEAM GENERATOR TECHNOLOGY

French Creek Well # 2 Water Analysis Behind 1221 Ormonde Road

COD. Turbidity. Complete Water Analysis Solutions Enhancing OEM Capabilities. Conductivity. Salinity TOC. Nitrate

SFT-E-1992 HSE Manager PERSONAL DATA EDUCATION LANGUAGES COMPUTER SKILLS TRAINING COURSES AND CERTIFICATIONS

"Significant Cost Savings Obtained Using Advanced Membrane Systems for Cooling Tower Water Treatment and in ZLD plants

Making feed water for you! Advantage. Protecting any Water Treatment System against. Scaling. a Water Company WAT C H WAT E R

NPDES COMPLIANCE OF COOLING TOWERS BLOWDOWN AT POWER PLANTS WITH RECLAIMED WATER AS SOURCE WATER

Prakruti Environmental Engineers (Environmental Laboratory), 1, Utkanth Society, B/H Alkapuri Club, Alkapuri, Vadodara, Gujarat

NTPC O&M Conference Performance and Optimization of Water Utilisation Increase of Existing Power Plants. Speaker Name; Tufani Ram 13-14/02/2013

CALA Directory of Laboratories

Steam and Water Analysis Systems (SWAS) An Exclusive Range for Sample Conditioning and Analysis Systems

MARAMA Webinar August 7, Angelos Kokkinos Chief Technology Officer Babcock Power, Inc.

Boiler Water No.1 Test Kit Instruction Manual

Western BLRBAC Review/Refresher of Tappi Water Quality Guidelines and Contamination Procedures for mill boilers operating on high purity water

Design Considerations for Advanced Combined Cycle Plant Using Fast Start Drum Type HRSGs

DECOMPOSITION OF HYDRAZINE IN PRESERVED BOILERS 1

Cooling Tower Blowdown Treatment and Reuse in a Coal Fired Power Plant in India - Reducing the water footprint in coal fired power plants -

Wastewater Characterization. Tenaska Westmoreland Generating Station

Complete Water Analysis Solutions for Power, Heat & Steam Generation

Nadeem Shakir Qatar Petroleum. The 2nd Joint Qatar Japan Environmental Symposium, QP JCCP The 21st Joint GCC Japan Environmental Symposium

Application Data Sheets ISSUE DATE 17/04/ :09:40

Des Moines River Water Quality Network

Study of Failure of the Steam Tubes of Boiler Furnaces in Najebia Power Plant ABSTRACT Introduction

Common Well Problems. Common Well Problems. Well Forensics. Difficult Well Problems May Require Well Forensics 12/11/2017

Water supplied by Marafiq does not meet the process requirements.

Transcription:

Introduction to Advances in Power Plant Chemistry

Objectives and other details of modules Duration 90 minutes Training aids Power point Presentations Objective At the end of the session participants will be able to: Describe advances made in boilers - design & size and chemical control limits with reference to different types / sizes of boilers for: Feed water Steam water cycle Superheated steam cycle Condensates List out online and offline instruments in SWAS and purpose of these instruments Use online and offline instruments for measuring parameters related to water chemistry 11/27/13 Fußzeilentext 2

Advances in Boiler design and its implication for water chemistry Double Drum Boiler early 60s 50-100MW Single Drum with mud and clean compartment Russian design/skoda-50, 100, 200 MW Single Drum Boiler- BHEL based on CE design/alstom/ansaldo - 210, 250, 500 MW, 600MW (Chinese) Drum less subcritical Boiler- Stain France - 500MW Supercritical Boiler- BHEL based on Alstom design- 660, 800 MW, MHI, Ansaldo, Toshiba, Babcock 660 MW 11/27/13 Fußzeilentext 3

Chemical Control Limits in Different Design Boiler For Steam-water Cycle

CHEMICAL CONTROL LIMITS FOR FEED WATER OF 60,100 & 200 MW SN Parameter 60 MW 100MW 200 MW 1 ph at 25oC 8.8-9.0 8.8-9.0 8.8-9.0 2 Cation Conductivity, µs/cm 0.3 0.3 0.2 3 Dissolved O2, µg/l, max 7 7 5 4 Silica, µg/l, max 20 20 20 5 Residual N2H4, µg/l 20-30 20-40 10-20 6 Total Fe, µg/l, max 10 10 10 7 Total Cu, µg/l, max 5 5 5

CHEMICAL CONTROL LIMITS FOR FEED WATER OF 500 MW AND ABOVE SN Parameter 500 MW 1 ph at 25oC 9.0 9.2 2 Cation Conductivity, µs/cm 0.2 3 Dissolved O2, µg/l, max 5 4 Silica, µg/l, max 10 5 Residual N2H4, µg/l 10 20 6 Total Fe, µg/l, max 10 7 Total Cu, µg/l, max 3 11/27/13 Fußzeilentext 6

