W E T L A N D V E G E TAT I O N T U K U R A K A U W E T L A N D. Notified designation. Likely long term designation. Construction footprint

Similar documents
Ecological Management Plan (EMP)

Proposed resource consent conditions as at 10 December 2012

Technical Report 26. Ecological Impact Assessment

Description. First Draft for BECA. review. review. Signed

Construction Environmental Management Plan (CEMP)

BEFORE A BOARD OF INQUIRY MACKAYS TO PEKA PEKA EXPRESSWAY PROPOSAL

Ecologically Beneficial Native Afforestation Site Prioritisation. for carbon sinks and other purposes. Kāpiti Coast District

Erosion and Sediment Control Plan (ESCP)

21 Terrestrial ecology

Settlement Effects Management Plan (SEMP)

subdivision BUSH LIVING ENVIRONMENT ASSESSMENT CRITERIA RULES

Tools and methods to manage groundwater and settlement effects from the construction of an expressway on peat deposits

D9. Significant Ecological Areas Overlay

Peka Peka to North Ōtaki Expressway Proposal

13 Land Use Activities and Indigenous Biological Diversity

Network utilities, subject to compliance with Part 6 (Infrastructure) A.3 Existing vegetation cover.

IMPACT MONITORING & MANAGEMENT The Challenge of a New Paradigm

Appendix D: Draft designation and resource consent conditions

S e c t i o n B i o d i ve r s i t y

30 November New Zealand Transport Agency, Christchurch Attn To: Richard Shaw PO Box 1479 Christchurch Dear Richard

3 Objectives 3 Ob jec tives

1. RESOURCE MANAGEMENT STRATEGY

Issues... 1 Objectives... 3 Policies... 4 Methods of Implementation... 5 Rules... 8

subdivision INFILL SUBDIVISION ASSESSMENT CRITERIA RULES

Beds of Water Bodies 14 September 2017

STATEMENT OF EVIDENCE OF BRYDON NICHOLAS HUGHES ON BEHALF OF THE KAPITI COAST DISTRICT COUNCIL. Groundwater. DATE: 5 October 2012

an overarching Construction Environmental Management Plan (CEMP); a series of topic specific management plans (e.g. noise, air quality etc); and

Scheme Assessment Report

National Policy Statement for Freshwater Management. National Environmental Standard on Ecological Flows and Water Levels

27 Land and groundwater contamination

Prepared by Christchurch City Council, P.O. Box 73013, Christchurch. Submission by Avon-Ōtākaro Network, 9 Stable Way, Christchurch 8051

TRANSMISSION GULLY PROJECT. TECHNICAL REPORT #11 Ecological Impact Assessment August 2011

Form 1: Application for resource consent

Greater Wellington Regional Council BIODIVERSITY STRATEGY. Cover photos

Progress in Implementing Porirua and Catchment Strategy and Action Plan

INDICATIVE SITE SPECIFIC ENVIRONMENTAL MANAGEMENT PLAN (SSEMP)

Kaipara District Plan

BUILDINGS WITHIN A FAULT AVOIDANCE ZONE

5 Land and Soil Module

Report to ENVIRONMENTAL PLANNING & REGULATIONS Committee for information

The aims of the Kaipara River Catchment Water Allocation Strategy are:

13 Section 32 Summary for the Residential Chapter

KAPITI COAST DISTRICT COUNCIL SUBDIVISION AND DEVELOPMENT PRINCIPLES AND REQUIREMENTS

subdivision WORKING ENVIRONMENT AND COMMUNITY ENVIRONMENT RULES ASSESSMENT CRITERIA

Draft long term plan Consultation - supporting information. Draft activity chapters

JW/docDM AEE for Non-Minimum Impact Activities

B7. Toitū te whenua, toitū te taiao Natural resources

Waituna Creek Restoration

14 NATURAL HAZARDS Background Resource Management Issues

A smaller 7.65MW wind farm at Mount Stuart, comprising 9 turbines with a maximum height of 75- metres, was also constructed in 2011.

MPT.2.8. Management Plan Technique. Index. Description and Explanations

8 Subdivision and Development

E2. Water quantity, allocation and use

RIPARIAN LAND MANAGEMENT AND PUBLIC ACCESS DISTRICT WIDE ACTIVITY

OPERATIVE STATUS and SEAL OF THE COUNCIL

Relevant objectives and policies

CONTENTS. Tairāwhiti Resource Management Plan Part F

5.2 Discharges to water and land

Southshore residential red zone: Summary of Technical Information as at September Area ID: 1. Purpose of this document

E1. Water quality and integrated management

5.3 CONSERVATION (WETLAND) ZONE

8. Indigenous Biodiversity

Southshore residential red zone: Summary of Technical Information as at October Area ID: 1. Purpose of this document

Appendix R. Social and Environmental Screen

CATEGORY a protection of the natural environment, its ecosystems and biodiversity.

general natural area GUIDELINES TO THE RULES This section updated September 2015

Berth 9 Quay Extension Environmental Statement Non-Technical Summary

RESIN & WAX HOLDINGS LIMITED, PO BOX 5228, WELLESLEY STREET, AUCKLAND 1141

Maniapoto Clean-Up Priorities Project. Ā muri kia mau ki tēnā, kia mau ki te kawau mārō, whanake ake, whanake ake

Part B Assessment of Environmental Effects. Earthworks (Minor Effects) Consent No.:... Earthworks (Minor Effects) AEE 6

LNG Canada Development Inc.

September 2016 ID Competency Statement Type

Through the adoption of proposed mitigation measures, it is considered that the Project will be consistent with this objective.

