Multi-layer Insulation Blanket for Walls

Similar documents
Multi-layer Insulation Blanket for Walls

Multi-layer Insulation Blanket for Walls

Multi-layer Insulation Blanket for Walls

Multi-layer Insulation Blanket for

Multi-layer Insulation Blanket for use in Walls

Multi-layer Insulation Blanket for Floors

Multi-layer Insulation Blanket for Floors

EcoHome-Insulation.com. Aluminium Foil Bubble Insulation. General Purpose Insulation. Dry Lining. Cavity Wall. Insulation System.

Multifoil-Insulation.com. The Highest Performing Certificated MultiFoil on the Market Thermally the best performing multi-foil on the market by far.


2 in 1 Breathable Multi-layer Insulation Blanket. Thermal insulation in a 40mm thin, flexible, multi-layer breathable membrane


BDA Agrément BAW /01/C

APPROVALS. Jabwall has been approved for this application since 1979, and was the first partial-fill insulation product to gain BBA approval.

Concrete Soffit Direct Fix

The brighter way to insulate

Eco-Versal. insulation. Polyisocyanurate (PIR) foam core with aluminium foil composite to both sides BASELINE TOPLINE SLIMLINE

An introduction to Part L U-values

Certificate No: EW560

Installation instructions Thin, flexible multi-foil insulation

TRISO-SUPER 10 DATA SHEET

PRODUCT GUIDE. One of the most comprehensive selections of Insulation Products on the market

CERTIFICATE No VTT-C Date of issue

LABC REGISTERED THERMAL SYSTEMS TO PART L

LABC RegisteRed thermal systems to PARt L 2006 And 2010 multi-foil insulation And BReAtheR membranes

Xtratherm Thin-R Thermal Liner (XT/TL Grade)

Xtratherm Thin-R Partial Fill Cavity Wall Board (XT/CW Grade)

URSA MINERAL WOOL URSA Cavity Batts

Typical detail: New roof with breathable underlay

June Residential New Build Timber Frame Walls

Thermal Laminate Board.

Xtratherm Thin-R Thermal Liner (XT/TL Grade)

Floors Walls Roofs. Jabfill Premium. APPLICATION: Full-fill Cavity Wall Insulation PRODUCTS: Vencel Resil Limited

The Celotex Handy Guide

Jabfill High Performance (HP)

K12 Framing Board. Insulation

Superior Performance PIR Insulation. XO/FB Insulaton for Steel & Timber Frame. Walls 12/4956

Loft Conversions - Attic Walls

Superior Performance PIR Insulation XO/FB. Insulaton for Steel & Timber Frame. Walls 12/4956

Product & Installation Guide for New Build & Refurbishment Projects. exceeding the performance criteria of all current Building Regulations

TW50. Insulation STANDARD DETAILS FOR 50 MM INSULATION BOARD IN A 100 MM CAVITY. Low Energy Low Carbon Buildings. Wall lining. Inner leaf blockwork

K12 Framing Board. Insulation INSULATION FOR USE BEHIND WALL LINING AND FRAMED WALLS

REFLECTIVE TECHNOLOGY CONSTRUCTION MEMBRANES

Superior Performance Phenolic Insulation. SR/FB Insulation for Steel and Timber Frame. Walls AS LOW AS 10/4803

Superior Performance Phenolic Insulation. SR/FB Insulation for Steel and Timber Frame. Walls AS LOW AS 10/4803

URSA Cavity Batts URSA GLASSWOOL.

A4/8 PS AW2324D Issue 10 May Permishield

Wall lining Inner leaf blockwork. K106 Cavity Board. Flexible sealant STANDARD DETAILS FOR 115 MM INSULATION BOARD IN A 125 MM CAVITY

Building Regulations for the Conservation of Fuel and Power

Insulation. Second Issue November Quick Guide. Building a better Kingdom together. Low Energy Low Carbon Buildings

NEW Not just a vapour control layer, it also acts as supplementary insulation! HCONTROL REFLEX+

NAME OF PRODUCT MANUFACTURER PRODUCT DESCRIPTION CERTIFICATION PROCEDURE. Date of update May 30, 2018 Valid until May 29, 2023 HYBRIS

Leaving Certificate Revision Notes. Airtightness. Potential air leakage paths (the numbered points in section 2.1 give a description for

CERTIFICATE NAME OF PRODUCT MANUFACTURER PRODUCT DESCRIPTION CERTIFICATION PROCEDURE. No VTT C Date of issue , Updated July 1, 2011

PRODUCT CERTIFICATE NAME OF PRODUCT MANUFACTURER PRODUCT DESCRIPTION CERTIFICATION PROCEDURE

BBA Information Bulletin No 3

Contents P/ 3. Ensuring Optimal Results P/ 4. Roof Insulation SF40 P/ 5. Roof Insulation Over Rafter Application P/ 6

TECHNICAL. Cavity Wall Partial - Fill Insulation. Stylite.

