Installation. Guide. Installation. Foundation Preparation

UNDERSLAB OPTION

PLATON RUGGED, DIMPLED HIGH-DENSITY POLYETHYLENE (HDPE) MEMBRANE THAT KEEPS FOUNDATIONS AND FLOORING DRY ADVANCED TECHNOLOGY EASY INSTALLATION

Installation Manual. Foundations. Version 2

Installation Manual. Foundations. Version 4.3ᵠ

DMX AG AIR-GAP MEMBRANE. Section Damproofing and Waterproofing

PART 1 GENERAL 1.1 SECTION INCLUDES. A. Below grade waterproofing and dampproofing 1.2 RELATED SECTIONS 1.3 REFERENCES

SLAB ON GRADE Insul-Joint or Expansion Joint Material as Required by A/E Specifications AquaCheck Liquid Coating 400 (Waterproofing Membrane) with Aqu

E. Section Polymer Modified Cement Waterproofing. K. Section Sub drainage: Foundation perimeter drainage.

Installation Guidelines VBC Products

E. Section Polymer Modified Cement Waterproofing. K. Section Sub drainage: Foundation perimeter drainage.

SECTION SELF-ADHERING SHEET MEMBRANE WATERPROOFING

2.18 INTERIOR & EXTERIOR FINISHES VAPOR & AIR BARRIERS

Insulated Concrete Forms (ICFs)

ITEM 458 WATERPROOFING FOR STRUCTURES

E. Section Polymer Modified Cement Waterproofing. K. Section Sub drainage: Foundation perimeter drainage.

FirstEnergy Program Overview

Colphene BSW Training and Application Guide. Colphene BSW Waterproofing Membrane. 1. Prepare substrate

TOTAL FLOW Soil Sheet Drain

A. The work of this section includes, but is not limited to, the following:

FLUID APPLIED WATERPROOFING

Insulation. First Revison October DC14 Drainage Mat INSTALLATION GUIDE FOR RESIDENTIAL & COMMERCIAL APPLICATIONS

WeatherSmart Air Barrier Installation Guide

1 PVC or ABS drain with strainer

ROOFING CONTRACTORS GENERAL TRADE KNOWLEDGE EXAMINATION CONTENT INFORMATION

A Design Review of Waterproofing Codes

Installation Information 2016

A. Product Data: Submit manufacturer s product data, with complete general and specific installation instructions, recommendations, and limitations.

The better way to build TM. Installation Manual NAILBASE PANELS

INSTALLING WATER-RESISTIVE BARRIERS & FLASHING

BELMURO WALL SYSTEM INSTALLATION GUIDE

Groundwater Seepage. Causes of Basement Seepage and Leaks Hydrostatic Pressure

HouseWrap Applications System R-Value: R-4.17 Horizontal Heat Flow Only

Installation Information 2018

TABLE OF CONTENTS. 1.0 INTRODUCTION 1.1 Greenstone Structural Engineered Panels 1.2 Drawing and Element Numbers

84 Lapping & Jointing 86 Service Pipe Penetrations 87 Sealing to Cavity Wall Constructions 88 protecting Membranes 90 System Components.

ALLNEX DAMP PROOF AND TANKING MEMBRANES. Product. Scope. Appraisal No. 805 [2013] Appraisal No. 805 (2013) Amended 26 January 2018.

LIQUID RUBBER INDUSTRIES ENGINEERING SPECIFICATIONS FOR ENGINEERS AND ARCHITECTS. Diagram 1: Standard Membrane Continuation 150 mm Overlap

SikaProof Bentonite Plastic DPM overlap - Compacted Backfill Scale 1:5. Detail no: SB01 - Nov 2013

NUDURA ESTIMATOR. User Guide Guest Login

Pulaski County, Virginia

TUFF-TAC TM BRIDGE MEMBRANE INSTALLATION GUIDE

J41 Reinforced bitumen membrane roof coverings

10 EXTREME BASEMENT PANELS

BITUTHENE 3000 and BITUTHENE Low Temperature Below-Grade

BRANZ Appraisal Certificate # 461 (2010) Internal wet areas.

Student Services & Classroom Addition

5.0 NUDURA PRODUCTS ON SITE STORAGE PACKAGING, UNIT ASSEMBLY, USAGE

The Freudenberg Politex Group

Table of Contents. 1 Introduction. 2 Description. 3 Tools and materials. 4 Footings or slabs. 5 Coursing placement. 6 Reinforcing steel

NUDURA FIELD GUIDE CHECKLIST & PROJECT LOG

Installation Guidelines for DENDRO-SCOTT Root Barrier

DuPont Tyvek Wall Underlay Install Guide

The better way to build TM. Installation Manual FOUNDATION SIPs & FROST WALLS SIPs

PART 4 - SELF ADHERING WATERPROOFING

SpaVault TM Installation Guide for Bullfrog Spas (7-10 x 7-10 x 38 )

Tensile ASTM D1970 MD = 939 psi / CD = 1252 psi Self Sealability / water penetration resistance around nails. ASTM D1970 Section 7.

