State of the art CFB technology for flexible large scale utility power production

Similar documents
Circulating fluidized bed technology for utility-scale lignite power plants

The Latest CFB Technology Developments for Flexible Large Scale Utility Power Production

Samcheok Green Power 4 x 550 MW e Supercritical Circulating Fluidized-Bed Steam Generators in South Korea

Foster Wheeler Energia Oy P.O.BOX 201, FI Varkaus, Finland

Circulating Fluidized Bed Technology for Large Scale Power Generation Using Coal and Petroleum Coke

Towards New Milestones In CFB Boiler Technology CFB 800MWe

Circulating Fluidized Bed Technology Towards 800 MWe Scale Lagisza 460 MWe Supercritical CFB Operation Experience

The CFB Technology Benefits in Comparison with Conventional Solid Fuel Generation Technologies for Utility and Cogeneration Applications

First Operating Experiences of 55 MWe Konin and 205 MWe Polaniec CFB Boilers Firing 100% Biomass

Foster Wheeler Advanced Bio CFB Technology for Large Scale Biomass & Peat Firing Power Plants

FLEXI BURN CFB WP4: Boiler design and performance

The Growing Experience of Fuel Flexible Circulating Fluidized Bed Technology in Large Scale Power Generation

Internal Recirculation Circulating Fluidized-Bed Boilers

Fuel Impact on Boiler Concept - outlook , Värme- och Kraftkonferensen 2012 Morgondagens energisystem Juha Sarkki Edgardo Coda

Adoption of USC CFB Technology to Achieving Lower Cost Generation and Environmental Sustainability. Gerd Heiermann & Douglas Spalding

Techno-Economic Evaluation of. with Post Combustion Capture

Ⅰ. Introduction of Samcheok Green Power

CO2 Capture with Foster Wheeler s Flexi-burn TM CFB Technology

IMPACT OF OPERATING CONDITIONS ON SO 2 CAPTURE IN A SUPERCRITICAL CFB BOILER IN POLAND

Fuel Flexible CFBs are the Future of Solid Fuel Power Generation

Lecture 4: Fluidised Bed Oxyfuel Boilers and CCS. Monica Lupion CO 2 Capture Programme CIUDEN

SUPERCRITICAL COAL FIRED POWER PLANT

The Value Proposition of Circulating Fluidized Bed Technology for the Utility Power Sector

The Introduction of Foster Wheeler s 660 MWe Supercritical CFBC Technology for the India Market

DEVELOPMENT OF FLEXI-BURN CFB BOILER CONCEPT FOR OXY-CFB-300 COMPOSTILLA PROJECT

Foster Wheeler s 660 MWe Supercritical CFBC Technology Provides Fuel Flexibility for Asian Power Markets

Development of High Efficiency CFB Technology to Provide Flexible Air/Oxy Operation for Power Plant with CCS FLEXI BURN CFB

MOVING MOUNTAINS FOR GREEN ENERGY

Happipoltto. Arto Hotta Foster Wheeler Energia Oy. CCS Seminaari Hanasaari, Espoo

High efficient multi-fuel CYMIC concept for biomass, rejects and coal for Hamburger Hungaria Katriina Jalkanen Valmet Technologies Oy

TCP Training. CFB Boiler for TCP, Thailand. General Overview Jyrki Appelgren

Operating Experience of Circulating Fluidized Bed Scrubbing Technology in Utility Size Power Plants

Fluid Bed Scrubbing TECHNOLOGY

SOME ENERGY-EFFICIENT TECHNOLOGIES IN JAPAN

3D Modelling of Oxygen Fired CFB Combustors in Different Scales

Circulating Fluidised Bed Technology for Indian and other coals Dr John Topper IEA Clean Coal Centre, London

Babcock Borsig Steinmüller GmbH. Bełchatów - Retrofitting the EU s Largest Power Plant Site

The Value Proposition of Circulating Fluidized Bed Scrubbing Technology. Robert Giglio Foster Wheeler Global Power Group

