Power Engineer Exams. Eligibility Requirements and Supporting Documentation Required

Similar documents
DEPUTY CHIEF POWER ENGINEER (1st CLASS PLANT)

POWER ENGINEERS ACT REGULATIONS

REGULATION OF THE MINISTER OF COMMUNITY, ABORIGINAL AND WOMEN S SERVICES. Safety Standards Act M 62

City of Oswego. Personnel Department 13 West Oneida Street Oswego NY Phone: Fax:

VENTURA COUNTY, PUBLIC WORKS AGENCY INVITES APPLICATIONS FOR: Transportation Engineering Manager I-II 0359PWA-17AF (KP) An Equal Opportunity Employer

EZY Intellect Pte. Ltd., #1 Changi North Street 1, Singapore

.1 marine diesel engine.1 approved in-service appropriate experience.2 marine steam turbine.2 approved training.3 marine gas turbine ship experience

NOTE ON PERFORMANCE TESTING

SUPERVISING FOOD PRODUCTION EQUIPMENT TECHNICIAN

EXAMINING BOARDS AND EXAMINATIONS FOR CERTAIN INSPECTORS, JOURNEYMEN, MAINTENANCE SUPERVISORS, MASTERS, OPERATORS AND SPECIALTIES REGULATED

Revised: Previously Issued As: P/BC

Revised: Previously Issued As: P/BC

Program Outcome 1 explain concepts related to the marketing mix of product, price, place, promotion and the contribution of each to an organization.

C XI CODE NO CITY PLANNING OCCUPATIONAL GROUP [127] CITY PLANNER

Mechanical-Electrical Technology MECHANICAL-ELECTRICAL TECHNOLOGY Sacramento City College Catalog

LAUNDRY. S No Description As is Recruitment Rules Recommendation of Coordination Committee AIIMS PGIMER JIPMER. PB-1,Rs Grade Pay Rs.

MEHLVILLE FIRE PROTECTION DISTRICT Critical Care Paramedic

Practice Final Exam (A) Six problems. (Open-book, HW solutions, and notes) (Plus /minus 10 % error acceptable for all numerical answers)

BCM00 Introduction to Building Controls and HVAC (available on request) One day course BCIA Members VAT Non-members VAT

VENTURA COUNTY, PUBLIC WORKS AGENCY INVITES APPLICATIONS FOR: Survey Technician III 1926PWA-AA16 (KP) An Equal Opportunity Employer

PECO Combined Heat & Power Symposium

&sharedwin...

CONTINUAL SERVICE IMPROVEMENT ITIL INTERMEDIATE TRAINING & CERTIFICATION

Enclosure (3) to NVIC 15-14

WHEREAS, the Borough of Belmar wished to amend certain sections of the ordinance relating to State Uniform Construction Code Fees.

Facilities Management

Combined Heat and Power (CHP) En Banc Hearing Pennsylvania Utility Commission. David B. Bordo October 7, 2014

Office of Human Resources. HVAC Mechanic LJ2743

Apprenticeship and Industry Training. Trade Competency Verification Qualification Candidate. Automotive Service Technician

Auburn Facilities Energy Reduction Plan

I. Requisition: Requisitions will be used to submit 4 different types of requests: Eligible

Abstract Submission. Key Points: Financial incentives, energy efficiency, best practices

OFFICIAL PROGRAM STANDARDS NOTIFICATION Issued: November 5, 2009

Fall MERCER COUNTY COMMUNITY COLLEGE Business Technology Division. Course Outline. Heavy Commercial Systems I. HRA 205 Course Number

MINISTRY OF INDUSTRY, TRADE AND COOPERATIVES Office of the Cabinet Secretary

PRESENTED BY: BRAD SWEARINGEN JIM NONNENMANN, PE

INTERMEDIATE QUALIFICATION

Guideline for In-Service Assessment of Ammonia Refrigeration Plants

INTERMEDIATE QUALIFICATION

CLIMBING ARBORIST STATUTORY DECLARATION OF WORK EXPERIENCE

4. Direct engineering consultants in the development of plans and specifications. 10%

Document Control Information

COMPRESSED AIR EXPRESS STUDY

Weekly Job Postings & Internship Opportunities. Updated on December 4, 2013

Lecture (5) on. Thermal Power Plant Unit Selection. By Dr. Emad M. Saad. Mechanical Engineering Dept. Faculty of Engineering.