A4/8 PS AW2002 Issue 6 Sept Permishield

Garage Conversion - Between and Under Joist Applications

PIR Insulation XT/TF. Insulation for Timber Framed Walls. Walls 08/ /0183

The Ufoil Range of Insulation

Xtratherm Thin-R Partial Fill Cavity Wall Board (XT/CW Grade)

A4/6 PS AW1551 Issue 4 Nov Permishield

Best Prac ce Guide No. 2. (Version 1 April 2015) Design and Installa on guidelines for par al fill cavity wall boards

Light steel frame walls

Hello Future DUAL TESTING. DUAL PERFORMANCE. HYBRID.

PRODUCT & INSTALLATION GUIDE

CALL TO TALK TO THE SAS TEAM

TRISO-SUPER 10 INSTALLATION GUIDELINES

URSA TF Roll URSA GLASSWOOL.

Boost' R Hybrid Roof GENERAL INSTALLATION GUIDELINES GENERAL INFORMATION TOOLS / ACCESSORIES PRECAUTIONS -1- VIEW ACTIS HYBRID VIDEOS ON

DriLyner 5.2. DriLyner. Drywall masonry lining systems. Key facts. Sector Guide

Wall Linings. As well as complete dry lining solutions we also provide fast-drying parge coat to ensure airtightness,

URSA MINERAL WOOL URSA Timber Frame Roll & URSA Timber Frame Slab

Limiting (average) Limiting (individual) Extensions (Wall>0.70, Roof>0.25) Extensions (Wall<0.70, Roof<0.25)

Brick Veneer Walls. Insulation

Permicav XV TM NEXT GENERATION OF VAPOUR-PERMEABLE INSULATION FOR WALLS WITH CAVITIES

Between and Under Rafter Applications

June Non - Residential Refurbishment Internal lining walls

Cavity closers, fire & acoustic stops Thermo-loc standard cavity closers Thermo-loc plus X and plus C cavity closers Thermo-loc

A Handbook of thermal bridging details incorporating aircrete blocks

June Non - Residential Refurbishment 5.5 Basements

robustdetails E-FC-7 Separating Floor Concrete Separating Floors Concrete E-FC-7

The future-proof solution for pitched roofs. L-Ments Self-supporting, insulating roofing elements

The Celotex Handy Guide

PIR Insulation. XT/PR Insulation for Pitched Roofs. Roofs 08/ /0183

June Residential Refurbishment Basements

T-Barrier System. Masonry Applications. Satisfying Fire, Thermal and Acoustic Requirements at the Combined Party Wall and Pitched Roof Junction

GypLyner. GypLyner. Metal framed wall lining system. All our systems are covered by SpecSure when using genuine Gyproc and Isover products.

wall underlay Product BRANZ APPRAISAL No. 695 (2010) Scope Thermakraft Industries (NZ) Ltd PO Box Botany Manukau 2163 Auckland

APPLICATION: Floor insulation precast suspended concrete floor. Products: Jabfloor 70, 100, 150, 200, 250

ROCKWOOL FLEXI Insulation Application Guide

A Handbook of thermal bridging details incorporating aircrete blocks

PIR Insulation XT/TL-MF. Insulation for Drylining Walls (Mechanically Fixed) Walls 04/ /0183

MULTIFOIL INSULATION TLX SILVER AND TLX SILVER FB FOR PITCHED ROOFS

Why party wall insulation is required

CI/SfB (57) Uniclass L7513 November 2015 BUILDTIGHT TM RANGE...

APPLICATION: Floor insulation below chipboard finish

APPLICATION: Floor insulation precast suspended concrete floor. Products: Jabfloor Premium 70 and 100

Transcription:

Multilayer Insulation Blanket for Walls Thermal Insulation in a 40mm thin, flexible, multilayer membrane Meets requirements of L1A, L1B 2010 High performance wall insulation Full Agrément certification Thermally tested in accordance with EN 16012 High thermal resistance of up to 3.00m²K/W Class 1 Surface spread of flame Ideal for New build & Refurbishment Effective solar overheating barrier Lightweight, flexible & 40mm thin Fast and simple installation Vapour control layer & only 40mm thin Distributor www.superquiltinsulation.com Thermally the best performing multifoil on the market by far. RD850111 194186

