CFWI STORMWATER SUBTEAM PROJECTS REPORT. Steering Committee Meeting

Similar documents
FWCA Workshop The Central Florida Water Initiative. John Shearer, P.E., BCEE Shearer Consulting Inc. March 30, 2016 Orlando Utilities Commission

Project Name: St. Johns River/Taylor Creek Reservoir

Water Reuse: Orlando s Experiences & Perspectives. Rick Howard, PE Public Works Director

Florida Springs Protection and Restoration: Legislation, Projects and Prospects

Partnerships Changing Water Management Challenges & Strategies. David MacIntyre Parsons Brinckerhoff

Altamonte Springs FDOT I-4 Storm water Capture and Reclaimed Water Project Phase I

Central Florida has historically utilized

Ed Torres, MS, PE, LEED AP Director of Public Works & Utilities. Altamonte Springs -FDOT Integrated Reuse & Stormwater Treatment

St. Johns River Water Quality Projects. St. Johns River Water Quality Projects Fiscal Year

DEVELOPMENT OF A WATER SUPPLY PLAN FOR POLK COUNTY & ITS MUNICIPALITIES

American Water Resources Association 2016 Annual Conference November 13 17, Collaborative Water Supply Planning Where are we Going?

The Future of Alternative Water Supplies in the SWFWMD. Workshop: Practicable Sustainability: Implementing Water Reuse/Supply/Resource Projects

POLK COUNTY SOUTHEAST WELLFIELD DESCRIPTION OF PROJECT PLANNING LEVEL PROJECT DETAILS. (Water Supply Options project number 28)

PUBLIC PRIVATE PARTNERSHIPS

GOALS, OBJECTIVES AND POLICIES

Central Florida Water Initiative Minimum Flows and Levels and Reservations Team

Regional Water Supply Plan

Regional Water Supply Planning

Potable Reuse as an Alternative Water Supply. AWRA Conference Orlando, FL

STORMWATER HARVESTING FOR ALTERNATIVE WATER SUPPLY IN VOLUSIA COUNTY, FLORIDA

City of Winter Haven Water Sustainability Program. Mike Britt, P.E., Natural Resources Division

Appendix 3 MIA and Ridge Lakes Stakeholder Outreach Response and Results

SPECIAL PUBLICATION SJ2005-SP19 EAST-CENTRAL FLORIDA WATER SUPPLY PLANNING INITIATIVE FINAL REPORT

ORANGE COUNTY WATER SUPPLY FACILITIES WORK PLAN FISCAL YEAR 2007/2008 TO 2017/2018

[THIS PAGE INTENTIONALLY LEFT BLANK]

Water Supply Planning: Roadmap to Florida s Water Supply Future. Eric T. Olsen

Heartland Region. FY2019 Cooperative Funding Initiative. Preliminary Project Evaluations and Rankings

Winter Haven, FL & the Peace Creek Watershed. Howard T. Odum Center for Wetlands University of Florida

DRAINAGE AND NATURAL AQUIFER GROUNDWATER RECHARGE ELEMENT

A Brief Summary of the Water Bill, SB 552 1

O R A N G E C I T Y S INTEGRAT E D W AT E R R E S O U R C E S M A N A G E M E N T & R E S I L I E N C Y P L A N

CENTRAL FLORIDA WATER INITIATIVE

Environmental Protection Division. Wekiwa Spring and Rock Springs Basin Management Action Plan (BMAP) Status Update

The Feasibility of Using Reclaimed Water for Direct and Indirect Aquifer Recharge in the Tampa Bay Area

In support of an alternative water supply

GOALS, OBJECTIVES AND POLICIES

A. POTABLE WATER SUB-ELEMENT GOAL I-1: STRIVE TO PROVIDE HIGH QUALITY POTABLE WATER TO CURRENT AND FUTURE RESIDENTS AND VISITORS.

The City of Cocoa (City) is located in east

Preface CENTRAL FLORIDA WATER INITIATIVE Final CFWI RWSP, Planning Document, Volume I

Indian River Lagoon Council

Your region, Your water, Your voice at the table

Charlotte Harbor SWIM Plan Update Proposed Quantifiable Objectives and Management Actions, January 2019

Chapter 3 Previous Studies

St. Johns County LSJR TAC Meeting

GROVE LAND UTILITIES, LLC

Your region, Your water, Your voice at the table

CENTRAL FLORIDA WATER INITIATIVE

U.S. Geological Survey (USGS) Florida Water-Use Program

CITY OF BOYNTON BEACH COMPREHENSIVE PLAN UTILITIES ELEMENT

Ed Torres, M.S., P.E., LEED AP

A Springs Protection Initiative for NE Florida: Reversing the Fate of Florida's Iconic Springs via Science, Projects and Enlightened Management