Lünen State-of-the-Art 813MW Coal-Fired USC Boiler with High Efficiency and Flexibility

Biomass Power Plants

Power Generation from Solid Fuels 4) Springer

Foster Wheeler BFB Boilers Licensee Expertise for Brazilian Markets. October 29, 2014

Power Engineering II. Technological circuits of thermal power plants

1-D dynamic modeling of oxygen fired coal combustion in 30MWth CFB boiler

Design and commissioning of a 1MW th pilot-scale oxy-fuel circulating fluidized bed with high oxygen concentration

Plants Fulfilling the Future Requirements

High-Efficiency Integrated Solid Wasteto-Energy

CFB Technology for Coal, Lignites and Petcokes. PowerGen Asia, Bangkok, Sept 19-21, 2017

global power group David J. Parham Executive Vice President, Global Sales & Marketing Global Power Group

CLEAN COAL TECHNOLOGIES, CHALLENGES AND FUTURE SCOPE

Chapter 2.6: FBC Boilers

Doosan Lentjes. High efficiency biomass CFB boilers for the Asian market. Speaker: Frank Leuschke Doosan Lentjes GmbH Germany

Environmentally Sound Technology Biomass Fuelled Energy Plants. Combined Heat and Power Supply. Biomass Fired Steam Generator

The answer of CFB technology to the greenhouse gas problem: CO 2 postcombustion capture and oxycombustion in supercritical CFB boilers

8 th SGC International Seminar on Gasificaton October 15 th -16 th, 2014 Malmö, Sweden

Retrofit of Rodenhuize 4 power station: The Max Green and Cold Back-up-projects

Cross-effects and total gas clean-up system lay-out

OPERATING EXPERIENCE OF CIRCULATING FLUIDIZED BED SCRUBBING TECHNOLOGY IN UTILITY SIZE POWER PLANTS AND REFINERIES

Electricity Generation Technology Overview

Fluidized bed Oxy-fuel combustion and CCS

Up gradation of Boilers to Implement New Pollution Norms

Maximising the available fuel portfolio improved affordability

Effect of co-firing of biomass on operation of fluidized bed boiler

CFB Market Growth in the World. Coal Conversion Technology

Combined Cycle Gasification Plant

Co-Firing of REF and Biofuels in a CFB With Advanced Steam Parameters and a High Plant Efficiency in Igelsta Plant, Sweden

+ economic + + flexible + + innovative + BENSON Boiler

Valmet CFB gasifier IEA Task 33 Bioenergy Workshop on Waste Gasification

Development of High Efficiency CFB Technology to Provide Flexible Air/Oxy Operation for Power Plant with CCS FLEXI BURN CFB

Innovative Boiler Design to Reduce Capitel Cost and Construction Time

Experiences from Commissioning and Test Operation of Vattenfall s Oxyfuel Pilot Plant

HIGH PRESSURE BOILERS

CHAPTER 8 CONCLUSIONS

12th International Conference on Fluidized Bed Technology

New Power Plant Concept for Moist Fuels, IVOSDIG

International Power s CCS Initiatives.

Ultra-Supercritical Oxyfuel Power Generation for CO2 Capture

REC weight factor for different renewable energy source REC : Renewable Energy Certificate

From clean coal power plants to the zero emissions power plants: 10 years of experiences of ENEL

MIT Carbon Sequestration Forum VII Pathways to Lower Capture Costs

Design Advancements in USC Pulverized Coal Boilers. Dr Bin Xu Doosan Babcock Energy America LLC

NEW TECHNOLOGIES IN COAL-FIRED THERMAL POWER PLANTS FOR MORE EFFECTIVE WORK WITH LESS POLLUTION

Module-3A: Heat Transfer Equipment. Applied Thermo Fluids-II (Autumn 2017) Dr. M. Ramgopal, Mechanical Engineering, IIT Kharagpur

