REPRINTED FROM MAGAZINE JANUARY/FEBRUARY 2017

Similar documents
PROCESS GAS WASTE HEAT BOILERS WITH THIN FLEXIBLE TUBESHEET DESIGN

BORSIG Process Heat Exchanger GmbH. Egellsstr. 21 Phone: +49 (0) 30 / Berlin/Germany Fax: +49 (0) 30 /

SYNLOOP WASTE HEAT BOILER IN AMMONIA PLANTS

The strongest thing we build is your trust.

WASTE HEAT BOILERS FOR NITRIC ACID, CAPROLACTAM AND FORMALDEHYDE PLANTS

WASTE HEAT BOILERS FOR NITRIC ACID, CAPROLACTAM AND FORMALDEHYDE PLANTS

SYNTHESIS GAS COOLER DOWNSTREAM OF PARTIAL OXIDATION OF OIL OR NATURAL GAS

Inspection and Welding Repairs of Pressure Vessels

horticultural applications

GENERAL CONTENTS SECTION I - NUCLEAR ISLAND COMPONENTS

Corrosion in GASCO Habshan CBA Units and its mitigation

BORSIG SYNTHESIS GAS COOLER DOWNSTREAM OF PARTIAL OXIDATION OF OIL OR NATURAL GAS PROCESS HEAT EXCHANGER. A Member of KNM Group Berhad

TROUBLE SHOOTING IN DELAYED COKER UNIT- INSPECTION EXPERIENCE

Oil & Gas Project demands on Engineering

PROCESS GAS WASTE HEAT RECOVERY SYSTEMS

NQA-1 Graded Approach, 55-Gallon Drum Summary

Decommissioning of Dairyland Power s Lacrosse Boiling Water Reactor

SmartSPEND. KBR SmartSPEND SM. The Economic Approach to Project Development and Execution that Delivers Maximum Project Returns

Structural Performance of next-generation nuclear components: lessons from the UK's R5 and R6 structural integrity assessment procedures

ASME BPVC SECTION 1 - RULE FOR CONSTRUCTION OF POWER BOILERS

SPECIFICATION FOR SPHERICAL VESSELS (PROJECT STANDARDS AND SPECIFICATIONS)

SUPPLIER QUALITY SCOPE AND FACILITY QUESTIONNAIRE. Bantrel Co. Project #:

Pressure Points. Governing Code Edition Section I Table of Contents

Regardless of any alternative pricing provided, a quotation for the items specified herein shall be provided.

Relationship Between Design and Materials for Thermal Power Plants. S. C. Chetal

Section 4. Annex to IAEA Request for Proposal STATEMENT OF WORK. Primary/Secondary cooling water Heat Exchangers

Regardless of any alternative pricing provided, a quotation for the items specified herein shall be provided.

Turnaround And Major Capital Project Services

PROCESS GAS WASTE HEAT RECOVERY SYSTEMS

Rycroft Process Solutions 1 PROCESS SOLUTIONS

BORSIG PROCESS GAS WASTE HEAT RECOVERY SYSTEMS

The use of Heavy Plate in the fabrication of Urea Pool Reactor

Fossil Materials and Repair - Program 87

QUALITY ASSURANCE PROTOCOL (QAP)

Materials and Qualification Procedures for Ships

Materials and Welding. Capability & Experience

Training Program for Urea Engineers. Tailor Made to Your Wishes

HOW TO CONSTRUCT ASME BOILER BY THAI ASSOCIATION OF BOILOER AND PRESSURE VESSEL

Sulfur Tail Gas Thermal Oxidizer Systems By Peter Pickard

Specification for Pipe Fittings

Course: 141 TIG WELDING OF STAINLESS STEEL. Module 9

SECTION MISCELLANEOUS METALS

Simoneau Presentation

WASTE HEAT RECOVERY. Clean Energy and Efficiency Solutions for the Global Energy Market

FERAN Aluminum clad steel for Power Plants Direct Air Cooled Condensers (DACC)

KOPETZ BUSINESS PROCESS MAP LEVEL 1 INQUIRY TO DELIVERY

nalcofabtech.com A Nalco Champion Company

MATERIALS OF CONSTRUCTION FOR PROCESS EQUIPMENT AND PIPING SYSTEMS

GUJARAT NARMADA VALLEY FERTILIZERS & CHEMICALS LIMITED

CNC PROFILING PLATE ROLLING SUBMERGED ARC WELDING

DESTEC ON-SITE SERVICES

ASTM Standards for Pipe & Fittings

Lean ethylene. Raising profitability in olefin plants

CSI HISTORY AND CAPABILITIES


Seawater corrosion resistant piping systems for large diameters up to 100 / 2.5 metres O.D.