REPORT RECLAIMED WATER DEFICIT & AUGMENTATION OF RECLAIMED WATER SYSTEM PROJECTION STUDY ON LONG TERM WATER SUPPLY. December 2014

September 9, EPB/UNF Environmental Symposium

St. Lucie Estuary/ Southern Indian River Lagoon Water Resource Summary

PREDEVELOPMENT VERSUS POSTDEVELOPMENT VOLUME ANALYSIS: An Application of Continuous Simulation Modeling using PONDS Version 3 Software

Heartland Region. Final Project Evaluations and Rankings

Restoration of Florida's Iconic Springs: Legislative and "Turn Dirt" Solutions

Overview of the Draft 2010 Water Supply Assessment Report

Lake Tohopekaliga Nutrient Reduction Plan and Best Management Practice Pollutant Load Analysis

Michael Weatherby, P.G., MWH, Tampa, FL

INFRASTRUCTURE ELEMENT/NATURAL GROUNDWATER AQUIFER RECHARGE SUB-ELEMENT

Florida Ocean Outfall Legislation: What it Means for Utilities and What They Are Doing to Comply

Everglades Restoration Definitions

The Effects of Urbanization on Water Supply

Sustainability of a potable water supply for a

Northern Tampa Bay Phase II Projects December 2004

Overview of the Draft 2010 Water Supply Assessment Report. Suwannee River Water Management District

Comprehensive Plan for Unincorporated Hillsborough County Potable Water Element - DRAFT

CHAPTER 10 NATURAL GROUNDWATER AND AQUIFER RECHARGE ELEMENT

Drought Issues and Challenges in South Florida Terrie Bates South Florida Water Management District September 26, 2007

Appendix K. Water Supply Development Project Options

Everglades Restoration Update. Melissa Meeker, Executive Director

Cape Coral Integration of Irrigation Source Waters

Agenda. Statutory Directive for MFLs. Statutory Directive for Reservations Draft Priority List and Schedule

St. Johns County s Approach to Merging Water Quality and Supply Challenges

POLK COUNTY UTILITIES DIVISION

Subject: WUP Integrated Water Use Permit (IWUP) Annual Water Conservation Progress Report (AWCPR)

SOUTHERN WATER USE CAUTION AREA REVIEW

MARION COUNTY COMPREHENSIVE PLAN 2035

CENTRAL FLORIDA WATER INITIATIVE

Adopted Projects at Priority List Meeting August 9, 2017

PEACE RIVER MANASOTA REGIONAL WATER SUPPLY AUTHORITY Orange Hammock Ranch Conservation Fact Sheet

But State Regulations Only Do So Much

Tampa Bay Region. Final Project Evaluations and Rankings

Importance of Reclaimed Water in Florida

POTABLE WATER ELEMENT

C-51 Reservoir Project Potential Opportunities. Robert M. Brown, Assistant Executive Director

A. POTABLE WATER AND GROUNDWATER RECHARGE WATER SUB-ELEMENT

Comprehensive Plan Update - Potable Water Section Planning Commission Workshop: November 10, 2014

MARION COUNTY COMPREHENSIVE PLAN 2035

Florida Forever Work Plan

NGWA INFORMATION BRIEF

A Multi-Stakeholder Partnership to Protect, Manage, and Restore our Springs: A National Estuary Program Model for the Florida Springs Coast

Planning Today For Water Tomorrow

POLK CITY. CITY COMMISSION WORKSHOP Polk City Government Center 123 Broadway Boulevard SE AGENDA

South Florida Water Management District Future Directions. Melissa Meeker, Executive Director

Groundwater and Base Flow BMPs BMPs for Nitrogen Removal in Marion County

Joint Alachua County/City of Gainesville Water Supply Facilities Work Plan January 10, 2018 Draft 2

Guidelines for Preparation of Reuse Feasibility Studies for Consumptive Use Permit Applicants

Capital Improvements

Transcription:

CFWI STORMWATER SUBTEAM PROJECTS REPORT Steering Committee Meeting October 24, 2014 Stephen R. Miller, PE Subteam Leader

Other Stormwater, Dispersed, Storage, etc. County CFWI SubRegions Project Name Implementing Agency or Entity Project Description Project Type Water Source Est. Water Generated (MGD) Seminole SJRWMD Altamonte Springs FDOT Reuse & Stormwater Treatment (AFIRST) Altamonte Springs Stormwater treatment and associated facilities to produce public access reuse Other Reclaimed water and stormwater reuse 4.5 All Counties Multiple Dispersed Storage Multiple Dispersed storage of stormwater/ surface water Other Stormwater surface water TBD 4.5

Stormwater Sub-team Project Types Water Supply, primarily reclaimed water systems augmentation (WS) Natural systems/ MFL Recovery with secondary leakage to Floridan Aquifer (MFL) Recharge into known high infiltration sites directly impacting Floridan water supply sources and springs flows (RE) Riverine Systems Augmentation with secondary benefits to the Indian River Lagoon (R)

Potential Water Supply Benefits of MFL Restoration and Recharge Projects Natural systems MFL s restoration with stormwater (in areas historically impacted by wellfield systems) coupled with associated leakage into the upper Floridan Aquifer could help facilitate achieving the targeted 50 MGD of additional groundwater withdrawal. GAT to quantify Recharge of stormwaters into the Upper Floridan in known high infiltration areas such as Conserve I & II and the Upper Wekiva Basin, coupled with retrofitting of certain Orlando area drainage wells could allow for additional future groundwater withdrawals. GAT to quantify

Stormwater Projects Evaluations Judge Farms, Osceola County (WS) 6 MGD Ocoee / SR 50, Orange County (WS) 1 MGD Reedy Creek / RCID, Orange & Osceola Counties (MFL) 4 MGD Winter Garden, Orange County (RE) 2 MGD Lake Wailes / Peace Creek, Polk County (MFL) 1.4 MGD

Stormwater Projects Evaluations (cont.) Winter Haven Area/ Peace Creek, Polk County (WS/RE) - 10 MGD* C-1 Canal/ SJ River/ Palm Bay, Brevard County (R) - 50 MGD Future project concepts for Wekiva, Econ, Shingle Creek and Lake Jesup Basins (RE & MFL) - 30 MGD *subject to rerating and ET analysis

Judge Farms, Osceola County (WS) Stormwater Supplement Reclaimed Water Project 6 MGD Purpose: Judge Farms Project is stormwater water storage facility utilizing natural topography and berming to create approximately a 200 acre reservoir for a 6 MGD supplemental reclaimed water source. Cost Estimates: Components: Wells, Pipes, Pumps, and Treatment Total Capital: $25M Operation and Maintenance: $250 K/year Unit Production Cost: $ 0.92/1,000 gallons Water Resource Constraints: Pending Model Results. Reliability of this water supply is 77% at 5 MGD; 95% reliability at 10 MGD with E. Lake Toho augmentation Partners & Governance: St. Cloud, Osceola, TOHO, FDEP and SFWMD

Feasibility: Planned components are neither complex nor difficult to construct. Determination of willing partners, community s support, water quality and groundwater model effects under investigation. Funding Options: State appropriation, impact fees, revenue bonds Implementation Schedule: Feasibility Study: 2015-2016 Land Acquisition: 2016 Project Design: 2017 Construction: 2018-2020 Central CENTRAL FLORIDA Florida COORDINATION Water Initiative AREA Judge Farms, Osceola County (WS) Stormwater Supplement Reclaimed Water Project 6 MGD Project Evaluation Status: Over 90% Complete

Ocoee/SR 50, Orange County (WS) Stormwater Reclaimed Water Project 1 MGD Purpose: Capture stormwater in FDOT rights-of-way and pond systems to supply the City of Ocoee with reclaimed water system augmentation. Project to coincide with planned FDOT widening project. Funding Options: FDOT, City of Ocoee Cost Estimates: The SR 50 widening project is not finalized at this time. The intent is to partner with FDOT to develop a stormwater design that would produce savings in land required and enable this stormwater capture approach to be made cost feasible.

Ocoee/SR 50, Orange County (WS) Stormwater Reclaimed Water Project 1 MGD Water Resource Constraints: Water quality projections and related treatment requirements need to be determined. It is estimated that the water supply will be 60% reliable at 1.2 MGD, and 90% reliable 0.6 MGD. Implementation Schedule: Feasibility Study: TBD Land Acquisition: TBD Project Design: TBD Construction: TBD

Reedy Creek/RCID, Orange & Osceola Counties (MFL) Stormwater Mitigation & Recharge Option 1: 4mgd; Option 2: 7mgd Purpose: Address altered/urbanized RCID stormwater impacts by capturing base flows in the drainage system that have resulted from drainage system infrastructure interception of the pre 1960 s surficial water table. Use that water as a source for natural systems MFL restoration and associated recharge in tactically beneficial locations. Cost Estimates: Options 1&2 Components: Pipes, Pumps, Surface water intake, and RIBS Total Capital: $1 M, $10 M Operation and Maintenance: TBD Unit Production Cost: $0.05/1,000 gallons, $1.10/1,000 gallons. Partners & Governance: RCID, FDOT, WMD local government

Implementation Schedule: Feasibility Study: 2015-2016 Land Acquisition: NA Project Design: 2017 Construction: 2019-2020 Central CENTRAL FLORIDA Florida COORDINATION Water Initiative AREA Reedy Creek/RCID, Orange & Osceola Counties (MFL) Stormwater Mitigation & Recharge Option 1: 4mgd; Option 2: 7mgd Water Resource Constraints: Water quality requirements need more investigation. There is early support for a FDOT Environmental Look Around (ELA) process, as well as other collaborations. Refining the modeled groundwater impacts analysis and ongoing data needs. Project Evaluation Status: Over 90% Complete

Winter Garden, Orange County (WS & RE) Stormwater Capture Project 2 MGD Purpose: Intercept and capture stormwater flows near Lake Apopka in two locations on City properties for reclaimed water augmentation and recharge purposes. Benefits also include surcharge of Floridan Aquifer for City wellfield and reductions in nutrient loading to Lake Apopka. Funding Options: City of Winter Garden, SJRWMD Cost Estimates: Components: Pipes, Structures, Excavation and Berms, and Pumps Total Capital: $2.41 M Operation and Maintenance: <$150K/ year Unit Production Cost: <$0.50/ 1,000 gallons

Winter Garden, Orange County (WS & RE) Stormwater Capture Project 2 MGD Water Resource Constraints: The reliability of this water supply requires additional evaluation, but is estimated as 60% at 2.5 MGD, and 90% at 1.2 MGD. Water quality treatment for reclaimed use provided by City WWTP. Implementation Schedule: Final engineering and funding: 2015-2016 Construction: 2016-2018

Lake Wailes, Polk County (MFL) Stormwater Mitigation Project 1.4 MGD Purpose: Augment Lake Wailes to meet established MFL. The project takes stormwater flow from Peace Creek Canal (PCC), when available, and conveys water to Lake Wailes. Funding Options: State grants, impact fees, revenue bonds and state revolving fund loans Cost Estimates: Components: Pipes, Pumps, Surface water intake, and RIB Total Capital: $13.5 M, $20 M Operation and Maintenance: $32,550, $190,168 Unit Production Cost: $1.30/1,000 gallons (Option 1), $2.21/1,000 gallons (Option 2)

Lake Wailes, Polk County (MFL) Stormwater Mitigation Project 1.4 MGD Water Resource Constraints: Water quality requirements need more investigation. The project proposes use North Lake Wales to provide a level of treatment to improve water quality and a RIB for the second option. Implementation Schedule: Feasibility Study: 2015-2016 Land Acquisition: 2016 Project Design: 2017 Construction: 2018-2020 Project Evaluation Status: Over 90% Complete

Winter Haven Area/Peace Creek, Polk County (WS/RE) Stormwater Restoration Project 10 MGD* Purpose: To restore the natural hydrology of up to 10,000 acres of wetland systems currently drained and impacted by the Peace Creek Canal, enhance lake levels for surrounding natural systems, and harvest stormwaters for reclaimed water supply and/or recharge in the City of Winter Haven and adjoining municipalities. Funding Options: P3 s and Private Investments associated with CSX ILC; SWFWMD and local municipalities Cost Estimates: Total capital: $100M -$200M Operation and maintenance: $3M-$7MYear Unit production cost: $1.5-$3/1,000 gallons * Subject to rerating and ET analysis of applicable program elements for current Sapphire Necklace proposal

Winter Haven Area/Peace Creek, Polk County (WS/RE) Stormwater Restoration Project 10 MGD* Water Resource Constraints: ET analyses have not been prepared for this project as proposed, nor have leakage benefits to the Floridan Aquifer been quantified (GAT). Benefitting lakes and related MFL adoption require further study. Peace River MFL could also be positively impacted. Implementation Schedule: Feasibility studies and Land Acquisition: 2015-2017 Design and Permitting : 2017-2019 Construction: Phase 1: 2019-2022, Phase 2: 2023-2035 *Subject to rerating and ET analysis of applicable elements for current Sapphire Necklace proposal

C-1 Canal/Palm Bay, Brevard County (R) SJ River Augmentation Project 50 MGD Purpose: Capture and redirect 50 MGD (average) of fresh water discharges from the C-1 Canal system in southern Brevard County into the St. Johns River. Today, this system discharges an average of 37.5 billion gallons per year, or 103 MGD, into the Indian River Lagoon (IRL). This would augment river flows to support planned surface water supply projects in Orange and Seminole counties. Funding Options: State of Florida, SJRWMD, FDOT, Regional and local utilities, US EPA, U.S. Congress Cost Estimates: Components: Land, reservoir, construction, structures, pumps and piping Total Capital: $15 M - $90 M Operation and Maintenance: $2.0 M/Year Unit Production Cost: $0.07 - $0.42/1,000 gallons

