UNION PEARSON EXPRESS UNION STATION PLATFORM AND WAITING LOUNGE CANADIAN CONSULTING ENGINEERING AWARDS Photo credit: Tom Arban Photography

Similar documents
Public Sector Leadership Awards UP Express Transforming the Way Toronto Moves. Nominating Information: Organization: Metrolinx, Union Pearson Express

News Release TRANSPORT MINISTER ANNOUNCES WINNING PROPOSAL FOR TORONTO AIR-RAIL LINK. No. H132/03 For release November 13, 2003

Speaking Notes. I am going to give you a quick overview of what we have achieved. Modernization

Transit Service Guidelines

Energy Program: Proposed High-Speed Rail Station Portland, Oregon. Christiaan Bovard

UP EXPRESS POP UP PARTNERSHIP PLAN

Executive Summary i Regional Transportation Plan March 2018

EXECUTIVE SUMMARY ORGANIZATION OF REPORT

Avalon Airport Rail Link. Community and Stakeholder Issues and Ideas Report Understanding what s important. December 2011

APPENDIX A - PLANS AND POLICY REVIEW FEBRUARY 2017

Ann Arbor Station Environmental Review. Public Information Meetings April 2, 2014

North Side Transfer Zone. Public Open House April 16, 2014

Building for Prosperity: Public Infrastructure in Ontario

Business Point Airport Corporate Centre

KONE elevators for commercial buildings

Chapter 4. Recommendations

OFF PEAK DELIVERIES. Ministry of Transportation. Pan/Parapan Am Games Branch Goods Movement Office Peel Goods Movement Task Force November 1, 2013

CITY OF VAUGHAN EXTRACT FROM COUNCIL MEETING MINUTES OF APRIL 11, 2018

Breakfast with the Experts PURCHASING MADE #GYBPurchasing. RIC Centre is a member of

There are three main operational challenges we need to address. We need to:

FUTURE BUS RAPID TRANSIT PLANS

Service Business Plan

APPENDIX B - GLOSSARY FEBRUARY 2017

Stakeholder Consultation Outcomes

David King, Railway Procurement Agency 14 th November 2012

Chapter 3 Stakeholder Interviews and Summary of Needs

Adolfson & Peterson Construction, Megan Bond; ; CATEGORY 3: Meeting the Challenge of a Difficult Job General Contractor

Table of Contents. YRT/Viva at a Glance 17 Our Commitment 18

Union Station Rail Corridor East Enhancements Project

US & USRC Track Capacity Study Train Capacity Analysis Present to Maximum Capacity and Beyond

407 TRANSITWAY. Planning & Preliminary Design

BBL. Corporate Overview. National Rankings MODERN HEALTHCARE TOP DESIGN-BUILD COMPANIES 1

Final Publishable Summary

GO Transit Individual Environmental Assessment for Georgetown South Rail Corridor Service Expansion & Airport Transportation Link

Shaping our future. A summary of BC TRANSIT S STRATEGIC PLAN 2030

I. BEST DESIGN OF A MIXED OR MULTI-USE PARKING & TRANSPORTATION FACILITY

To provide an update on the progress of the Peel Goods Movement Task Force and Peel Goods Movement Strategic Plan.

Infrastructure and Growth Leadership Advisory Group Ideas and Approaches Survey

EXECUTIVE SUMMARY 1. OVERVIEW OF TRANSPORTATION PROBLEMS AND OPPORTUNITIES

Priorities are for AG comment at today's meeting. Four time frames proposed for implementation

2018 OAKVILLE TRANSIT ANNUAL ACCESSIBILITY PLAN

Airports in the Region Case Study

PROTECTING Our Quality of Life... Why the Capital Region Needs to Invest in Mass Transit NOW

CUSTOM SOUNDWALL PROJECTS & ACCESSORIES

Transportation and Utilities

Country Report on Sustainable Urban Transport

TORONTO, ONTARIO, CANADA

CREATING CONNECTIONS IN YORK REGION

fast forward to a sustainable future 2005 TAC Sustainable Urban Transportation Award Nomination Viva York

Motor Manufactured in-house by SPACE, this high output, high speed and silent 50W motor can easily move door panels of up to 80kg.