Oxy-fuel combustion integrated with a CO 2 processing unit

Boiler & Heater Group

Duke Energy Seminar September 3 5, 2008 Concord, NC

FIRING ESTONIAN OIL SHALE IN CFB BOILERS ASH BALANCE AND BEHAVIOUR OF CARBONATE MINERALS

Doosan Lentjes Circulating Fluidised Bed Boiler Technologies

PORTFOLIO OF PRODUCTS AND SERVICES

A MODEL DEVELOPMENT ON USC-CFB BOILER SYSTEM FOR DYNAMIC SIMULATION OF COAL-FIRED POWER PLANT

BFB (bubbling fluidized bed) Power Plants (CHP) Fuel: RDF or Biomass CHP

Expanded capabilities of corrosion prediction in FB boilers

Lectio Praecursoria. Lappeenranta University of Technology. From the SelectedWorks of Kari Myöhänen

Click to edit Master title style

Power Generation: A Continued Role for Coal?

Simulation and Prediction of Pollutants in a Flexi-Burn Oxyfuel Pulverized Coal Power Plant

Integration of carbon capture unit with power generation: technology advances in oxy-combustion plants

Kazushige KUROSAWA*, Zhibao ZHANG**, and Zhengbing WANG** [Delivered Products & Systems] 1. Introduction. 2. Overview of Nanjing

Enhancing Performance Improving Combustion Efficiency Reducing Plant Emissions Including Advanced NOx & SOx Reduction. Ammegen.

Development of Integrated Flexi-Burn Dual Oxidant CFB Power Plant

Transcription:

State of the art CFB technology for flexible large scale utility power production Kalle Nuortimo Amec Foster Wheeler Varkaus, Finland Presented at PowerGen Russia Moscow Russia 3-5 March 2015 Amec Foster Wheeler 2015.

ABSTRACT Circulating fluidized bed (CFB) has emerged among the leading combustion technologies for utility-scale, solid-fuel-fired power plants, especially when multi-fuel capabilities are required. Established benefits of high efficiency and reliability, supreme fuel flexibility, with low emissions and installation costs, have been demonstrated on nearly 440 Amec Foster Wheeler s CFB boilers including both, subcritical and oncethrough supercritical boilers. CFB technology is a efficient method with which to generate large scale power with a broad variety of solid fuels. This makes CFB technology ideal to meet the current challenges in the power production markets. This paper will discuss the background behind, and reasons for, the success of CFB technology. This will be achieved by highlighting the key market drivers behind CFB technology s development, and the technical challenges that needed to be overcome during its development in the past 30 years. CFB technology is currently available in large scale sizes (up to 800 MW e ) for a wide array of solid fuels. CFB technology has proven to be ideal for firing a variety of solid fuels, such as bituminous and anthracite coals, lignite, petroleum coke, peat and biomass. This fuel flexibility, the possibility of fuel switching, and the possibility of co-firing are some of the significant economic advantages behind the technology. Users of CFB technology are able to choose/use the most cost effective fuel at any given time. This opens up the opportunity to use lower cost local fuels for power generation instead of high quality fuels with higher transportation costs. Furthermore, CFB technology is well positioned to meet the current pressure for increased fuel- and operational flexibility in the power production sector that has been caused by the rise of renewable power, such as solar and wind. Finally, this paper will presents latest utility CFB technology references built or are under construction to meet the requirements of the current power production market, such as the Samcheok Green Power plant (the world s largest CFB technology based power plant (4x550 MWe) that both fires coal and co-fires biomass), and the lignite fired Kladno (135 MWe) power plant in Czech and lignite fired Kolin Soma plant (2x225MWe) in Turkey. Keywords: Utility CFB technology, Coal combustion, Renewable Energy

