Transportation Worker Identification Credential (TWIC) Program. American Association of Port Authorities 2013 Security Seminar July 17, 2013

Similar documents
QUALITY ASSURANCE FOR SHRP2 R06C TECHNOLOGIES

PUBLIC POWER = + + LOCAL CONTROL LOW RATES HIGH RELIABILITY

Indiana Energy Status

Analysis of NBI Data for California Bridges

Educating and Training Tomorrow s Workforce

Indiana Energy Landscape

Developing a Framework for Integrated Energy Network Planning

Destination for Education? Your Facility. Bring Us to You!

Mary. E. Torrence DVM, Ph.D., DACVPM National Program Leader, Food Safety

Election Day Command Centers: The Vortex 2016 STATE CERTIFICATION TESTING OF VOTING SYSTEMS NATIONAL CONFERENCE MIT JUNE 20, 2016

The #1 PHR/SPHR Certification Prep Tool

Laws are like. better not to see. made.

State of the Network. EN2014 February 25, 2014

2011 State Average Electricity Prices (cents/kwh)

Non-Ambulatory Cattle and Calves

The Bee Informed Partnership Management Survey Results (2011) Respondent Profile. BeeInformed.org

A Comparison of In-Service Statistical Test Programs

Tax Credit Trends and Overview: Turning HR Departments Into A Profit Center. December 8, 2016

The Component Model of Infrastructure (CMI): An Infrastructure Model for Evaluating Tobacco Control Programs

Renewable Energy Buyers Alliance (REBA): Accelerating GHG reductions through a buyer-led movement

OF PIPEDREAMS AND PIPELINES

Update on Energy Efficiency Opportunities in the Commonwealth

Infrared Technology: Its Application and Benefit

Goal Setting: Nutrient Pollution Standards and Technology. October 29, Ephraim King OST

SALARY SNAPSHOT: HIM PROFESSIONALS IN 2016

ISO s Data Management Roadmap. October 13, 2015

Watershed Plan Implementation in Oklahoma: What We Do and What We ve Learned

Energy and Water: Emerging Issues and Challenges. Mike Hightower Water for Energy Project Lead Sandia National Laboratories

Sierra Club National Survey on Coal, Climate and Carbon Pollution Key Findings

Sarah Doll, Safer States BizNGO December 2014

Potential Damage from Asian Longhorned Beetle

MA Perspectives on Building Priorities for Climate and Energy Policy

IPNI North American Soil Test Summaries. Tom Jensen, Director in North America Program Cell:

Labor Market Equilibrium

Topics. Examination of Time Lags in Automatic Refills Kolmogorov Smirnov Statistical Test

Sales and Marketing Material Distribution for External Channel. July 2017

FHWA SHRP2 Overview & National Perspective. Steve Cooper SHRP2 Renewal Pavement Engineer

Advanced Fuel Cycles?

IDEM Update. ACEC Indiana Environmental Business and Funding Conference September 15, 2016 The Willows, Indianapolis

HOW CAN WE MAKE MORE JOBS GOOD JOBS?

EPOXY INTEREST GROUP EPOXY-COATED REINFORCING STEEL IN PARKING GARAGES

Risk Mitigation Benefits of Energy Efficiency

NCHRP 20-68A US Domestic Scan Program. Scan Advances In Civil Integrated Management (CIM)

Bridge Management Questionnaire Report

Farm Computer Usage and Ownership

Construction & Materials Outlook. March 9, 2009 Ken Simonson, Chief Economist AGC of America USA

Consumer-Friendly and Environmentally-Sound Electricity

Milk Production, Disposition, and Income

Future of the US Federal Highway Program

NCHRP 20 68A U.S. Domestic Scan Program. Domestic Scan 13 03

PAVEMENTS AND INNOVATION

Capacity of Refrigerated Warehouses

CPAs Making Sense of a Changing and Complex World. October 24, 2011 NASBA 104 th Annual Meeting Gregory J. Anton, CPA AICPA Chairman