C-1 Canal/Palm Bay, Brevard County (R) SJ River Augmentation Project 50 MGD Water Resource Constraints: Diverted flows would not prohibit discharges to IRL under major storm events. Significant water quality benefits to the IRL include increased salinity, and decreased nutrients. Adequate water quality treatment is expected to be provided in proposed reservoir system. Implementation Schedule: Design and land acquisition: 2015-2016 Land acquisition: 2017-2019 Permitting and construction: 2017-2025

Future Project Concepts for Wekiva, Econ, Shingle Creek and Lake Jesup Basins 30 MGD Purpose: To capture base flows of urbanized stormwater pond and related storage recovery bleed down systems throughout the Orlando area to provide recharge waters to high infiltration / RIB sites throughout west and Northwest Orange County. Also, retrofitting of certain Orlando area drainage wells and other stormwater management strategies should evaluated. Funding Options: State of Florida, FDEP, SJRWMD, SFWMD, Regional utilities Cost Estimates: TBD

Future Project Concepts for Wekiva, Econ, Shingle Creek and Lake Jesup Basins 30 MGD Water Resource Constraints: The concept for these projects involve collecting and pumping post-treatment stormwaters on a base flow level to RIB s and drainage wells for infiltration into the upper Floridan Aquifer to benefit groundwater withdrawals and MFL s including spring flows. It is not expected that additional water quality treatment would be required. The greatest constraint will be identification of rights-of way and easements for pipeline conveyance systems improvements. Implementation Schedule: Feasibility Study: 2015-2017 Design and Construction: TBD

Stormwater Projects Evaluations Judge Farms, Osceola County (WS) 6 MGD Ocoee / SR 50, Orange County (WS) 1 MGD Reedy Creek / RCID, Orange & Osceola Counties (MFL) 4 MGD Winter Garden, Orange County (RE) 2 MGD Lake Wailes / Peace Creek, Polk County (MFL) 1.4 MGD

Stormwater Projects Evaluations (cont.) Winter Haven Area/ Peace Creek, Polk County (WS/RE) - 10 MGD* C-1 Canal/ SJ River/ Palm Bay, Brevard County (R) - 50 MGD Future project concepts for Wekiva, Econ, Shingle Creek and Lake Jesup Basins (RE & MFL) - 30 MGD

Questions?

Stormwater Sub-team Basic Project Questions 1. Identify regional water supply project 2. Cost-benefit analysis of yield 3. Cost estimates (Capital & Annual O&M) 4. Identify water resource constraints 5. Identify potential partners and governance options 6. Pumping, storage and transmission configurations

7. Project feasibility 8. Funding sources Central CENTRAL FLORIDA Florida COORDINATION Water Initiative AREA Stormwater Sub-team Basic Project Questions 9. Project limitations or constraints resulting from rule inconsistency 10. Other considerations public concerns or non-technical obstacles 11. Estimated implementation schedule

A First, City of Altamonte Springs (WS) Stormwater Supplement of Reclaimed Water Project 4 MGD Purpose: Integrate stormwater and reclaimed water by capturing a portion of the stormwater from the I-4 Ultimate FDOT project in the City of Altamonte's Regional Stormwater Facility at Cranes Roost. After transfer and treatment, this new integrated water resources system blends the City's reclaimed water with the treated stormwater. When excess reclaimed/stormwater is available, this blended water (additional quantities) from the Regional Water Reclamation Facility will be sent to the City of Apopka for reuse or recharge. Cost Estimates: Components: Pipes, Pumps, and Treatment Total Capital: $13.3 M Operation and Maintenance: $ Unit Production Cost: $0.93/1,000 gallons Water Resource Constraints: Pending Model Results Partners & Governance: Inter-local Agreement between Altamonte Springs, Apopka, FDOT and SJRWMD

A First, City of Altamonte Springs (WS) Stormwater Supplement of Reclaimed Water Project 4 MGD Feasibility: Local and State agencies creatively solves stormwater issues and land constraints reducing I-4 road construction costs & the project augments the reclaimed water supplies for 2 local governments. Funding Options: WMD, Local government, FDOT Implementation Schedule: Feasibility Study 2007 Land Acquistion N/A Project Design 2013 Construction 2014-2016 Project Evaluation Status: 100 % Complete