HYDROGEN GENERATION FOR MODERN REFINERIES

EPROM Company Profile

EuropEan lifting devices

Laser Cladding Services

Contents EN 14015:2004 (E) page

STANDARD SPECIFICATION FOR ALUMINUM FRAMING FOR RAILROAD PASSENGER SHELTERS

The following sub-systems are provided and the integration of these is described below:

COKE-OVEN GAS PROCESSING EQUIPMENT

Titanium Clad Steel Hot Working Considerations & Applications. May, 20th 2014 Sorrento ITALY. by Stéphane PAULY

CNC PROFILING PLATE ROLLING SUBMERGED ARC WELDING

CONTENTS. Fittings, Bends, and Intersections

Capability Statement

Industeel. Clad plates

voestalpine SPECIALTY METALS UK Experts in Oil & Gas, CPI & Energy industries voestalpine High Performance Metals UK

PRECISION MACHINING & MANUFACTURING SERVICES

Originally presented at ASM International, Materials Solutions, Columbus, Ohio in October 2004 Richard Bolton MEng, AMIChemE, Area 42 Consulting

Fluid Catalytic Cracking (FCC) delivering Predictable Results

Engineering Field Service ASME Repairs B31.3 piping Bundle Extraction Maintenance

METALLIC MATERIAL SPECIFICATION

Head Office and Workshops Auckland Office Taupo Office Brisbane Office

we move more than fluids Plate Heat Exchangers Type XPS + safe + smart + efficient LASER WELDED

SHARING YOUR VISION. BUILDING SUCCESS.

PROJECT MONITORING ENGINEERING RISK SPECIALISTS. Introduction. Project Delay In Start Up Monitoring

Open Art, Coke Drum Specification

Insultec is a worldwide multi-local organization specializing in the design, supply and installation of insulation for major industrial projects.

Purge gas recovery. High-quality, customised solutions for the recovery of valuable gases from ammonia synthesis purge streams.

AS/NZS ISO FUTURE Of Australia s Welding Industry. How To Use It. Weld Australia. Helping Secure The

A tradition of specialisation. Custom heat exchangers as unique as your individual requirements.

Common Operating Problems

OUR FFICIENCY ARTNER

Using corrosion resistant stainless steels to improve reliability in Urea & Nitric Acid Plant

DP Specialist Anti - Corrosion. Boiler. Clean energy, natural solutions

SECTION MECHANICAL EQUIPMENT - GENERAL REQUIREMENTS

Urea and Nitric Acid Plants: Projects, shutdown, revamping, debottlenecking Improvement of Supply Chain Management

PART PG GENERAL REQUIREMENTS FOR ALL METHODS OF CONSTRUCTION

Section includes plate heat transfer panels as detailed in drawings listed in Section 1.1 Related Documents.

Internals for Radial Flow Reactors

CHAPTER 1 INTRODUCTION TO PIPING SYSTEM

Strong Acid Equipment Review and Developments. COBRAS 2017 Frans Kodeda /26

In The Name OF God Hampa E ner ner Ener y gy Engineering EEngineering & & Design Company Design Compan

FOYNES ENGINEERING. Bringing Quality, Expertise and Experience in the delivery of Mechanical Engineering Projects

Post Weld Heat Treatments for New and In Service Coke Drums Paul Kovach - Stress Engineering Services Richard Boswell - Stress Engineering Services

Heat Recovery Technology Applied to Direct Reduction (DR)-Process, Challenges and Benefits

A White Paper February System for piping global management

Transcription:

REPRINTED FROM MAGAZINE JANUARY/FEBRUARY 2017 G. MANENTI, V. PESCUMA AND S. SARTI, ALFA LAVAL OLMI SPA, ITALY, PROVIDE AN OVERVIEW OF THE DELIVERY SCHEDULE FOR A KEY PIECE OF HEAT TRANSFER EQUIPMENT, PROCESS GAS BOILER PACKAGES, TO FERTILIZER PLANTS.

