Multi-layer Insulation Blanket for Walls

Similar documents
Multi-layer Insulation Blanket for

Multi-layer Insulation Blanket for Walls

Multi-layer Insulation Blanket for Walls

Multi-layer Insulation Blanket for use in Walls

Multi-layer Insulation Blanket for Walls

Multi-layer Insulation Blanket for Floors

Multi-layer Insulation Blanket for Floors

Multifoil-Insulation.com. The Highest Performing Certificated MultiFoil on the Market Thermally the best performing multi-foil on the market by far.



EcoHome-Insulation.com. Aluminium Foil Bubble Insulation. General Purpose Insulation. Dry Lining. Cavity Wall. Insulation System.

BDA Agrément BAW /01/C

2 in 1 Breathable Multi-layer Insulation Blanket. Thermal insulation in a 40mm thin, flexible, multi-layer breathable membrane

APPROVALS. Jabwall has been approved for this application since 1979, and was the first partial-fill insulation product to gain BBA approval.

Installation instructions Thin, flexible multi-foil insulation

Certificate No: EW560

Concrete Soffit Direct Fix

Eco-Versal. insulation. Polyisocyanurate (PIR) foam core with aluminium foil composite to both sides BASELINE TOPLINE SLIMLINE

The brighter way to insulate

An introduction to Part L U-values

LABC REGISTERED THERMAL SYSTEMS TO PART L

LABC RegisteRed thermal systems to PARt L 2006 And 2010 multi-foil insulation And BReAtheR membranes

Xtratherm Thin-R Thermal Liner (XT/TL Grade)

Thermal Laminate Board.

June Residential New Build Timber Frame Walls

Typical detail: New roof with breathable underlay

Superior Performance PIR Insulation. XO/FB Insulaton for Steel & Timber Frame. Walls 12/4956

PRODUCT GUIDE. One of the most comprehensive selections of Insulation Products on the market

BDA Agrément BAR /01/C

Superior Performance PIR Insulation XO/FB. Insulaton for Steel & Timber Frame. Walls 12/4956

Superior Performance Phenolic Insulation. SR/FB Insulation for Steel and Timber Frame. Walls AS LOW AS 10/4803

Superior Performance Phenolic Insulation. SR/FB Insulation for Steel and Timber Frame. Walls AS LOW AS 10/4803

CERTIFICATE No VTT-C Date of issue

Xtratherm Thin-R Thermal Liner (XT/TL Grade)

A4/8 PS AW2324D Issue 10 May Permishield

The Celotex Handy Guide

ALUMINIUM FOIL BUBBLE INSULATION AIRTEC SINGLE AND AIRTEC DOUBLE DRY LINING WALL INSULATION

Floors Walls Roofs. Jabfill Premium. APPLICATION: Full-fill Cavity Wall Insulation PRODUCTS: Vencel Resil Limited

Building Regulations for the Conservation of Fuel and Power

Xtratherm Thin-R Partial Fill Cavity Wall Board (XT/CW Grade)

The Ufoil Range of Insulation

URSA MINERAL WOOL URSA Cavity Batts

TRISO-SUPER 10 DATA SHEET

K12 Framing Board. Insulation

Light steel frame walls

Jabfill High Performance (HP)

ALUMINIUM FOIL BUBBLE INSULATION AIRTEC DOUBLE DOUBLE BUBBLE CAVITY WALL INSULATION

A4/8 PS AW2002 Issue 6 Sept Permishield

K12 Framing Board. Insulation INSULATION FOR USE BEHIND WALL LINING AND FRAMED WALLS

A4/6 PS AW1551 Issue 4 Nov Permishield

BDA Agrément BAW /01/A

CERTIFICATE NAME OF PRODUCT MANUFACTURER PRODUCT DESCRIPTION CERTIFICATION PROCEDURE. No VTT C Date of issue , Updated July 1, 2011

Loft Conversions - Attic Walls

PIR Insulation XT/TF. Insulation for Timber Framed Walls. Walls 08/ /0183

Insulation. Second Issue November Quick Guide. Building a better Kingdom together. Low Energy Low Carbon Buildings

NAME OF PRODUCT MANUFACTURER PRODUCT DESCRIPTION CERTIFICATION PROCEDURE. Date of update May 30, 2018 Valid until May 29, 2023 HYBRIS

URSA Cavity Batts URSA GLASSWOOL.

