Multi-Year Area-Based Permitting Policy for Mineral and Coal Exploration Activities

Similar documents
Note: This is a draft document and does not represent a position or decision by government. Part 2: Policy for Cumulative Effects Management

CEF. Cumulative Effects Framework. Interim Policy. for the Natural Resource Sector. October Cumulative Effects Framework

clarify the roles of the Department and minerals industry in consultation; and

ONE WINDOW COORDINATION PROCESS for Mineral Development Projects in Ontario

THE proposed IMPACT ASSESSMENT SYSTEM

READING GUIDE. Purpose of the Document

INTERIM CONSULTATION PROCEDURE WITH TREATY 8 FIRST NATIONS September 2011

BC MINES ACT PERMITTING: UPDATE ON GOVERNMENT STRUCTURE, ROLES, RESPONSIBILITIES AND REQUIREMENTS

IMPLEMENTATION OF THE METIS SETTLEMENTS CONSULTATION POLICY

PROVINCE OF BRITISH COLUMBIA MINISTRY OF ENERGY AND MINES

March Protected area boundary adjustments fall within one of three categories:

Guide to Involving Proponents When Consulting First Nations

Proceedings of the 18 th Annual British Columbia Mine Reclamation Symposium in Vernon, BC, The Technical and Research Committee on Reclamation

Expert Panel Review of Federal EA Processes British Columbia s Submission

THE proposed IMPACT ASSESSMENT SYSTEM. A Technical Guide

Notice of Public Tender

THE ENERGY DEVELOPMENT CYCLE

May 8, 2017 EASB File #: Transaction #:

THE RELATIONSHIP BETWEEN ABORIGINAL ENGAGEMENT AND SUSTAINABLE DEVELOPMENT

Consulting Indigenous Communities:

NRS Compliance and Enforcement Harmonization Project October 15 th 2014 Presenter: Stewart Guy

Ministry of the Environment and Climate Change / Ontario Waterpower Association / Ministry of Natural Resources and Forestry

MEMORANDUM OF UNDERSTANDING. Between HER MAJESTY THE QUEEN IN RIGHT OF CANADA AS REPRESENTED BY THE MINISTER OF NATURAL RESOURCES.

Transporter Management Plan Form

Project & Environmental Review Aboriginal Consultation Information for Applicants. Vancouver Fraser Port Authority

Assessment of Environmental Liabilities of Historically Reclaimed Sites

MEMORANDUM OF UNDERSTANDING ( MOU ): FIRST NATION HERITAGE SITE CONSERVATION IN HUL QUMI NUM TUMUHW

Guidelines for the Closure and Reclamation of Advanced Mineral Exploration and Mine Sites in the Northwest Territories

Santoy 8 Satellite Mine at the Seabee Gold Mine. Technical Review Comments. on the. Environmental Impact Statement.

Audit of Public Participation and Consultation Activities. The Audit and Evaluation Branch

Regional Land Use Planning. Guidelines on what to expect from the Government of the Northwest Territories 2016

Consultation Protocol of the Mikisew Cree First Nation

General Order #4473/76 was specific to oil and gas well sites, gathering and flow lines. The order contained the following statement and resolution:

Consultation with Indigenous Communities on Environmental Approvals. The Six-Minute Environmental Lawyer Susan Morgan, Counsel MOECC October 4, 2017

TRCA ENGAGEMENT GUIDELINES (June 2015)

ENVIRONMENTAL ASSESSMENT REVITALIZATION DISCUSSION PAPER

December 2, 2016 EAB File #: Transaction #:

National Centre for First Nations Governance CONSULTATION FACT SHEET 2

Reconciling the duty to consult with other law

LANDSCAPE UNIT PLANNING QUESTIONS AND ANSWERS General Version

Service Plan for First Nations Relations Division (FNRD)

Environmental Assessment Office SERVICE PLAN 2004/ /07

Mineral Exploration Challenges and Opportunities

TOWARDS RESULTS-BASED STANDARDS FOR MINE RECLAMATION IN BRITISH COLUMBIA. John C. Errington, Ph.D., P.Ag.