Process gas boiler (PGB) packages are heat transfer equipment where process gases are cooled by means of water vaporisation. They consist of a boiler and a steam drum as a minimum, but other heat exchangers are frequently included. Major PGB packages, in terms of dimensions and technology, are installed in ammonia plants. Depending on heat recovery philosophy and process licensor technology, a complex ammonia PGB package constitutes several items, such as a reforming boiler, shift conversion boiler, ammonia synthesis boiler, steam drum, boiler water preheater and steam superheater. Figure 1 is a typical outline drawing of a complex package. For large-scale ammonia plants (>1600 tpd), where optimisation of the heat recovery scheme is essential, PGB packages have complex layouts and significant dimensions; they may produce up to 200 tph of steam. Water-side of ammonia PGB packages works normally at a high pressure (>10 MPa); process gas is at a high temperature and pressure and may also have a corrosive action on construction steels. For instance, hot reforming and ammonia synthesis gases are at approximately 1000 C and 3.5 MPa(a), and at 430 C and 20 MPa(a), respectively. Accordingly, ammonia PGB packages are installed on main process stream and work under critical operating conditions. This makes their operating and mechanical reliability a key parameter for plant OPEX. The ammonia PGB package complexity is also due to other specific features. The PGB, steam drum and other exchangers are interconnected by means of a large set of water and steam piping where this layout is often tortuous. Moreover, the steam drum is usually supported by the piping itself, instead of an independent structure, and boilers/exchangers can be subjected to loads and movements along more than one direction. This makes structural design and site assembly challenging. When the process gas temperature is above 450 500 C, such as in the reforming PGB, pressure parts containing the gas are lined with refractory, which must be engineered and installed by specialised sub-suppliers. Furthermore, since a significant portion of construction materials is made of high-nickel alloys, first-class manufacturing quality and capabilities are necessary. Finally, according to process licensor operating criteria, ammonia PGB packages may require special devices for finely controlling the heat transfer performance. Figure 1. Outline of a large ammonia PGB package. Due to the relevance of PGB packages in engineering, procurement and construction of fertilizer plants, this article reports a short review of a typical delivery schedule for a large package, from design to site assembly, as per supplier s experience. Representative milestones and potential issues are highlighted. Delivery schedule PGB packages for ammonia plants represent one of the most critical items for plant CAPEX and delivery schedule. As a consequence, package scheduling and supply progress are always subjected to a tight survey by contractors and final-users. Ammonia PGB packages are usually considered as long lead items by contractors; a package can take 13 15 months from purchase order for delivering single items. On the other hand, due to the size equipment, pre-assembly at a supplier s workshop is impractical. Transport dimensions (W x H x L) of reforming boiler and steam drum can reach, for instance, 3200 x 3000 x 14000 mm and 3200 x 3500 x 14000 mm, with a dry weight ranging from 80 130 t. Figure 2 reports the delivery schedule of a typical large ammonia PGB package. The package comprises: n No. 1 reforming boiler. n No. 1 reforming steam superheater. n No. 1 shift conversion boiler. n No. 1 ammonia synthesis boiler. n No. 1 steam drum. n No. 1 set of interconnecting piping. The schedule refers to ex-works delivery of single items: each item is delivered in one complete block, ready to be assembled at the site. The delivery comprises three major phases: n Engineering. n Materials procurement. n Manufacturing. These three phases generally represent the scope of supply and work of the PGB package supplier. Engineering Engineering takes approximately six months. During this period, both standard heat exchangers and specific PGB package documents are prepared and issued to the client. Within the standard documentation are datasheets, drawings, coded mechanical calculations, project management documents, manufacturing procedures, non-destructive tests procedures, quality control and inspection plans. As for specific documentation, there are thermal-hydraulics calculations, refractory procedures, thermal-mechanical and structural finite element analysis, valves and instruments requisitions, and supports requisitions. Last but not least, a relevant portion of the engineering timescale is dedicated to issuing manuals and procedures for site assembly, commissioning, operations and maintenance of the package. Since the package is complex and represents a strong process and structural interconnection among items (Figure 1), design changes on one item during the engineering phase WORLD FERTILIZER REPRINTED FROM JANUARY/FEBRUARY 2017