Insulation for use in Walls Benefits General Meets requirements of L1A, L1B 2010 Fully certificated Thermally tested in accordance with EN 16012 High thermal resistance of up to 3.00m²K/W Class 1 Surface spread of flame Ideal for New build & Refurbishment Effective solar overheating barrier Lightweight, thin & flexible Fast and simple installation Vapour control layer is a very flexible, easy to fit, multilayer insulation thermally tested in accordance with EN 16012 achieving a high thermal resistance of up to 3.00m²K/W for accompanied by a 25mm air cavity either side of the material. How does Work? Due to the special composition of multilayers of insulation, effectively deals with all forms of energy transfer (i.e. conduction, convection and radiation). works most effectively by reflecting infrared radiation. This means that not only is effective in winter by reflecting heat back into the building and cold out, but also in summer is a very effective solar over heating barrier reducing the need for artificial cooling systems, preventing uncomfortable heat build up in the building. Installation of for Timber Frame and Masonry Wall Applications and additional insulation products should be in accordance with the Certificate, YBS fixing instructions and current good building practice. When the is cut to fit around openings, care should be taken to minimise gaps. can be cut easily using sharp scissors or a knife. The surfaces of the masonry wall should be sound and free from loose material; large projections should be removed and holes filled and levelled. A survey of the wall may be required to establish the extent of any packing that may be required to ensure a uniform plane for the materials to be fixed. Bearing surfaces for timber battens should comply with BS 8212 : 1995. The depth of timber battens will determine the air space achieved on either side of the, YBS recommend 25mm battens. All joints and perforations in the products must be securely sealed with YBS Foil Tape Services may be accommodated within the void created by the dry lining system. RD850111 194186 1

Timber Frame Installation of for Timber Frame wall applications and additional insulation products should be in accordance with the certificate, YBS fixing instructions and current good building practice. is applied directly from the roll either vertically or horizontally depending on the wall height, pulled tight and stapled onto the timber studs at minimum 300mm centres. UValue Combined Method (W/m 2 K) 0.24 BreatherFoil FR Sheathing Board Stud 102.50 50.00 4.00 12.00 89.00 0.770 0.060 0.133 0.665 0.125 0.092 should be overlapped at each joint by approx. 50mm and stapled onto the battens, the joins should be sealed using 75mm YBS Foil Tape. 12.50 0.190 0.066 Perpendicular counter battens, recommended 25mm by 38mm are fixed to the wall. Battens must always be placed at the top and bottom of the wall and around the perimeter of doors and windows. The plasterboard is fixed over the materials and onto the battens in the usual manner. BreatherFoil FR 0.120 Sheathing Board Stud UValue table For individual calculation please contact the EcohomeInsulation technical team on 0905 051 0022* Description 25mm Batten 38mm Batten and YBS BreatherFoil FR 0.25 W/m 2 k 0.24 W/m 2 k, YBS BreatherFoil FR and 50mm Glasswool 0.040 0.21 W/m 2 k 0.20 W/m 2 k, YBS BreatherFoil FR and 100mm Glasswool 0.040 0.17 W/m 2 k 0.16 W/m 2 k, YBS BreatherFoil FR and 25mm PIR 0.022 0.21 W/m 2 k 0.20 W/m 2 k, YBS BreatherFoil FR and 50mm PIR 0.022 0.18 W/m 2 k 0.17 W/m 2 k, YBS BreatherFoil FR and 100mm PIR 0.022 0.14 W/m 2 k 0.14 W/m 2 k, YBS BreatherFoil FR and 140mm PIR 0.022 0.13 W/m 2 k 0.12 W/m 2 k, YBS BreatherFoil and 0.17 W/m 2 k 0.17 W/m 2 k, Standard Breather Membrane 0.30 W/m 2 k 0.28 W/m 2 k, Standard Breather Membrane and 50mm Glasswool 0.040 0.24 W/m 2 k 0.22 W/m 2 k, Standard Breather Membrane and 100mm Glasswool 0.040 0.19 W/m 2 k 0.18 W/m 2 k, Standard Breather Membrane and 25mm PIR 0.022 0.25 W/m 2 k 0.23 W/m 2 k, Standard Breather Membrane and 50mm PIR 0.022 0.21 W/m 2 k 0.20 W/m 2 k, Standard Breather Membrane and 100mm PIR 0.022 0.16 W/m 2 k 0.15 W/m 2 k, Standard Breather Membrane and 140mm PIR 0.022 0.14 W/m 2 k 0.13 W/m 2 k, Standard Breather Membrane and 0.19 W/m 2 k 0.18 W/m 2 k 2