DIGITAL BROCHURE - PASSENGER FLOWS

BOSTON INNER HARBOR WATER TRANSPORTATION T Ferry. Presented by

Metrolinx s GTHA Urban Freight Action Plan Peel Goods Movement Task Force

Executive Summary. Reimagining a Legacy Transit System: Lessons from Wilmington, Delaware

Pier CAC DRAFT - Project Issues List. Draft. reserve Finance X X

REGIONAL EXPRESS RAIL UPDATE

Cluster 2/Module 2 (C2/M2): Introduction to Network Design.

407 TRANSITWAY - KENNEDY ROAD TO BROCK ROAD MINISTRY OF TRANSPORTATION - CENTRAL REGION

REGIONAL EXPRESS RAIL (RER)

Kennedy Station Online Consultation

SiMobility Flow helps travelers feel right at home in every environment. siemens.com/mobility

Locally Preferred Alternative. Work In Progress; Subject To Change Without Notice 1

APPENDIX F1 Legislative Context

Class 158 Overhaul and Refurbishment Case Study October Train Maintenance Delivered

I. BEST DESIGN OF A MIXED OR MULTI-USE PARKING & TRANSPORTATION FACILITY

Munenori SHIBATA Transport Planning and Marketing Laboratory, Signalling and Transport Information Technology Division

MEMORANDUM. Executive Summary. Recommendation. Background

CENTRE FOR TRANSPORTATION AND INFRASTRUCTURE (CTI)

JCDecaux N O R T H A M E R I C A

Transportation Report to SPC on Transportation and Transit 2017 March 15. ISC: UNRESTRICTED TT Page 1 of 7 ROUTEAHEAD UPDATE

Saskatoon BRT A Catalyst for City Building

GLA - Future rail. ACE response. July 2018

High-rise solutions Design. Bringing form and function to life.

Rounding out the 2040 Vision

The Policies section will also provide guidance and short range policies in order to accomplish the goals and objectives.

CITYMOBIL ADVANCED ROAD TRANSPORT FOR THE URBAN ENVIRONMENT

United Airlines - Logan International - Boston, MA. Products, Processes & Performance. 240 W x 55 H, 10-leaf, bi-parting Door System with tail door

Tap Ta p in t in o t an easier easier co c mmut mmut..ta p Ta p int in o PRESTO Update Metrolinx Board

Canadian Tire Real Estate Limited Proposed Warehouse Distribution Centre Town of Caledon

Category: 11 Best Building Project GC ($70M) Contractor: Saunders Construction. Project Name: 16 Chestnut Office Tower, Denver, Colorado

2016 transit accessibility plan

Gainesville- Haymarket Extension (GHX) VRE Operations Board Work Session July 15, 2016

Bus Rapid Transit Network Marketing Strategy

New. Stations. Public Information Centre

4. IDENTIFICATION OF SPECIFIC TRANSPORTATION PROBLEMS WITHIN THE STUDY AREA

If Region cf Peel Wti kit i/oti Leadershi

CREATING CONNECTIONS IN THE CITY OF VAUGHAN ANTOINE BELAIEFF, DIRECTOR, REGIONAL PLANNING, METROLINX

Hong Kong International Airport Medium & Long Term Development Plans. The British Chamber of Commerce 18 July 2012

downtown business association Investigating the Impact of The City Centre Airport Redevelopment on Downtown Edmonton Executive Summary

SHIFT²RAIL Stakeholder meeting Innovations Programs - IP4 & IP5

WHAT WE HEARD. Phase 1 Engagement Swartz Bay Terminal Development Planning. What we heard. In collaboration with