ENGINEERING, PROCUREMENT & MANUFACTURING SCHEDULE ID Task Name 1 AL OLMI - WORLD FERTILIZER - EXAMPLE PROJECT 2 PO AWARD 3 ENGINEERING STATUS - FIRST ISSUE OF DOCUMENTS 21 HEAT EXCHANGERS MATERIALS 44 STEAM DRUM MATERIALS 54 HEAT EXCHANGERS & STEAM DRUM MANUFACTURING 55 REFORMING BOILER MANUFACTURING 56 BUNDLE MANUFACTURING 82 INLET CHANNEL MANUFACTURING 102 OUTLET CHANNEL MANUFACTURING 122 SHELL MANUFACTURING 143 SHELL + BUNDLE ASSEMBLING & WELDING 151 TUBES TO TUBESHEET WELDING - CHANNELS ASSEMBLY 186 PWHT - NDE - HYT - REFRACTORY INSTALLATION - SANDBLASTING & PAINTING - PREPARATION FOR SHIPMENT 203 SHIFT CONVERSION BOILER MANUFACTURING 204 BUNDLE MANUFACTURING 230 INLET CHANNEL MANUFACTURING 250 OUTLET CHANNEL MANUFACTURING 270 SHELL MANUFACTURING 291 SHELL + BUNDLE ASSSEMBLING & WELDING 299 TUBES TO TUBESHEET WELDING - CHANNELS ASSEMBLY 334 PWHT - NDE - HYT - SANDBLASTING & PAINTING - PREPARATION FOR SHIPMENT 351 REFORMING STEAM SUPERHEATER MANUFACTURING 352 SHELL MANUFACTURING 452 SHELL PWHT-NDE-INTERNAL PARTS ASSEMBLING 465 CHANNEL MANUFACTURING 533 TUBEBUNDLE PREPARATION 575 TUBEBUNDLE + CHANNEL ASSEMBLING 586 TUBE BUNDLE PWHT-NDE- TUBE SIDE HYDROTEST 601 TUBEBUNDLE+SHELL ASSEMBLING; SHELL SIDE HYDROTEST 620 CHANNEL INTERNALS ASSEMBLING 635 CLOSING-SANDBLASTING-PAINTING & PREPARATION FOR SHIPMENT 643 AMMONIA SYNTHESIS BOILER MANUFACTURING 644 SHELL MANUFACTURING 721 SHELL PWHT-NDE-INTERNAL PARTS ASSEMBLING 734 CHANNEL MANUFACTURING 802 TUBEBUNDLE PREPARATION 844 TUBEBUNDLE + CHANNEL ASSEMBLING 855 TUBE BUNDLE PWHT-NDE- TUBE SIDE HYDROTEST 870 TUBEBUNDLE+SHELL ASSEMBLING; SHELL SIDE HYDROTEST 889 CHANNEL INTERNALS ASSEMBLING 904 CLOSING-SANDBLASTING-PAINTING & PREPARATION FOR SHIPMENT 912 STEAM DRUM MANUFACTURING 913 SHELL PREPARATION 962 HEADS PREPARATION 969 HEADS TO SHELL FIT-UP & WELDING 973 HYDROTEST + NDE 977 SANDBLASTING & PAINTING - SHIPPING PREPARATION 982 INTERCONNECTING PIPING MATERIAL 987 INTERCONNECTING PIPING MANUFACTURING 988 SANDBLASTING & PAINTING - SHIPPING PREPARATION M-1 M1 M2 M3 M4 M5 M6 M7 M8 M9 M10 M11 M12 M13 M14 Figure 2. Engineering, procurement and manufacturing schedule. usually have a significant impact on others. This is the most critical potential issue during engineering. In particular, changes may be caused by: n Comments from the client on design. Often, client project specifications and specialists refer to standard shell-and-tubes exchangers engineering, which is difficult to be fully applied to a complex package constituted of special and proprietary technology items. As a result, strong discussions between clients and suppliers may arise about few or, even, minor design details. To avoid such expensive incomprehension, either several portions are removed from project specifications during the bidding phase or, more reasonably, clients adopt a general approach to accept the supplier s tailor-made design. Actually, for ammonia PGB packages, only specifications from process licensors should be considered as fully mandatory. n Structural constraints. During the bidding phase and first months of the job, supporting and auxiliary structures are often not yet finalised. For instance, staircases/platforms/ladders around the steam drum should be finalised after the general layout of the package has been agreed; yet, civil activities must be defined as soon as possible. This frequently creates priority issues that are difficult to resolve. In the worst case, this may have a big impact on the interconnecting piping and the equipment nozzles layout. n Issues for assembly and commissioning at site. Each ammonia PGB package has an optimised and tailor-made design, and therefore assembly and commissioning activities at a site are comparable from one plant to the other, but never identical. As a consequence, when unexpected assembly and commissioning issues occur (usually in an advanced phase of the job if not directly at the site), the package design may undergo expensive changes in terms of time and cost. Materials procurement The materials used in an ammonia PGB package range from carbon steel to high-nickel alloys (60 70% Ni). The most commonly used materials for pressure components are carbon steels and low alloy steels; for some specific components and for several internals, stainless steels and nickel alloys are preferred. Overall package weight could reach 350 400 t, which means millions of Euros of materials. Procurements of materials is a challenging activity due to the following reasons: n Several metallurgical grades and types (tubes, plates, forgings) must be procured. n Materials have significantly different delivery times and prices. n Expensive materials (alloys) suffer from price volatility and have long delivery times. n Pressure components have large thicknesses so no stock materials can be considered. n Plates and forgings have large formats, which only a few mills can supply. n Special forgings, with complex shapes, are often required. REPRINTED FROM JANUARY/FEBRUARY 2017 WORLD FERTILIZER