TECHNICAL PROPOSAL GUIDELINES FOREWORD

Advancing the Participation of Indigenous Peoples

2015/ /18 SERVICE PLAN

Executive Summary. 6 Natural Resource Permitting Project

PROVINCE OF SASKATCHEWAN MINISTRY OF ENVIRONMENT MINISTERIAL CHANGE APPROVAL PURSUANT TO SECTION 16(2)(a) THE ENVIRONMENTAL ASSESSMENT ACT

Protocol Agreement. Ministry of Sustainable Resource Management and the Oil and Gas Commission

10. GREENHOUSE GASES EAST-WEST TIE TRANSMISSION PROJECT AMENDED ENVIRONMENTAL ASSESSMENT REPORT

AND. as represented by the Minister of Agriculture and Lands. (Each a 'Party' and collectively the 'Parties')

The Tsleil-Waututh Nation. And

HARDROCK PROJECT CONSULTATION PLAN for Long Lake #58 First Nation

2016/ /19 SERVICE PLAN

Licensing Process for New Uranium Mines and Mills in Canada

October 2, 2015 EAB File #: Transaction #:

Resource Access Roads Framework

Submission to Local Government and Environment Select Committee on HERITAGE NEW ZEALAND POUHERE TAONGA BILL (JUNE 2012)

Comments On "Reforming Environmental Assessment In British Columbia: A Legislation Discussion Paper"

Alberta Energy Regulator Mandate and Roles Document

Environmental Assessment Program

Reasons for Ministers Decision

EAO s Assessment of an Application for Certificate Amendment Prince Rupert Gas Transmission Project

UPPER NASS LAXYIP STRATEGIC ENGAGEMENT AGREEMENT (the Agreement ) This Agreement is dated for reference September 12, 2018 ( Effective Date )

The Government of Saskatchewan Guidelines for Consultation with First Nations and Métis People: A Guide for Decision Makers.

Proponent Handbook. Voluntary Engagement with First Nations and Métis Communities to Inform Government s Duty to Consult Process

2017/ /20 SERVICE PLAN

British Columbia s. VVater Act. Modernization. Policy Proposal on British Columbia s new Water Sustainability Act. December 2010

CEPA CONSULTATION FRAMEWORK PRINCIPLES, OBJECTIVES AND GUIDELINES. 6/25/2014 Page 1 of 13

Review of the Fisheries Act 23 DECEMBER 2016 PREPARED BY: THE CANADIAN ENERGY PIPELINE ASSOCIATION

BUSINESS SECTOR STRATEGY:

1.0 Re: Exhibit B-5-1, Section 5.7.1, p. 5-26, line 6-9

PROVINCIAL AGRICULTURAL LAND COMMISSION

PROJECT AGREEMENT FOR THE BURNCO AGGREGATE MINE IN BRITISH COLUMBIA

Proponent Handbook. Voluntary Engagement with First Nations and Métis Communities to Inform Government s Duty to Consult Process

PROJECT AGREEMENT FOR THE VICTOR DIAMOND MINE EXTENSION IN ONTARIO

Canadian Environmental Assessment Act, Newfoundland Environmental Industry Association November 21, 2012

Town of Bowden Province of Alberta Policy Document ( ) PUBLIC PARTICIPATION POLICY

BACKGROUND INFORMATION. for the INITIAL FEDERAL PUBLIC COMMENT PERIOD. on the

Aboriginal Affairs and Northern Development

KITSAULT MINE PROJECT ENVIRONMENTAL ASSESSMENT. Section Compliance Reporting

Evolution of Compliance Oversight of Environmental Assessment Projects in BC

PROVINCE OF BRITISH COLUMBIA MINISTRY OF ENERGY AND MINES

Approval and Permitting Requirements Document for Renewable Energy Projects

CABINET DIRECTIVE ON STREAMLINING REGULATION

CEPA CONSULTATION FRAMEWORK PRINCIPLES, OBJECTIVES AND GUIDELINES. 6/12/2014 Page 1 of 13

The Effluent Permitting Process under the Environmental Management Act. An Overview for Mine Project Applicants

T F Airport Road Fort St John BC V1J 4M6

Complaint Investigation

Shell Quest Carbon Capture and Storage Project. Shell Canada Limited

FRPA ADMINISTRATION BULLETIN

Ministry of Forests, Lands, Natural Resource Operations & Rural Development Assistant Deputy Minister, Integrated Resource Operations Victoria, BC

Alberta Aggregate (Sand and Gravel) Allocation Directive. November, 2017

NEWS RELEASE. New management plan to be developed for grizzly bears

NEWFOUNDLAND AND LABRADOR BOARD OF COMMISSIONERS OF PUBLIC UTILITIES ACTIVITY PLAN

8 Upper York Sewage Solutions Individual Environmental Assessment Approval Status Update

Environmental Regulation & Mine Permitting in Ontario

SCHEDULE. 1 Part 10 of the Health, Safety and Reclamation Code for Mines in British Columbia is repealed and the following is substituted:

Reasons for Decision Establishment of a Section 17 Land Act

Transcription:

Mines and Mineral Resources Division Multi-Year Area-Based Permitting Policy for Mineral and Coal Exploration Activities 1. Introduction The Mines and Mineral Resources Division (MMRD) has historically issued permits for mineral and coal exploration projects on the basis of annual applications to perform work on a site. In recent years, a need for increased operational flexibility has been recognized. Also, First Nations communities have expressed concern regarding responding to consultation for numerous applications in the same permitted area. Thus, there has been a movement towards issuance of multi-year area-based work approvals. An increased number of multi-year area-based permits are expected to streamline administrative processes and decrease the number of applications that need to be considered on an annual basis. Multi-year area-based (MYAB) permitting is the practice of authorizing exploration activities, typically for up to 5 years within identified activity area(s) underlain by the mineral or coal tenure area of the project. Proponents have the flexibility to execute exploration programs over the entire area of the authorization and over the lifecycle of the authorization as field results and market conditions dictate. MMRD oversight of MYAB permits is done through annual acceptance of an Annual Summary of Exploration Activities (ASEA) and a MYAB Work Program Annual Update. The ASEA details activities completed over the previous year and tracks site reclamation. The MYAB Work Program Annual Update tracks consistency with the scope of the approved work program and indicates what portion of the remaining approval may be completed in the upcoming year. MYAB permitting promotes the concept of consultation with First Nations on a specific geographic area, not merely site specific locations for proposed work. This allows the consultation process to address interests in a larger area on the basis that work could occur in the area over a number of years. With the aim to obtain an enhanced understanding of potential impacts to First Nations and/or rights over a larger geographic area, proponents and government are better able to implement appropriate mitigation actions throughout the term of the approval. This policy is not intended to place restrictions on the statutory decision-making power of inspectors. Discretion to decide whether or not an MYAB approach is acceptable remains with the inspector, based on the nature of the proposed work, including the geographic or geologic conditions of the work area, their experience with the proponent, wildlife or other values on the land base. Inspectors should work closely with applicants to encourage the use of MYAB permitting when it makes sense. Mines and Mineral Resources Division Page 1 of 6

Specific Objectives of MYAB Permitting To provide proponents with the approval to carry out an exploration program over a specified area, typically for up to five years. To provide more certainty to companies by enabling them to commit to longer-term work programs based on overall projected impacts. To provide MMRD with the ability to review and consult on a longer-range basis, thus eliminating repetitive referrals for First Nations, communities, clients, MMRD staff and other government agencies for the same or similar work in a given area. To outline the scope of a work program for First Nations in a manner that facilitates meaningful discussion regarding possible impacts to First Nations rights while reducing the administrative burden on First Nations communities. To improve communications with First Nations through ongoing sharing of information on the progression of approved exploration activities. To provide companies with the flexibility to change the sequence of exploration activities and modify exploration plans as field results dictate, within the scope of the approved Mines Act permit. To provide a more accurate footprint of exploration activities that will assist in cumulative effects assessments and provide greater transparency to the public regarding the full scope of a mining activity and its impacts. As with all applications, to ensure both exploration applications and approved activities meet the health and safety standards and environmental protection requirements contained in the Mines Act, the Code and all other applicable legislation. Mines and Mineral Resources Division Page 2 of 6

2. MYAB Permitting Procedures Legislation Policy Section 10(3) of the Mines Act provides the Chief Inspector (inspector) with the authority to set the length of term for permits issued under Section 10. To establish a recommended procedure for issuing MYAB permits for exploration projects. The purpose of issuing MYAB permits is to provide proponents with greater flexibility to adapt their proposed exploration programs in response to field results, unforeseen geographic barriers, market pressures, etc. in order to provide greater certainty of the ability to undertake their work, and to reduce repetitive administration efforts by focussing on thorough up-front planning and consultation. Permits issued under this policy should typically be for a term of no more than 5 years. The area(s) of proposed exploration activities must lie within a contiguous mineral or coal tenured area. There can be more than one area of exploration activity specified within a MYAB application. Permit Revisions Sections 10(6) and 10(7) of the Mines Act provide the inspector with the authority to add conditions or change existing conditions when a permit is revised or when the term of a permit is extended. MYAB permitting is intended to reduce the need for revisions to the scope of exploration projects. Projects are permitted and consultation occurs based on the total expected disturbance to the site over the broadest area the project is expected to impact. Permit revisions are not required if the work does not significantly depart from the scope of the MYAB permit. If there is a significant departure from the scope of a MYAB permit, a permit revision may be required. Inspectors will determine whether a change to the work program requires a revision to the permit or is acceptable without any revisions. Permit revisions may require First Nations consultation. Possible grounds for revisions may include, but are not limited to the following: Applicant seeking to exceed the total estimated exploration activities proposed in the original application (e.g., number of drill or trench sites, type of access, etc.). Mines and Mineral Resources Division Page 3 of 6

