Lean Manufacturing Implementation in Small and Medium Industry

Similar documents
Lean manufacturing implementation in reducing waste for electronic assembly line

INTRODUCTION 1. When manufacturing processes of products being examine through customer s perspective, we will be able to identify 2 types of processe

INTRODUCTION 1. When manufacturing processes of products being examine through customer s perspective, we will be able to identify 2 types of processe

The Toyota Way. Using Operational Excellence as a Strategic Weapon. Chapter 1 9/11/ Ps. September 11, 2014

Learning Objectives. 1. Explain how lean systems improve internal and supply chain operations

Ch 26 Just-In-Time and Lean Production. What is Lean Production? Structure of Lean Production System. Activities in Manufacturing.

Production Line Analysis via Value Stream Mapping: A Case Study in Pakistani Manufacturing Firm

APPLICATION OF LEAN METHODS FOR IMPROVEMENT OF MANUFACTURING PROCESSES

Research Article Special Issue

Lean Manufacturing 1

International Lean Manufacturing Lessons National Localization Indaba Balázs Németh, Phd. Kvalikon Consulting

Integrating Big Island Layout with Pull System for Production Optimization

IT 470a Six Sigma Chapter X

Improving Scrum with. Lean Thinking Nuno Rafael SGMUN 2016

JUST IN TIME. Manuel Rincón, M.Sc. October 22nd, 2004

LEAN MANUFACTUING-CONCEPT, LIMITATION, APPLICATIONS: AN OVERVIEW

International Journal of Recent Advances in Multidisciplinary Research Vol. 01, Issue 03, pp , September, 2014

Session III. LEAN Enterprise and Six Sigma

Lean manufacturing concept: the main factor in improving manufacturing performance a case study

OM (Fall 2016) Outline

A PM on Lean Production Randel Ltd.

The basic concept of waste

Outline. Push-Pull Systems Global Company Profile: Toyota Motor Corporation Just-in-Time, the Toyota Production System, and Lean Operations

LEAN CERTIFICATION BODY OF KNOWLEDGE RUBRIC VERSION 3.0

ABSTRACT I. INTRODUCTION LITERATURE REVIEW

Chapter 11. In-Time and Lean Production

JIT and Lean Operations. JIT/Lean Operations

Lean Manufacturing Approach to Minimize Waste Production Parts STN Wfx000 RIB at the Prismatic Medium Machine 2 in PT X

LEAN PRODUCTION FACILITY LAYOUT.

Application of the Lean Manufacturing principles to an Injection Moulding Industry

Dennis Bricker Dept of Mechanical & Industrial Engineering The University of Iowa. JIT --Intro 02/11/03 page 1 of 28

Lean Operations. PowerPoint slides by Jeff Heyl. Copyright 2017 Pearson Education, Inc.

Journal of American Science 2015;11(5) Implementation of Lean Logistics in Apparel Manufacturing

Historical Phases of Production

CHAPTER 1 INTRODUCTION

Lean Basics Overview. EMC 2011 Training. NCDENR April Copyright 2010 EMC Corporation. All rights reserved.

Lean Food Production - A Healthy Diet For Manufacturers. Prof. Thomas Neitzert

COST REDUCTION THROUGH WASTE MANAGEMENT IN AUTO PARTS INDUSTRY: A CASE STUDY

PRODUCTIVITY IMPROVEMENT BY IMPLEMENTING LEAN PRODUCTION APPROACH

Continuous Improvement Toolkit

International Journal of Advance Engineering and Research Development A REVIEW - INVESTIGATION ON LEAN MANUFACTURING

Lean Gold Certification Blueprint

Outline. Pull Manufacturing. Push Vs. Pull Scheduling. Inventory Hides Problems. Lowering Inventory Reveals Problems

An Application of Lean Manufacturing to Enhance the Runtime in the Machine Shop

Using Lean Manufacturing Techniques to Improve Production Efficiency in the Ready Wear Industry and a Case Study

COMPUTERIZED VALUE STREAM SYSTEM (CVSS) TO REDUCE WASTE IN LEAN MANUFACTURING OPERATION

LEARNING TO SEE an introduction to lean thinking

Just-In-Time (JIT) Manufacturing. Overview

Just In Time (JIT) Quality and Reliability Engg. (171906) H I T. Hit suyo na mono O Iru toki iru dake Tasukuran

These tend to be sequential, and offer increasing levels of efficiency to an organisation.