Faculty of Engineering 2 nd year 2016 Mechanical Engineering Dep. Final-exam (code: M 1222)

ILLINOIS ENERGY NOW Energy Efficiency Incentives for State Facilities. December 2016

Description of the assignment: Local Technical Consultant on GHG Emissions Measurement, Reporting and Verification (MRV) for buildings

Thermodynamics: Homework A Set 6 Jennifer West (2004)

EMPLOYMENT APPLICATION PO Box 1070, Canby, OR Telephone:

- 2 - SME Q1. (a) Briefly explain how the following methods used in a gas-turbine power plant increase the thermal efficiency:

NOTE ON PERFORMANCE TESTING

th Class Power (Operating) Engineer Certification and Examination Guide

2.5 inch Supply/Attack Hose Assembly and Deployment 1.75 inch Charged Attack Line Deployment and Fire Stream Manipulation

Boiler and Pressure Equipment Regulations

Development of 700 C Class Steam Turbine Technology

Elliott Turbine Generator Sets PRODUCT

Ing. Alberto Cavallo, Ing. Ezio Pasqualon

Power Engineers And the Industrial Application of Gas Turbines IAGT 2015

Document Control Information

Powerline Technician Trade Regulation Consultation Discussion Guide. SUBMISSIONS DUE: November 4, 2016

7 th NATIONAL CERTIFICATION EXAMINATION Nov FOR ENERGY MANAGERS & ENERGY AUDITORS

Document Control Information

BID/JOB ANNOUNCEMENT

The Peoples Gas and North Shore Gas Natural Gas Savings Programs

Name: Title: Address 1: City: State:

Custom Application 2018 Retrofit Program

SAN DIEGO POLICE DEPARTMENT PROCEDURE PROVISIONAL SWORN EMPLOYEE PROGRAM

Schedule No. 9 to By-law No

Campbell Arnott s Contractor Management

2. Chilled Water Storage: A 4.4-million gallon chilled water storage tank improves Cornell s ability to meet peak cooling needs.

A. Cornell s district energy systems include the following components:

Conservation First Framework LDC Tool Kit Final v2.1 July 1, 2017

TransPacific Energy Advantage: Case Studies

Wadsworth, Ohio: The Place to Work

Non-Domestic Gas Safety. Click here to enter text.

Application Document Submittal for AISC Certification - Fabricators and Manufacturers

Industrial Gas Boilers

NOTE ON PERFORMANCE TESTING

sports facilities co2 chiller Efficiency, quality and reliability built-in all our ecofriendly products

Eligibility of a Heat Pump Based on the Primary Energy Factor

Unofficial Translation

Eng Thermodynamics I: Sample Final Exam Questions 1

Wx Process. Wx PROCESS. Weatherization Assistance Program Indiana Field Guide. Chapter 1 Wx Process 1-1

Fire Officer II CERTIFICATION PORTFOLIO

Energy Management Training Portfolio

SZS Oil and Gas Fuel Steam Boiler Product Range Offerings

Local Union No International Brotherhood of Electrical Workers, AFL-CIO P.O. Box 4790 Walnut Creek, CA 94596

EnergyMasters Auditor Accreditation Assessment Form

Accreditation Criteria for In-service Inspection of Pressure Systems/Equipments

Minnesota Conservation

Proud Manufacturer of

FERRARI NORTH EUROPE APPRENTICESHIP PROGRAMME

Engineering Technician IV-PW (Land Surveyor)

MAINTENANCE WORKER II

- Brad Gauthier, QSI Interiors Ltd.

CONSTRUCTION SUPERVISOR

NEW ZEALAND S SCHEDULE OF COMMITMENTS FOR TEMPORARY ENTRY FOR BUSINESS PERSONS

UNIT E: PERFORMANCE EVALUATION

Nova Scotia Apprenticeship Agency / Nova Scotia Community College Stewardship Report Academic Year

Transcription:

Power Engineer Exams Eligibility Requirements and Supporting Documentation Required PREREQUISITES SUPPT DOCUMENTS Fifth Class (a) not less than six months of experience in assisting in the operation of a steam or hot water boiler developing over 200 kw (20 boiler horsepower); (b) completed and passed the Basic Building Operation Course approved by the minister and have not less than three months of experience in a heating plant developing over 200 kw (20 boiler horsepower); (c) completed and passed the Advanced Building Operation Course or Building System Technician Course approved by the minister, and have not less than one month of experience thereafter in a heating plant developing over 200 kw (20 boiler horsepower). Fourth Class A1 experience Power Engineer Exams Eligibility Requirements and Supporting Documentation Required 1

PREREQUISITES SUPPT DOCUMENTS Fourth Class B1 (except as noted in clauses (e) and (f) to the right) (a) have at least one year of experience in assisting in the operation of a high pressure plant developing not less than 250 kw (25 boiler horsepower); (b) have completed and passed a Fourth Class Course in power engineering approved by the minister, and acted in the capacity described in clause (a) for a period of not less than one-half year; / (c) be a graduate engineer; (d) have not less than six months of the experience specified in clause (a) and, been employed for a period of not less than 12 months on the design, construction, installation, repair, maintenance or operation of plant equipment; (e) have been in charge of a low pressure heating plant developing not less than 750 kw (75 boiler horsepower) for not less than 24 months while holding a Fifth Class or Special Boiler Operator ; (f) have at least 24 months experience in a low pressure plant developing not less than 1500 kw (150 boiler horsepower) while holding a Fifth Class or Special Boiler Operator. Third Class A1, A2 Valid MB 4 th Class No experience other than the experience the candidate needed to obtain their 4 th class. Power Engineer Exams Eligibility Requirements and Supporting Documentation Required 2