1 INTRODUCTION New boundaries for power plant operation are being set in the global energy production markets. Several international factors have led to increased pressure to develop power plant technology that is capable of both fuel flexible and highly efficient operation. The shale gas boom in the US has lowered the global coal price, making coal plants more economical than gas plants and favouring solid fuel firing in large scale in rest of the world. At the same time, initiatives for the reduction of greenhouse gas emissions have encouraged the use of mixtures of biomass with other solid fuels. Also air pollution regulation has been tightening on a global scale, resulting stricter emission limits for large combustion plants. This means that boiler technology needs to be developed in order to be able to increase fuel flexibility and meet the stringent emission limits. To achieve these goals, supercritical steam parameters and specialised boiler designs have been developed. In particular, CFB technology has been a focus of development due to its capacity for economical large utility power production and its enhanced environmental and operational performance in terms of reduced fuel needs, reduced pollutants emitted and the capability to adapt to sudden changes in the power demand. Circulating Fluidized Bed (CFB) boiler technology has been growing in size and number (Figure 1) over the past three decades and it has now established its position as a viable and ideal utility scale boiler technology. Figure 1. Amec Foster Wheeler CFB reference (as by Jun, 2014).

2 DEVELOPMENT STEPS TO ACHIEVE A UTILITY SIZE CFB 2.1 Technology development background CFB technology development started with small demonstration units constructed in the 1970s. Following this, the size of the technology increased, with industrial size units constructed in the 1980s and utility size units of over 200 MW e constructed in the 1990s. Since the 1990s, CFB technology has increasingly challenged the popularity of Pulverised Coal (PC) technology in large scale energy generation. Today, there are over 30 Amec Foster Wheeler CFB units firing a wide range of fuels of a scale of over 200 MW e in operation, or under construction, worldwide. Furthermore, CFB technology has now advanced to the point where it is possible to construct once through units (OTU) utilising supercritical steam parameters. Amec Foster Wheeler has built up extensive experience of CFB power plants which utilise supercritical steam parameters with once-though steam cycle technology. Examples of this are the Łagisza power plant (460 MW e ) in Poland, the Novocherkasskaya power plant (330 MW e ) in Russia, and the latest Samcheok power plant (4 X 550 MW e ) in South Korea. These references are shown in Table 1 below. Table 1. Amec Foster Wheeler OTU CFB references Country In MW e Main fuel Łagisza, Poland production 2009 460 Polish Bituminous coal Novocherkasskaya, Russia 2015 330 Russian Anthracite, Bituminous coal Samcheok, South Korea 2015 4 x 550 Indonesian Sub-Bituminous coal, biomass These examples demonstrate that Amec Foster Wheeler is on the cutting edge of CFB technology development and has the capability to design and construct utility size CFB technology boilers with supercritical steam parameters and once-through technology. Knowledge and experience has been achieved by committing to CFB technology and its continuous and determined development work, which has included an experience database of over 400 reference boilers in operation. Emphasis has been on the mechanical design issues of CFB technology and on understanding the process conditions affecting heat transfer, flow dynamics, combustion characteristics, gaseous emission control, and thermo hydraulics. By carrying out work in bench-scale test rigs and pilot plants, field testing of operating units, model development, and simulations carried out using developed semi-empirical models or more theoretical models, a detailed understanding of these processes has successfully been built up. This has led to development of detailed design criteria for larger units, which has been successfully implemented in boiler projects. Design criteria has also been supported by data collected, model development work, and correlations with conventional boiler design. Figure 2 below shows the development of the size of CFB boilers.

Figure 2. Increase of the size of CFB boilers The viability of CFB technology and its main design components has been proven in utility scale power production. The scale-up of CFB technology with super-critical steam parameters of up to 800 MW e is now technically ready and commercially available. The special features of CFB technology with supercritical steam parameters are presented in the next chapter. 3 AMEC FOSTER WHEELER LARGE-SCALE OTU CFB TECHNOLOGY The Basic OTU CFB concept is based on a CFB process that provides high plant efficiency. The concept incorporates supercritical steam parameters accompanied by Benson vertical tube technology and is based on in-line boiler arrangement (presented in Figure 3). The furnace and the separators in the design form a compact hot loop package and the convection pass consists of a steam-cooled enclosure containing the convection superheaters and reheaters. This is then followed by the economizer and the rotary regenerative air heaters. The design of the convection pass follows the same principles used in large two-pass PC boilers. The hot loop and convection pass are connected with steam cooled cross over ducts (CODs).

Figure 3. CFB boiler in-line concept The water and steam design of the OTU CFB boiler is based on the low mass flux BENSON once-through technology licensed by Siemens AG. This technology is ideal for the CFB design because it utilises vertical furnace tubes instead of the spiral wound tubing that is used in many other once-through designs. In proven CFB designs, natural circulation is achieved by using vertical tubing as the normal arrangement and it is beneficial to use a similar design for supercritical OTU boilers. The heat transfer rate in CFB boilers is very low and is uniform in comparison to Pulverised Coal (PC) boilers and the required water mass fluxes are relatively low. The low heat fluxes also allow the use of normal smooth tubes in the furnace walls with a mass flux of 550-650 kg/m 2 s at full load. The fluid temperatures were carefully analysed after each evaporator tube system in different load conditions when creating the OTU CFB design and it was found that the low and uniform heat flux of the CFB furnace and the BENSON low mass flux technology makes the fluid temperatures very uniform. The OTU CFB design requires the plant to be operated with sliding steam pressure so that the boiler pressure follows the turbine load. At lower loads (below ca. 70%), the main steam pressure is typically below the critical pressure (221 bar) and at higher loads the boiler operates at supercritical pressures. During boiler start-up and shut down a circulation pump is used to ensure that water flow through the evaporator is maintained to ensure proper cooling. The two-phase flow from the outlet headers of the evaporator walls is collected in the vertical water/steam separators where the water is then separated from the steam and led to a single water-collecting vessel (see Figure 4). When the boiler load exceeds the BENSON point at approximately 30% load, the steam exiting the evaporator walls is slightly superheated. At this point, the circulation system can be closed and the boiler will have achieved the once-through operation mode.

Figure 4. Steam circuitry 3.1 Latest milestone in the OTU CFB technology: Samcheok Green Power 4 x 550 MW e In July 2011, full notice to proceed was given by Hyundai Engineering and Construction for the design and supply of supercritical Circulating Fluidized Bed (CFB) steam generators for the Samcheok Green Power Project in South Korea. The contract included the design and supply of four 550 MW e advanced vertical tube, oncethrough supercritical CFB steam generators (Figure 5) feeding two steam turbines. The CFB steam generators have been designed to burn imported coal mixed with biomass whilst at the same time meeting all environmental requirements. Once the Samcheok CFB units enter commercial operation in 2015, they will be the world's most advanced CFBs and will provide a new level of fuel flexibility, reliability and environmental performance.

Figure 5. Samcheok Green Power 4 x 550 MW e 3.1.1 Design details The Samcheok boiler design is based on OTU CFB concept and follows the same basic design features used in the Łagisza plant. The boiler material requirements for most sections of the Samcheok boilers are very conventional and normal boiler materials have been used. Furthermore, the design for the Samcheok boilers is free of T24-steel. 3.1.2 Design fuel The CFB steam generators at the Samcheok plant are designed to burn imported coals mixed with biomass whilst at the same time meeting strict environmental requirements. The fuel that will be primarily used for the Samcheok plant is sub-bituminous coal sourced from several international coal mines (mainly in Indonesia). The boilers have also been designed to be able to co-fire wood pellets (Table 2). Table 2. Fuel specifications Bituminous Coal Biomass LHV (a.r.) MJ/kg 14,2 24,9 15,8-18 Moisture % 20 43 5 15 Ash (a.r.) % 1,2 15,3 0,7 5 Sulphur (a.r.) % 0.1-1 0-0,16