Kooragang Wetland Rehabilitation Project : 21 years of ecosystem repair and management in the Hunter River estuary Updated: 8/3/2016

DRAFT DECISION AND REPORT OF BOARD OF INQUIRY UNDER SECTION 149Q OF THE ACT

Ministry for the Environment - Biodiversity Planning and Management Research

National Environmental Standards for Plantation Forestry. Overview of the regulations

Contents LM Land Management... 1

Most of Kaipara s District is Rural and this Chapter sets out how this area will be managed through the District Plan

Assets and services mean the way that stormwater and wastewater is collected into a network, transported, treated and/or discharged, and includes

Appendix 11. Erosion and Sediment Control Management Plan. Appendix 11

Contents. LM Land Management 1. Issues 1. Objectives 4. Policies 4. Methods of Implementation 5. Rules 8. Land Management 14 September 2017

ACKNOWLEDGEMENTS. Melanie McColgan of the Waimaori Streamcare Programme your time, knowledge and patience with the children was truly inspirational.

Waitarere Beach Road Curves Project Erosion and Sediment Control Plan

WESTERN WWTP CONTINUOUS DISCHARGES TO THE CMA. Application under section 127 of the RMA to cancel condition 24 of WGN [33277] February 2018

G: DESIGNATIONS PART G DESIGNATIONS KAPITI COAST DISTRICT COUNCIL G - 1 DISTRICT PLAN

7 Section 32 Summary for the Natural Hazards Chapter

URBAN WATER QUALITY STRATEGY FOR OTAGO. Caring for Otago s environment: Enabling communities to thrive

8.3.1 Objective TW1 Recognition of Values & Traditional Relationships

PART A RESOURCE MANAGEMENT REQUIREMENTS

15B Maori Purposes: Treaty Settlement Land

LNG Canada submitted a formal update as per Condition 11.2 of the CEAA Decision Statement on June 30, 2017:

This chapter describes the potential hydrological effects of the Project in terms of:

FORM B: DAMMING AND DIVERSION OF WATER

14 Business: Commercial and Industrial Chapter

AND STATEMENT OF EVIDENCE OF RICHARD JOHN MATTHEWS

30A RULES FOR RENEWABLE ENERGY GENERATION

Welcome Bay Sub-Catchment Action Plan

6.5 The Present Situation Water Quality Stormwater quality is currently being improved by:

SECTION 3: Water, Wetlands and Waterways

Transcription:

Notified designation Likely long term designation Construction footprint Wetlands & wet depressions Vegetation affected Wetland condition monitoring location 2.03 June 14, 2013 W09181B_WET_ValuedWetlands_A4mb.mxd 2.03 2.04 2.05 2.06 2.07 2.08 Sedge-rushland dominated wetlands Cyperus ustulatus dune depressions Manuka wetlands Manuka wetlands with Sphagnum Mature & maturing swamp forest with kahikatea Open water / permanent ponds NOTE : Maps show design as lodged for AEE. Location and extent of ecological mitigation planting to be subject to detailed design. 1:750 @ A4 2.08 m 0 50 W E T L A N D V E G E TAT I O N T U K U R A K A U W E T L A N D 6

Notified designation Likely long term designation Construction footprint Wetlands & wet depressions Vegetation affected Wetland condition monitoring location 2.05 June 14, 2013 W09181B_WET_ValuedWetlands_A4mb.mxd 2.03 2.04 2.05 2.06 2.07 2.08 Sedge-rushland dominated wetlands Cyperus ustulatus dune depressions Manuka wetlands Manuka wetlands with Sphagnum Mature & maturing swamp forest with kahikatea Open water / permanent ponds NOTE : Maps show design as lodged for AEE. Location and extent of ecological mitigation planting to be subject to detailed design. 1:1,500 @ A4 m 0 50 100 W E T L A N D V E G E TAT I O N N G A R A R A W E T L A N D 7

7.8 Estuarine/marine habitat 7.8.1 Introduction The TR 5: Estuarine Habitat & Species: Description and Values, describes the ecological values of the estuaries traversed by the Project Alignment. In summary, of the six stream mouths that will potentially receive discharges from earthworks associated with this project all but the Waikanae estuary are high energy environments directly exposed to wave action and so are unlikely to suffer from sediment deposition. In contrast the Waikanae Estuary has areas of mud flat and saltmarsh which could be adversely affected by a large discharge. A range of consent conditions require monitoring of sediment discharges and adaptive management where effects are observed during and post-construction. 7.8.2 Consent conditions There are five consent conditions that relate to the protection and management of estuarine/marine environments (G.27, G.34, G.38, G.40 & E.9). A number of these are the responsibility of other disciplines (e.g. E.9) but will require ecological input. The consent conditions that relate specifically to estuarine/marine habitat and species are listed in full in Attachment 6. 7.8.3 Plan objectives There are four key requirements for management of Waikanae Estuary: Sediment and erosion control will be developed and carried out in coordination with water and habitat quality monitoring by the Project Ecologist. Carry our 1 year of Baseline sampling prior to earthworks and establish trigger thresholds. Monitor through construction and for two years following construction. Respond to any exceedence of triggers. 7.8.4 Summary of baseline studies The Waikanae River estuary is a tidal river mouth estuary. The low energy environment of the Waikanae Estuary has potential to accumulate sediment and associated contaminants. The location of Waikanae Estuary can be seen on Map 22. 7.8.5 Protection requirements Marine and estuarine protection comes from best practice Erosion and Sediment Control and this is addressed in Attachment 4 and also outlined in the freshwater section above. 18 June 2013 // Page 95