LEAN PRODUCTION SYSTEM

A CASE STUDY OF PRODUCTION LINE BALANCING WITH SIMULATION

Profit = Price - Cost. TAKT Time Map Capacity Tables. Total Productive Maintenance. Visual Control. Poka-yoke (mistake proofing) Kanban.

TYPICAL FACTORY LAYOUT vs THE TOYOTA APPROACH

Available online at ScienceDirect. Procedia CIRP 40 (2016 )

Lecture 9 MBF2213 Operations Management Prepared by Dr Khairul Anuar. L9: Lean synchronization

A Survey on Reduction of Setup Time for Various Manufacturing Processes using SMED

LEAN SIX SIGMA GLOSSARY OF TERMS

Introduction to the Toyota Production System (TPS)

Supply Chain Management. Dr Mariusz Maciejczak

Operations Management - 5 th Edition

Finished goods available to meet Takt time when variations in customer demand exist.

A REVIEW ON THE SELECTION OF LEAN PRODUCTION TOOLS AND TECHNIQUES

Leadership and the Toyota Production System

Optimization of Production Process and Machining Time in CNC Cell through the Execution of Different Lean Tools

TPS Basics. What defines worth? Value: The key focus. Delivery. Worth Value= Cost. Functionality: what the product will do Performance Features

Chapter 3 JUST IN TIME SYSTEM

Manufacturing inventory performance enhancement using lean management

SCM 302 OPERATIONS MANAGEMENT JIT

ASSESSMENT OF LEAN TOOLS IMPLEMENTATIONS IN AUTO PARTS INDUSTRIES OF LUDHIANA

Impact of Lean Strategies on Different Industrial Lean Wastes

Just-in-Time System. Dr S G Deshmukh

Assembly Line Efficiency Improvement by Using WITNESS Simulation Software

THE CHALLENGES TO THE IMPLEMENTATION OF LEAN MANUFACTURING

APPLICATION OF LEAN MANUFACTURING USING SIMULATION

Development of Production Layout Model to Improve Production Efficiency

MAS BEST PRACTICE SKILLS EVENT LEAN AWARENESS WORKSHOP

An Introduction to Lean. Heidi Maier Sagstad

International Journal of Technical Research (IJTR) Vol. 5, Issue 1, Mar-Apr 2016

Lean Manufacturing. Overview and Perspectives on Lean Methods and Tools. WIW at WERC

Chapter 13. Lean and Sustainable Supply Chains

Investigating the Influences of Automated Guided Vehicles (AGVs) as Material Transportation for Automotive Assembly Process

Kanban Applied to Reduce WIP in Chipper Assembly for Lawn Mower Industries

Terms and Definitions

Lean production and willingness to change

Lean Implementation challenges in Discrete manufacturing Industries

Line Balancing on AUDI B8 Cable Assembly Line using MUDA: A Case Study

Implementation of Lean Manufacturing through Value Stream Mapping Gaurav Kothari 1 Dr. Devendra Singh Verma 2

LEAN MANUFACTURING & TPM.

Lean Principles. Jerry D. Kilpatrick. This article was originally written for and published by MEP Utah in 2003 (

Ch 16 Automated Production Lines

Politecnico di Torino. Porto Institutional Repository

Operations Management

Principles and Practices of Lean Production applied in a Metal Structures Production System

Supply Chain & Procurement Roundtable. Lean Supply Chain. Workshop

CHAPTER 1 INTRODUCTION

The Book of Value Stream Maps II

Where to Use Automated Production Lines. Automated Production Lines. Benefits of Automated Production Lines. Automated Production Line - Defined

Role of value stream mapping in process development: A Review

Transcription:

