CoTE Presentation LNG to Power Stornoway s Renard Mine Canada LNG Export 2015 May 19, 2015

Similar documents
LNG Terminal in Świnoujście. Mutual Joint Visit Workshop for Seveso Inspections 26 September 2017, Nicosia, Cyprus

Energy East Pipeline. Project Overview. Kevin Maloney Manager, New Build Pipeline AB, NB, JV Irving and Cromer September, 2014

LNG TERMINAL IN ŚWINOUJŚCIE AS A LNG GATE TO THE BALTIC SEA

Alan D. Hatfield PE Braemar Wavespec USA Houston, Texas. Yukon Energy Corporation LNG Workshop

U.S. EPA Greenhouse Gas Reporting Rule, New Source Performance Standards, and Methane Emissions Reduction Opportunities

COGENERATION PLANT OPTIMIZATION

Building what matters

Building what matters. Midstream Solutions. Oil & Gas

Development Mining Shaft Sinking Mechanized Raising Raise Boring UG Construction Engineering

LNG Perspective. IBC Working Committee Duisburg. MAN Energy Solutions - Russia. th, 2019

PERP Program LNG Receiving Terminals New Report Alert

Background Information on Gaz Metro Operations

Member of DP World Group

Growth Leadership: Vopak s LNG growth strategy

Developing efficient and reliable LNG infrastructure to support Indonesia s fast-growing energy demand

Green FSRU for the future

Gas Infrastructure Development in CEE: building basis for a major shift in energy-mix

ALTERNATIVE FUELS THE PROSPECTS OF CNG AND LNG. 06 October 2016 I SGOA conference 2016

LNG Import Facility Infrastructure Options

LNG as a marine fuel in BC. West Coast Marine LNG Workshop 26 th June 2012

Atlantic Link: An Update. June 6, 2017

Building a Canadian Diamond Resource Base Stornoway s Renard Diamond Project

ENERGY AND THE ENVIRONMENT

OIL & GAS DOWNSTREAM ASSET OPTIMISATION AND COMPLIANCE FOR PROCESS INDUSTRIES, STORAGE AND DISTRIBUTION

Floating LNG What are the key business development risks and mitigation strategies in a FLNG project?

LNG market update. Surge in LNG supply creates opportunities to open new markets

Fredericton, New Brunswick Community Panel Session. National Energy Board August 15, 2016

We deliver gas infrastructure

Sydney, September, STS PRESENTATION for an ASX Listed Miner

Pre-Winter Briefing Northeast Gas Association

CHAPTER 3: GENERAL DESCRIPTION OF THE PROPOSED COEGA INTEGRATED POWER PROJECT

Development of LNG solutions in the Baltic States

LNG basics. Juan Manuel Martín Ordax

Saint John, New Brunswick Community Panel Session. National Energy Board August 8, 2016

The New England Clean Power Link A powerful wind and hydro partnership for Massachusetts

LIQUEFIED NATURAL GAS INNOVATIONS FOR A SPECIALIZED MARKET

New Brunswick Building and Construction Trades Council 2014 Conference. Presenter. David Simon Construction and Turnaround Manager Irving Oil

Petronet LNG Ltd., India. LNG Terminal Design- Major Design Considerations

LNG TERMINALLING PROGRAMME.

The general design of a LNG-terminal. Background

Marine Facilities for LNG Carrier Transfer Alternatives

LNG TERMINALLING PROGRAMME.

LCNG-LNG refuelling stations LNG AS A FUEL FOR VEHICLES.

Processing LNG Offshore: Maximizing Reliability, Performance & Safety. By Inga Bettina Waldmann at KANFA Aragon FLNG World Congress 28 th June 2016

Environmental and Social Impact Assessment [ESIA] for Proposed Liquefied Natural Gas (LNG) Project at Tema in the Greater Accra Region of Ghana

Building a Cree Mining Workforce

Lars Odeskaug - TORP CEO

Small Scale LNG From Concept to Reality. Chris Johnson, General Manager, LNG New Markets, Shell

Quality Control. at Regasification Terminal. Shuji YAMAMOTO. TOKYO GAS CO., LTD Field Operation and Planning Sect.

LNG LIQUEFACTION, SHIP AND REGASIFICATION GAS MANAGEMENT PROGRAM DEPT. OF CHEMICAL ENGINEERING UNIVERSITY OF INONESIA

Supply of natural gas to island economies

Dominion Cove Point Export Project Platts 16 th Annual Liquefied Natural Gas February 9, 2017

Our goal is to be the best, not necessarily the biggest, contracting organization on Earth. Peter Kiewit

Modular Fabrication and Project Cargo Development

Supplier Engagement October 4, 2018

Port of Algoma. Focal Point of the Great Lakes Region

Natural Gas. and the Liquefaction Process

John Hart Generating Station Replacement Project. December January 2014 Community Construction Update Report #8

