Road Stabilization And Dust Control

Similar documents
ITEM 231 CEMENT STABILIZED CRUSHED AGGREGATE BASE COURSE

ITEM 231 CEMENT STABILIZED CRUSHED AGGREGATE BASE COURSE

Polymer Modified Cement

Soil Stabilization. The future of sustainable structural sub-bases and solutions for unsuitable soils.

Stanford University Facilities Design Guidelines SECTION SEAL COATS. C. Section : Traffic Striping and Pavement Markings

Clements Fluids Roadmaster Calcium Chloride for Dust Control & Road Stabilization. Clements Fluids Management, LLC

FULL DEPTH RECLAMATION. FDR Candidates STABILIZER DESIGN. Benefits. Benefits LOCAL ROADS PROGRAM What is Full Depth Reclamation (FDR)?

TECHNICAL SPECIFICATION

RECONSTRUCTION OF DISTRESSED PAVEMENTS Full-Depth Rehabilitation (FDR) (Portland cement)

A. Texas Department Transportation 2004 Standard Specifications for Construction of Highways, Streets and Bridges (TxDOT):

Full-Depth Reclamation with Cement

ITEM 252 IN-PLACE FULL DEPTH COLD FLEXIBLE PAVEMENT RECYCLING

Road Conditioning Asphalt Crushing Soil Stabilization CLAUSSEN

Cement Stabilized Soil (CSS) (Portland cement)

Item 247 Flexible Base

Item 247 Flexible Base

ITEM 247 FLEXIBLE BASE

A. Texas Department of Transportation 2004 Standard Specifications for Construction and Maintenance of Highways, Streets and Bridges (TxDOT).

SECTION 28 AGGREGATE BASE COURSE (FAA P-208) [For base course under runway and taxiway surfaces, use Section 29, FAA Item P-209.]

ITEM 275 PORTLAND CEMENT TREATED MATERIALS (ROAD MIXED)

CITY OF SAN ANGELO ITEM 275 PORTLAND CEMENT TREATED MATERIALS (ROAD MIXED)

TECHNICAL SPECIFICATION

FLEX BASE PROPERTIES. Richard Izzo, P.E. Geotechnical, Soils & Aggregates Section Materials & Tests Division Transportation Short Course

SPECIFICATIONS FOR ASPHALT-RUBBER SURFACE TREATMENT WITH AGGREGATE COVER

LTRC QUALITY CONTROL OF TRENCH BACKFILL AT HIGHWAY CROSS-DRAIN PIPES. Zhongjie Doc Zhang, PhD, P.E. October 2004

SPWA Fall Rural Roads Workshop

Soil-Cement Technology for Pavements: Different Products for Different Applications

Section 25 Aggregate Subbase

Glossary of Terms - A -

City of Estevan. Construction Specifications

Asphalt Rubber Chip Sealing DRAFT MAINTENANCE SPECIFICATION. March 22, 2007

CITY OF LETHBRIDGE SECTION INFRASTRUCTURE SERVICES Page 1 of 7 GRANULAR BASE PREP

SOM August 2009 Alaska

SECTION ASPHALT PAVING

INDEX DESCRIPTION MATERIALS CONSTRUCTION MEASUREMENT PAYMENT 6

Integrated Pavement Solutions

An Overview of Low Cost Pavement Alternatives in Canada

Rehabilitation of the Blue Ridge Parkway with FDR and AC Overlay. Michael Walters FHWA EFLHD October 7, 2014

Full Depth Reclamation

SECTION BITUMINOUS SURFACE TREATMENT

REPORT OF PORTION OF PECOS EXPERIMENTAL ROADS PROJECT BUILT BY SCOTT ENVIRONMENTAL SERVICES, INC.

LAPEER COUNTY ROAD COMMISSION ANNUAL BID SLURRY SEAL SURFACE SPECIFICATIONS

OKLAHOMA DEPARTMENT OF TRANSPORTATION SPECIAL PROVISIONS FOR SUBGRADE STABILIZATION

MONTEZUMA COUNTY COLORADO ROAD AND BRIDGE STANDARD SPECIFICATIONS

Wmega Retaining Wall Specification

LIFETIME WATERPROOFING SEALANT FREQUENTLY ASKED QUESTIONS

Section 409 of the Standard Specifications is hereby deleted and replaced with the following: DESCRIPTION

NORTH HARRIS COUNTY REGIONAL WATER AUTHORITY PORTLAND CEMENT. Section PORTLAND CEMENT STABILIZED SUBGRADE

Special Provision Item P-152 Excavation and Embankment

SPECIFICATIONS FOR BONDED WEARING COURSE

SPECIAL SPECIFICATION 2093 LIME/CEMENT STABALIZED SUBGRADE

MSCAA /04 ITEM P-219 RECYCLED CONCRETE CRUSHED AGGREGATE BASE COURSE DESCRIPTION MATERIALS

A. Texas Department of Transportation 2004 Standard Specifications for Construction and Maintenance of Highways, Streets and Bridges (TxDOT).