Wall A spider clip is fitted on to the wall tie against the inner leaf and this creates the minimum cavity between the product and the blockwork. The initial run of is positioned over the wall ties, ensuring that it is kept taut but with sufficient drop to below floor insulation. can be cut with a sharp blade to fit onto wall ties. The top edge of the material should be a minimum of 75mm over the top row of the wall ties giving a weathered lap joint. When a full run is in position, the retaining clip is fixed to the wall tie to keep the central to the cavity. The second leaf is built up to the topmost line of the wall ties, (or two courses below) and the second run of installed ensuring a minimum lap of 75mm. Vertical joints in the should always be on a line of wall ties, ensuring a 100mm lap (ie 50mm either side of the wall tie) and sealed using YBS Foil Tape At internal and external corners a recommended air space of 25mm must be maintained. UValue Combined Method (W/m 2 K) 0.24 Thermal Block Plaster Dabs Thermal Block s Plaster Dabs 102.50 50.00 20.00 100.00 15.00 12.50 0.770 0.110 0.190 0.040 0.133 0.909 0.170 0.066 UValue table For individual calculation please contact the EcohomeInsulation technical team on 0905 051 0022* Description 100mm 110mm and 100mm Dense Block 1.130 0.31 W/m 2 k 0.29 W/m 2 k and 100mm Medium Block 0.500 0.30 W/m 2 k 0.28 W/m 2 k and 100mm Lightweight Block 0.250 0.29 W/m 2 k 0.27 W/m 2 k and 100mm Thermal Block 1.110 0.26 W/m 2 k 0.24 W/m 2 k and 100mm Thermal Block 0.110 Thin Mortar 0.25 W/m 2 k 0.24 W/m 2 k and 140mm Dense Block 1.130 0.31 W/m 2 k 0.29 W/m 2 k and 140mm Medium Block 0.500 0.29 W/m 2 k 0.27 W/m 2 k and 140mm Lightweight Block 0.250 0.25 W/m 2 k 0.26 W/m 2 k and 140mm Thermal Block 1.110 0.24 W/m 2 k 0.23 W/m 2 k and 140mm Thermal Block 0.110 Thin Mortar 0.23 W/m 2 k 0.22 W/m 2 k 3

Dry Lining Vertical counter battens, minimum 25mm by 38mm battens are fixed to the wall at 400mm centres. Battens must always be placed at the top and bottom of the wall and around the perimeter of doors and windows. is applied directly from the roll either vertically or horizontally depending on the wall height, pulled tight and stapled onto the battens at minimum 300mm centres. UValue Combined Method (W/m 2 K) 0.28 Block 100.00 50.00 100.00 0.770 1.130 0.040 0.292 0.180 0.89 should be overlapped at each joint by approx. 50mm and stapled onto the battens, the joins should be sealed using 75mm YBS Foil Tape. Insulated 30.00 0.560 Counter battens are fixed to the wall battens through the material at 600mm centres. The plasterboard is fixed over the and onto the battens in the usual manner. Insulated s UValue table For individual calculation please contact the EcohomeInsulation technical team on 0905 051 0022* Description 25mm Batten 38mm Batten and Solid Wall 0.34 W/m 2 k 0.29 W/m 2 k, Solid Wall and 30mm Insulated EPS 0.29 W/m 2 k 0.26 W/m 2 k, Solid Wall and 40mm Insulated EPS 0.27 W/m 2 k 0.24 W/m 2 k, Solid Wall and 0.22 W/m 2 k 0.19 W/m 2 k and Wall uninsulated 0.33 W/m 2 k 0.28 W/m 2 k, Wall uninsulated & 30mm Ins. EPS 0.28 W/m 2 k 0.25 W/m 2 k, Wall uninsulated & 40mm Ins. EPS 0.26 W/m 2 k 0.23 W/m 2 k, Wall uninsulated & 0.22 W/m 2 k 0.18 W/m 2 k and Wall Insulated 0.25 W/m 2 k 0.22 W/m 2 k, Wall Insulated & 30mm Ins. EPS 0.23 W/m 2 k 0.21 W/m 2 k, Wall Insulated & 40mm Ins. EPS 0.22 W/m 2 k 0.20 W/m 2 k, Wall Insulated & 0.18 W/m 2 k 0.16 W/m 2 k 4