CHEMICAL CONTROL LIMITS OF STEAM-WATER CYCLE OF 60,100 & 200 MW SN Parameter 60 MW 100MW 200 MW 1 ph at 25oC 9.2 9.7 9.2 9.5 9.2 9.5 2 Sp. Conductivity, µs/cm, at 25oC, max 30 50 30 3 Silica, mg/l, max 2.5 1.5 0.4 4 Phosphate, mg/l 2 6 2 6 2-4 5 Chloride, mg/l, max 1.6 1.0 1.0 11/27/13 Fußzeilentext 7

CHEMICAL CONTROL LIMITS OF STEAM-WATER CYCLE OF 500 MW & ABOVE SN Parameter 500 MW 1 ph at 25oC 9.1 9.4 2 Sp. Conductivity, µs/cm, at 25oC, max 20 3 Silica, mg/l, max 0.1 4 Phosphate, mg/l 1 2 5 Chloride, mg/l, max 0.5 11/27/13 Fußzeilentext 8

CHEMICAL CONTROL LIMITS OF SUPERHEATED STEAM CYCLE OF 60,100 & 200 MW SN Parameter 60 MW 100MW 200 MW 1 ph at 25oC 8.8 9.0 8.8 9.0 8.8 9.0 2 Cation Conductivity, µs/cm, at 25oC, max 0.35 0.3 0.2 3 Silica, µg/l, max 20 20 20 4 Sodium, µg/l, max 10 5 5 5 Ammonia, mg/l, max 0.5 0.5 0.5 6 Iron, µg/l, max 10 10 10 7 Copper, µg/l, max 58.8 5 5 11/27/13 Fußzeilentext 9

CHEMICAL CONTROL LIMITS OF SUPERHEATED STEAM CYCLE OF 500 MW & ABOVE SN Parameter 500 MW 1 ph at 25oC 9.0 9.2 2 Cation Conductivity, µs/cm, at 25oC, max 0.2 3 Silica, µg/l, max 10 4 Sodium, µg/l, max 5 5 Ammonia, mg/l, max 1.0 6 Iron, µg/l, max 10 7 Copper, µg/l, max 3 11/27/13 Fußzeilentext 10

CHEMICAL CONTROL LIMITS OF CONDENSATE OF 60,100 & 200 MW SN Parameter 60 MW 100MW 200 MW 1 ph at 25oC 8.8 9.0 8.8 9.0 8.8 9.0 2 Cation Conductivity, µs/cm, at 25oC, max 0.35 0.3 0.3 3 Silica, µg/l, max 20 20 20 4 Dissolved O2, µg/l, max 50 40 40 5 Ammonia, mg/l, max 0.5 0.5 0.5 6 Total Iron, µg/l, max 10 10 10 7 Total Copper, µg/l, max 5 5 5 11/27/13 Fußzeilentext 11

CHEMICAL CONTROL LIMITS OF CONDENSATE OF 500 MW & ABOVE SN Parameter 500 MW 1 ph at 25oC 9.0 9.2 2 Cation Conductivity, µs/cm, at 25oC, max 0.2 3 Silica, µg/l, max 10 4 Dissolved O2, µg/l, max 40 5 Ammonia, mg/l, max 1.0 6 Total Iron, µg/l, max 10 7 Total Copper, µg/l, max 3 8 Sodium, µg/l, max 5 11/27/13 Fußzeilentext 12

CHEMICAL CONTROL LIMITS OF STEAM-WATER CYCLE FOR POWER PLANT UNITS TREATED CONDENSATE CPU In/Out) S.N. PARAMETER 2x500MW 3x500MW 3x500MW 1. Type of CPU provided Deep MB Deep MB Deep MB (Ammonex) (Consep) (Seprex) IN/OUT IN/OUT IN/OUT 2. ph at 25oC, max -- 9.2/-- 9.2/-- 3. 4. 5. 6. 7. 8. 9. 10. 11. Ammonia, µg/l, max Cation Conductivity, µs/cm, at 25oC, max Silica, µg/l Sodium, µg/l Chloride, µg/l Iron, µg/l Copper, µg/l TDS, µg/l -- --/0.1 20/5 10/1 10/1 50/5 5/2 100/25 50/10 500/-- --/0.1 20/5 10/2 10/2 50/5 5/2 100/25 50.5/ 500/-- --/0.1 20/5 10/2 10/2 50/5 5/2 100/25 50/5 Crud, µg/l 13

CHEMICAL CONTROL LIMITS OF STEAM-WATER CYCLE FOR COAL/GAS BASED UNITS (100 & 200 MW) PRIMARY STATOR WATER SN Parameter 60 MW 100MW 200 MW 1 ph at 25oC 2 Sp. Conductivity, µs/cm, at 250C, max Stator is cooled by H2 Stator is cooled by H2 6.8 7.0 3 Dissolved O2, mg/l, max 1.0 4.5 4 Copper, µg/l, max - 5 Iron, µg/l, max - 1.0 11/27/13 Fußzeilentext 14