PREREQUISITES SUPPT DOCUMENTS Third Class B1, B2 Valid MB 4 th Class (a) since the issue of the applicant's Fourth Class, must have (i) acted as chief engineer in a Fourth Class Plant for a period of not less than one year, (ii) acted as shift engineer in a Third Class Plant for a period of not less than one year, (iii) had charge of the operation of a low pressure heating plant developing more than 3000 kw (300 boiler horsepower) for a period of not less than two years, or (iv) acted as assistant shift engineer in a Second Class Plant for a period of not less than one year; (b) must have completed at least one year on the design, construction, installation, repair, maintenance or operation of plant equipment, and had experience in assisting in any of the capacities described in clause (a) for a minimum period of not less than one-half of the time specified in the clause for that capacity; (c) must have had experience in assisting in the operation of a First, Second or Third Class Plant for a period of not less than two and one-half years; (d) must have completed and passed a Third Class Course in power engineering approved by the minister and acted in any of the capacities described in clause (a) for a period of not less than one-half of the time specified in the clause; (e) must be a graduate engineer and have acted in any of the capacities described in clause (a) or (b) for a period of not less than one-half of the time specified in the clause for that capacity. Second Class A1, A2, A3 Valid MB 3 rd Class No experience other than the experience the candidate needed to obtain their 3 rd class. Power Engineer Exams Eligibility Requirements and Supporting Documentation Required 3

PREREQUISITES SUPPT DOCUMENTS Second Class B1, B2, B3 Valid MB 3 rd Class (a) since the issue of the Third Class, must have acted (i) as chief engineer in the operation of a Third Class Plant for a period of not less than two years, (ii) as shift engineer in the operation of a Second Class Plant for a period of not less than two years, (iii) as assistant shift engineer in the operation of a First Class Plant for a period of not less than two years, or (iv) as shift engineer in the operation of a Third Class Plant for a period of not less than three years; (b) must have acted in any of the capacities described in clause (a) for a period of not less than one-half of the time specified in clause (a) for that capacity and completed at least two years in a supervisory capacity on the repair, design, construction, installation, operation or maintenance of plant equipment; (c) must have acted in any of the capacities described in clause (a) for a period of not less than one year and must be a graduate engineer; (d) must have successfully completed and passed a Second Class Course in power engineering approved by the minister, and acted in any of the capacities described in clause (a) for a period of not less than one-half of the time specified in the clause. First Class A1, A2, A3, A4 Valid MB 2 nd Class No experience other than the experience the candidate needed to obtain their 2 nd class. Power Engineer Exams Eligibility Requirements and Supporting Documentation Required 4

PREREQUISITES SUPPT DOCUMENTS First Class B1, B2, B3, B4 Valid MB 2 nd Class (a) Since the issue of the Second Class, must have acted (i) as chief engineer of a Second Class Plant for a period of not less than two and one-half years, (ii) as shift engineer in the operation of a First Class Plant for a period of not less than two and one-half years, or (iii) as assistant shift engineer of a First Class Plant for a period of not less than three and one-half years, assisting in supervising all aspects of the shift operation; (b) must have acted in one of the capacities described in clause (a) for a period of not less than 15 months and must be a graduate engineer; (c) must have successfully completed and passed a First Class Course in power engineering approved by the minister, and acted in any of the capacities described in clause (a) for a period of not less than one-half of the time specified in the clause. Special Boiler Operator Class (a) not less than six months of experience assisting in the operation of a high pressure plant developing over 50 kw (five boiler horsepower); (b) completed and passed the Special Boiler Operator Course approved by the minister, and have not less than three months of experience thereafter in the operation of a high pressure plant capable of developing over 50 kw (five boiler horsepower). Power Engineer Exams Eligibility Requirements and Supporting Documentation Required 5

PREREQUISITES SUPPT DOCUMENTS Refrigeration Class (a) not less than one year of experience in assisting in the operation of a refrigeration plant developing over 175 kw (17.5 boiler horsepower); (b) completed and passed a course approved by the minister and assisted in the operation of a refrigeration plant developing over 175 kw (17.5 boiler horsepower) for a period of not less than six months. Verification of Refrigeration Plant Operating Steam Traction Engine Class (a) have experience in operating a steam traction engine; and (b) be competent in the operation of a steam traction engine. Power Engineer Exams Eligibility Requirements and Supporting Documentation Required 6