YBS MULTI-LAYER INSULATION SUPERQUILT

BBA Information Bulletin No 3

REFLECTIVE TECHNOLOGY CONSTRUCTION MEMBRANES

PRODUCT CERTIFICATE NAME OF PRODUCT MANUFACTURER PRODUCT DESCRIPTION CERTIFICATION PROCEDURE

NEW Not just a vapour control layer, it also acts as supplementary insulation! HCONTROL REFLEX+

June Non - Residential Refurbishment 5.5 Basements

Garage Conversion - Between and Under Joist Applications

Product & Installation Guide for New Build & Refurbishment Projects. exceeding the performance criteria of all current Building Regulations

Contents P/ 3. Ensuring Optimal Results P/ 4. Roof Insulation SF40 P/ 5. Roof Insulation Over Rafter Application P/ 6

TW50. Insulation STANDARD DETAILS FOR 50 MM INSULATION BOARD IN A 100 MM CAVITY. Low Energy Low Carbon Buildings. Wall lining. Inner leaf blockwork

June Residential Refurbishment Basements

BDA Agrément BAW /01/A

GypLyner. GypLyner. Metal framed wall lining system. All our systems are covered by SpecSure when using genuine Gyproc and Isover products.

Wall lining Inner leaf blockwork. K106 Cavity Board. Flexible sealant STANDARD DETAILS FOR 115 MM INSULATION BOARD IN A 125 MM CAVITY

TECHNICAL. Cavity Wall Partial - Fill Insulation. Stylite.

Permicav XV TM NEXT GENERATION OF VAPOUR-PERMEABLE INSULATION FOR WALLS WITH CAVITIES

Sarking & Insulation Products A Blue Chip Company

Leaving Certificate Revision Notes. Airtightness. Potential air leakage paths (the numbered points in section 2.1 give a description for

Best Prac ce Guide No. 2. (Version 1 April 2015) Design and Installa on guidelines for par al fill cavity wall boards

Hello Future DUAL TESTING. DUAL PERFORMANCE. HYBRID.

PIR Insulation. XT/PR Insulation for Pitched Roofs. Roofs 08/ /0183

ROCKWOOL FLEXI Insulation Application Guide

Xtratherm Thin-R Partial Fill Cavity Wall Board (XT/CW Grade)

PIR Insulation XT/TL-MF. Insulation for Drylining Walls (Mechanically Fixed) Walls 04/ /0183

URSA TF Roll URSA GLASSWOOL.

The future-proof solution for pitched roofs. L-Ments Self-supporting, insulating roofing elements

Sheathing Board Xtra protection, built in.

August 2008: Issue 1. Non - Residential New Build 4.5 Basements

Wall Linings. As well as complete dry lining solutions we also provide fast-drying parge coat to ensure airtightness,

T-Barrier System. Masonry Applications. Satisfying Fire, Thermal and Acoustic Requirements at the Combined Party Wall and Pitched Roof Junction

DriLyner 5.2. DriLyner. Drywall masonry lining systems. Key facts. Sector Guide

April Section 5. Basements

CI/Sfb (2 ) Rn7 M2 Fourth Issue June Product Selector INSULATION FOR ROOFS, WALLS & FLOORS. Low Energy Low Carbon Buildings

Brick Veneer Walls. Insulation

June Non - Residential Refurbishment Internal lining walls

Limiting (average) Limiting (individual) Extensions (Wall>0.70, Roof>0.25) Extensions (Wall<0.70, Roof<0.25)

June Residential New Build Render and cladding walls

URSA MINERAL WOOL URSA Timber Frame Roll & URSA Timber Frame Slab

The Celotex Handy Guide

Guidance on U Values from Domestic Heating Design Guide

Between and Under Rafter Applications

Sheathing Board Xtra protection, built in.