COAL BASED UNITS (500 MW AND ABOVE) PRIMARY STATOR WATER SN Parameter 500 MW 1 ph at 25oC 8.5 9.0 2 Sp. Conductivity, µs/cm, at 250C, max 2.2 3 Dissolved O2, µg/l, max 10 4 Copper, µg/l, max 20 5 Iron, µg/l, max 20 11/27/13 Fußzeilentext 15

CHEMICAL CONTROL LIMITS OF STEAM-WATER CYCLE FOR GAS/NAPHTHA BASED UNITS FEED WATER SN Parameter 88MW (GT)+ 149MW (ST) 111.19M W(GT) 109.3M W(ST) 106MW (GT) 116.1MW (ST) 144.3MW (GT) 225MW (ST) 1 ph at 25oC 9.2 9.7 8.5 9.5 9.0 9.5 8.5-9.5 2 Cation Conductivity, µs/cm 0.2 0.2 0.2 0.2 3 Dissolved O2, µg/l, max 7 7 10 7 4 Silica, µg/l, max 20 20 20 20 5 Residual N2H4, µg/l, max - 10-10 6 Total Fe, µg/l, max 20 20 20 30 7 Total Cu, µg/l, max 3 3 5 20 11/27/13 Fußzeilentext 16

CHEMICAL CONTROL LIMITS OF STEAM-WATER CYCLE FOR GAS/NAPHTHA BASED UNITS BOILER WATER (HP DRUM) SN Parameter 88MW (GT)+ 149MW (ST) 111.19M W(GT) 109.3MW (ST) 106MW (GT) 116.1MW (ST) 131 MW(GT) 225MW (ST) 1 ph at 25oC 9.8 10.2 9.2 10.3 9.5 10.5 9.0 9.8 2 Sp. Conductivity, µs/cm, at 25oC, max 50 100 150 150 3 Silica, mg/l, max 4.0 2.0 2.0 2.0 4 Phosphate, mg/l, max 6 3 10 1 10 2-6 5 TDS, mg/l, max 100 100 100 100 6 Chloride, mg/l, max 10 10 10 10 7 Total Iron, mg/l, max 0.5 0.5 0.5 0.5 8 Total Copper, mg/l, max 0.1 0.1 0.1 0.1 11/27/13 Fußzeilentext 17

GAS/NAPHTHA BASED UNITS BOILER WATER (LP DRUM) SN Parameter 88MW (GT)+ 149MW (ST) 111.19M W(GT) 109.3MW (ST) 106MW (GT) 116.1MW (ST) 131 MW(GT) 225MW (ST) 1 ph at 25oC 9.8 10.2 9.2 10.3 9.5 10.5 9.0 10.5 2 Sp. Conductivity, µs/cm, at 25oC, max 50 100 150 150 3 Silica, mg/l, max 4.0 2.0 5.0 2.0 4 Phosphate, mg/l, max 6 3 10 10 20 15 5 TDS, mg/l, max 100 100 100 100 6 Chloride, mg/l, max 10 10 10 10 11/27/13 Fußzeilentext 18

CHEMICAL CONTROL LIMITS OF STEAM-WATER CYCLE FOR GAS/NAPHTHA BASED UNITS MAIN STEAM SN Parameter 3x88MW (GT)+ 1x149 MW (ST) 4x111.19 MW(GT) +2x109.3 MW(ST) 4x106 MW (GT) +2x116.1 MW (ST) 3x144.3 MW(GT) +1x225 MW (ST) 1 ph at 25oC 9.2 9.7 8.5 9.5 8.8 9.2 8.8 9.2 2 Cation Conductivity, µs/cm, at 25oC, max 0.2 0.2 0.2 0.2 3 Silica, µg/l, max 20 20 20 20 4 Sodium, µg/l 10-10 10 5 Ammonia, mg/l, max - - - - 6 Iron, µg/l, max 20 - - 20 7 Copper, µg/l, max 3 - - 20 8 Chloride, µg/l, max - - - 3 11/27/13 Fußzeilentext 19

GAS/NAPHTHA BASED UNITS CONDENSATE SN Parameter 3x88MW (GT)+ 1x149 MW (ST) 4x111.19 MW(GT) +2x109.3 MW(ST) 4x106 MW (GT) +2x116.1 MW (ST) 3x144.3 MW(GT) +1x225 MW (ST) 1 ph at 25oC 9.2 9.7 8.5 9.2 8.8 9.2 8.5 9.5 2 Cation Conductivity, µs/cm, at 25oC, max 0.2 0.2 0.2 0.2 3 Silica, µg/l, max 20 20 20 20 4 Dissolved O2, µg/l, max 100 20 20 25

SWAS Online Instruments in SWAS Silica Analyzer Phosphate Analyzer ph meter Conductivity meter ACC Conductivity meter Hydrazine Analyzer Ammonia Analyzer Dissolved Oxygen Analyzer 21

SWAS OFF Line Instruments in SWAS ph meter Conductivity meter Turbidity meter Double Double bean spectrophoto meter to analyze: Silica Ammonia Hydrazine Phosphate Iron Copper 22