7.8.6 Mechanisms for protection i. Detailed Design Freshwater ecology involvement in development of the ESCP as it relates to sediment discharge, monitoring and adaptive management. Baseline sampling and development of triggers. ii. Enabling Works Nil iii. Construction Bi-annual sampling (winter and summer) of the Waikanae Estuary is required to monitor sediment levels through construction. Response to significant events if deemed appropriate. iv. Post Construction Post construction monitoring will continue in the Waikanae Estuary for two years to confirm there have been no long term adverse effects. 7.8.7 Monitoring Attachment 6 details the construction and post-construction monitoring required. In summary, this comprises the following: Bi-annual intertidal estuarine sampling based on the Estuarine Environmental Monitoring National Protocol will be undertaken within the Waikanae Estuary in the same locations as the baseline surveys during winter and summer thorough construction and for 2 years post-construction. This monitoring will be carried out by the Project Ecologist based on methods detailed in Attachment 6 and reports will be prepared accordingly. 7.8.8 Management i. Management Triggers Attachment 6 details the triggers that if exceeded, will determine whether an effect has occurred in estuarine fauna. In summary this triggers is: A 50% variation in either Permanova-type analysis or Shannon-Weiner diversity indices from the baseline data ii. Process if Adverse Effects In the event unanticipated adverse effects occur, a response may be required. iii. Remedial options The potential options to remedy effects on estuarine fauna will be determined on a case-by-case basis depending on a range of factors. Options may include the following: 18 June 2013 // Page 96

Machine clearance or raking of any deposited sediments Temporarily opening up the Waikanae River to flush out any contaminants/sediment. The method used will be determined as part of required response. iv. Additional Mitigation Nil 7.8.9 Linkages There are two conditions specific to other activities that overlap with protection of the ecological values of estuarine/marine habitat. They are: An overlap between the EMP and the Erosion and Sediment Control Plan (ESCP) under conditions G.26A to G.28 and E.2 to E.11 as it relates to discharges to streams and the Coastal Marine Area; An overlap between the Construction Erosion and Sediment control plans (CESCPs) under Conditions E.1 to E.11 as they relate to events such as exceedances of water quality triggers in streams or impacts on wetlands or the estuarine/marine environment; These require liaison and coordination through design and construction between the Project Ecologist and the Erosion and Sediment Management team. 7.8.10 Roles and responsibilities In summary the responsibilities for estuarine/marine ecosystems are: i. Design Manager (Roading and Structures) Liaison with Project Ecologist over development of development of the ESCP and associated monitoring, ii. Environmental Manager Communication with Project Ecologist through staging of earthworks. iii. Site Foreman Responsible for liaison with Project Ecologist during enabling works and construction phase for erosion and sediment control methods. Responsible for liaison with Project Ecologist during any exceedence of erosion and stormwater standards and associated reporting. iv. Project Landscape Architects Nil v. Project Ecologist Environmental Awareness Training of personnel responsible for supervising earthwork site staff in conjunction with the Environmental Manager. 18 June 2013 // Page 97

Carrying our ongoing construction and post-consultation monitoring of estuarine systems in the Waikanae Estuary. Developing in consultation with the Environmental Manager any adaptive management programmes in the event effects are greater than consent conditions allow. 18 June 2013 // Page 98

Tutere St Ara Kuaka Tutere St WhitmoreGrve " WAE-02 " Waikanae Estuary Scientific Reserve WAE-01 Accessway Oratia St Tutere St Barrett Drv Tutere St Durie Pl Major Te Ropata Pl Queens Rd Weggery Pl Marew a Tamati Pl Queens Rd Pine Ridge Tce Cres Hick s Drive West Manly St Tce Olive Te KupeRd Manly St Tce Oli v e Manly St Hadfield Pl Winton St Manly St Manly St Taranui Manly St Way Takahe Drv Kakapo Crt Kotuku Drv PatekeWay Kotuku Drv Kotuku Drv PetrelClse Makora Rd Ruru Rd Kokako Rd May 08, 2013 W09181B_MAR_CoastalMarine_A4.mxd Donovan Rd Michael Rd Percival Rd Francis Rd Byron St Donovan Rd Winton St Mazengarb Rd Walton Rd Ra ngiatea St " Sample & Monitoring Sites DOC Reserve Michael Rd The Avenue Lane Rifleman PinewoodGrve Manly St The Drive The Drive Wo od Matu ku Pl Lgh The Drive 1:10,000@ A4 m 0 100 200 300 400 500 Ot aihanga Rd COASTAL MARINE AREA & RIVER MOUTHS Waikanae Estuary 1

7.9 Mitigation sites and the SSEMPs 7.9.1 Introduction Mitigation requirements have been determined based on the known extent of vegetation loss and the loss of streams, wetlands, and habitat for lizards and fernbird. These mitigation quantities are described in resource consent conditions G.42 to G.42B. In summary a total of 40.7 ha of planting is required for the purposes of landscape and ecological mitigation. This sum includes terrestrial revegetation, wetland development and restoration, stream restoration and the formation of enhanced waterway diversions. This mitigation is to occur in six sites and for each site a Site Specific Ecological Mitigation Plan (SSEMP) is required. 7.9.2 Consent conditions Consent conditions are divided between those that specify the quantum of mitigation that is required (G.42 and G.43, see Section 3.5 of this report) and those that detail the contents of the SSEMPs for each mitigation site (G.19, G.19A, G42C, see Section 3.6). The purpose of SSEMPs is to ensure details of the mitigation works are consistent with the EMP and will achieve the outcomes and standards required under condition G.33B. Condition G.42, G.42A, and G.42B set out the quantum of mitigation that is required, the timing of that mitigation and notes that it should be as far as practicable like-for-like. Condition G.43 sets out the requirements for protection of these mitigation sites in the long term. Condition G.19 and G19A relate to preparation and certification of the SSEMPs and their consistency with the EMP. Condition G.42C sets out the purpose of the SSEMP, identifies what each SSEMP must include, specifies which key stakeholders must be consulted with, and summarises reporting requirements. The following flowchart outlines the Site Specific Management Plan (SSMP) process. 18 June 2013 // Page 100

