Hoesch isorock vario Installation recommendations

Similar documents
Hoesch isodach integral Technical information

lindab we simplify construction LindabSandwichPanels Installation instructions Mineral Wool Panels

Installation Guide. PAROC panel solutions

HOESCH ROOFLIGHT DOME SYSTEM. TECHNICAL DATA SHEET HOESCH Isodach RD and Thermorock Dach SIMPLE. EFFICIENT. HIGH LEVEL OF PREFABRICATION

Installation guidelines System: Cofraplus 220

Hoesch Roof System 2000

structure. lightness. montastep. rebated façade profiles with hidden fastening system made of steel and aluminium

Conergy SolarFamulus II

Kingspan Day-Lite Klick

Hoesch isowand integral Technical information

D Side lap. Side lap screw spacing < 500mm factory-installed seals on side lap. Decoupling tape > 60mm

Radiant PV-RoofTopRac System Planning and Installation With Australia AS/NZS1170.2:2011 AMDT

Hoesch Additive Floor Technical information The easily mounted floor system for large spans

Perfect technology with design. Hoesch Sectional door elements

Mounting systems for solar technology

Pipes, Piles, and Accessories

On-roof system Tau Installation manual

TRAPEZOIDAL SHEET METAL RAIL LIFT/VARIO for trapezoidal sheet metal roofs

INSTRUCTIONS AND GUIDELINES

Sandwich panel SPA Product description

OWNER S MANUAL SERIES MDS-96-BK, SM, DR

Instruction Manual. Modular Attenuator Assembly

SECTION PRE-ENGINEERED EXTRUDED ALUMINUM DECKING WALKWAY COVERS SPECIFICATION

OWNER S MANUAL SERIES MDS-96-BK, SM, DR

MAST ARMS: ALUMINUM, TRUSS TYPE AND DAVIT TYPE

SOUNDGUARD INSTALLATION MANUAL

SECTION (formerly 05425) PRE-ENGINEERED, PRE-FABRICATED COLD-FORMED STEEL ROOF & FLOOR TRUSSES

Infinity - Century Combination Installation Instructions Gelcoat & Solid Surface Bathware

INSTALLATION GUIDE Sika SolarMount 1 Exposition East West

Exterior System installation instructions

PanelGrip Dry Glaze Glass Railing System

HOESCH INSULATED GUTTER. Technical Details and Instructions for Installation CHARACTERISTICS. ADVANTAGES. BENEFITS.

Laying Recommendations for Broadloom Carpet

Installation Instructions/Operation and Maintenance Manual. Models PLG-60 PLG-72. PS DOORS Contact Information. Website psdoors.

V 2.0 ASSEMBLY GUIDE. TS Platform Scale Series 2

Type II Environmental Declaration according ISO 14021:2001/A1:2011

Technical Data Sheet

Maximum thermal performance ISOLEREN INSULATED METAL PANELS INSTALLATION GUIDE

Manufacturer of Coolers, Freezers, Step-Ins, Refrigeration Trailers and Sliding Doors COOLER AND FREEZER INSTALLATION MANUAL

For more information on Pictura visit CI/SfB (41) R December New. Pictura. High performance cladding

Platform stair lift PLG7

KEEP FOR FUTURE REFERENCE MRT FORKLIFT ADAPTER READ ALL INSTRUCTIONS AND WARNINGS BEFORE USING THIS PRODUCT

Architectural Roof and Wall Products Guide Specifications

innostrail - installation instructions Subject to technical changes / January 2010 STRAIL level crossing systems & STRAILastic track damping systems

TECHNICAL DATA Grecatec 10 mm ProfileOG1 (40-250)

Site Preparation... 2

Roofing. Polymeric sheet for roof waterproofing. Product Description. Tests. Product Data Sheet Edition _1

TECHNICAL DATA SHEET. fire protective board, reinforced full-core plasterboard

Installation. Natrix

Open-Web Truss Long Span Installation Guidelines

INSTALLATION INSTRUCTIONS FOR PLASCORE L2550 LINER WALL

DuraComp Composite Decking Installation Guide. Hidden Plastic Clip Fixing

Architectural Roof Products Guide Specifications

PV-ezRack Trapezoidal Installation Guide V2.0

Facade panel PICTURA Product Information Sheet

Niagara / DLG-85 Shower Cabin Installation and User s guide

Architectural Roof Products Guide Specifications

ifix INSTALLATION MANUAL PV flat roof installation system Version

A-BEAM W Erection Manual 2

Technical Data Sheet

Model: 770 Light Vehicle Scale Size: 8 x30 x5 Size: 10 x30 x5 Capacity: 40K CLC: 20K Capacity: 60K CLC:30K Installation, Set-Up and Operation Manual

TECHNICAL DESCRIPTION OF A MULLION/TRANSOM WALL OF MB-SR50 EI SYSTEM

USER MANUAL FOR MOLDS MOLDS FOR THE PRODUCTION OF CONCRETE ELEMENTS

Insulation boards PhoneStar

Model # 800SM-PS3. 8/3/2016 Page 1 of 8

WEIGHT PER PIECE (LBS.)

ACM. Product Data Sheet

Fundamentals of Insulated Panel Installation. MBCEA 2016 Clearwater, FL

SRP-AirOutshield UV Issued:

GENERAL SPECIFICATION FOR FIRE RATED APPLICATIONS

FORM HEADWALL. FORM HEADWALL (floor mount) (floor mount) Installation Manual

Modular Simplicity Dero

Roofing. Sika-Trocal SG 1.5 mm. Polymeric membrane for roof waterproofing. Product Description

Architectural Wall Products Guide Specifications

Construction. Sarnafil TS Polymeric membrane for roof waterproofing. Product Description

Series 9000 Ceramicsteel Column Covers Clad with Authentic

USER S MANUAL. HAKI Loading Tower

Model # 504S-P. 9/14/2011 Page 1 of 9

Reinforced concrete slot channel

FRP Specifications. Section Fiberglass Reinforced Polymer (FRP) Hollow Core Building Panels Products and Fabrications REVISED 11.

1675 Locust Street Red Bud, IL Phone: Fax: WARRANTY & TERMS

RIGGING INFORMATION & INSTRUCTIONS SEASONS-4 RES PRODUCTS

Wall-Mount & Back to Wall Toilets

BESTMOVE STANDING TRANSFER AID

1.02 RELATED SECTIONS: Water supply piping, water use piping, electrical, irrigation, foundations, site plans.

Installation instructions. LORO-ATTIKASTAR siphonic drains

Model # 338S-PR. 5/1/2014 Page 1 of 12

BESTMOVE STANDING TRANSFER AID

TECHNICAL DOCUMENT QBISS ONE B

1.02 RELATED SECTIONS: Water supply piping, water use piping, electrical, irrigation, foundations, site plans.

SK2000 Boltless Pallet Rack Installation and Assembly Manual

Model # 338S-OP. 9/30/2011 Page 1 of 13

Model: LoLander Series Truck Scale Model: LL FT Model: LL FT Installation, Set-Up and Operation Manual

Model # 238HS-P8. 4/27/2011 Page 1 of 11

Model # 338S-P. 7/31/2012 Page 1 of 13

Standing Seam Installation Guide

USER S GUIDE for HAKITEC 750. TEMPORARY ROOF with HAKI Trak Sheeting ( Hand-Built )

Architectural Roof and Wall Products Guide Specifications

HELIOSTAR 252, 218 VERTICAL, FREE INSTALLATION

Rolling Towers. Layher Uni Light Tower Instructions for Assembly and Use. Mobile working platforms according to DIN EN 1004:

Transcription:

A company of ThyssenKrupp Steel 1/12 D tk Info 2.4.2 5.2005 1

Table of contents Page 1. Regulations / Directives 2 2. Delivery / Unloading 3 3. Storage on the site 4 4. Preparation for installation 4 5. Protective foil (PF) 5 6. Cutting on site 5 7. Installation 6 7.1 How to order 7 7.2 Aligning / Checking 8 8. Fastening 9 9. Design details 10 10. Other matters 10 Hoesch isorock vario You have decided in favour of a product from our Hoesch isorock range, i.e. for a highquality industrially fabricated product. Thank you very much! In order to ensure that after completion of the production process, the product will be treated with the same care as in our company, we would like to inform you about the following mandatory handling procedures: 1. Regulations / Directives Among other things, the following must be noted: General official approval no. Z-10.4-235, irorock General official test certificate P - SAC 02/III - 096 This item of technical information Hoesch isorock vario Accident prevention regulations issued by the employers' liability insurance associations Directive for the installation of profiled steel sheets for roof, wall and floor decking issued by IFBS, information no. 8.01 Information in the structural analysis and in the laying plans relating to the project 2/12

2. Delivery / Unloading Please check the Hoesch isorock vario packages on their arrival on site. Any complaints and any evidence of damage must be recorded on the shipping documents and reported without delay to the appropriate sales office. Complaints related to visible damage which are submitted later will not be considered. Unloading and transport of the packages must be carried out singly i.e. one at a time. Never unload two or more packages at the same time (pictures 1 and 3)! When using a fork lift truck for unloading, the forks must take up the package below the two central styropor pallets (centre distance 980 mm) (picture 2). The maximum package length is 8m for this method of unloading; otherwise a fork extension with an additional fork arm must be used. When using a crane for unloading, a spreader bar as well as suitable, sufficiently dimensioned lifting slings (no ropes or chains) should be used. Make sure that the panel edges are well protected (picture 4). Fasten the slings to the spreader bar so that they hang vertically and can be pulled through the two supplied unloading aids (50 mm x 300 mm x 1060 mm) (picture 5). Place the unloading aids between the styropor pallets, the protective surfaces being on the sides towards the Hoesch isorock vario package. < 8 m 980 1 2 1/4 1/2 3 4 1/4 5 1060 350 50 3/12

3. Storage on the site Store the Hoesch isorock vario panels on a firm, dry and clean base. When the panels are stored outdoors, make sure that they are protected against rain, storms and dirt. The formation of condensate must be avoided. Make sure that the packages are stored in a slightly inclined position in order to allow any water that may have entered the package to drain out (picture 6). When Hoesch isorock vario packages are stored for an extended period of time on site they should be protected by a textile cover and/or stored in a place where they are protected against direct weathering (e.g. under canopies or inside dry buildings) (picture 7). Do not pile the packages one on top of another (picture 8) and do not store them on panels which have been installed already (e.g. on the roof). Secure any packages which have already been opened. α 6 7 8 4. Preparation for installation work Before commencing installation work, the supporting structure must be checked that it is suitable for the installation. Any defects must be reported to the works supervisor, in accordance with VOB. The necessary supporting widths must be determined on the basis of the structural analysis and the laying plans relating to the project. 4/12

5. Protective foil (PF) Structural members provided with protective foil must be installed immediately, taking the following into account: The protective foil must be protected against UV radiation. It must be pulled off during installation work but not later than six weeks after delivery of the panels to the site (picture 9). In overlapping areas the protective foil must be removed before commencing installation work. 6. Cutting on site Only use suitable cutting tools, e.g. a compass saw with fine teeth for the panels, plate shears and a nibbler for flashings (picture 10). Any chips must be removed immediately. Thermal cutting processes (e.g. abrasive cutting machines) must not be used. The "Hoesch isotrim " cutting tool has proved to be well suited for carrying out cuttings on site. It can be ordered from (part no. Z00-011) (picture 11). Any cut-outs in panels prepared before the panels are installed must be reinforced appropriately for transport on site. 9 10 11 Hoesch isotrim 5/12

7. Installation In order to ensure that installation takes place without any problems it is recommended that the following tools are used and the following order of work is observed. For lifting and positioning the panels, it is recommended that a screw clamp is used (picture 12). GmbH will provide these screw clamps against payment of a deposit (part no. Z43-171.0). In the case of horizontal installation, it is recommended that at least two clamps are used (picture 13). For long elements, a spreader bar should be used. The lifting devices must be secured against accidental undoing (e.g. by slip-resistant rubber pads or by an additional lanyard). When vacuum cups are used which keep panels in place by suctional force, ensure that such devices are suitable for use with mineral wool sandwich panels. For more information, please contact the manufacturer of these devices. Incorrect use or unsuitable devices may cause damage to the Hoesch isorock vario element, especially when these devices are used on cover sheets with a flat surface (type E). When removing single panels from a package, make sure that any deformation, deflection and localised loads on the panels are avoided! The panels should be transported vertically (pictures 14 A+B)! 12 13 6/12

7.1 How to order Normally, the panels are delivered packaged with their inside (B side) up. Only the lowermost panel is packaged with its outside up (A side). For many years, this procedure has worked well for transport and handling on site. If otherwise required for installation reasons, please state on the order "A side up". This will ensure that the panels are packed accordingly with the exception of the uppermost panel which is packaged with its B side up, in order to protect the topmost A side. 14 A 14 B 7/12

7.2 Aligning / Checking The first panel must be exactly aligned and fastened, independent of the laying direction (vertical, horizontal, diagonal). It is not possible to correct the position of the subsequent panels by realigning the longitudinal joint (picture 15). The longitudinal joints of the panels are provided with factory-inserted sealing tapes. Tight sealing is only ensured when observing the correct cover width (standard: 1000 mm) (picture 16). For checking the cover width, control marks spaced between 5 and 10 m should be provided on the supporting structure. For correct and expert installation, we recommend the use of pressing-on devices provided by ThyssenKrupp Bausysteme (part no. Z 43-114) as an installation aid (picture 18). Using these devices, modular dimensions can be easily and exactly adhered to, and the required pressing-on force for achieving tight seals can be precisely adjusted. The number of devices required (at least 2) depends on the length of the panels. Please note: Individuals are allowed to walk on the Hoesch isorock panels for installation purposes but the panels should not be misused as an installation platform or a base for the storage of materials from any other trade. 1000 15 outside Joint gap 2 mm black sealing tape Pressing-on device Control mark inside 8/12 grey sealing tape 16 17

8. Fastening Hoesch isorock panels are fastened in the longitudinal joint using the concealed fastening method. Depending on the structural requirements, the elements are fastened to the supporting structure with or without a load distribution plate (part no. Z43-141.0) (picture 18). For fastening the panels, only use officially approved stainless steel fasteners. For the type of bolt, the number of bolts, their size and their spacing, please see the installation plan. The installation plan is based on the project-related structural analysis and the Hoesch isorock approval Z-10.4-235. In the case of panels classified as fire-resistant (DIN 4102-2, 3), the installation plan is based on the official test certificate P-SAC 02/III- 096. The correct length of the screws can be determined as shown in picture 18. Make sure that the cover sheet is not indented by excessive tightening of the bolts. It is recommended that so-called "façade bolts" with supporting thread under the head are used. It is recommended that electric drills with a bit stop are used. Any drilling chips must be removed immediately. In order to ensure correct positioning of the fasteners, an auxiliary groove is provided on the tongue side of the panel (picture 19). without load distribution plate officially approved fasteners 18 TONGUE GROOVE d - 20 d = Element thickness mm with load distribution plate 2 Load distribution plate Part no. Z43-141 19 Groove for screw positioning 9/12

9. Design details Proposed design details for foot points, roof connections etc. may be downloaded from our homepage www.tks-bau.com. 10. Other matters These installation recommendations are based on many years of experience by us and our customers. They have been prepared to the best of our knowledge. The latest version of our technical documentation and also these installation recommendations can be found on our homepage www.tks-bau.com. If the above procedures are not observed, any right to make a complaint in the event of damage will be inadmissible. Observance of the recommendations does not release the user of our products from his obligation of complying with the local situation and circumstances. 10/12

Notes

GmbH Hammerstraße 11 D-57223 Kreuztal Phone: +49 / 27 32 / 599 1 221 Fax: +49 / 27 32 / 599 1 219 E-Mail: export.tks-bau@thyssenkrupp.com Internet: www.tks-bau.com The information contained herein defines assured properties only when they are individually confirmed in writing. Subject to modification. bc