SITE ASSEMBLY SCHEDULE ID Task Name M2 1 AL OLMI - WORLD FERTILIZER - EXAMPLE PROJECT 2 ERECTION - ASSEMBLY ACTIVITIES AT FERTILIZER SITE 3 REFORMING BOILER ERECTION & TEMPORARY STRUCTURE ASSEMBLY 4 STEAM DRUM ERECTION & ASSEMBLY ON TEMPORARY STRUCTURE 5 REFORMING BOILER/STEAM DRUM RISERS & DOWNCOMERS** FIT-UP & WELDING - NDE - PWHT 6 TEMPORARY STRUCTURE REMOVAL 7 AMMONIA SYNTHESIS BOILER ERECTION 8 AMMONIA SYNTHESIS BOILER/STEAM DRUM DOWNCOMERS FIT-UP & WELDING - NDE 9 SHIFT CONVERSION BOILER ERECTION 10 SHIFT CONVERSION BOILER/STEAM DRUM DOWNCOMERS FIT-UP & WELDING - NDE 11 PARTIAL ERECTION OF PERMANENT STEEL STRUCTURE 12 AMMONIA SYNTHESIS BOILER + SHIFT CONVERSION BOILER/STEAM DRUM RISERS FIT-UP & WELDING - NDE 13 LOCAL PWHT ON ALL PGC & SYNTHESIS BOILER JOINTS TO PIPING SPOOLS - NDE 14 REFORMING STEAM SUPERHEATER ERECTION 15 REF.BOILER/STEAM SUPERHEATER TRANSFERLINE FIT-UP & WELDING - NDE - PWHT - REFRACTORY RESTORING 16 ERECTION OF PERMANENT STEEL STRUCTURE COMPLETION 17 PERMANENT PIPING SUPPORTS FIT-UP & WELDING - PAINTING TOUCH-UP M3 Figure 3. Site assembly schedule. Construction materials are costly and, as shown in Figure 2, can take up to eight months for delivery. Consequently, any design change or issue along the job may have a large impact on materials procurement. On the other hand, to assure a proper delivery time of the package, sub orders for long delivery materials must be placed with sub-suppliers at least 2 2.5 months after the purchase order. To be compliant with this constraint, engineering must issue general and detailed drawings within approximately 6 8 weeks to have a first approval from the client before any procurement. Manufacturing This is the most critical phase in delivering an ammonia PGB package: a successful manufacturing, in terms of quality and delivery, is always appreciated and rewarded by clients. First of all, this phase must absorb all of the possible delays arising from the first two phases this sometimes means recovering a full month's delay. Then, package manufacturing is a craftwork: several special items, tailor-made in terms of engineering and materials, with large dimensions, with high-level quality welding, with different manufacturing sequences, must be fabricated in parallel. The manufacturing schedule for each boiler and exchanger includes the following major operations: n Manufacturing of shell and channel(s). n Manufacturing of bundle (including exchanging tubes to tubesheet welding). n Bundle and shell, or bundle and channel(s), assembly. n Final assembly. n Finishing (post-weld-heat-treatment, hydrostatic tests, refractory installation, sandblasting, etc.). Each of these operations includes tens of sub-operations, which must be done according to a specific and rigid sequence, mainly based on the manufacturer s experience. During manufacturing, the client attends with its appointed inspector(s) in order to guarantee that everything is done as required and to the agreed quality and documentation. However, as aforementioned, the manufacturing of such packages is a craft, based on the craftsmanship of the fitters/welders and on the expertise of the welding/manufacturing engineers; therefore, it is fully the supplier s duty to define the manufacturing schedule