Risk Assessment and Preventive Measures Checklist for Construction and Renovation. Location of Construction: Project Start Date: Estimated Duration:

Similar documents
Developed and Presented by: Wisconsin Healthcare Engineering Association

Orientation Program for New Infection Control Professionals

Form 9: Infection Control Preventive Measures Level 4

State of Kuwait Ministry of Health Infection Control Directorate. The role of infection control In design of health care facilities

Infection Control Risk Assessment Matrix of Precautions for Construction & Renovation

Infection Control Risk Assessment Matrix of Precautions for Construction & Renovation

ICM X-09 DEFINITION COMMENTS

Construction in Healthcare: Does it put Patients or Workers at Risk? Not if we do ICRA correctly! Infection Control Risk Assessment (ICRA)

University Health Network Infection Prevention and Control Requirements during Construction, Renovation and Building Maintenance

Australasian Health Facility Guidelines. Part D - Infection Prevention and Control D Construction and Renovation

To establish criteria for construction, renovation and maintenance regarding infection prevention and control measures.

Infection Prevention & Control

INFECTION CONTROL ISSUES IN CONSTRUCTION AND RENOVATION

Resource Center. Investigation Areas

Section Infection Control Procedures. Part 1 - General

DUQUESNE UNIVERSITY ASBESTOS OPERATIONS & MAINTENANCE PROGRAM

Facility Manager Basic Training: Infection Prevention and Control

University of Toronto Asbestos Management Program PROCEDURAL CHECKLIST FOR TYPE 1 ASBESTOS ACTIVITIES

Civista Medical Center Thad Maugle RESEARCH. The construction at Civista Medical Center consists of three phases; a main

Construction in Healthcare Facilities

These procedures are to be followed by all persons required to perform the following work:

EPA s New Renovation, Repair and Painting Rule

LOWE S INSTALLER LRRP CHECKLIST FOR RENOVATIONS PERFORMED IN PRE-1978 HOUSING AND CHILD-OCCUPIED FACILITIES

Project 6668 Second beach Concession-Stanley Park Drive,Vancouver, BC Division 02080

Asbestos Abatement Standard Procedures Indoor Environment Group, Inc.

Certification Number: NAT Lead Renovation, Repair and Painting Program

A COMPLETE GUIDE TO HOSPITAL ANTEROOMS. A Complete Guide to Hospital AnteRooms

Construction ABHR: Additions, Blueprints, Hoarding and Renovations. Jim Gauthier, MLT, CIC Senior Clinical Advisor, Infection Prevention

START WORK NOTIFICATION

Project 6668 Kerrisdale Senoirs Centre-5851 West Boulevard,Vancouver, BC Division 02080

Construction Indoor Air Quality (IAQ) Management Plan

Read Health Canada s Tools for schools Action Kit s Introduction, Backgrounder and pages 14-3 to

EPA s Lead Program Rule At-A-Glance

Post Abatement Project Report - Sample Draft Form:

Asbestos Management Program

ADDENDUM NO. 03 SEPTEMBER 13, 2017 THE SOLICITATION MENTIONED ABOVE IS AMENDED AS SET FORTH BELOW.

New Montgomery County Elementary School. Construction Indoor Air Quality Management Plan IEQc3.1 IAQ Plan During Construction

Appendix B PROCEDURES FOR REMOVAL OF MOULD-CONTAMINATED MATERIALS

Mold Remediation. Containment guidelines: based on the size of the infected area.

In general, the management plan development process consisted of:

Indoor Air Quality Management Plan for LEED

BASF Corporation Title: ASBESTOS HANDLING, REMOVAL AND DEMOLITION

Interior Containment: Limit Access and Post Signs

UI Procedures for Asbestos Management

PROJECT TITLE PROJECT NO: CONTRACT TITLE GRANT NO: UNIVERSITY OF CALIFORNIA, DAVIS CITY, CALIFORNIA

Section Asbestos Removal

e. Potential sources of air contaminants do not exist near the building. (e.g. chimneys, stacks, industrial plants, exhaust from nearby buildings)

A. Illinois Asbestos Abatement Act, as amended through Public Act , effective July 14, 1995.

RENOVATIONS SIMPLE FORM FOR APARTMENT ALTERATIONS

APPE NDIX F TY PE 2 ASBE STOS WORK PROCEDURES

Animal Facility Biosafety Level 3 Checklist (date: April 16, 1998)

DIVISION 02 SELECTIVE DEMOLITION

Section Asbestos Containment Procedures

PROCEDURES FOR REMEDIATION OF FUNGI IN INDOOR ENVIRONMENTS LEVEL I:

Gramercy Place Condo Association, Inc.