INDEX DESCRIPTION MATERIALS APPROVAL FOR BASE COURSE CONSTRUCTION MEASUREMENT PAYMENT 6

Suggested Guidelines for Hot Mix Asphalt (HMA) Underlayment in Track by AREMA Committee l-sub Committee No. 2 - Ballast.

LAGRANGE TOWNSHIP 353 South center street p.o. box 565 lagrange ohio 44050

A. Submit product data sheets and literature verifying fire ratings and physical properties of materials.

7.1 Flexible Pavement Design. 7.2 Rigid Pavement Design TRANSPORTATION SYSTEM ENGINEERING 1, 61360

Construction Specification 28 Lime Treated Earthfill

TECHNICAL INFORMATION SCREED

610 - DOUBLE ASPHALT SURFACE TREATMENT SECTION 610 DOUBLE ASPHALT SURFACE TREATMENT

A-9,250 Parking Structure Resurfacing Cement Look

DIVISION 2100 SITEWORK

610 - DOUBLE ASPHALT SURFACE TREATMENT SECTION 610 DOUBLE ASPHALT SURFACE TREATMENT

ITEM D-701 PIPE FOR STORM DRAINS AND CULVERTS

Section 3 Specification 3.20 Slurry Seal TABLE OF CONTENTS

FULL DEPTH RECLAMATION

SECTION ASPHALT PAVING

SECTION CONCRETE SEGMENTAL RETAINING WALL SYSTEM

GOODHUE COUNTY DEPARTMENT OF PUBLIC WORKS

SPECIFICATIONS FOR FULL DEPTH RECLAMATION WITH CALCIUM CHLORIDE

SECTION STRUCTURAL EXCAVATION FOR STRUCTURES

INNOVATIVE MAINTENANCE MATERIALS, EQUIPMENT AND OPERATIONS FOAMED ASPHALT. Tomas Trevino, P.E. Maintenance Engineer Corpus Christi District

ITEM 481 MONOLITHIC REINFORCED CONCRETE BOX SEWERS

SECTION SOILS REPORT

302 LIME TREATED SUBGRADE SECTION 302 LIME TREATED SUBGRADE

The specified emulsion for chip seal shall conform to the following applicable requirements:

S Pene- Krete (Spray- Applied)

REUSE YOUR ROADWAY Road Rehabilitation Technology

Installation Guidelines

FULL - DEPTH RECYCLING OF ASPHALT PAVEMENTS WITH PORTLAND CEMENT

Everything you need to know about Chip Seals and Fog Seals

Advantages of Full Depth Recycling

PREVENTATIVE MAINTENANCE OF ASPHALT CONCRETE PAVEMENTS

Full Depth Reclamation

Utility Cut Restoration

Draft Specifications and Design Guidelines for Use of Scrap Tires in Embankment Construction

UNDERSTANDING UNPAVED ROAD MATERIAL PERFORMANCE INTERPRETATION David Jones, PhD University of California Pavement Research Center

Topic #4 Soil Compaction

SECTION 503 TEMPORARY PAVEMENT RESTORATION

Controlling Fugitive Dust On Construction Sites And Gravel Roads. Scott Johnson, STSC

TechniSoil G5 Installation Specification

Structural System. Design Considerations Concrete Structures. Materials Formwork Labor Time

ITEM 260 LIME TREATMENT FOR MATERIALS USED AS SUBGRADE (ROAD MIXED)

APPENDIX "B" ASPHALT CONCRETE PAVEMENT FOR STREET AND DRIVEWAY CONSTRUCTION

MIDLAND COUNTY ROAD COMMISSION

CITY OF FARGO SPECIFICATIONS AGGREGATE BASES

NORTH HARRIS COUNTY REGIONAL WATER AUTHORITY. Section CEMENT STABILIZED BASE COURSE. 1. Foundation course of cement stabilized crushed stone.