Advances in Smart Systems Research ISSN 2050-8662 Vol. 5. No. 1 : pp.17-29 : isrp16-004 Lean Manufacturing Implementation in Small and Medium Industry N.H.Zakaria 1, N.M.Z.N.Mohamed 1,2 *, A.N.M.Rose 1, M.F.F.Ab. Rashid 1 1 Faculty of Mechanical Engineering, Universiti Malaysia Pahang, 26600 Pekan, Malaysia 2 Automotive Engineering Centre, Universiti Malaysia Pahang, 26600 Pekan, Malaysia Abstract Lean manufacturing is an approach that aims to remove and reduce wastes in every aspect of production including the customer relations, supplier systems, product design, and plant management. The purpose of this study is to identify low productivity activities at an electronic company assembly line. An actual case study at an electronic company in Malaysia was conducted for this purpose. WITNESS simulation software was used in this study to identify the waste that existed in the production line. It was identified that Gauging Process of the assembly line had been addressed as the production line with the lowest productivity. The lean manufacturing concept employed has identified and rectified the problems related to low productivity in the assembly line based on Witness simulation results. The method used in the study has been acknowledged as a standard for future line setup. Keywords: lean manufacturing; WITNESS; simulation; assembly line; waste reduction. 1. Introduction Lean manufacturing is a method to reduce wastes in every aspect of production. It can be implemented by companies to remain competitive by having quality products at low cost and fast delivery. The study was to implement lean manufacturing at a Small and Medium Enterprises (SME) company, where existing process implementation needs to be identified and later a new improved process should be figured out to be a basis for future set up. In this particular SME, suitable methods or tools based on lean manufacturing perception were to be applied to overcome problems that occurred at the production line [1]. The SME company produced trimming potentiometers, position sensors, resistor and resistor networks, integrated passive networks, turns counting dials, precision potentiometers, transformers and inductors, hybrid and power hybrid microcircuits. The main purpose of this study was to identify low productivity activities at an electronic company assembly line by using Copyright 2016 Future Technology Press and the authors 17

lean manufacturing method and Witness simulation in order to offer solutions for the company to increase productivity and processing. 1.1 Type of waste Lean manufacturing is commonly known as Lean Production System (LPS) which is based on Toyota Production System (TPS). To prevent any misperception, the word Toyota is changed and named as Lean. The main purpose of system is to eliminate numerous kind of wastes through improvement actions [2]. Lean manufacturing classified seven types of wastes such as; product defects, waiting time, processing waste, overproduction, motion waste, inventory, and transportation [3]. In general, basic understanding about wastes; defect is manufactured products that are out of specification [4], service components that cause in rework, scrap, checkup, flawed materials or replacement production. Waiting time means postponements allied with stock-outs, equipment downtime, machine breakdown, capacity bottlenecks and lot processing delays [5]. Processing waste is processed phases that are not essential to manufacture the product [6]. Overproduction is more products being produced than demand and before it is needed. Motion waste is defined as a human motion that are pointless and work-in-process (WIP) moving extensive distances [7]. Then, inventory is additional raw material, finished goods, or WIP, which contributes towards pending further processing, while transportation, waste means work done to transport unnecessary stock to a warehouse [7][8][9]. Based on a research that had been done in 200 SME companies, their perceptions toward lean are cost saving, continuous improvement, waste reduction, tools and technique to improve production operation, fully integrated management philosophy, a way of life, comprehensive system of organizing and managing the supply chain and lastly is headcount reduction [10]. 1.2 Recommended practices The cluster of lean production methods is grouped into five categories as shown in Table 1 [1]. Based on the study, the recommended practices are sorted according to types of lean methods [10] [12] [13]. 18

Table 1. Cluster of lean production methods Type Machinery and equipment Material flow and layout Organization and staff Production planning and control Quality Lean Methods Low Cost Automation Overall Equipment Effectiveness (OEE) Preventive Maintenance Single Minutes Exchange of Dies (SMED) Total Productive Maintenance Cellular Manufacturing First in first out (FIFO) One-piece-flow Simulation software Optimization of the supply chain Value Stream Mapping (VSM) Work station design 5S Autonomous work groups Benchmarking Ideas management Job rotation Lean office (Administration) Kaizen Standardization Just in Sequence Just in Time Kanban Line Balancing and Muda reduction Milkrun PPS Simulation software Optimal lot size Visual Management FMEA Poka Yoke Quality Circles Six-Sigma Statistical Process Control (SPC) Supplier Development Total Quality Management Zero Defect 19