PI s Name Date Bldg./Rm#

ASBESTOS YOUR QUICK GUIDE DON T BE AN EASY TARGET

LANSING HOUSING COMMISSION NOTICE OF REQUEST FOR PROPOSALS RFP No

Work Plan for Window Removal and Remediation Rooms: 200 Wing classrooms, Cafeteria and Kitchen Thomas Prince School Princeton, Massachusetts

Asbestos Management Program

Asbestos Exposure. COMMONWEALTH SCAFFOLD Quality Scaffolding Across New England

Poisonings from Housing. A Regulatory Update

Table of Contents. C. Recommended Remediation Firms: upon request

Asbestos During Brake and Clutch Service Work Self Inspection Checklist

Kelly Village Apartments 3118 Green Houston, Texas 77020

Levels of Risk. TRAPIC 2016 Fall Conference Oct. 7, Construction Mgmt. and Infection Control, Andrew Streifel 1

Thames Valley District School Board. The Board has assigned the following responsibilities to ensure compliance with the above Policy and Legislation.

Inspection Checklist for NIH BL3 Laboratories (7 CFR 331; 9 CFR 121; 42 CFR 73; NIH Guidelines)

Standard Operating Procedures for the Control of Lead During Building Maintenance and Construction Activities. Type 1 Lead Operations

Lead Based Paint Policy

Asbestos in the Workplace: A Guide to Removal of Friable Asbestos Containing Materials

SECTION OSHA REQUIREMENTS - SAFETY AND HEALTH REGULATIONS INFECTION CONTROL GUIDELINES VAMC Salisbury North Carolina

BP U.S. Pipelines and Logistics (USPL) Safety Manual Page 1 of 8

Lead-based Paint Regulations Webinar November 21,

LOS ANGELES COMMUNITY COLLEGES OFFICE OF THE CHANCELLOR ADMINISTRATIVE REGULATIONS INDEX NUMBER B-4

Safety & Risk Management Policies and Procedures Mold Policy and Procedure Safety & Risk Management Policies and Procedures

LANSING HOUSING COMMISSION NOTICE OF REQUEST FOR PROPOSALS RFP No. 1-AMP Christopher Christopher Repair

Anticipated ICR 56 Revisions. Relating to Fire/Life Safety & Other Significant Issues

CADMIUM AWARENESS Revision Date: 04/2017

BP U.S. Pipelines and Logistics (USPL) Safety Manual Page 1 of 8

ASBESTOS MANAGEMENT PROGRAM. Carleton University

Lead Safe Practices and Compliance

Moisture and Mold Control

Environmental Infectious Disease Management in Healthcare Facilities Dr. Andrew Streifel, University of Minnesota A Webber Training Teleclass

LEAD HAZARD CONTROL PROGRAM

Mold Remediation. 1. Purpose and Requirements. 2. Scope. 3. General Responsibilities HS13_IAQ_SOP_002. Occupational Safety & Health

ASSESSMENT, CLEANING & RESTORATION OF HVAC SYSTEMS (ACR-2002)

Good indoor air quality (IAQ) management has become paramount in the construction industry as study

John F. Koerner, MPH, CIH

Adv. 3.2: Asbestos Abatement Rev

BARR & CLARK Independent Environmental Testing Asbestos Lead Mold Phase I ASBESTOS REMOVAL SPECIFICATIONS

Project Summary. Sustainability Facts. LEED for New Construction Rating (out of 69 possible points) Total Score 40 Sustainable Sites 7

WESTERN CONNECTICUT STATE UNIVERSITY ASBESTOS ABATEMENT PROCEDURE E-101

Healthcare construction

Asbestos Management Program

PAINT REMOVAL SPECIFICATION CONTRACTOR GUIDE FOR LEAD PAINT REMOVAL

Virginia Department of Health Office of Drinking Water

RIVER VALE BOARD OF EDUCATION PROPERTY Page 1 of Indoor Air Quality Standards 7421 INDOOR AIR QUALITY STANDARDS

INTRODUCTION TO THE PROGRAM

AIR POLLUTION CONTROL REGULATION NO. 24 REMOVAL OF LEAD BASED PAINT FROM EXTERIOR SURFACES

Transcription:

Risk Assessment and Preventive Measures Checklist for Construction and Renovation Location of Construction: Project Start Date: Estimated Duration: Project Manager (PM): Contractor(s): Infection Prevention & Control Professional (ICP): PM s phone number: Contractor s phone number: ICP s phone number: Yes No Construction Activity (see Part A) Yes No Population Risk Group (see Part B) Type A: Inspection, noninvasive Group 1 : Lowest Risk activities. Type B: Small scale, short Group 2 : Medium Risk duration, minimal dust generating activities. Type C: Activities that generate moderate to high Group 3 : Medium to High Risk levels of dust, requires greater than one work shift to complete. Type D: Activities that generate high levels of dust, major demolition and construction activities requiring consecutive work shifts to complete. Group 4 : Highest Risk