wall underlay Product BRANZ APPRAISAL No. 695 (2010) Scope Thermakraft Industries (NZ) Ltd PO Box Botany Manukau 2163 Auckland

Transcription:

Multilayer Insulation Blanket for Walls Thermal Insulation in a 40mm thin, flexible, multilayer membrane Meets requirements of L1A, L1B 2010 High performance wall insulation Full Agrément certification Thermally tested in accordance with EN12667 High thermal resistance of 2.44m²K/W Class 1 Surface spread of flame Ideal for New build & Refurbishment Effective solar overheating barrier Lightweight, flexible & 40mm thin Fast and simple installation Vapour control layer & only 40mm thin Thermally the best performing multifoil on the market by far. RD850111 BDA Agrément Nr. 194186

Insulation for use in Walls Benefits General Fixing Instructions Meets requirements of L1A, L1B 2010 Fully certificated Thermally tested in accordance with EN12667 High thermal resistance of 2.44m²K/W Class 1 Surface spread of flame Ideal for New build & Refurbishment Effective solar overheating barrier Lightweight, thin & flexible Fast and simple installation Vapour control layer is a very flexible, easy to fit, multilayer insulation thermally tested in accordance with EN12667 achieving a high thermal resistance of 2.44m²K/W for accompanied by a 25mm air cavity either side of the material. How does Work? Due to the special composition of multilayers of insulation, effectively deals with all forms of energy transfer (i.e. conduction, convection and radiation). works most effectively by reflecting infrared radiation. This means that not only is effective in winter by reflecting heat back into the building and cold out, but also in summer is a very effective solar over heating barrier reducing the need for Artificial cooling systems, preventing uncomfortable heat build up in the building. Installation of for Timber Frame and Masonry Wall Applications and additional insulation products should be in accordance with the Certificate, YBS fixing instructions and current good building practice. When the is cut to fit around openings, care should be taken to minimise gaps. can be cut easily using sharp scissors or a knife. The surfaces of the masonry wall should be sound and free from loose material; large projections should be removed and holes filled and levelled. A survey of the wall may be required to establish the extent of any packing that may be required to ensure a uniform plane for the materials to be fixed. Bearing surfaces for timber battens should comply with BS 8212 : 1995. The depth of timber battens will determine the air space achieved on either side of the, YBS recommend 25mm battens. All joints and perforations in the products must be securely sealed with YBS Foil Tape Services may be accommodated within the void created by the dry lining system. RD850111 BDA Agrément Nr. BAW 09341 BAW 09342 BAW 09343 194186 2

Timber Frame Fixing Instructions Installation of for Timber Frame wall applications and additional insulation products should be in accordance with the certificate, YBS fixing instructions and current good building practice. is applied directly from the roll either vertically or horizontally depending on the wall height, pulled tight and stapled onto the timber studs at minimum 300mm centres. UValue Combined Method (W/m 2 K) 0.27 Brick, External Cavity BreatherFoil FR Sheathing Board Stud Cavity Thickness (mm) 102.50 50.00 4.00 12.00 89.00 Conductivity (W/mK) 0.770 0.130 Resistance (m 2 K/W) 0.060 0.133 0.665 0.125 0.092 should be overlapped at each joint by approx. 50mm and stapled onto the battens, the joins should be sealed using 75mm YBS Foil Tape. Plasterboard 40.00 12.50 0.190 2.440 0.066 Perpendicular counter battens, recommended 25mm by 38mm are fixed to the wall. Battens must always be placed at the top and bottom of the wall and around the perimeter of doors and windows. The plasterboard is fixed over the materials and onto the battens in the usual manner. Total Resistance Brick, External Cavity BreatherFoil FR 0.120 3.677 Sheathing Board Stud Cavity Plasterboard UValue table *For custom calculations please send request to technical@ybsinsulation.com Description and YBS BreatherFoil, standard breather membrane and 30mm PIR, YBS BreatherFoil and 25mm PIR, YBS BreatherFoil and 50mm glasswool, YBS BreatherFoil and 50mm PIR X 2 layers with cavities and Stndard Breather Membrane, YBS BreatherFoil and 100mm glasswool, YBS BreatherFoil and 100mm PIR UValue 0.27 W/m 2 k 0.25 W/m 2 k 0.22 W/m 2 k 0.22 W/m 2 k 0.19 W/m 2 k 0.20 W/m 2 k 0.18 W/m 2 k 0.15 W/m 2 k 3