2.0 Methodology In completing this project, wise and smooth approaches were planned in details. The improvement activity was following Plan-Do-Check-Act (PDCA) method. Some visits were planned to study the current condition and observe areas that need to be improved. Firstly, the data collection was made by having interview sessions with the company supervisor and also their workers. Another approach used to get the data collections was by Genchi Genbutsu which means go and see the actual situation. Literally, by doing this approach, it helps to have a better understanding of the current condition at the factory. Other than Genchi Genbutsu, Gemba is another approach used to find abnormality through observation which helped to identify main processes in production. Once the data was captured from the study, it should be simulated by using Witness software. The core of this software was to establish a dynamic process simulation based on the data input. Witness simulated the current performance and triggered the user on the abnormalities in the production system. It also suggested the areas to be improved in order to achieve desired process performance and also supported continuous improvement activities [11]. The Witness simulation software was able to create a variety of discrete and continuous elements. Depending on the type of element, each element could be in any number of states which means either idle, busy, blocked, in-setup, broken down, and waiting labour [11]. At the end of the simulation activity, the result from the data will be analysed and improvements will be made for future set-up. 3.0 Result and discussion Current data collection as shown in Table 2 and Table 3 was the initial input to the Witness simulation activity. This data input was necessary for commands used in the software. Layout of the focused cell was become the main focus area in this study as shown in Fig.1. This layout was then transferred into Witness environment as in Fig. 2. 20

Table 2. Data collections at current production Demand per day 4000 Working Hours per day 10 hours Break per day 0.75 hours Available Working Hours per day 9.25 hours Takt Time 8.3 seconds Target per Hour 433 Conveyor Speed (m/s) 0.03 28.7 9 2 4.7 33.3 7.3 11 39 31.3 63.7 Wire Header VMI VMI Gauging Gauging Epoxy Forrming Assembly & Cutting Conveyor Conveyor Header Wire Test & Chopping VMI Epoxy Epoxy Assembly Forming Packaging 3 16 & Cutting 5.3 14 22.7 38 12.7 91 66 56.3 95 8 Curing Oven Cooling Wire Soldering Wire Soldering 1800 300 54.3 55.3 Wire Stripping Fig. 1. Current layout in focused cell 21

Workers Process Table 3. Cycle time for each worker Cycle time 1 (Sec) Cycle time 2 (Sec) Cycle time 3 (Sec) Ave. Cycle Time (Sec) 1 Wire Soldering 59 58 46 54.3 2 Wire Soldering 60 58 48 55.3 3 99 99 86 95 4 56 55 58 56.3 5 67 64 68 66 6 92 91 89 91 7 62 65 64 63.7 8 34 29 31 31.3 9 40 38 39 39 10 Wire Forming & 12 10 11 11 Cutting 11 Wire Forming & 13 12 13 12.7 Cutting 12 Header 13 15 14 14 Assembly 13 Header 7 8 7 7.3 Assembly 14 Epoxy 40 37 37 38 15 Epoxy 40 30 30 33.3 16 Epoxy 24 22 22 22.7 17 Chopping 3 3 3 3 18 Gauging 4 5 4 4.7 19 Gauging 2 2 2 2 20 VMI 5 15 7 9 21 VMI 13 15 14 14 22 VMI 31 27 28 28.7 23 Test & Packaging 3.1 Data Analysis of Current Production 6 5 5 5.3 The simulation showed that after 4.8 hours of working, the output obtained were 1041 pieces. The performance of it is calculated below: (1041 pieces 288 minutes Performance= ) 7 piece per minute x 100=51.64% (1) 22