Part A: Types of Construction Activity Type A Type B Type C Type D Inspection and non-invasive activities. These include, but are not limited to, activities that require removal of ceiling tiles for visual inspection (limited to 1 tile per 50 square feet), painting (but not sanding), wall covering, electrical trim work, minor plumbing (disrupts water supply to a localized patient care area [e.g. 1 room] for less than 15 minutes), and other maintenance activities that do not generate dust or require cutting of walls or access to ceilings other than for visual inspection. Small scale, short duration activities that create minimal dust. These include, but are not limited to, activities that require access to chase spaces, cutting of walls or ceilings where dust migration can be controlled for the installation/repair of minor electrical work, ventilation components, telephone wires or computer cables, and sanding of walls for painting or wall covering to only repair small patches. It also includes plumbing that requires disruption to the water supply of more than one patient care area (e.g. >2 rooms) for less than 30 minutes. Any work that generates a moderate to high level of dust or requires demolition or removal of any fixed building components or assemblies (e.g. counter tops, cupboards, sinks). These include, but are not limited to, activities that require sanding of walls for painting or wall covering, removal of floor coverings, ceiling tiles and casework, new wall construction, minor duct work or electrical work above ceilings, major cabling activities, and any activity that cannot be completed within a single work shift. It also includes plumbing that requires disruption to the water supply of more than one patient care area (e.g. >2 rooms) for more than 30 minutes but less than 1 hour. Major demolition, construction and renovation projects. These include, but are not limited to, activities that involve heavy demolition or removal of a complete cabling system and new construction that requires consecutive work shifts to complete. It also includes plumbing that results in disruption to the water supply of more than one patient care area (e.g. >2 rooms) for more than 1 hour.

Part B: Population and Geographical Risks Groups Group 1 Lowest Risk Office areas Unoccupied wards Public areas Group 2 Medium Risk All other patient care areas unless stated in Group 3 or 4 Outpatient clinics unless stated in Group 3 or 4 Admission/ discharge units Group 3 Medium to High Risk Day surgery Physiotherapy tank areas Laboratories (specimens) General med/surg. wards other than those listed in Group 4 Geriatrics Long-term care Group 4 Highest Risk Oncology units and outpatient clinics for patients with cancer Wards and outpatient clinics for patients with AIDS or other immunodeficiency Dialysis units All endoscopy areas Pharmacy admixture rooms Sterile processing rooms Part C: Construction Activity and Risk Group Matrix A copy of the Risk Assessment and Preventive Measures Checklist must be sent to the Infection Prevention and Control Department when the matrix indicates that Class III and/or Class IV preventive measures are required (see shaded areas). Adaptations to the prevention measures can only be made after approval has been provided by the ICP.The ICP should also be consulted when construction activities need to be done on hallways adjacent to Class III and Class IV areas. Construction Activity Risk Group Type A Type B Type C Type D Group 1 I II II III/IV Group 2 I II III IV Group 3 I III III/IV IV Group 4 III III/IV III/IV IV

Part D: Recommendations for Infection Control Preventive Measures Class I Engineer/Maintenance Staff and Contractors a. Construction/Renovation Activities Dust Control* Immediately replace tiles displaced for visual inspection Vacuum work area b. Plumbing Activities Schedule water interruptions during low activity (e.g. evenings if at all possible) Flush water lines prior to reuse Observe for discoloured water Ensure water temperature meets the standards set by the facility Ensure gaskets and items made of materials that support the growth of Legionella are not being used Ensure faucet aerators are not installed or used Maintain as dry an environment as possible and report any water leaks that occur to walls and substructures Environmental Services a. Plumbing Activities Report discoloured water and water leaks to maintenance and ICP Medical/Nursing Staff a. Construction/Renovation Activities Risk Reduction Minimize residents exposure to construction/renovation area b. Plumbing Activities Report discoloured water and water leaks to maintenance and ICP *Note: Class II specifications must be followed if dust will be created during the Type A construction activity. Date: Signatures:

Class II The following specifications are to be considered in addition to Class I Engineer/Maintenance Staff and Contractors 1. Dust Control Execute work by methods that minimize dust generation from construction or renovation activities (e.g. wet mop and/or vacuum as necessary) Provide active means to minimize dust generation and migration into the atmosphere - Use drop sheets to control dust - Control dust by water misting work surfaces while cutting - Seal windows and unused doors with duct tape - Seal air vents in construction/renovation area - Place dust mat at entrance to and exit from work areas 2. Ventilation Disable the ventilation system in the construction/renovation area until the project is complete Monitor need to change and/or clean filters in construction/renovation area 3. Debris Removal and Clean-up Contain debris in covered containers or cover with a moistened sheet before transporting for disposal Avoid collection tanks and long pipes that allow water to stagnate Consider hyperchlorinating or superheating stagnant potable water (especially if Legionella is already present in potable water supply) Environmental Services Dust Control Wet mop and vacuum area with a HEPA filtered vacuum as needed and when work is complete Wipe horizontal work surfaces with a disinfectant