Voluntary Renewable Energy Markets 101. Noah Bucon Senior Analyst, Policy & Certification Programs Center for Resource Solutions

2014 AIM Specialty Health. All Rights Reserved.

FHWA Cooperative Agreement Subtask. Longitudinal Joints Intelligent Compaction

ERP States Produce Results

The Discussion. WV s Observations Literature Review. SEAUPG Annual Meeting Williamsburg, VA Thursday, November 19, 2015

North Dakota Asphalt Conference April 6-7, 2010

The Changing Landscape and Business Case for Water Loss Control

Tack Coat Best Practices

Commercial Vehicle Information Systems and Networks (CVISN) Program

NUCLEAR BY THE NUMBERS A PRIL

COMPARISON REPORT OF THE COMPENSATION SURVEY

IDOT HMA Update. Christine M. Reed, P.E. Director Division of Highways Illinois Department of Transportation

Fraud and Abuse Oversight Strategy for Part C and Part D. Program Integrity and Part D

Farms and Land in Farms

Building Energy Codes Update NGA Energy Working Group

Welcome to the Charter Communications Routing Guide

Agricultural Land Values

NCHRP 20-68A US Domestic Scan Program

1. Audited Media Platforms. Print Publication: Average Net Circulation: 15,536 (Print Edition)

Bank of the Sierra stays in the black with the help of Eaton UPS and service plan

Manufactured Housing In the United States

U.S. Wind Industry Fourth Quarter 2014 U.S. Wind Industry First Quarter 2016 Market Report Market Report

Post Installation Inspection - Value Assurance. Stew Waller, P.E., LEED AP

THIS IS SUPERFUND. A Citizen s Guide to EPA s Superfund Program

American Voting Experience: Voter Registration Modernization. Presidential Commission on Election Administration Ben Ginsburg & Bob Bauer Co-Chairs

Welcome! Performance and Registration Information Systems Management. PRISM IRP Annual Meeting. June 5, Today s Agenda

The Impact of National Pollutant Discharge Elimination System Permits on Pesticide Use

The Future of Greenhouse Gas Emissions Trading in North America

APWA Sustainability Conference June 28, 2011

Rate Design: Basics and What s Possible

Eaton CSE never misses a beat for Charter Communications uptime requirements

Special Update: Salary Budget Survey

2012 Election and Promotional Products Interaction

Integrity Data Hub (IDH) Request for Information

EPA Carbon Regulations Stakeholder Meeting

Enhancing Laboratory Preparedness through Emergency Response Full-Scale Exercises. U.S. Environmental Protection Agency August 7, 2014

Presidential Commission on Election Administration & Voter Registration. Future of California Elections Los Angeles, CA February 25,2016

Subcommittee on Maintenance Update. Des Moines, Iowa July 20, 2015

Today s Propane. National Propane Gas Association

Voluntary & Compliance Markets. Renewable Energy Markets 2010

REGIONAL ENERGY BASELINES AND MEASUREMENT AND VERIFICATION PROTOCOLS

NMCI Services and Delivery. June 17, 2003 Bill Richard EDS NMCI Enterprise Client Executive

Full page: 8.5" wide X 11 depth. Open Rate: Local: $54, Full Page $18, /4th Page National: $54, Full Page $18,500.

The story of renewable energy

Agent Inside

CAPITAL SPENDING SURVEY MACHINE TOOLS EXECUTIVE SUMMARY PRESENTED ANNUALLY BY.