and smooth any resulting issues. The most critical manufacturing operations that are potentially sources of difficulty are: n Pre-heating, welding and cooling of large thick components made of enhanced carbon steels or low-alloy steels with 2.5Cr or more. n Tube-to-tubesheet welds. n Buttering, weld overlay and cladding. n PWHT. Last but not least, installation of refractory materials, carried out by proven sub-suppliers, represents a key operation since improper quality of refractory lining often causes expensive and annoying problems at a site during operations. As can be noted from Figure 2, manufacturing takes approximately nine months and overlaps with engineering and materials procurement; this is a potential source of severe issues, intrinsic to the high-level product, which can only be faced with proper expertise. Site assembly The site assembly of large ammonia PGB packages is a mix of supplier and contractor experience. Therefore, the schedule given in Figure 3 is for reference only as there may be large variations and changes depending on contractor requirements and plant erection schedules. Since the steam drum is frequently not provided with independent supports but it is supported by the interconnecting piping, the assembly is difficult and requires important resources. The most critical operations usually are: n Assembly of the steam drum on top of the reforming boiler: this requires a special and heavy temporary structure since the supporting piping is installed once the equipment is in place. n Alignment of items: these have significant dimensions and weight and, chiefly, have interconnecting nozzles of large size and thickness. n Assembly of piping, which usually have a tortuous routing. Analysis of site activities must be done between the supplier and the client as early as possible during the project, since site assembly problems may be disastrous in terms of cost and time. Alignment templates, transport and WORLD FERTILIZER REPRINTED FROM JANUARY/FEBRUARY 2017

lifting equipment, welding materials and tools, non-destructive examinations, spare parts, and finishing are key topics to be well defined before the equipment has left the workshop. A trouble-free complete mechanical assembly, with skilled fitters and welders, usually takes a minimum of two months. Conclusion The article is a short review of a typical delivery schedule for a large ammonia PGB package. The schedule includes engineering, materials procurement, items manufacturing and site package assembly. It is highlighted that due to special technology, tailor-made design and the large dimensions of items, critical delivery issues may arise along the job and heavily impact on the final supply. Delivery of such complex and skilled packages must be based particularly on a friendly and accurate cooperation between suppliers and clients/contractors. Reliability at heart Solid performance First-class manufacturing Alfa Laval Olmi process heat exchangers At Alfa Laval Olmi, the operational reliability of our products always comes first. Product quality is the result of knowledge, hard work and the right mindset. Every detail meets your requirements and nothing has been left to chance. Contact us sales.olmi@alfalaval.com www.alfalaval.com