BUILDING DEVELOPMENT POLICIES AND PROCEDURES ADMINISTRATIVE/GENERAL

Transcription:

Road Stabilization And Dust Control

What to expect from SOS Environmental & Services? Dust Control? Less Road Maintenance Choices to meet needs and budget Technical Support Road Stabilization? Sub base for asphalt or cement Replacement for asphalt or cement Seal coats for soil stabilization or cement surfaces High strength, high durability top coat Substantially reduced cost

Unique Features of SOS Environmental Products Efficient application of product via microemulsion technology Denser matrix using nano technology Use of high strength cements Liquid applications Low water to solids ratios Seal coats normally only used for high end surfaces

Let s start with dust control (by answering some questions about your situation) Are you just addressing some neighbor complaints? Do you want to improve or preserve your road/yard? Do you want to reduce your labor costs? Take a minute, give these serious thought and answer each with yes/no.

If you have a yes for (1) or a no for (3) see column A Surface Option Deeper Option Do a surface treatment Reform the road or yard Use a low cost product Use a balanced product Repeat often Touch up periodically Put money in the bank

Dust control leads to road stabilization they are directly linked. Dust, or fine particles, are what holds a roadbed or truck yard together. Without the fine particles, binding becomes very difficult.

Common way to proceed with dust and road stabilization Surface treat in areas problematic to people complaints When a road needs to be repaired, treat for dust at the same time. Preferred repair sequence: Dig fines out of the ditches and place them back on the road such that the ditches drain readily Spread windrow gravel and fines evenly on the road Spray Dust Master and mix with grader Create a crown with the grader Spray again to seal and bind surface Compact with a rubber tired roller on smooth drum roller Apply a 0.1 gal/sq yd seal coat

What to do if spraying is all that is possible? Wet the dust with a 10:1 dilution with water wetting surfactant added Allow traffic to travel the road to compress and mix the dust into the road base After traffic has collapsed the dust material onto the base, apply a diluted Dust Master or Dust Check Reapply as necessary, adjusting the dilution up or down to meet your specific needs.

SOS Environmental Products & Services There is a wide range of dust control & stabilization products and services available from SOS Environmental. Rig site stabilization Pipe and truck yard stabilization Road stabilization and technical service Dust Control Surface sealers

A good dust program can save a bundle on yard maintenance!

Greenfield Site Development High Compressive Load Site From low plastic limit clay to:

Reasons for Effectiveness: Nanoparticles Submicron particles, in combination with surface tension reducers, can penetrate into the small voids in the soil. There they set up ceramic bond bridges between the soil particles. While the liquid is dark brown, it is laden with millions of sub-micron particles

Reasons for Effectiveness: Special Cement Mixes Ordinary Portland Cement (OPC) will have 28 day compressive strengths of 5,000 6,000 psi. With other components, this strength range can be shifted to 9,000 11,000 range. Depending upon the objectives, the mixture can be adjusted for freeze-thaw issues, water requirements, tougher surfaces, etc. The options are endless.

Reasons for Effectiveness: Moisture Control

Procedure: Sampling (1) Sample site, nearby soil and other relevant materials. (2) Get size distribution (3) Check liquid limit, plastic limit, PI (4) Compressive strength of soil, chemical blends (5) Proctor Density Curve

Procedure: Sampling If the site is problematic; e.g. no history as to the subsoil composition, then SOS Environmental may elect to take core samples. This is an inexpensive way to determine the condition of a future site.

Procedure: Mobilization Mobilization includes: (1) Getting storage tanks on location (2) Getting dry materials on location; (3) Getting liquids on location; (4) Lining up yellow iron and coordinating with yellow iron contractor

Procedure: Initial Reclaiming/mixing Spread any dry materials on evenly on location. Depending upon the soil characteristings reclaim 6-15 inches before adding any liquid materials. Depending upon the time allowed more than one reclaimer may be required.

Procedure: Surface Activation The activation mixture prepares the soil particle surfaces so that ceramic bonds can easily form. The activation mixture also lowers the surface tension so that the mixture can flow into the smallest of soil pores.

Liquid and nanosized mixtures that create the cement bonding with the soil. Procedure: Spray DCP 100 A and B Mixtures

Procedure: Reclaim thoroughly

Shoot grade on 10 foot centers to avoid bird baths on location. Procedure: Level to grade

Procedure: Padfoot and Grade before Smooth Drum

Procedure: Smooth drum and rock (if necessary)

Dust Control (Lease Road part of package) Sealing of the limestone surface is an alternative available if full depth treatment is not necessary. This treatment creates a cement surface coating that significantly reduces water penetration to the pad.

SB2 rock is often used as the top coat. It should be watered and compacted according to a Proctor Density curve; otherwise, it can act as a sponge on the surface of your pad. Dust Control: After

Summary Maximum treatment rate: 1.25 acre/day DCP-100 works on clay, well graded and sandy soil Sandy soil requires either clay addition or more concentrated mix Cost: $15,000 - $45,000 per acre depending upon depth and compressive load required.