Radiology Staffing Survey 2010

Transcription:

Transportation Worker Identification Credential (TWIC) Program American Association of Port Authorities 2013 Security Seminar July 17, 2013

Current Program Statistics 2.6M. Total Enrollments 2.4M. Total Cards Issued 162,000. Extended Expiration Date TWIC Requests 51,300 Total Ineligible Applicants 136... Enrollment Centers 5.5 Days Average Time Between EED TWIC Request and Arrival of Card at Enrollment Center 5 10 Days.. Average Time Between Full Enrollment and Arrival of Card at Enrollment Center* * With no eligibility issues 2

Program Dashboard - Current

Projected Enrollment Surge as 5-Year TWICs Expire EEDs are 60% of TWIC renewals Plans for capacity and throughput to meet surge established by UES contractor 4

Customer Service Initiatives Increase TWIC Call Center Capacity Increased number of Call Center customer service representative four-fold Resulted in dramatic reduction in wait times and number of abandoned calls Add Web-Based EED and Replacement Card Request Application Allows workers to request EED TWICs or replacement cards online without having to contact call center Requests can be made at any time (24/7) Will further ease Call Center call volume Increase Number of TWIC Enrollment Centers Under the new Universal Enrollment Services contract TWIC enrollment services will be offered at as many as 300 centers Most UES enrollment centers will offer both TWIC and Hazardous Material Endorsement (HME) services (Map on next slide) 5

Universal Enrollment Services (UES) Sites WA OR NV CA ID AZ UT MT WY CO NM Current TWIC Enrollment Sites 136 UES will provide over 300 Enrollment Sites ND SD NE KS OK MN IA MO AR WI IL MI IN TN KY OH PA WV VA SC VT NC NY NH ME MA RI CT NJ DE MD DC AK HI TX LA MS AL GA FL 6

Customer Service Initiatives (Continued) Implement TWIC OneVisit Coast Guard Authorization and Maritime Transportation Act of 2012 requires that TSA reform the TWIC processes to allow for one visit to complete the TWIC enrollment process and receive a TWIC Once OneVisit is fully implemented all TWIC cards will be mailed directly to workers (home or alternate mailing address) Cards will be activated and ready to use PIN will already be set; sent to worker in separate envelope; worker can have PIN changed at any enrollment center OneVisit will be implemented in three phases: Phase 1 Alaska test; manual mailing process Began June 26th in Anchorage Will expand to all enrollment centers in Alaska in July 2013 Phase 2 Expansion of Alaska test a second location (late 2013) Phase 3 Nationwide automated mailing (late 2014) 7

TWIC Card and Reader Technology TWIC Reader Pilot Ended May 2011 Report to Congress submitted February 2012 GAO Report published May 2013 TSA position on results of pilot: the TWIC reader pilot generated considerable data that proved helpful in evaluating reader performance and assessing the impact of using readers at maritime facilities. Following analysis of the pilot results, TSA concluded that TWIC reader systems function properly when they are designed, installed, and operated in a manner consistent with the characteristics and business needs of the facility or vessel operation. TWIC Qualified Technology List (QTL) Purpose: Provide the public with a list of readers certified to meet the TWIC Card and Reader Hardware Specification (of May 2008); supports reader rule Process: Independent, accredited laboratories test readers submitted by reader vendors for compliance with the TWIC specification Adds certified readers to the QTL and publishes the list to the public Status: Several readers are in various stages of testing and certification 8

TWIC Card and Reader Technology (Continued) Failed Cards During the reader pilot, and from reports from workers and stakeholders, TSA learned that many TWICs did not work with readers particularly with contactless readers Forensic testing indicated the primary cause of card failure was detachment of the radio frequency (RF) transmitting antenna from the card s integrated circuit chip A recently completed analysis of data collected from field examination of cards held by workers in four geographic regions indicated: High failure rates for TWICs issued prior to September 2009 Significantly lower failure rates for TWICs issued after September 2009 Likely reason for lower failure rates: change in method of attaching RF antenna to chip independently undertaken by card stock supplier Note: All TWIC card stock is drawn from GSA-approved card stock; card stock is the same as that used for Federal smart card credentials 9

Thank You. Questions? John Schwartz Assistant Director Transportation Worker Identification Credential (TWIC) Program Phone: (571) 227-2177 Email: john.schwartz@dhs.gov 10