Cavity Wall Fixing Instructions The spider clip is fitted on to the wall tie against the inner leaf and this creates the minimum cavity between the product and the blockwork. The initial run of is positioned over the wall ties, ensuring that it is kept taut but with sufficient drop to below floor insulation. can be cut with a sharp blade to fit onto wall ties. The top edge of the material should be a minimum of 75mm over the top row of the wall ties giving a weathered lap joint. When a full run is in position, the retaining clip is fixed to the wall tie to keep the central to the cavity. The second leaf is built up to the topmost line of the wall ties, (or two courses below) and the second run of installed ensuring a minimum lap of 75mm. Vertical joints in the should always be on a line of wall ties, ensuring a 100mm lap (ie 50mm either side of the wall tie) and sealed using YBS Foil Tape At internal and external corners a recommended air space of 25mm must be maintained. UValue Combined Method (W/m 2 K) 0.27 Brick, External Cavity Cavity Thermal Block Plaster Dabs Plasterboard Total Resistance Brick, External Cavity Cavity Thermal Block Plasterboards Plaster Dabs Thickness (mm) 102.50 50.00 40.00 100.00 15.00 12.50 Conductivity (W/mK) 0.770 0.110 0.190 Resistance (m 2 K/W) 0.060 0.133 2.440 0.909 0.170 0.066 0.120 3.898 UValue table *For custom calculations please send request to technical@ybsinsulation.com Description and light weight block (0.250 W/mk) and thermal block (0.110 W/mk) and 140mm thermal block (0.110 W/mk) UValue 0.30 W/m 2 k 0.27 W/m 2 k 0.25 W/m 2 k 4

Dry Lining Fixing Instructions Vertical counter battens, minimum 25mm by 38mm battens are fixed to the wall at 400mm centres. Battens must always be placed at the top and bottom of the wall and around the perimeter of doors and windows. is applied directly from the roll either vertically or horizontally depending on the wall height, pulled tight and stapled onto the battens at minimum 300mm centres. UValue Combined Method (W/m 2 K) 0.29 Brick, External Insulated Plasterboard Thickness (mm) 2 40.00 30.00 Conductivity (W/mK) 0.770 Resistance (m 2 K/W) 0.060 0.292 2.440 0.560 should be overlapped at each joint by approx. 50mm and stapled onto the battens, the joins should be sealed using 75mm YBS Foil Tape. Total Resistance 0.120 3.472 Counter battens are fixed to the wall battens through the material at 400mm centres. The plasterboard is fixed over the and onto the battens in the usual manner. Brick, External Insulated Plasterboards UValue table *For custom calculations please send request to technical@ybsinsulation.com Description (Cavity Wall) UValue 0.32 W/m 2 k and 30mm insulated plasterboard (0.560 m 2 k/w) 0.28 W/m 2 k and 40mm insulated plasterboard (0.810 m 2 k/w) 0.26 W/m 2 k X 2 layers with cavities 0.20 W/m 2 k Description (Solid Wall) UValue 0.34 W/m 2 k and 30mm insulated plasterboard (0.560 m 2 k/w) 0.29 W/m 2 k and 40mm insulated plasterboard (0.810 m 2 k/w) 0.27 W/m 2 k X 2 layers with cavities 0.20 W/m 2 k 5