LNG R&D for the Liquefaction and Regasification Processes

Brownfield Projects. Equinox Engineering

Why Break Bulk? Gregory Gowans, Director Global Logistics CBIL. 1 Engineering Solutions... Delivering Results

LNG REGASIFICATION PLANTS: CRYOGENIC ORC TO ENHANCE THE EFFICIENCY OF LNG TERMINALS

LNG Experience. Owner & Investor Project Management

B.C. TOWBOAT INDUSTRY CONFERENCE

FUELING THE FUTURE. Natural Gas Vehicles Canadian Update. Alicia Milner - CNGVA CONFERENCE MANUFACTURER S

17 th INTERNATIONAL CONFERENCE & EXHIBITION ON LIQUEFIED NATURAL GAS (LNG 17)

LNG & High Horsepower Markets AAPA 2013 Facilities Engineering Seminar Vancouver, BC November 2013

Appendix 1-A Well Testing

Innovation in Mining. Flora Livesey. Sustainable Development Technology Canada

Doug Bloom, President, Spectra Energy Transmission West September 8, 2011

ELIGIBILITY CRITERIA FOR QUALIFICATION OF EPC CONTRACTORS FOR LNG TERMINAL AT GANGAVARAM, VISAKHAPATNAM, ANDHRA PRADESH (INDIA)

(FSRU/FSU) POWER PLANT LARGE SMALL LNG CARRIER UNIT STORAGE AND POWER PLANT TERMINAL JETTY LNG FILLING SMALL

Who is WesPac Midstream?

NOT FOR PRINT DISTRIBUTION

LNG TERMINALLING PROGRAMME

Floating LNG Business A breakthrough in offshore gas monetization

LNG IMPORT OPTIONS STUDY REPORT

For personal use only

Overview of Oil and Gas Sector Methane Emissions and Potential Projects

17 th INTERNATIONAL CONFERENCE & EXHIBITION ON LIQUEFIED NATURAL GAS (LNG 17)

Supplier Fair Windsor-Essex

AltaGas. Introduction to AltaGas and the Proposed Ridley Island Propane Export Terminal. Prince George City Council July 11, 2016

Siemens at LNG 16 News from Siemens Energy Oil & Gas

LNG LIQUEFACTION SOLUTIONS

- ASGMT LNG Supply Chain & Custody Transfer Measurement in the U.S.

Motorways of the Sea Forum. Brussels, 16 th of June 2017

Disclaimer & Important Notice

U.S. Energy Association U.S. Trade & Development Agency Mongolian Delegation Business Roundtable. June 15, 2011 Washington, D.C.

Joyce Lake update, the new DSO zones at Lac Le Fer to Iron Arm Range

Atlas Copco Mining and Rock Excavation Technique. Capital Markets Day 2017 Helena Hedblom, Business Area President

LNG Hub in Klaipėda. Mindaugas Aleška Head of Business Development Division SC Klaipėdos Nafta 1

Pre-Winter Briefing Northeast Gas Association

Carbon Energy Low cost, low emission energy has arrived

NEWFOUNDLAND & LABRADOR REFINING CORPORATION OPEN HOUSE ON THE PROPOSED NEW REFINERY. North Harbour, Placentia Bay.

Alcan s growing presence in Australia

LNG R E F E R E N C E P R O J E C T S. Phone: +49(0) GOC Engineering GmbH Bachovenstr. 8; Sinzig, Germany

17 th INTERNATIONAL CONFERENCE & EXHIBITION ON LIQUEFIED NATURAL GAS (LNG 17)

ENERGY AND NATURAL RESOURCES

GRAIN LNG Challenges & benefits for the deployment of LNG in ports. October 2017 BPA Conference, Poole, UK

GLADSTONE TO JAPAN: EXPORT LNG PROJECT. December 2007

Transcription:

CoTE Presentation LNG to Power Stornoway s Renard Mine Canada LNG Export 2015 May 19, 2015

Agenda SNC-Lavalin / Kentz Brief overview Global LNG presence LNG in Canada Stornoway Diamond Corporation Brief overview Renard Diamond Mine LNG / Gas options Achievements Upcoming events 0750-TP07/May 2015 2

SNC-Lavalin is Founded in 1911 World class engineering & construction firm, and a major player in the ownership of infrastructure Ranked by ENR among Top 10 Global Design Firms Some 40,000* employees executing projects in more than 100 countries Permanent offices in more than 50 countries Annual revenues 2014: CA$ 8.2 B Listed on the Toronto Stock Exchange * includes newly acquired Kentz Corporation Limited 0750-TP07/May 2015 3 well established

Long History, Strong Legacy Expanded Internationally SNC and Lavalin Merged 1911 1986 Founded in Canada 1921 Public Company on Toronto Stock Exchange 1991 SNCL acquired Kentz, becoming Tier 1 EPC provider 1919 Founded in Ireland First International Project in Saudi Arabia 1977 1982-87 Operations expanded to South Africa, Australia, Caribbean Public Company on London Stock Exchange 2008 2014 Acquired Valerus, provider of gas processing, compression and production solutions 2014 0750-TP07/May 2015 4

SNC-Lavalin/Kentz s Operating Offices 0750-TP07/May 2015 5

Global LNG Construction & Commissioning footprint 0750-TP07/May 2015 6

Liquefied Natural Gas (LNG) Terminal CANAPORT LNG Location: Saint John, New Brunswick, Canada Capacity: 1 billion SCFD Completion: 2009 Services: EPC Onshore portion (JV) Scope / Units: Three (3) gas compressors Jetty topside & unloading arms Three (3) LNG tanks (full containment) Regasification facilities 0750-TP07/May 2015 7

8 Polskie Liquefied Natural Gas Terminal POLSKIE LNG Location: Swinoujscie, Poland Completion: 2010 Services: FEED Lump Sum Description: Open Rack Vaporizers (ORVs) and Submerged Combustion Vaporizers (SCVs) Two (2) 160,000 m 3 LNG tanks Nitrogen Injection capability Can accommodate ships up to 216,000 m 3 LNG 0750-TP07/May 2015 8

Stornoway Diamond Corporation Leading Canadian diamond exploration and development company Listed on the TSX (SWY) Headquartered in Montreal, QC Flagship asset 100% of Renard Diamond Project, Quebec s first diamond mine The only Canadian diamond mine accessible year-round by road 0750-TP07/May 2015 9

Renard Mine Located in the James Bay region, approx. 400 km north of Chibougamau (800 km north of Montreal) Combined open pit and underground mine plan Nameplate capacity: 2.2 mtpa (1.6 m carats/year) Overall investment: 811 M CA$ SNC-Lavalin to coordinate the EPCM activities Impacts and Benefits Agreement (Mecheshoo Agreement) signed with the Crees of Eeyou Itshee Partnership agreement signed with local communities of Chibougamau and Chapais 0750-TP07/May 2015 10

Renard Mine : Timeline Renard Mine Road: Completed August 2013 Start of Construction: July 2014 First Concrete: April 7, 2015 Power Plant Building Completion: Q4-2015 Power Plant Energization: Q3-2016 Plant Commissioning: Q4-2016 Plant Commercial Production: Q2-2017 Plant Full Production: Summer 2017 0750-TP07/May 2015 11

Renard Mine : Power Option The ore processing plant and auxiliary systems require approximately 10 MW of power Among the options available to Stornoway: Power from the grid Diesel engine Gas engine Power from the grid was soon rejected due to the high cost of installing a 150 km transmission line for a single user The traditional Diesel engine option was first retained by Stornoway 0750-TP07/May 2015 12

Renard Mine : LNG / Gas Option In September 2013, Stornoway mandated SNC-Lavalin to undertake a prefeasibility study and in January 2014 a feasibility study to evaluate the possibility and the benefits of using LNG to generate the required Power for the facilities The LNG / Gas option would: Reduce Unit Power Cost by 37% Overall Operating Cost reduction of 7% (8 10 M$/year) Diesel consumption reduction by 80% Greenhouse Emissions reduction by 43% 0750-TP07/May 2015 13

Renard Mine : LNG Supply & Transportation Gaz Métro will be the supplier of LNG from its existing and expanded liquefaction facilities in Montreal Transportation of the LNG with a fleet of LNG Trailers 0750-TP07/May 2015 14

Renard Mine : LNG Storage & Distribution Client selected to have a total of 1800 m3 storage capacity, split into 6 pressurized bullets LNG is vaporized through a glycol vaporizer Natural Gas is distributed to the Power Generation Building as well as other buildings for heating 0750-TP07/May 2015 15

Renard Mine : Power Generation Seven 2.1 MW rated gas gen-sets, providing sufficient power generation capacity for the project s normal operating specification of 9.5 MW Significant energy is recovered from gen-set s exhaust and jacket to heat the underground mine ventilation air 0750-TP07/May 2015 16

Renard Mine : Power Generation 0750-TP07/May 2015 17

Achievements Application of a relatively new set of regulations CSA Z276-2015 LNG Production Storage and Handling to small or medium scale facilities Distance between equipment, between equipment and accommodation facilities, away from blast zone potential fall out Impact following a potential release 0750-TP07/May 2015 18

Achievements Long distance LNG transportation 365 days per year Driving on Highways, Regional Roads and Mine Roads Planning is to have distinct driver crews for highway and off-road In the case of an eventual LNG spill, there would be limited impact on fauna and flora compared to diesel 0750-TP07/May 2015 19

Achievements Harsh environment design and construction Maximum prefabrication due to high cost for on-site fabrication Transportation of pre-fab assembly, equipment and materials by truck to site 0750-TP07/May 2015 20

Upcoming Events Communication with communities along the LNG Route Commissioning and powering of the facilities Training on LNG handling 0750-TP07/May 2015 21