GO RAIL NIAGARA SERVICE EXTENSION

MIDCOAST MAINE TRANSIT STUDY. In Association with: MORRIS COMMUNICATIONS

REGIONAL INTERMODAL RAIL TRANSIT SYSTEMS ENSURING OUR ECONOMIC AND TRANSPORTATION FUTURE

2.3 TRANSIT VISION 2040 FROM VISION TO ACTION. Enable a quantum leap in suburban transit STRATEGIC DIRECTION

Performance-Based Technology Scanning for Intercity Rail Passenger Systems

Optimized Time Management And Scheduling For Users

REGIONAL INTERMODAL RAIL TRANSIT SYSTEMS ENSURING OUR ECONOMIC AND TRANSPORTATION FUTURE

Transit Project Assessment Process

MOBILITY MEETS BIG DATA

Transcription:

UNION PEARSON EXPRESS UNION STATION PLATFORM AND WAITING LOUNGE CANADIAN CONSULTING ENGINEERING AWARDS 2016

1 PROJECT OUTLINE The Union Pearson Express is a significant urban transportation project that provides express, high-quality rail service, connecting Union Station in downtown Toronto with Terminal 1 at Toronto Pearson International Airport. Given the scope change from a one-storey to a two-storey structure, as lead designers for this Metrolinx project, WSP used innovative approaches to overcome several design, project, and heritage challenges to complete this project in time for the 2015 Pan Am and Parapan Am Games. INNOVATION One of the most ambitious and important transportation projects in the history of the province of Ontario, the Union Pearson Express provides rapid, high-quality rail service, connecting Union Station in downtown Toronto with Terminal 1 at Toronto Pearson International Airport. WSP was originally retained by Metrolinx to design the new station as a renovation/ fit-out of an existing space. The scope then evolved into the preliminary and detailed design for a two-level, 1,709-squaremetre (18,000-square-foot) station including a main level (waiting platform, customer service, retail area, public washrooms, and janitor room) and mezzanine level (passenger lounge, crew room, staff and public washrooms, and electrical, mechanical, and communications rooms), as a partial renovation / addition to the existing building at 7 Station Street (the Skywalk), owned by Allied Properties REIT. Construction required partial demolition and modification of the existing building structural system. With an aggressive and unadjusted project schedule, and many complexities, a number of innovative approaches were used to deliver the new two-storey station on time and on budget.

2 Platform Screen Door System The station is unique in that the platform edge is enclosed with a Platform Screen Door System, with automatic sliding doors that open and close in-sync with the doors of the Diesel Multiple Unit (DMU) trains. These doors improve passenger safety by reducing wind effect, improve climate control within the station, prevent litter build up on track which can be a fire risk, and improve the sound quality of platform announcements by reducing background noise from arriving and departing trains. Site Access The physical constraints, already bound by a confined site in all directions, also included completing significant demolition and structural work within an existing, occupied building without affecting other tenants and building operations. All demolition work had to be conducted at night with respective dust and acoustic protection. Also the crane that was used to transport construction material needed to be positioned carefully and precisely so not to damage any existing structures. Active Transit Hub This project was located next to the busiest active transit hub in Toronto the Union Station. Given the multiple stakeholders and tight timeline, the construction site layout and schedule required careful planning and coordination in order to finish the project on time without interrupting the operation of Union Station. COMPLEXITY Multiple Stakeholders As the project included renovations and addition to an existing building, the project had to respect the requirements of various stakeholders (Metrolinx, Allied Properties REIT, and UP Express) and the contract documents had to identify all required constraints. The WSP design team coordinated closely to deliver a building design that met all stakeholder requirements. Client Scope Change This station was initially conceived as a single-storey retro-fit of leased space within an existing structure. This evolved into a two-storey structure although the deadline for Pan Am/Parapan games remained fixed. The new scope was accommodated without impact to project schedule.

Physical Constraints Requirements included a retail space, public washrooms, waiting area, customer service area, mechanical room/electrical room/communications room/staff rooms, staff washrooms, and waiting platform. The height of the new building was constrained to 25 feet, 10 inches due to the adjoining Skywalk building. Other constraints included limitations posed by the existing building, the high traffic railway corridor to the South, the existing Union Station train shed to the East, and Simcoe Street to the West. Constraints were North, South, East, and West as well as vertically. Working closely with the architect, all constraints were realized through creative design and collaboration with the team. 3 Heritage consideration: The new structure was built on top of and adjacent to railway buildings dating to the 1930s. Working with a multidiscipline team and all stakeholders, careful consideration and management was needed to balance heritage value with a new contemporary context. SOCIAL AND/OR ECONOMIC BENEFITS Improving transit to Pearson Airport has been of interest to the GTA since the late 1950s. UP Express is North America s first dedicated air-rail link, offering travelers a comfortable and reliable way to get from Union Station to Toronto Pearson International Airport in 25 minutes and by avoiding city traffic congestion. It also offers amenities that make the journey easier and more pleasant, like airline check-in kiosks, power outlets, luggage racks, onboard Wi-Fi, multi-currency ATMs, upto-the-minute flight information, unique retail opportunities and a lounge.

3 UP Express Union Station is the flagship of the UP service. This state-of-the-art train shuttle runs from Union Station to Toronto Pearson every 15 minutes, 19.5 hours a day and seven days a week. Situated beside the Skywalk, the station, at over 18,000 square feet, is located between one of the busiest rail corridors and commuter stations in Ontario. As of March 2016, an adult fare from Union Station to Pearson Airport was reduced to $12, with further discounts for Presto card users ($9 one way from Union to Pearson) and for those boarding at Bloor and Weston stations. With the adjustment to the fare price, ridership is trending upwards and UP Express continues to respond as a dedicated air rail link, with 80 percent of passengers destined to or from the airport. ENVIRONMENTAL BENEFITS The UP Express solution offers people more transit options, a faster ride that includes world-class amenities which ultimately reduces travel congestion. Emission Reductions UP Express trains are newly designed and manufactured, Tier 4, clean-diesel, Diesel Multiple Units (DMUs). UP Express is the first rail service in North America to use Tier 4 clean-diesel which reduces airborne particulate emissions by 90 percent and nitrogen oxides by 80 percent, compared to existing technology. These state-of-the-art vehicles can be converted to electric propulsion in the future. A convenient option for commuters, the UP Express reduces the use of cars and taxis as the only other reliable way to get from downtown to Toronto Pearson International Airport. Energy Efficient The train s braking energy is converted into electricity by the auxiliary power generator, and helps to provide onboard lighting and heating. Station lighting design was carefully coordinated with the architectural concept and met the client s expectations and goal for light levels, sustainability, and energy. Ergonomics and Safety: A Platform Screen Door System was used to ensure a comfortable, seamless and safe transition from the platform to the arriving trains.

Sustainability Principles The project followed the latest principles of sustainability such as using 100 percent energy-efficient LED lighting, connected to DX controls and photo sensors for daylight harvesting. 4 Efficient Design The UP Express is projected to carry 2.5 million people annually. The trains, fitting in a maximum of three-car sets, allows for flexibility in convenience and maintenance. MEETING CLIENT S NEEDS The new project design and objectives were seen as an opportunity to showcase a state-of-the-art transit experience to residents and visitors to the city. Although the project involved multiple stakeholders and a significant scope change, meeting the client s objectives was critical to the success of the project. Two rigorous and creative design options were provided to the client and the option selected included a second level passenger lounge and waiting area. All aspects of the design, the look-and-feel of the station, as well as the entire system, would ultimately position UP Express as a player on the world stage. Despite the scope change, project remained on schedule. Daily communication was imperative to understand all the new requirements. Capitalizing on WSP s intimate knowledge with Union Station and its surroundings, the team also established contacts and working relationships with other relevant agencies and property owners in the area. Using a progressive and creative approach, the team was able to think outside the box to solve technical problems and overcome constraints. The trains and facility were designed to meet the current needs and those of the future. The trains themselves are energy-efficient and house cutting-edge amenities. The design, itself, was created to meet sustainability principles. The passenger ride is ergonomically devised to create a relaxing experience. Having the resources, knowledge and skills available to react to the scope change, which caused a massive structural engineering challenge, a sound solution was designed and delivered to meet the client s objectives.

CANADIAN CONSULTING ENGINEERING AWARDS 2016