Dwarf Wall Fixing Instructions Installation of for dwarf wall applications with additional insulation products should be in accordance with the certificate, YBS fixing instructions and current good building practice. is applied directly from the roll either vertically or horizontally depending on the wall height, pulled tight and stapled onto the timber studs at minimum 300mm centres. UValue Combined Method (W/m 2 K) 0.22 Loft Void PIR (Between Studs) Stud cavity Thickness (mm) 50.00 40.00 Conductivity (W/mK) Resistance (m 2 K/W) 0.060 2.174 2.440 should be overlapped at each joint by approx. 50mm and stapled onto the battens, the joins should be sealed using 75mm YBS Foil Tape. Plasterboard Total Resistance 12.50 0.190 0.066 0.120 4.860 Perpendicular counter battens, recommended 25mm by 38mm are fixed to the wall. Battens must always be placed at the top and bottom of the wall and around the perimeter of doors and windows. The plasterboard is fixed over the products and onto the battens in the usual manner. Loft Void PIR Stud Cavity Plasterboards UValue table *For custom calculations please send request to technical@ybsinsulation.com Description UValue and 50mm PIR 0.21 W/m 2 k and 100mm glasswool 0.20 W/m 2 k X 2 layers with cavities 0.22 W/m 2 k 6

Dormer Cheeks Fixing Instructions Installation of for dormer cheek applications with additional insulation products should be in accordance with the certificate, YBS fixing instructions and current good building practice. is applied directly from the roll either vertically or horizontally depending on the wall height, pulled tight and stapled onto the timber studs at minimum 300mm centres. UValue Combined Method (W/m 2 K) 0.29 Tiles BreatherFoil FR Sheathing Board Stud Cavity Thickness (mm) 10.00 4.00 9.50 89.00 Conductivity (W/mK) 0.833 0.140 Resistance (m 2 K/W) 0.060 0.012 0.665 0.125 0.068 should be overlapped at each joint by approx. 50mm and stapled onto the battens, the joins should be sealed using 75mm YBS Foil Tape. Plasterboard 40.00 12.50 0.190 2.440 0.066 Perpendicular counter battens, recommended 25mm by 38mm are fixed to the wall. Battens must always be placed at the top and bottom of the wall and around the perimeter of doors and windows. The plasterboard is fixed over the materials and onto the battens in the usual manner. Total Resistance Tiles BreatherFoil FR 0.120 3.556 Sheathing Board Stud Cavity Plasterboard UValue table *For custom calculations please send request to technical@ybsinsulation.com Description and YBS BreatherFoil (Cladding) and YBS BreatherFoil and 25mm PIR (Cladding), YBS BreatherFoil and 50mm PIR (Cladding) X 2 layers with cavities and standard breather membrane (Cladding) UValue 0.28 W/m 2 k 0.23 W/m 2 k 0.20 W/m 2 k 0.20 W/m 2 k 7

Foil taped joins should be overlapped at each joint by approx. 50mm and stapled onto the battens, the joints should be sealed using YBS 75mm Foil Tape. Vapour control layer When all joints are sealed using foil tape also works as a vapour control layer. knife available YBS Foil joining tape available 8

RD850111 BDA Agrément Nr. BAW 09341 BAW 09342 BAW 09343 194186 CAD Drawings Can now be downloaded from www.ybsinsulation.com Technical Properties Product Description 19 Components Thickness 40mm approx. Weight 880g/m 2 Mechanical Properties Value Reference Standard Thermal performance 2.44m 2 K/W BS EN 12667 Flammability Class 1 BS 4761 Class E BS EN 135011 Water vapour resistance 1569MNs/g BS EN 12572 Emission coefficients of surfaces 0.05 ASTM C 1371 Tensile strength 142KPA BS EN 1608 Packaging 15m 2 7.5m 2 Width 1.5m 1.5m Length 10m 5m Weight 13.5Kg 6.75Kg Yorkshire Building Services (whitwell) Ltd Crags Industrial Park, Morven Street, Creswell, Derbyshire, S80 4AJ Tel: +44 (0) 844 99 100 44 Fax: +44 (0) 844 99 100 55 EMail: sales@ybsinsulation.com Web: www.ybsinsulation.com Yorkshire Building Services (whitwell) Ltd. YBS V1 03/2012