Applicant seeking to substantially change the type of mechanized work (e.g., from a drilling program to a test pit, trench or bulk sample program). Applicant seeking to expand the area of the proposed disturbance. Application Review Only a complete application that meets the requirements of the Mines Act and the Code will be accepted by the Ministry. Applicants should use the same application tool that is used for other Notices of Work. The MYAB Proponent Guide and, for bulk samples and underground activities, Part 10 of the Code provides additional guidance on submitting an application. A MYAB application must include a description of activities proposed for the first year of the term of the authorization. Applications must include mapping as outlined in the Proponent Guide, including digital spatial files illustrating the specific area(s) within which activities are proposed. The digital spatial files are used for statusing of other land uses and values which guide consultation and referral processes. During the application review process, proponents may be required to submit additional studies and information in support of related issues, including engineering, water, and archaeological assessments. Providing comprehensive information during the permitting process should be anticipated and is expected to lead to more effective referral and First Nations consultation processes and reduce the need for permit revisions in the future. Application Referral Applications may be referred by the Ministry to seek input from other provincial and federal agencies on the project s potential impacts, on how impacts might be reduced, and to advise of additional permits and approvals from the referral agencies as required. MYAB applications undergo the same referral process as other NOW applications. Applicants should be advised that a sufficient referral period is required for agencies to provide comments. According to the Code, agencies have 30 days to respond to referrals; however, there are circumstances under which an extension may be required. First Nations Consultation The Province of British Columbia has a legal duty to consult with First Nations on proposed exploration activities that may adversely impact proven or claimed Aboriginal rights (including title), or treaty rights. Mines and Mineral Resources Division Page 4 of 6

MYAB permitting promotes the concept of consultation with First Nations on a specific geographic area, not merely site specific locations for proposed work. This allows the consultation process to address interests in a larger area on the basis that work could occur in the area over a number of years. With the aim to obtain an enhanced understanding of potential impacts to First Nations and/or rights over a larger geographic area, proponents and government are better able to implement appropriate mitigation actions throughout the term of the permit. Ministry staff will use information that is readily available to the Province to determine the appropriate level of consultation for the individual project and whether any accommodation is required. If the inspector determines that accommodation is necessary, the Ministry will work closely with the proponent and First Nations to develop conditions within the permit or through other processes. Site Inspections Once an application is approved and a Mines Act permit is issued, the Ministry ensures that the operator and the operation are in compliance with the terms and conditions of the permit. The inspection process works the same for MYAB permits as it does for any other mining activity. Regular site inspections are critical for all mine activities to ensure that proponents are working within the permit scope, adequate securities are being held by the Ministry, and appropriate health and safety measures are being implemented. Annual Reporting MYAB projects are the same as site-specific projects in that a specific scope of activities is approved. The only difference is that the permittee has more flexibility as to where these activities are conducted. Additional applications and approvals are not required as long as activities remain within the identified work area(s), stay within the scope of approved activities, and all permit conditions are met. An ASEA is required as a condition of an exploration permit for the calendar year in which activities are conducted and may include several periods of activity within the calendar year. For MYAB permits, a MYAB Work Program Annual Update must also be submitted annually. These documents must be submitted by March 31 each year, regardless of whether activities were conducted or not in the preceding calendar year. If activities are to re-commence between January 1 and March 31, the annual reporting documents must be Mines and Mineral Resources Division Page 5 of 6

submitted at least 30 days prior to the proposed re-commencement of activities. Annual reporting must be received by the inspector prior to recommencement of activities. As part of the annual review of these reports, reclamation securities may be adjusted, and/or annual permits (e.g., Explosives Magazine Storage and Use Permit, Free Use Permit, etc.) may be issued. Annual reporting may be shared with First Nations that assert territory over the project area. The inspector may also share the annual reporting with other agencies or other stakeholders, if deemed necessary. Site Reclamation Policy Review To protect the Crown s assets, MYAB permits will require reclamation security in an amount sufficient to reclaim the site, and proportional to the expected impacts to the site, as per sections 10(4) and (5) of the Mines Act. Regular inspections of permitted sites will occur to determine whether the appropriate reclamation work is occurring and whether the scope of the bond is proportional to the amount of disturbance occurring on the site. This policy will be formally reviewed and updated on an annual basis. Mines and Mineral Resources Division Page 6 of 6