Dwarf Wall Installation of for dwarf wall applications with additional insulation products should be in accordance with the certificate, YBS fixing instructions and current good building practice. is applied directly from the roll either vertically or horizontally depending on the wall height, pulled tight and stapled onto the timber studs at minimum 300mm centres. UValue Combined Method (W/m 2 K) 0.19 Loft Void PIR (Between Studs) Stud cavity 50.00 35.00 0.22 0.040 0.500 2.174 should be overlapped at each joint by approx. 50mm and stapled onto the battens, the joins should be sealed using 75mm YBS Foil Tape. 12.50 0.190 0.066 Perpendicular counter battens, recommended 25mm by 38mm are fixed to the wall. Battens must always be placed at the top and bottom of the wall and around the perimeter of doors and windows. The plasterboard is fixed over the products and onto the battens in the usual manner. Loft Void PIR Stud s UValue table For individual calculation please contact the EcohomeInsulation technical team on 0905 051 0022* Description 25mm Batten 38mm Batten and 50mm Glasswool 0.040 0.24 W/m 2 k 0.22 W/m 2 k and 100mm Glasswool 0.040 0.19 W/m 2 k 0.18 W/m 2 k and 25mm PIR 0.022 0.25 W/m 2 k 0.23 W/m 2 k and 50mm PIR 0.022 0.21 W/m 2 k 0.19 W/m 2 k and 75mm PIR 0.022 0.18 W/m 2 k 0.17 W/m 2 k and 100mm PIR 0.022 0.16 W/m 2 k 0.15 W/m 2 k Two Layer 0.21 W/m 2 k 0.19 W/m 2 k 5

Dormer Cheeks Installation of for dormer cheek applications with additional insulation products should be in accordance with the certificate, YBS fixing instructions and current good building practice. is applied directly from the roll either vertically or horizontally depending on the wall height, pulled tight and stapled onto the timber studs at minimum 300mm centres. UValue Combined Method (W/m 2 K) 0.24 Tiles BreatherFoil FR Sheathing Board Stud 10.00 25.00 4.00 9.50 89.00 0.833 0.140 0.040 0.012 0.665 0.121 0.068 should be overlapped at each joint by approx. 50mm and stapled onto the battens, the joins should be sealed using 75mm YBS Foil Tape. 12.50 0.190 0.066 Perpendicular counter battens, recommended 25mm by 38mm are fixed to the wall. Battens must always be placed at the top and bottom of the wall and around the perimeter of doors and windows. The plasterboard is fixed over the materials and onto the battens in the usual manner. Tiles BreatherFoil FR Sheathing Board Stud UValue table For individual calculation please contact the EcohomeInsulation technical team on 0905 051 0022* Description 25mm Batten 38mm Batten and YBS BreatherFoil FR 0.25 W/m 2 k 0.24 W/m 2 k, YBS BreatherFoil FR and 50mm Glasswool 0.040 0.21 W/m 2 k 0.20 W/m 2 k, YBS BreatherFoil FR and 25mm PIR 0.022 0.21 W/m 2 k 0.20 W/m 2 k, YBS BreatherFoil FR and 50mm PIR 0.022 0.18 W/m 2 k 0.17 W/m 2 k, YBS BreatherFoil and 0.17 W/m 2 k 0.17 W/m 2 k, Standard Breather Membrane 0.30 W/m 2 k 0.28 W/m 2 k, Standard Breather Membrane and 50mm Glasswool 0.040 0.24 W/m 2 k 0.22 W/m 2 k, Standard Breather Membrane and 25mm PIR 0.022 0.25 W/m 2 k 0.23 W/m 2 k, Standard Breather Membrane and 50mm PIR 0.022 0.21 W/m 2 k 0.20 W/m 2 k, Standard Breather Membrane and 0.19 W/m 2 k 0.18 W/m 2 k 6

RD850111 194186 CAD Drawings Can now be downloaded from www.ybsinsulation.com Foil taped joins should be overlapped at each joint by approx. 50mm and stapled onto the battens, the joints should be sealed using YBS 75mm Foil Tape. Vapour control layer When all joints are sealed using foil tape also works as a vapour control layer. knife available YBS Foil joining tape available Technical Properties Product Description 19 Components 40mm approx. Weight 800g/m 2 Mechanical Properties Value Reference Standard Core Thermal m 2 K/W BS EN 16012 Thermal 13mm 0.490m 2 K/W BS EN 16012 Thermal 20mm 0.790m 2 K/W BS EN 16012 Flammability Class E BS EN 135011 Water vapour resistance 1569MNs/g BS EN 12572 Emission coefficients of surfaces 0.02 EN 16012 Tensile strength 142KPA BS EN 1608 Packaging 15m 2 7.5m 2 Width 1.5m 1.5m Length 10m 5m Weight 12.5Kg 6.25Kg Distributor Insulation.com www.superquiltinsulation.com Tel: 0845 652 1597 Email: sales@superquiltinsulation.com Manufactured by Yorkshire Building Services (Whitwell) Ltd. YBS V2 12/2012