3.1.3 Steam parameters The steam pressure and temperature that has been selected for the Samcheok plant has been shown to be viable in other supercritical units and conventional boiler steel materials can be used for the boiler s construction. Table 3 below presents the main design steam parameters of the 4 x 550 MW e (gross) CFB boilers that will be built at Samcheok. Table 3. Design Steam parameters at 100 % load SH flow kg/s 437,7 SH pressure bar(g) 257 SH temperature C 603 RH flow kg/s 356,4 RH pressure bar(g) 53 RH temperature C 603 Feed water temperature C 297 3.1.4 Emission limits The CFBs will meet the stringent emission values given below in Table 4 without needing any additional backend flue gas desulphurisation equipment for SOx control. Table 4. Emission values Item Unit Limit value Method to meet SOx ppm (as SO 2 ) Max. 50 (6% O 2 ) Limestone injection to furnace; no backend desulphurization equipment needed NOx ppm (as NO 2 ) Max. 50 (6% O 2 ) SCR between economizer and air heaters Particulate matter mg/m 3 n Max. 20 (6% O 2 ) ESP

3.1.5 Unit Operation The normal operating mode of the Samcheok unit is co-ordinated control with sliding pressure operation. The boilers will normally be operated at the same load level and any load change requests will be forwarded to the boilers simultaneously and with similar control parameters. The steam temperatures will be individually controlled in order to ensure that the required temperatures in the main steam and reheated steam systems are achieved. Reheated steam share between the boilers will be continuously monitored and controlled in accordance with the applicable firing rates. 4 NATURAL CIRCULATION CFB TECHNOLOGY FOR UTILITY POWER PRODUCTION 4.1 CFB boiler technology in Kladno power plant In 2010, the Swiss utility company Alpiq awarded a 135 MW e lignite fired EPC power plant contract to Kraftanlagen München (KAM) for the Kladno power plant in the Czech Republic. The project was designed to replace old technologies with a more efficient and environmentally cleaner plant, producing energy for the local community whilst meeting the requirements of flexibility from the electrical grid system. For the boiler at the Kladno power plant, Alpiq required CFB boiler technology that was specifically designed to co-fire lignite and biomass. The Kladno boiler represents the new generation of utility power boilers. The Kladno CFB boiler has been designed to co-fire lignite and biomass with the capability of adapting to sudden load change requirements in the electricity grid. The design of the new Kladno CFB boiler (Figure 6) incorporates solids separators built from steam cooled panels integrated with the combustion chamber. The steam cooled separator design avoids the occurrence of heavy refractory linings in the separator. The final superheating stage and the final reheating stage are INTREX TM heat exchangers located in special enclosures at the bottom of the furnace (adjacent to the main combustion chamber). The INTREX TM heat exchangers are located outside the main combustion area, which enables them to be used as the last superheating and reheating stages. This results in higher steam temperatures because the INTREX TM heat exchangers are protected from the fouling and corrosive environment of the boiler s hot flue gas. The INTREX TM heat exchangers also provide high load-following capabilities and turndown ratios.

Figure 6. Kladno K7 CFB boiler design The design basis of the Kladno boiler is presented in tables 5-7. Table 5. Kladno fuel data Lignite Biomass Sulphur 1,35% d.s. 0.13% d.s. Nitrogen 0,67% d.s. 1% d.s. Moisture 26,6% a.r 40% a.r Ash 19,78 % d.s. 3,33% d.s. LHV 15,61 MJ/kg 9,7 MJ/kg Table 6. Kladno boiler steam data STEAM DATA Total Heat Output 303 MW th Steam Flow 105/102 kg/s Steam Pressure 133/33 bar(a) Steam Temperature 541/541 C Feedwater Temperature 251 C Table 7. Kladno boiler design performance Flue Gas Exit Temperature 130 C Boiler Efficiency 93,2% Emission * Guarantees 40 % to 100 % BMCR ½ hour average - NO x <190 mg/nm 3 - SO 2 <190 mg/nm 3 - CO <95 mg/nm 3 - NH 3 <10 mg/nm 3 (slip cat. installed) - NH 3 <20 mg/nm 3 (w/o slip cat.) Particulate Matter <20 mg/nm³ *) Emissions expressed in dry fluegases @ 6%O2 The new Kladno K7 lignite firing CFB boiler unit replaced an old coal-fired unit, which was commissioned at the Kladno power plant in the late 1970s. The new unit will be operated alongside two 135 MW e CFB units, which were previously commissioned in the 1990s, and is located adjacent to the old boilers. This allows the new boiler to utilise many of the existing plant systems, such as the coal handling and water treatment plant. Scope of work for the CFB boiler included the design of the boiler; the delivery of the boiler house enclosure with its steel structures, the boiler pressure parts, the auxiliary equipment, the lignite crushers, the fuel silos for solid biomass fuel and lignite, the fuel feeding equipment for biomass fuel and lignite, and the bag filter; the

erection and construction of the boiler; and the start-up, performance testing and commissioning of the boiler. The time schedule that was adopted for the project is presented in Table 8. Table 8. Project execution schedule Contract Award December 2010 Start of Erection November 2011 Commercial Operation December 2013 The main fuel utilised for the new CFB boiler at the Kladno power plant is lignite obtained from a local mine (Bilina). The CFB Boiler is designed for biomass co-firing of a maximum of 10 % heat input. Despite the fact that the lignite is obtained from only one source, there is substantial variation in the fuel quality, especially in terms of in-organic matter, which results in a dry solids range of 13 to 30 %. For biomass, the variation is even wider, giving a moisture range of 25 to 55 %. The CFB boiler s ability to use fuel with such a wide variation in quality clearly demonstrates its excellent fuel flexibility. The Kladno CFB boiler incorporates the latest design of solids separators build from water or steam cooled panels integrated with the combustion chamber. The design also features INTREX TM superheaters. The high performance of the solids separator leads to a high solids circulation rate and a uniform combustion temperature profile across the whole operation range. After commencing commercial operation in December 2013, the operation of the Kladno power plant has been excellent. According to the performance tests, all performance guarantees have been fulfilled within a large margin, demonstrating that CFB boiler technology is able to meet and surpass all the requirements set for a modern utility power unit. 4.2 Harbin Electric International Co. Ltd. (HEI), Soma, Turkey Amec Foster Wheeler has been awarded a contract by Harbin Electric International Co. Ltd. (HEI) for the design and supply of two circulating fluidized-bed (CFB) boiler islands and flue gas scrubbers for HIDRO-GEN Energy Import, Export, Distribution and Trading Inc., a subsidiary of Kolin Group of Companies. HEI is acting as EPC contractor for HIDRO-GEN s power project to be built close to lignite mines, near the town of Soma, west part of Turkey, 135 km north from Izmir (Figure 7). Figure 7:Location of the Turkish lignite fields and Soma CFB boilers (picture:iea)

Amec Foster Wheeler has received a full notice to proceed on this project in January 2014. Commercial operation of the new steam generators is scheduled for the beginning of 2017 (Table 9). Table 9. Project execution schedule Contract Award January 2014 Start of Erection April 2015 Commercial Operation January 2017 Amec Foster Wheeler s scope includes design and supply two 255 MWe (gross megawatt electric) steam generators and auxiliary equipment for the boiler islands, flue gas cleaning systems with Amec Foster Wheeler CFB scrubbers, and technical advisory services during erection and commissioning. The CFB boilers will be designed to burn local lignite, due to the significant economic benefit of using this fuel for power generation. This is also the largest CFB project awarded in Turkey until today. 4.2.1 Soma boiler design Soma CFB boilers are designed to utilize local lignite reserves located near Soma town, with design heating value of 6.77 MJ/kg (see Table 11). Boilers are natural circulation type of drum boilers with reheat (see steam parameters in Table 10). The CFB boilers design incorporates solids separators built from steam cooled panels integrated with the combustion chamber. The final superheating stage are INTREX TM heat exchangers located in special enclosures at the bottom of the furnace (adjacent to the main combustion chamber)(figure 8). Figure 8: Soma CFB boilers

Table 11. Soma boiler steam data SH flow kg/s 198,5 SH pressure bar(a) 173 SH temperature C 565 RH flow kg/s 173 RH pressure bar(a) 53 RH temperature C 565 Table 10. Soma fuel data DESIGN FUEL DATA Lignite Sulphur 0,95 % d.s. Nitrogen 0,53% d.s. Moisture 23,3% a.r Ash 42,9 % d.s. LHV 6,77 MJ/kg Feed water temperature C 262 Table 12. Design performance Boiler Efficiency 89,98% Emissions - NO x <200 mg/nm 3 - SO 2 <200 mg/nm - CO <200 mg/nm Particulate Matter <30 mg/nm³ *) Emissions expressed in dry fluegases @ 6%O2 4.2.2 Soma CFB flue gas cleaning To reach required emission values (Table 12) in economic way, the circulating fluidized bed scrubbing (CFBS) technology has been applied in the Soma power plant. This is a viable pathway for addressing multi-pollutant control in a cost effective manner. There are two identical flue gas cleaning lines, which consist of CFB scrubber including bag-house with solids re-circulation (Figure 9). Figure 9. CFB scrubber

Construction costs can be reduced as the major system components can be pre-assembled on the ground and lifted into place during system erection. The technology provides high pollutant removal efficiencies for SO 2, SO 3, HCl and HF. Further the absorber/fabric filter arrangement is highly adaptable for sorbent injection for removal of heavy metals including mercury. The main advantages of this technology combined with CFB boiler is reduced operating cost due to lower limestone consumption. 5 DYNAMIC BOILER PERFORMANCE When designing a CFB boiler, it is important to ensure safe and efficient steady-state operation, high flexibility in fuel or fuel mixtures to be combusted, and high flexibility in the boiler s operational range. The increased requirements for solid fuel fired power plant operation and control dynamics in some of the power markets have resulted in a particular focus on the development of flexible operation with fast load following in order to fulfil the load change requirements. There has also been an increased emphasis on boiler designs needing to meet stringent emission limits. The trend of needing to increase flexibility requirements in power markets will set new targets for the development of conventional solid fuel based power plants. New functions and capabilities, such as low load operation and fast load following, are expected to result from this rapid development, particularly within the field of CFB technology. In comparison with conventional PC technology, CFB technology provides the possibility to utilise various fuel blends. This includes raw lignite together with dried lignite, coal, and mixtures of biomass. Moreover, when firing these fuels CFB technology is able to meet all of the relevant emission requirements as well as the boiler minimum load/load change requirements. Consequently, the need for dynamic capability is constantly increasing. Furthermore, there is also an increasing need to be able to shut down the plant for the night and achieve a fast start up in the morning.

6 SUMMARY CFB technology development has undergone extensive development since the 1970s and Circulating Fluidized Bed (CFB) technology has now established its position as a viable and efficient utility-scale boiler technology. When considering whether to build new plants, or to repower old plants, efficiency, environmental performance and operational flexibility are the key issues that developers need to consider. High efficiency means lower fuel consumption and lower levels of ash and air emissions, including lower emissions of carbon dioxide (CO 2 ). CFB technology has been proven to be capable of achieving these goals by means of both supercritical steam parameters and specialised boiler designs for biomass firing in the utility scale. CFB boiler designs have also achieved a high level of operational flexibility, which represents the next generation in utility power generation. New more tighten capabilities e.g. for low load operation and fast load following, are expected from current and new power generation capacity. These aims have been directly taken into account when undertaking CFB development programs in order to ensure compliance with future load control requirements. All of these achievements, as well as the further development efforts currently being undertaken, make CFB technology the optimum choice to meet the market s demands both now and in the future to utilise a broad range of fuels in large scale power generation.