A. This Section provides information regarding vapor permeable roof underlayment for the exterior roof.

RADIANT PANEL SYSTEM PLANNING & INSTALLATION. Roth Radiant Heating Systems

Spec Master 5/7/ For each product requiring color and texture selection, provide full size samples.

EVOH PENETRATIONS INSTALLATION GUIDELINES PERMINATOR PLACEMENT

Carroll County Bureau of Permits and Inspection Residential Code Compliance Guidelines Detached Garage

Start the installation at one corner of the building. Unroll the first sheet of MiraPLY-H square/parallel to the building wall, starting at one corner

SECTION FLUID-APPLIED WATERPROOFING

Light-Metal Roof Edge, Raised

GUIDELINES FOR RETAINING WALLS 4-0 IN HEIGHT OR LESS

84 Lapping & Jointing 86 Service Pipe Penetrations 87 Sealing to Cavity Wall Constructions 88 Protecting Membranes System Components.

6032 SH 3P Residential Shower Installation Instructions Gelcoat & Solid Surface Bathware

EverGuard Plaza Deck Roofing For Above-Grade Plaza Deck Applications

BG SYSTEM Expansion joint installation in blind-side formed floors and walls.

GUIDE SPECIFICATION FOR MEL-ROL : ROLLED, SELF-ADHERING WATERPROOFING MEMBRANE

How do you install yours?

Evaluation Report CCMC R Colphene ICF, ICF Foundation Membrane, Membrane de Fondation ICF (for dampproofing)

DuPont Tyvek Air Barrier Installation Guidelines. Canadian Version. Version 2

How To Construct a Ferro Cement Tank

Anchor bolts ASTM F1554, Gr. 36 Wide flange beams ASTM A992, Fy = 50 ksi Misc. structural steel ASTM A36, Fy = 36 ksi

ROOFING APPLICATION STANDARD (RAS) No. 109

PROLINER EPDM POND LINER

Ultra Wall System. CAD Detail Sets

PROTECTOWALL DPM MEMBRANE. Product. Scope. Building Regulations. Appraisal No. 517 [2013]

FreeStyle Linear Drain with Full Mortar Bed Adapter Kit

Weatherproofing & Sealing Systems

Weatherproofing & Sealing Systems

A-ONE Insulated Forms Installation Manual

200 STYRO RAIL TM

TABLE OF CONTENTS HALO INSTALLATION GUIDE. THE ADVANCED RIGID INSULATION ENVELOPE PRINTED 2017

A. This Section includes subdrainage systems for foundations and underslab areas. A. Product Data: For each type of drainage panel indicated.

WATERPROOFING TAMKOWATERPROOFING.COM

DURABILITY PUNCTURE RESISTANCE LONG TERM PERFORMANCE

FORTIFIED Home High Wind. Bronze New Roof Requirements

SECTION TW-60 Self-Adhering Sheet Waterproofing Membrane

Standard specification for the application of Danosa Two-Layer waterproof roofing membrane to plywood & concrete surfaces.

SECTION SELF-ADHERING SHEET FLASHING

fusion shower pan on wood joists installation guide

Important: Before You Start

MID-RISE DESIGN & CONSTRUCTION

Foundation Systems 1, spread foundations. What s the point? What types? The foundation s primary purpose is:

Freedom Barrier Free Shower Pan Installation Instructions

Freedom Barrier Free Shower Pan Installation Instructions

GUARANTEED ASPHALT LIMITED

Transcription:

DRAINAGE SOLUTIONS SINCE 1908 PLATON FOUNDATION WRAP RUGGED, DIMPLED HIGH-DENSITY POLYETHYLENE (HDPE) MEMBRANE THAT KEEPS FOUNDATIONS DRY ADVANCED TECHNOLOGY EASY INSTALLATION PROVEN PERFORMANCE ARMTEC.COM

INSTALLING PLATON AS A FOUNDATION WRAP MATERIAL REQUIREMENTS Platon Membrane One roll for every 19m (62') of foundation (allows for joint overlap) Membrane can be overlapped horizontally by 15cm (6") for deep foundations Platon Moulding 198cm (72") lengths Typically 5 pieces per job 10 lengths per roll of Platon if using Plugs Caulking Minimum 2 tubes per roll For concrete or wood foundations, use butyl rubber or asphalt-based roof cement For insulated concrete forms (ICF), use foam panel adhesive Do not use silicone, latex or polyurethane Platon Speedclips and/or Plugs 65 Speedclips per roll of membrane, or 1 bag of Platon plugs per 3 rolls of membrane Fastening Tool Use a nail gun for block and cured concrete For ICF and PWF, use a cordless drill/screwdriver Fasteners For concrete, use 32mm (1¼") concrete nails For ICF and PWF, use 41mm (1 5 8") corrosion-resistant deck screws Speedclips 1 per clip Moulding 10 per piece STEP 1 Prepare Break off all ties and projections on the wall and clear stone and debris from the footing. Seal tie rod holes with mastic. Insulated Concrete Form (ICF) walls do not need any surface preparation. Parge block walls. Chalk a line at finished grade around the foundation. STEP 2 Chalk And Caulk Run a generous bead of caulking 25mm (1 ) below the chalk line. If using Speedclips, caulk between the smooth tab and the wall to prevent dirt from getting behind the membrane and clogging the air gap. When using Speedclips and Platon Moulding, caulking is not required. 2 VISIT ARMTEC.COM FOR MORE INFORMATION

STEP 3 Roll Out Working from left to right, unroll the membrane along the foundation, dimples toward the wall, smooth tab at the top, following the chalk line. Keep the smooth tab tight to the wall and tack it up using Speedclips. Platon must wrap the foundation from a point directly touching the top of the footing up to finished grade or ground level. Where the finished grade slopes (for example, walkout basements), install tapered sections first. If the height of the roll permits, Platon can be creased sharply at the foundation/footing joint and brought out over the footing. Alternatively, excess membrane may be folded out and cut even with the footing edge. Standing the roll on the footing when unrolling Platon is easiest. Joints For vertical joints between rolls, overlap a minimum of 51cm (20 ). Water in the joint will flow to the footing drain before it reaches the wall. Horizontal joints, if required, should be overlapped by 5 dimples, with the upper course over the lower one. STEP 4 Fasten Fasten with Speedclips 30cm (12") apart along the top of the membrane. The Speedclip dimples mesh with the top two rows of Platon dimples and the Speedclip offset presses the smooth tab tight to the wall. Nail (or screw on ICFs) through the small center hole between dimples. Alternatively, fasten with Platon Plugs and nails in the second and third row of dimples, spaced 20cm to 30cm (8" to 12") apart. Secure the smooth tab with Platon Moulding strips along the top of the tab. Heavy Clay Soil For rolls taller than 2.06m (6 9 ), install a second row of Speedclips 61cm (24 ) apart, half-way up the wall. Backfill carefully in three or more lifts. When installing 3.05m (10 ) Platon, tack the roll 1.83m (6 ) up from the footer with Speedclips 61cm (24 ) apart, then use a ladder to fasten the top. Without Speedclips, clay soil requires additional plugs in the fifth row of dimples. STEP 5 Platon Moulding Moulding seals open air gap areas of Platon where dirt could enter and clog the air gap. Typically, these areas are the beginning and end points of installation. No caulking is required when used in conjuction with Speedclips because Platon Moulding provides a continuous seal along the top of the membrane. 3

INSTALLING PLATON AS A FOUNDATION WRAP STEP 6 - SPECIAL APPLICATIONS Corners Bend and crease the membrane to provide the best fit. Windows Cut Platon membrane flush with the side and 8cm (3") lower than the window opening. If using Speedclips, move the cutout piece down to seal the open horizontal cut, mesh the dimples and fasten with Speedclips. If using Platon Plugs, continue the nailing pattern below the window opening and seal the open horizontal cut with Platon Moulding. Window Wells The window well is installed over the membrane. Trim any exposed Platon inside the window well, along the sides, and caulk. Sloped Grades Note: Install Platon on the lowest elevation first, then the sloped grade, then the highter elevations. For a gradual slope, measure the grade change chalk line length, add 51cm (20") for joint overlap,and cut that length of Platon. Install with the smooth tab following the chalk line, fasten with Speedclips or Platon Plugs and Moulding, and trim along the edge of the footing. Steep Change in Grade Note: Install Platon on the lowest elevation first, then the sloped grade, then the highter elevations. Cut the membrane to match finished grade and seal the open edge with caulk and Platon Moulding. Tall Walls Overlap Platon horizontally when the distance from the footing to the finished grade exceeds the roll height. Cut a section of Platon into predetermined widths (trim off the smooth tab) and install along the bottom using Speedclips. Install the full-height roll (with a smooth tab), overlapping the first strip by at least 15.2cm (6"). Jump Walls For example, a 1.2m (4') frost wall joins a 2.4m (8') basement foundation. Extend Platon 61cm (24") along the frost wall (shown right) and cut Platon horizontally so that it is flush with the bottom of the frost wall. Secure the top section to the frost wall and the lower section to the basement wall. Repeat the procedure on the other side of the frost wall, overlapping the Platon below the frost wall. Cap vertical open gaps with Platon Moulding and caulk the gap at the frost wall and foundation wall junction. Pipe Projections The pipe must be sealed to the foundation with hydraulic cement before Platon is installed. Split Platon vertically from the pipe to either top or bottom. Cut it snug around the pipe. Caulk around the pipe and both sides of the split. Apply a 61cm (24") wide patch of Platon over the split and fasten with Speedclips or Platon Plugs. Tear Repair Caulk around the tear. Apply a 61cm (24") wide patch of Platon over the tear, meshing the dimples, and fasten with Speedclips or Platon Plugs. 4 VISIT ARMTEC.COM FOR MORE INFORMATION

Flood Boot Apply a peel and stick or rubberized liquid waterproofing to cover the footing (or brick ledge) and wall to a point 30cm (12") higher than the anticipated water table. Follow product manufacturers instructions. A flood boot must be installed prior to installing Platon if: A high water table is encountered The footing drain is placed on top of the footing Floor slab is poured level with, rather than on top of, the footing On any horizontal below grade step in the foundation such as a buried brick ledge Insulation Platon and the air gap do not detract from the R value of the insulation. Extruded polystyrene (EPS) foam is installed over Platon Vertical insulation panels stand on the footing If installing Platon over foam, use Speedclips and concrete nails long enough to penetrate 2.5cm (1 ) into the concrete Footing Drainage A working footing drain is imperative with all foundation waterproofing systems. Follow the building codes in your area. Backfilling Clear stone must be placed over the footing drain and extended over the footing against the base of the Platon in accordance with local building codes. Backfill carefully do not permit machinery, large rocks or frozen clumps to impact the Platon, and use 2 or 3 lifts of backfill. Compacting each lift will reduce excessive settling later. Insulated Concrete Forms (ICFs) Platon is easily installed over oxidised, wet or dirty block, it can bridge 6mm (1/4") gaps, and it is unrestricted by temperature or weather. Caulk must be foam compatible (i.e. foam panel adhesive) Instead of concrete nails, screw into ICF web or fastening point On a Speedclip, use the fastening hole that best lines up with ICF web To transition from grade to cladding, screw a galvanized metal lath into ICF web The metal lath covers exposed foam and extends 50mm (2") or more over Platon Parge lath with mortar mix typically used on foundations Dirt cannot get behind the Platon, so caulking is not required Brick Ledges Since these usually protrude from the foundation, fasten Platon to the vertical wall below the brick ledge protrusion. Apply a peel and stick waterproofing membrane to cover the protrusion and horizontal brick ledge, and extending both up the wall behind the brick and over the top of the Platon. Note: Follow peel and stick manufacturers instructions for surface preparation and temperature restrictions. 5

INSTALLING PLATON AS A FOUNDATION WRAP Permanent Underslab or Between-Slab Dampproofing Install Platon membrane with the dimples down. Joints are sealed with butyl rubber roof and gutter caulk. House-wrap tape is used to hold joints together until the floor is poured. At walls, the edge of the Platon can be turned up so it is higher than the proposed floor thickness. (It can be trimmed flush with the floor later, if desired.) Reinforcing mesh and concrete are placed over the Platon membrane using standard placement procedures. For radiantly heated floors, EPS foam is placed over the Platon before the floor is poured. Platon is tough enough to walk on without damage, however set up plank walkways if concrete transport takes place over the membrane. FINISHED INSTALLATION OF PLATON FOUNDATION WRAP 6 VISIT ARMTEC.COM FOR MORE INFORMATION

INSTALLING SPEEDCLIPS EVERY 30CM (12") BACKFILLING OVER THE FOOTING DRAIN 7

Armtec is a leading provider of infrastructure solutions that deliver social, environmental and economic benefits for an ever-changing world. 1-877-5-ARMTEC ARMTEC.COM Drawings and product details are for information and/or illustrative purposes only, and may vary. Please contact your local Armtec representative for the most current product information. PLATON FOUNDATION WRAP / 2017-03 PROD-C02-G07-P02-2017-03-E