18 June 2013 // Page 101

7.9.3 Plan objectives The primary requirement for the ecological mitigation is: To achieve the levels of mitigation determined through the assessment of adverse effects for all habitats described in resource consent condition G.42 and associated conditions and detailed in the technical attachments. In addition to the area and location specified in condition G.42 and G.43, various consents require consideration of habitat types or features including: Creation of lizard habitat features. Creation of fernbird habitat features in the Kakariki SSEMP. Creation of wetland habitat that is as close as possible like for like, including: 4.1 ha sedge rushland; 1.3 ha Cyperus ustulatus dune depressions; 4.0 ha manuka wetlands; and 0.2 ha manuka sphagnum wetlands. 7.9.4 Summary of mitigation sites The ecological mitigation areas outlined in the SSEMP site maps have a range of mitigation requirements, including offset flood storage requirements to minimise flood risk and landscape and visual mitigation. However, as specified by the relevant consent conditions, all areas of ecological mitigation identified in the SSEMP maps will be designed by the Project Ecologist with input from the Project Landscape Architect to ensure these areas are constructed and maintained in a manner that results in these areas having the requisite ecological functioning, whilst fulfilling the other mitigation requirements. The SSEMP site maps that outline the indicative areas of ecological mitigation to be undertaken in each SSEMP area; often these areas are part of a larger planted area that fulfil both landscape and visual mitigation and for offset flood storage. However, where this occurs the planting proposed for the SSEMP areas identified have priority over the Planting Plan Maps included in Attachment 8 of the LMP. These maps and the final locations of ecological and landscape and visual mitigation planting within each SSEMP site will be refined through the Site Specific Management Plans prepared for each area. These mitigation and remedial works are to be carried out in six specific locations with each location requiring a separate Site Specific Ecological Mitigation Plan (SSEMP). The rationale for these ecological mitigation sites was that these areas provided the best opportunities to combine the ecological mitigation requirements for Project ecological effects (freshwater, terrestrial vegetation, wetlands, avi-fauna and herpetofauna), with a focus on integration with other mitigation works (e.g. flood storage requirements, landscape and visual requirements etc.). The six ecological mitigation sites are located on NZTA land within the Project designation (with the exception of a length of the Kakariki Stream, which is located on NZTA land 18 June 2013 // Page 102

outside the Designation). An additional ecological site (or SSEMP area) has been identified in the former Waikanae oxidation ponds on KCDC land. The former Waikanae oxidation pond site has been retained as a potential off-site mitigation area for two purposes: As an area to dispose of excess peat that cannot be used elsewhere within the Designation as part of landscaping and noise bund construction; or As an area for any other mitigation required to offset any additional wetland loss than has been consented (e.g. additional to the 1.8 ha of wetland loss consented). The location and extent of the ecological mitigation sites are listed below and shown in the following plans Map 23 to Map 29. Site Name SSEMP Site No 1 - Raumati Manuka Description: A large mitigation site that encompasses the Raumati Manuka Wetland and large flood offset storage areas. This site includes riparian, wetland, terrestrial and landscape and visual mitigation. SSEMP Site No 2 - Drain 7 Description: This large offset flood storage area comprises wetland and riparian ecological mitigation within an existing lowlying area south of the Wharemauku Stream. Interface with flood storage and landscape and visual mitigation planting. SSEMP Site No 3 - Otaihanga Wetlands Description: A large area of wetland, riparian and terrestrial mitigation (including landscape and visual mitigation) between Mazengarb Road and Otaihanga Road, that encompasses the Otaihanga Southern, Central and Northern Wetlands as well as areas of mahoe and kanuka forest. SSEMP Site No 4 - Muaupoko Stream Diversion Description: A small area of freshwater ecological mitigation being undertaken as part of the diversion and realignment of the Muaupoko Stream prior to its outlet to the Waikanae River. Mitigation to work in with existing Waikanae River riparian planting. SSEMP Site No 5 - Kakariki / Smithfield Description: A large area of terrestrial, wetland and riparian mitigation located predominantly within planted offset flood storage areas. This mitigation site is located within an ecological corridor between Nga Manu Nature Reserve and Te Harakeke/Kawakahia Wetland. This area includes large areas of landscape and visual mitigation) SSEMP Site No 6 - Hadfield / Paetawa B Chainage Between 3500 & 4300 Between 4900 & 5400 Between 8400 & 9150 Between 10500 & 10600 Between 13600 & 14900 Between 16800 & 18 June 2013 // Page 103

Description: A large area of predominantly riparian mitigation as part of the stream diversions and culverting in the Paetawa and Hadfield/Kowhai Stream catchments. Includes small areas of terrestrial ecological and landscape and visual mitigation. SSEMP Site No 7 - Former Waikanae Oxidation Ponds (potential site) Description: This area was formerly part of the wider Te Harakeke/Kawakahia Wetland prior to the Waikanae Oxidation Ponds. This area has a Kāpiti Coast District Council approved landscape and ecological restoration plan. This site has been identified as a potential mitigation site for any additional ecological effects outside of the consented wetland loss. 17700 Pharazyn Reserve 7.9.5 Protection requirements Long-term protection of these ecological mitigation sites is specified in condition G.43. Aspects of land tenure are outside of the scope of this EMP. However, this condition also specifies long term management requirements which must include i. Tree works ii. Eco sourcing iii. Weeds control iv. Fencing v. Pest management vi. Biosecurity act vii.inspections and reporting. Consistent with condition G.43, these requirements are to be identified in the SSEMP for each ecological mitigation site, including for that portion of the Kakariki Stream outside of the Designation. 7.9.6 Mechanisms for protection The SSEMPs will detail the actual locations and specific methods for development of these ecological mitigation sites which will be further detailed in the Site Specific Management Plans (SSMPs) to ensure integration and minimise duplication. i. Detailed Design Each of the ecological mitigation sites will have a SSEMP prepared, with the detail of implementation and monitoring for each aspect of the site contained within these SSEMP s (and/or as relevant the SSLMP s or SSMPs). 18 June 2013 // Page 104

ii. Enabling Works Nil iii. Construction Stream diversion formation and associated earthworks will be carried out under the supervision of the Project Ecologist. Wetland formation and associated earthworks will be carried out under the supervision of the Project Ecologist. All revegetation activity for the SSEMP areas will be the responsibility of the project landscape architect, with inputs from the Project Ecologist as required. iv. Post Construction Monitoring is required of all SSEMP sites to confirm that the mitigation has achieved the objectives. 7.9.7 Monitoring Monitoring will be undertaken within the SSEMP sites in accordance with the mitigation success monitoring requirements outlined in the relevant Attachments (wetland, indigenous vegetation, freshwater, avi-fauna and herpetofauna). 7.9.8 Adaptive management i. Management Triggers In the event mitigation does not meet the specific ecological requirements are set out in conditions and specified in the SSEMP, an adaptive management process will commence. 7.9.9 Linkages The key documents, in addition to this EMP, are the SSEMPs as they relate to the 6 ecological mitigation areas, the LMP and a number of the SSLMPs (under conditions DC.53C to DC.58) which are required to map and describe all revegetation activities. The four generic conditions that relate to the SSEMP are: General Condition G.1 requires works to be in general accordance with the Application plan sets including Ecological Mitigation Sites (attached to the EMP); General Condition G.15 describes the application of management plans (including the EMP) and SSMPs (including the SSEMP); General Condition G.19A describes the purpose of the SSMPs including the SSEMP; An overlap with conditions relating to stream diversion and reclamation (WS.1A to WS.12); 7.9.10 Roles and responsibilities In summary the responsibilities for ecological mitigation are: 18 June 2013 // Page 105

i. Design Manager Responsible for input into design of new and enhanced wetlands, planted offset flood storage areas and stream diversions through detailed design. ii. Environmental Manager Communication with the Project Ecologist through staging of earthworks for mitigation works. iii. Site Foreman Responsible for minimising disturbance to sites demarcated for ecological mitigation. Responsible for physical works associated with development of new and enhanced wetlands, planted offset flood storage areas and stream diversions. Responsible for salvaging areas of wetland vegetation within Project Footprint and transfer to ecological mitigation areas. iv. Project Landscape Architect Liaison and coordination with the Project Ecologist during development of the SSLMPs and the SSEMPs. Responsible for the development of multiple ecological mitigation requirements into the SSEMPs and relevant SSLMPs. v. Project Ecologist Liaising with design teams during detailed design, including inputs into SSEMPs and SSLMPs. Environmental Awareness Training of personnel responsible for supervising earthwork site staff in construction of ecological mitigation areas. Carrying our ongoing monitoring of ecological values in SSEMPs and SSLMPs where relevant. Developing in consultation with Environmental Manager and Project Landscape Architect any adaptive management programmes in the event mitigation does not reach required objectives. 18 June 2013 // Page 106

Estimated areas and lengths of ecological mitigation for focus area: Indigenous Terrestrial Habitat: 1.15 ha Indigenous Wetland Habitat: 2.07 ha Stream Mitigation: min 330 m Mitigation Focus Area EXISTING HABITAT (TO BE RETAINED) Indigneous terrestrial vegetation Indigneous wetland FRESHWATER MITIGATION Riparian mitigation planting Indigenous Riparian Planting: 1.14 ha Restored stream WETLAND MITIGATION Wetland mitigation planting Terrestrial mitigation planting OTHER INDIGNEOUS PLANTING Landscape & visual planting POTENTIAL MITIGATION SITES Raumati Kanuka Offset Storage Area OC Flood storage Raumati Manuka Wetland Offset Storage Area OB May 03, 2013 W09181B_MIT_SSEMP_Sites_A4mb.mxd Likely long term designation Notified designation Construction footprint NOTE : Location and extent of ecological mitigation planting to be subject to detailed design. 1:7,500 @ A4 m 0 100 200 300 400 500 SSEMP SITES - GENERAL LOCATION PLAN R A U M A T I M A N U K A 1

Mitigation Focus Area EXISTING HABITAT (TO BE RETAINED) Indigneous terrestrial vegetation Indigneous wetland FRESHWATER MITIGATION Riparian mitigation planting Estimated areas and lengths of ecological mitigation for focus area: Indigenous Terrestrial Habitat: Indigenous Wetland Habitat: Stream Mitigation: 4.34 ha 1.14 ha min 440 m Restored stream WETLAND MITIGATION Wetland mitigation planting Terrestrial mitigation planting OTHER INDIGNEOUS PLANTING Landscape & visual planting Indigenous Riparian Planting: 1.77 ha POTENTIAL MITIGATION SITES Flood storage Otaihanga Mahoe Otaihanga Kanuka Northern Otaihanga Wetland Southern Otaihanga Wetland Offset Storage Area 6A May 03, 2013 W09181B_MIT_SSEMP_Sites_A4mb.mxd NOTE : Location and extent of ecological mitigation planting to be subject to detailed design. 1:7,500 @ A4 Likely long term designation Notified designation Construction footprint m 0 100 200 300 400 500 SSEMP SITES - GENERAL LOCATION PLAN O TA I H A N G A W E T L A N D S 2

Mitigation Focus Area EXISTING HABITAT (TO BE RETAINED) Indigneous terrestrial vegetation Indigneous wetland FRESHWATER MITIGATION Riparian mitigation planting Restored stream WETLAND MITIGATION Wetland mitigation planting Terrestrial mitigation planting OTHER INDIGNEOUS PLANTING Landscape & visual planting POTENTIAL MITIGATION SITES Flood storage Waikanae River May 03, 2013 W09181B_MIT_SSEMP_Sites_A4mb.mxd Estimated areas and lengths of ecological mitigation for focus area: Indigenous Terrestrial Habitat: Indigenous Wetland Habitat: Stream Mitigation: Indigenous Riparian Planting: 0.0 ha 0.0 ha min 75 m 0.46 ha NOTE : Location and extent of ecological mitigation planting to be subject to detailed design. 1:7,500 @ A4 Likely long term designation Notified designation Construction footprint m 0 100 200 300 400 500 SSEMP SITES - GENERAL LOCATION PLAN M U A U P O K O 3

Mitigation Focus Area EXISTING HABITAT (TO BE RETAINED) Indigneous terrestrial vegetation Indigneous wetland FRESHWATER MITIGATION Riparian mitigation planting Estimated areas and lengths of ecological mitigation for focus area: Indigenous Terrestrial Habitat: Indigenous Wetland Habitat: Stream Mitigation: 4.32 ha 2.33 ha min 2350 m Restored stream Indigenous Riparian Planting: 8.80 ha WETLAND MITIGATION Wetland mitigation planting Terrestrial mitigation planting OTHER INDIGNEOUS PLANTING Landscape & visual planting POTENTIAL MITIGATION SITES Flood storage Offset Storage Area 11 Ngarara Wetland May 03, 2013 W09181B_MIT_SSEMP_Sites_A4mb.mxd NOTE : Location and extent of ecological mitigation planting to be subject to detailed design. 1:7,500 @ A4 Likely long term designation Notified designation Construction footprint m 0 100 200 300 400 500 SSEMP SITES - GENERAL LOCATION PLAN K A K A R I K I / S M I T H F I E L D 4

Mitigation Focus Area EXISTING HABITAT (TO BE RETAINED) Indigneous terrestrial vegetation Indigneous wetland FRESHWATER MITIGATION Riparian mitigation planting Estimated areas and lengths of ecological mitigation for focus area: Indigenous Terrestrial Habitat: Indigenous Wetland Habitat: Stream Mitigation: 1.65 ha 0.0 ha min 1375 m Restored stream WETLAND MITIGATION Wetland mitigation planting Terrestrial mitigation planting OTHER INDIGNEOUS PLANTING Landscape & visual planting Indigenous Riparian Planting: 5.25 ha POTENTIAL MITIGATION SITES Flood storage May 03, 2013 W09181B_MIT_SSEMP_Sites_A4mb.mxd Offset Storage Area 13 NOTE : Location and extent of ecological mitigation planting to be subject to detailed design. 1:7,500 @ A4 Likely long term designation Notified designation Construction footprint m 0 100 200 300 400 500 SSEMP SITES - GENERAL LOCATION PLAN H A D F I E L D / P A E TA W A B 5

Mitigation Focus Area EXISTING HABITAT (TO BE RETAINED) Indigneous terrestrial vegetation Indigneous wetland FRESHWATER MITIGATION Riparian mitigation planting Estimated areas and lengths of ecological mitigation for focus area: Indigenous Terrestrial Habitat: Indigenous Wetland Habitat: Stream Mitigation: 0.0 ha 3.92 ha min 1560 m Restored stream WETLAND MITIGATION Wetland mitigation planting Terrestrial mitigation planting OTHER INDIGNEOUS PLANTING Landscape & visual planting Indigenous Riparian Planting: 6.32 ha POTENTIAL MITIGATION SITES Flood storage Offset Storage Area 3A Offset Storage Area 2 May 03, 2013 W09181B_MIT_SSEMP_Sites_A4mb.mxd Likely long term designation Notified designation Construction footprint NOTE : Location and extent of ecological mitigation planting to be subject to detailed design. 1:7,500 @ A4 m 0 100 200 300 400 500 Raumati Kanuka SSEMP SITES - GENERAL LOCATION PLAN D R A I N 7 6

Mitigation Focus Area EXISTING HABITAT (TO BE RETAINED) Indigneous terrestrial vegetation Indigneous wetland FRESHWATER MITIGATION Riparian mitigation planting Restored stream WETLAND MITIGATION Wetland mitigation planting Terrestrial mitigation planting OTHER INDIGNEOUS PLANTING Landscape & visual planting POTENTIAL MITIGATION SITES Flood storage Potential wetland mitigation site, subject to agreement with KCDC and GWRC Ecological mitigation in this area to be consistent with Pharazyn Reserve Landscape and Ecological Restoration Plan 2011 May 03, 2013 W09181B_MIT_SSEMP_Sites_A4mb.mxd Likely long term designation Notified designation Construction footprint NOTE : Location and extent of ecological mitigation planting to be subject to detailed design. 1:7,500 @ A4 m 0 100 200 300 400 500 SSEMP SITES - GENERAL LOCATION PLAN F O R M E R W A I K A N A E O X I D A T I O N P O N D S 7

7.9.11 Staging of SSEMP mitigation The staging for implementation of the ecological mitigation and remedial works required are outlined in Figure 2. Any updates to this Figure will be undertaken through the SSEMP process. 18 June 2013 // Page 114

2015 ECOLOGICAL MITIGATION PLANTING INDICATIVE PROGRAMME ZONE SECTOR SUB SECTOR JANUARY FEBRUARY MARCH APRIL MAY JUNE JULY AUGUST SEPTEMBER OCTOBER NOVEMBER DECEMBER PP SSEMP SITE 5 Bulk earthworks HADFIELD/PAETAWA B complete NORTH SMI NGA SSEMP SITE 4 Bulk earthworks KAKARIKI/SMITHFIELD complete WAI SSEMP SITE 3 Bulk earthworks Planting Planting MUAUPOKO Complete starts complete CENTRAL MAZ OT SSEMP SITE 2 Bulk Earthworks Planting Planting OTAIHANGA WETLANDS complete starts complete RAU WHA SSEMP SITE 6 Bulk Earthworks Planting Planting DRAIN 7 Complete starts complete SOUTH POP RAU SSEMP SITE 1 RAUMATI MANUKA Version: June 2013

2016 ECOLOGICAL MITIGATION PLANTING INDICATIVE PROGRAMME ZONE SECTOR SUB SECTOR JANUARY FEBRUARY MARCH APRIL MAY JUNE JULY AUGUST SEPTEMBER OCTOBER NOVEMBER DECEMBER PP SSEMP SITE 5 Planting Planting HADFIELD/PAETAWA B starts ends NORTH SMI NGA SSEMP SITE 4 Planting Planting KAKARIKI/SMITHFIELD starts complete WAI SSEMP SITE 3 MUAUPOKO CENTRAL MAZ OT SSEMP SITE 2 OTAIHANGA WETLANDS RAU WHA SSEMP SITE 6 DRAIN 7 SOUTH POP RAU SSEMP SITE 1 Bulk earthworks Planting Planting RAUMATI MANUKA complete starts complete

8 Response to indicators of significant effects 8.1 Adaptive management Adaptive management requires monitoring, research and review. Once baseline monitoring has occurred, the assessment of monitoring results during and postconstruction will lead to adapted development and operation, either to anticipate potential problems identified by the monitoring, or to ensure any effects of the existing activity are reduced to acceptable levels. Review conditions provide flexibility to either expand or cut back activity should the monitoring suggest it is necessary. Figure 3: Adaptive Management Flow Chart 18 June 2013 // Page 116

Figure 3 provides an indicative process for monitoring, management and reporting for ecological monitoring. A key component of the adaptive management approach is the establishment of pre-construction baseline conditions against which to measure change. Monitoring through construction provides continual feedback to the Alliance on the effectiveness of environmental management methods. Monitoring post-construction establishes processes for remediation and/or mitigation if effects could not be avoided. 8.2 Response to observed effects In the event that adverse impacts on terrestrial, wetland, fernbird, in-stream or estuarine communities are detected by the monitoring programme, an adaptive management process will be triggered. An example of this process is shown in Figure 3. The process aims to ensure a link between the baseline monitoring undertaken and the construction and post-construction monitoring proposed. Baseline studies (and, where appropriate, existing local studies e.g. GWRC historical hydrological wetland monitoring information) will produce a trigger value. If the trigger value is exceeded it starts an adaptive management process that continues until the situation causing the trigger is remedied. Should a link between the adverse effect and Project practices be established then alterations to the operational methods (including modifications to environmental devices such as stormwater control devices) will be investigated as a first order response. GWRC will be consulted on any proposed changes to the on-site practices in accordance with consent condition G.40. Further monitoring would then be used to assess the effectiveness of the alterations. Factors to be assessed in the decision chain relating to the above include: The assessed likely cause(s) of the effect Whether the effect is ongoing The magnitude of the effect The sensitivity of the receiving environment The need for, and nature of, any remedial action. If any remedial action is deemed to be necessary (by the Regional Council) then the Alliance shall be responsible for the appropriate rectification or mitigation of the adverse effects detected. The Regional Council will be consulted during this process. However, should no such linkages be established between the Project work practices and the adverse environmental effects observed, then the Alliance shall not be liable for any remediation or mitigation works over and above those already required by the conditions of consent and the designation. 18 June 2013 // Page 117

8.3 Additional mitigation Resource consent conditions (including Condition G.34 k) require that in the event that additional indigenous vegetation or habitat loss or modification related to the Project occurs outside of the Project Footprint, including Project-related hydrological changes to wetlands, mitigation must be undertaken with calculations consistent with the Environmental Compensation Ratios outlined in Condition G.42 (outlined in the technical attachments 1, 4 and 5). The Project Ecologist and Environmental Manager will be responsible for determining any additional indigenous vegetation or habitat loss or modification outside of the areas identified in technical attachments 1, 3, 4, 5 and 6 and any additional mitigation requirements (in consultation with the Manager of Wellington Regional Council and Kāpiti Coast District Council). 9 Reporting There are numerous reporting requirements contained throughout the relevant consents, and these have been identified and are incorporated into the six technical attachments that follow. 10 Cultural 10.1 Cultural values and consent requirements As outlined in the cultural impact assessments (Technical Report 11 and Technical Report 12), the indigenous flora and fauna and associated ecological systems of the Kāpiti Coast are considered to have high cultural importance to tangata whenua. Consistent with their role as kaitiaki (stewards or guardians), Te Āti Awa ki Whakarongotai and Takamore Trust (and Ngati Toa in respect of the southern end of the Expressway) have a specific role in ecological mitigation and monitoring as outlined in the following consent conditions: The EMP shall be finalised in consultation with Te Āti Awa ki Whakarongotai and Takamore Trust; The monitoring to be undertaken pre-construction, during construction and postconstruction as required below in conditions G.38-G.40, including the role that Te Āti Awa ki Whakarongotai and Takamore Trust will have in observing monitoring; and Details of the involvement of Te Āti Awa ki Whakarongotai and Takamore Trust in observing the monitoring of culverts and fish passages during construction. Based on these requirements Te Āti Awa ki Whakarongotai and Takamore Trust will be consulted in the development of the EMP and SSEMPs, including discussion and agreement on the role of iwi monitors with regard to observing monitoring activities. 18 June 2013 // Page 118

10.2 Incorporation of cultural values in the EMP and SSEMPs The EMP has been developed on the basis that the maintenance and protection of existing areas of ecological value and the restoration and enhancement of new areas as ecological mitigation outlined in the EMP and associated SSEMPs will also have commensurate cultural values to Te Āti Awa ki Whakarongotai and Takamore Trust. Through protecting, enhancing and restoring indigenous ecosystems, the EMP and associated SSEMPs and SSLMPs will also enhance Maori cultural values through improving mahinga kai values and through establishing ecological linkages with sites of importance to Te Āti Awa ki Whakarongotai and Takamore Trust. For example, the large Kakariki/Smithfield mitigation area near Nga Manu Nature Reserve will have the following benefits for tangata whenua: Enhance downstream water quality through riparian planting and stormwater treatment of Expressway run-off for downstream mahinga kai areas (the Waimeha and Ngarara Streams and estuary); Provide habitat for indigenous fauna of particular importance to iwi such as tuna, kokopu, inanga, kereru consistent with the traditional habitats of these species. Provide habitat for indigenous flora of particular importance to iwi such as ti kouka (cabbage tree), harakeke (flax), totara, kahikatea etc. consistent with the traditional habitats of these species. Through the development of the SSEMPs, consultation will be undertaken with representatives of Te Āti Awa ki Whakarongotai and Takamore Trust on the creation of these mitigation areas, including where practicable, consideration of connections to mahinga kai. 10.3 Environmental awareness training cultural and ecological values The environmental awareness training shall include a process and programme for training of new staff members joining the Project team, and for any staff moving to a new Site Specific Management Plan (SSMP) area within the Project in accordance with Condition G.11. This training should take into account any requirements for Te Āti Awa ki Whakarongotai and Takamore Trust to undertake cultural ceremonies in relation to mahinga kai values, waahi tapu and regulatory controls (i.e. rahui) prior to the commencement of Work within any of the SSEMP areas. 11 Complaints Complaints will be managed through the process included in the Construction Environmental Management Plan (CEMP). Any complaints received relating to ecology and landscape activities will be reported to the Project Ecologist for discussion on the appropriate response with the Environmental Manager. 18 June 2013 // Page 119

12 Plan reviews A management review of the EMP will be undertaken as required by the Project s Environmental Manager and Project Ecologist. The review will take into consideration: any significant changes to construction activities or methods; any significant change in the related sub-plans (such as the ESCP); key changes to roles and responsibilities within the Project; changes in industry best practice standards or recommended pollution controls; changes in legal or other requirements (social and environmental legal requirements, the NZTA objectives and relevant policies, plans, standards, specifications and guidelines); results of inspection and maintenance programmes, and logs of incidents, corrective actions, internal or external assessments; and any public complaints. The EMP will be updated, with the necessary approval, throughout the course of the Project to reflect material changes associated with changes to construction technical or the natural environment. Approval from Greater Wellington Regional Council will be required for any relevant revisions of a material nature to the EMP. Reasons for making changes to the EMP will be documented. A copy of the original EMP document and subsequent versions will be kept for the Project records, and marked as obsolete. Each new/updated version of the EMP documentation will be issued with a version number and date to eliminate obsolete EMP documentation being used. 18 June 2013 // Page 120

13 References Ecological Technical Report 1: Terrestrial Vegetation & Habitats (including wetlands), Technical Report 27, Volume 3 of the MacKays to Peka Peka AEE. Ecological Technical Report 2: Herpetofauna, Technical Report 28, Volume 3 of the MacKays to Peka Peka AEE. Ecological Technical Report 3: Avifauna Studies Description and Values, Technical Report 29, Volume 3 of the MacKays to Peka Peka AEE. Ecological Technical Report 4: Freshwater Habitat & Species Description and Values, Technical Report 30, Volume 3 of the MacKays to Peka Peka AEE. Ecological Technical Report 5: Marine Habitat and Species Description and Values, Technical Report 31, Volume 3 of the MacKays to Peka Peka AEE. 18 June 2013 // Page 121

Attachments

Attachments Attachment 1: Indigenous Vegetation and Habitat Monitoring and Management Plan Attachment 2: Lizard Monitoring and Management Plan Attachment 3: Avifauna Monitoring and Management Plan Attachment 4: Stream and Aquatic Habitat Monitoring and Management Plan Attachment 5: Wetlands Habitat Monitoring and Management Plan Attachment 6: Estuarine / Marine Habitat Monitoring and Management Plan