Fig. 2. Layout of current production in Witness According to the Witness results of performance of each labor shown in Table 4, it showed that Gauging Process has workers with high percent of idleness. By referring to this result, further improvement process needs to be done. Table 4. Data for buffer in current production Name Total In Total Out Now In Avg. Size Avg. Time NumT02 946 621 325 161.62 3095.63 NumT01 684 684 0 0.33 8.62 Epoxy 1279 1279 0 0 0 NumLForming 1303 1282 21 10.18 141.62 NumGauging 1116 1116 0 2.25 36.55 WireSoldering 4613 3272 1341 667.43 2621.68 NumWMI02 1116 1043 73 31.26 507.5 NumVMI 1041 1041 0 0.01 0.09 NumChopping 1116 1116 0 0.89 14.45 3.2 Data Analysis of First Improvement The method used to create an improved process was by referring to the percentage of the idleness of the labors in the current production. Witness simulation reported that two labours from the Gauging Process station has a high percent of idleness compared to others. Based on this report, it was considered that one workstation should be reduced and re-run the process in Witness to analyse the effect of 23

reducing one labour, meaning the workstation was reduced from 23 to 22 as in Fig.3. Worker 19 was chosen to be removed because she has the highest percent of idleness of 93.84%. After the workstation has been removed, the labours performance did not have any different except for Worker 17, which was reduced from 85.53% to 71.05% of idleness since she handled the process that had been removed from Worker 19. Meanwhile, the output gained in this improvement was equal to the current production. The result proved that it was significant to reduce the workstation since the performance remained equal to the performance of the current production. The performance of this improvement was still 51.64%. Fig. 3. Layout of first improvement in Witness Table 5. Data for buffer in first improvement Name Total In Total Out Now In Avg Size Avg Time NumT02 946 621 325 161.62 3095.63 NumT01 684 684 0 0.33 8.62 Epoxy 1279 1279 0 0 0 NumLForming 1303 1282 21 10.18 141.62 NumGauging 1116 1116 0 2.25 36.55 WireSoldering 4613 3272 1341 667.43 2621.68 NumWMI02 1116 1043 73 31.26 507.5 NumVMI 1041 1041 0 0.01 0.09 NumChopping 1116 1116 0 0.89 14.45 24

3.3 Data Analysis of Second Improvement The second improvement was made by using the layout from the first improvement by having only one labour for Gauging Process. A re-allocating method was used in this improvement cycle by re-allocating the free labour from the first improvement (Worker 19) to a process that needed more workers. This improvement was carried out by referring to the buffer statistics of the Witness report. The free labour should be re-allocated to a workstation that has a bottleneck such as high capacity of buffers. The final improvement increased the company s productivity when the labour was re-allocating to VMI process. The analysis for the second improvement as shown in Fig. 4 increased the productivity of the production from 1041 to 1109 pieces of the total output. The productivity for this improvement was calculated below. (1109 pieces 288 minutes Performance= ) 7 piece per minute x 100=55.01% (2) Fig. 4. Layout of second improvement in Witness After second improvement cycle, the capacity of buffer for the process was decreased and making the total in of the process is approximately equal to the total out. This improvement helped the production by increasing the output. 25

Table 6. Data for buffer in second improvement Name Total In Total Out Now In Avg. Size Avg. Time NumT02 946 621 325 161.6 3095.63 NumT01 684 684 0 0.33 8.62 Epoxy 1279 1279 0 0 0 NumLForming 1303 1282 21 10.2 141.62 NumGauging 1116 1116 0 2.3 36.55 WireSoldering 4613 3272 1341 667.4 2621.68 NumWMI02 1116 1114 2 1.3 20.25 NumVMI 1111 1110 1 0.0 0.21 NumChopping 1116 1116 0 0.9 14.45 3.4 Precedence Diagram Precedence Diagram is a network showing a sequence of the task, with work element represented by nodes and precedence relationships represented by a line. Table 7 displays the details of each workstation on this production and based on the optimised data, a precedence diagram is constructed as in Fig. 5. 26

Table 7. Precedence data Work Element Precedence Time (min) A Wire Cutting 0.13 B Wire Soldering A 0.91 C Wire Soldering A 0.92 D B, C 2.53 E B, C 1.59 F B, C 1.48 G B, C 1.72 H B, C 1.61 I B, C 0.86 J B, C 0.73 K Wire Forming & Cutting H, I, J 0.18 L Wire Forming & Cutting D, E, F, G 0.21 M Header Assembly L, K 0.23 N Semi Auto Header Assembly M 0.12 O Epoxy N 0.63 P Epoxy N 0.38 Q Epoxy N 0.56 R Curing O, P, Q 35 S Chopping R 0.05 T Gauging S 0.08 U Gauging S 0.03 V VMI T, U 0.15 W VMI V 0.23 X VMI V 0.48 Y Test & Packaging W, X 0.09 Fig. 5. Precedence diagram 27

4. Conclusion and recommendation This study was conducted to identify low productivity issue at the assembly line of an electronic industry in Malaysia. Previously, the company was facing problems in identifying wastes that exists in the production lines. The company has the knowledge on lean manufacturing method, however the company was unable to find suitable lean method to be implemented. The critical issue was to find the best way in order to maximise the productivity. By conducting qualitative and quantitative studies, the practices which contributed to low productivity had been identified and simulated by using WITNESS software. According to the simulation results, processing waste has been identified as the highest score which did not contribute any benefit to the production activity. Benefit gained from the improvement helped the company to reduce cost as well as the productivity was increased since one of the bottlenecks has been identified and rectified. Based on the results, lean theories had been proved to contribute to the betterment of an electronic assembly production. Furthermore, the evaluation from WITNESS simulations highlights an alternative in identifying problems as well as to figure out ways of improvement that could be applied in the production line. Finally, this study suggests for future production set-up for the particular electronic assembly line by integrating virtual simulations, real and standardised work. References [1] Matt, D. T., & Rauch, E. (2013). Implementation of Lean Production in Small Sized Enterprises. Procedia CIRP, 12(0), 420-425 [2] Villa, A., & Taurino, T. (2013). From JIT to Seru, for a Production as Lean as Possible. Procedia Engineering, 63(0), 956-965. [3] Lewis, M. A., (2000), Lean Production and Sustainable Competitive Advantage, International Journal of Operation and Production Management. 20(0). 121-125. [4] Wahab, A. N. A., Mukhtar, M., & Sulaiman, R. (2013). A Conceptual Model of Lean Manufacturing Dimensions. Procedia Technology, 11(0), 1292-1298. [5] Womack, JamesP., Jones, DanielT, (1996), Lean Thinking: Banish Waste and Create Wealth In Your Corporation, Simon & Schuster, New York. 45(0), 457-470. [6] Hicks, B. J. (2007). Lean information management: Understanding and eliminating waste. International Journal of Information Management, 27(4), 233-249. [7] Melton, T. (2005). The Benefits of Lean Manufacturing: What Lean Thinking has to Offer the Process Industries. Chemical Engineering Research and Design, 83(6), 662-673. [8] Mehta, R. K, Mehta, D., Mehta, N. K., (2013). Lean Manufacturing Practices: Problems and Prospects. ANNALS, 3(0), 119-124. [9] Raja, M. I. (2011). Lean Manufacturing-an Integrated Socio-Technical Systems Approach to Work Design. Clemson University. 5(0), 35-43. 28

[10] Zhou, B., (2012), Lean principle, practices, and impacts: a study on small and medium-sized enterprises (SMEs). Springer Science Business Media LLC. 10(0), 112-117. [11] N.M.Z. Nik Mohamed, M.F.F. Ab Rashid, A.N. Mohd Rose and W. Y. Ting (2015). Production layout improvement for steel fabrication works. Industrial and Intelligent Information. 3(2), 133-137. [12] Yu, C. W., Kuan, Y. W., Anwar A., (2009). A study on lean manufacturing implementation in the Malaysia electrical and electronics industry. European Journal of Scientific Research. 38(4), 521-535. [13] Rose, A.M.N., Deros, B.Md., Rahman, M.N.Ab. & Nordin, N. (2011). Lean manufacturing best practices in SMEs, Proceedings of the 2011 International Conference on Industrial Engineering and Operations Management. 872-877. 29