Medical/Nursing Staff Risk Reduction Identify high risk residents who may need to be temporarily moved away from the construction zone Ensure that resident care equipment and supplies are protected from dust exposure Date: Signatures:

Class III The following specifications are to be considered in addition to Class I and Class II Engineer/Maintenance Staff and Contractors 1. Risk Reduction Ensure that ICP consultation has been completed and infection prevention and control measures have been approved 2. Dust Control Erect an impermeable dust barrier from true ceiling (includes area above false ceilings) to the floor consisting of two layers of 6 mil Polyethylene or Sheetrock Ensure that windows, doors, plumbing penetrations, electrical outlets and intake and exhaust vents are properly sealed with plastic and duct taped within the construction/renovation area Vacuum air ducts and spaces above ceilings if necessary Ensure that construction workers wear protective clothing that is removed each time they leave the construction site before going into patient care areas Do not remove dust barrier until the project is complete and the area has been cleaned thoroughly and inspected Remove dust barrier carefully to minimize spreading dust and other debris particles associated with the construction project 3. Ventilation Maintain negative pressure within construction zone by using portable HEPA equipped air filtration units Ensure air is exhausted directly outside and away from intake vents or filtered through a HEPA filter before being recirculated Ensure ventilation system is functioning properly and is cleaned if contaminated by soil or dust after construction or renovation project is complete Flush water lines at construction or renovation site and adjacent resident care areas before residents are readmitted

Environmental Services Increase frequency of cleaning in areas adjacent to the construction zone while the project is underway In collaboration with ICP, ensure that construction zone is thoroughly cleaned when work is complete Infection Prevention and Control Personnel 1. Risk Reduction Move high-risk residents who are in or adjacent to the construction area In collaboration with environmental services ensure that construction zone is thoroughly cleaned when work is complete Inspect dust barriers 2. Traffic Control In collaboration with the facility project manager designate a traffic pattern for construction workers that avoids resident care areas and a traffic pattern for clean or sterile supplies and equipment that avoids the construction area Consider hyperchlorinating or superheating stagnant potable water (especially if Legionella is already present in potable water supply) Medical/Nursing Staff Risk Reduction Move high-risk residents who are in or adjacent to the construction area Ensure that residents do not go near the construction area In collaboration with environmental services and ICP ensure that construction zone is thoroughly cleaned when work is complete Date: Signatures:

Class IV The following specifications are to be considered in addition to those in Class I, II and III Engineer/Maintenance Staff and Contractors 1. Dust Control Before starting the construction project, erect an impermeable dust barrier that also has an anteroom Place a walk-off mat outside the anteroom in resident care areas and inside the anteroom to trap dust from the workers shoes, equipment and debris that leaves the construction zone Ensure that construction workers leave the construction zone through the anteroom so they can be vacuumed with a HEPA filtered vacuum cleaner before leaving the work site; or that they wear cloth or paper coveralls that are removed each time they leave the work site Direct all personnel entering the construction zone to wear shoe covers Ensure that construction workers change the shoe covers each time they leave the work site Repair holes in walls within eight hours or seal them temporarily 2. Ventilation Ensure negative pressure is maintained within the anteroom and construction zone Ensure ventilation systems are working properly in adjacent areas Review ventilation system requirements in the construction area with ICP to ensure system is appropriate and is functioning properly 3. Evaluation Review infection control measures with other members of the planning team or delegate to evaluate their effectiveness and identify problems at the end of the construction project If there are concerns about Legionella, consider hyperchlorinating stagnant potable water or superheating and flushing all distal sites before restoring or repressurizing the water system

Environmental Services Evaluation Review infection prevention and control measures with other members of the planning team or delegate to evaluate their effectiveness and identify problems at the end of the construction project Infection Prevention and Control Personnel 1. Risk Reduction Regularly visit the construction site to ensure that preventive measures are being followed. Wear coveralls and shoe covers when visiting the site 2. Evaluation Review infection control measures with other members of the planning team or delegate to evaluate their effectiveness and identify problems at the end of the construction project If there are concerns about Legionella, consider hyperchlorinating stagnant potable water or superheating and flushing all distal sites before restoring or repressurizing the water system Medical/Nursing Staff Staff are not allowed to visit the construction site. Evaluation Review infection control measures with other members of the planning team or delegate to evaluate their effectiveness and identify problems at the end of the construction project Consider using another source of potable water for residents who are at greatest risk until potable water has been cleared for signs of Legionella after major plumbing installation/repairs Date: Signatures: