Computation of Hydrographs in Evros River Basin

Similar documents
Autumn semester of Prof. Kim, Joong Hoon

RAINFALL - RUNOFF MODELING IN AN EXPERIMENTAL WATERSHED IN GREECE

Hydrologic Engineering Center Hydrologic Modeling System (HEC-HMS) Sunil KUMAR Director, National Water Academy

Rainfall - runoff: Unit Hydrograph. Manuel Gómez Valentín E.T.S. Ing. Caminos, Canales y Puertos de Barcelona

What is runoff? Runoff. Runoff is often defined as the portion of rainfall, that runs over and under the soil surface toward the stream

1. Stream Network. The most common approach to quantitatively describing stream networks was postulated by Strahler (1952).

The Texas A&M University and U.S. Bureau of Reclamation Hydrologic Modeling Inventory (HMI) Questionnaire

SOUTHEAST TEXAS CONTINUING EDUCATION

IJSER. within the watershed during a specific period. It is constructed

International Journal of Scientific & Engineering Research, Volume 5, Issue 7, July-2014 ISSN Sruthy Nattuvetty Manoharan

Introduction to HEC HMS. Daene C. McKinney

HYDROLOGIC MODELING CONSISTENCY AND SENSITIVITY TO WATERSHED SIZE

UPDATE OF ARC TP108 RUN-OFF CALCULATION GUIDELINE

Event and Continuous Hydrological Modeling with HEC- HMS: A Review Study

HYDROLOGY WORKSHEET 1 PRECIPITATION

Hydrologic Engineering Center. Training Course on. Hydrologic Modeling with HEC-HMS. Davis, CA. Course Description

Hydrologic Engineering Center. Training Course on. Hydrologic Modeling with HEC-HMS April 2018 Davis, CA. Course Description

Runoff Hydrographs. The Unit Hydrograph Approach

Evaluation of the effects of underlying surface change on catchment hydrological response using the HEC-HMS model

Hydrology and Water Resources Engineering

HEC-HMS Modeling Summary: Cherry Creek Basin Tributary to Cherry Creek Dam

Runoff Processes. Daene C. McKinney

Learning objectives. Upon successful completion of this lecture, the participants will be able to describe:

Estimation of Infiltration Parameter for Tehri Garhwal Catchment

1 n. Flow direction Raster DEM. Spatial analyst slope DEM (%) slope DEM / 100 (actual slope) Flow accumulation

Control and mitigation of floods along transbasin diversion channel of Mekong tributaries and Nan river, Thailand

The impact of land use change on runoff and peak flood discharges for the Nyando River in Lake Victoria drainage basin, Kenya

A simple model for low flow forecasting in Mediterranean streams

THE RATIONAL METHOD FREQUENTLY USED, OFTEN MISUSED

RAINFALL-RUNOFF SIMULATION IN AN EXPERIMENTAL BASIN USING GIS METHODS

FAST WATER / SLOW WATER AN EVALUATION OF ESTIMATING TIME FOR STORMWATER RUNOFF

Hydrologic engineering Hydraulic engineering Environmental engineering Ecosystems engineering Water resources engineering

APPLICATION OF THE SWAT (SOIL AND WATER ASSESSMENT TOOL) MODEL IN THE RONNEA CATCHMENT OF SWEDEN

RAINFALL-RUNOFF STUDY FOR SINGAPORE RIVER CATCHMENT

5/25/2017. Overview. Flood Risk Study Components HYDROLOGIC MODEL (HEC-HMS) CALIBRATION FOR FLOOD RISK STUDIES. Hydraulics. Outcome or Impacts

Event and Continuous Hydrologic Modeling with HEC-HMS

DEVELOPMENT OF PEAK RUNOFF HYDROGRAPHS FOR OBA AND OTIN RIVERS IN OSUN STATE, NIGERIA

Hydrologic Calibration:

Hydrology and Water Management. Dr. Mujahid Khan, UET Peshawar

STUDY OF RAINFALL-RUNOFF RESPONSE OF A CATCHMENT USING SCS CURVE NUMBER COMBINED WITH MUSKINGUM ROUTING TECHNIQUES

Snyder Unit Hydrograph Parameters for Malasian Catchments

FLOOD FORECASTING USING FGM MODEL IN CHINDWIN RIVER BASIN. Win Win Zin 1*, F. Nestmann 2, J. Ihringer Introduction

Institute of Water and Flood Management, BUET, Dhaka. *Corresponding Author, >

A&M WATERSHED MODEL USERS MANUAL WATER RESOURCES ENGINEERING

Module 3. Lecture 6: Synthetic unit hydrograph

Use of IDF Curves Design of a roof drainage system

Development of a GIS Tool for Rainfall-Runoff Estimation

CLARK COUNTY REGIONAL FLOOD CONTROL DISTRICT HYDROLOGIC CRITERIA AND DRAINAGE DESIGN MANUAL

Effects of Antecedent Precipitation Index on the Rainfall-Runoff Relationship

Hydrology Days John A. McEnery 3 Department of Civil Engineering, University of Texas at Arlington, Arlington, Texas

Drainage Analysis. Appendix E

Hydrologic Study Report for Single Lot Detention Basin Analysis

San Luis Obispo Creek Watershed Hydrologic Model Inputs

APPLICATION OF A CONTINUOUS RAINFALL-RUNOFF MODEL TO THE BASIN OF KOSYNTHOS RIVER USING THE HYDROLOGIC SOFTWARE HEC-HMS

Distributed Hydrological Model For An Ungauged Subcatchment

Introduction to Hydrology, Part 2. Notes, Handouts

Estimating the 100-year Peak Flow for Ungagged Middle Creek Watershed in Northern California, USA

Engineering Hydrology. Class 16: Direct Runoff (DRO) and Unit Hydrographs

Hydrologic Modeling System (HEC-HMS) Adaptions for Ontario

Impact of Urbanization on Stormwater Runoff from a Small Urban Catchment: Gdańsk Małomiejska Basin Case Study

Introduction. Keywords: Oil Palm, hydrology, HEC-HMS, HEC-RAS. a * b*

ASSESSMENT OF DRAINAGE CAPACITY OF CHAKTAI AND RAJAKHALI KHAL IN CHITTAGONG CITY AND INUNDATION ADJACENT OF URBAN AREAS

Hydrological Modeling Report

Influence of river routing methods on integrated catchment water quality modelling

CONTINUOUS RAINFALL-RUN OFF SIMULATION USING SMA ALGORITHM

URBAN FLOODING: HEC-HMS

ENGINEERING HYDROLOGY

HYDROLOGIC MODELING FOR THE DETERMINATION OF DESIGN DISCHARGES IN UNGAUGED BASINS

The Impacts of Pelosika and Ameroro Dams in the Flood Control Performance of Konaweha River

INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN 40 C.F.R. PART PLANT YATES ASH POND 3 (AP-3) GEORGIA POWER COMPANY

APPENDIX IV. APPROVED METHODS FOR QUANTIFYING HYDROLOGIC CONDITIONS OF CONCERN (NORTH ORANGE COUNTY)

JOURNAL OF APPLIED SCIENCES RESEARCH

Introduction, HYDROGRAPHS

*Corresponding author Working Group, Theme: VIII/4:Water

Flood Mitigation at the Downstream Areas of a Transboundary River

Flood forecasting model based on geographical information system

A Comprehensive Review of Runoff Estimation by the Curve Number Method

Flood forecasting model based on geographical information system

ANALYSIS OF HYDRAULIC FLOOD CONTROL STRUCTURE AT PUTAT BORO RIVER

Examination of PRZM5.0 Storm Rainfall Depth and Distribution Algorithms Compared to Current U.S. Storm Trends

1 Introduction 1.1 HYDROLOGIC MODELS

Effects of initial abstraction ratio in SCS-CN method on modeling the impacts of urbanization on peak flows

2

FLOOD FORECASTING MODEL USING EMPIRICAL METHOD FOR A SMALL CATCHMENT AREA

Suspended Sediment Discharges in Streams

DEVELOPMENT OF A HYDRO-GEOMORPHIC MODEL FOR THE LAGUNA CREEK WATERSHED

MODULE 1 RUNOFF HYDROGRAPHS WORKSHEET 1. Precipitation

IMPROVED MODELING OF THE GREAT PEE DEE RIVER: DOCUMENTATION IN SUPPORT OF FEMA APPEAL. Horry County, South Carolina

Comparison of Rational Formula Alternatives for Streamflow Generation for Small Ungauged Catchments

ABSTRACT UNCERTAINTY AND SENSITIVITY ANALYSES OF THE MUSKINGUM-CUNGE CHANNEL ROUTING MODEL. Stephen Scott Reid, Master of Science, 2008

EVALUATION OF THE HEC-1 MODEL FOR FLOOD FORECASTING AND SIMULATION IN THE HORMOZGAN PROVINCE, IRAN

1 THE USGS MODULAR MODELING SYSTEM MODEL OF THE UPPER COSUMNES RIVER

Distribution Restriction Statement Approved for public release; distribution is unlimited.

APPENDIX E APPENDIX E ESTIMATING RUNOFF FOR SMALL WATERSHEDS

THE BIGGER THE BETTER? HOW SPATIAL RESOLUTION AFFECT RUNOFF MODELING AND WATERSHED DELINEATION INTRODUCTION

APPENDIX E ESTIMATING RUNOFF FROM SMALL WATERSHEDS

Module 3. Lecture 4: Introduction to unit hydrograph

Utah State University Department of Civil and Environmental Engineering CEE 3430 Engineering Hydrology Test 2. Date: 3/31/2014

Texas A & M University and U.S. Bureau of Reclamation Hydrologic Modeling Inventory Model Description Form

5/11/2007. WinTR-55 for Plan Reviews Small Watershed Hydrology Overview

Transcription:

European Water 31: 33-42, 2010. 2010 E.W. Publications Computation of Hydrographs in Evros River Basin P. Angelidis 1, G. Mystakidis 2, S. Lalikidou 2, V. Hrissanthou 2 and N. Kotsovinos 3 Department of Civil Engineering, Democritus University of Thrace, 67100 Xanthi, Greece 1 pangelid@civil.duth.gr 2 vhrissan@civil.duth.gr 3 kotsovin@civil.duth.gr Abstract: Key words: Evros River basin is a transboundary basin which extends in three countries: Bulgaria, Greece and Turkey. The whole basin area is about 53 000 km 2. 66% of the basin area belong to Bulgaria, 28% to Turkey and 6% to Greece. Evros River length in Bulgaria (Maritsa River) is about 321 km, in Greece about 218 km, while 203 km are the natural border between Greece and Turkey. In this study, continuous hydrographs, due to continuous hyetographs of the time period October 2004 September 2006, were computed at the outlets of the sub-basins of Evros River by means of the well-known hydrologic software HEC HMS. In concrete terms, the Bulgarian part of Evros (Maritsa) River basin was divided into 27 sub-basins and the Greek part into 13 sub-basins. Apart from that, the basin of Tountza River, which is a tributary of Evros River flowing through Bulgaria and Turkey, was divided into three sub-basins. Finally, the basin of Erythropotamos River, which is a tributary of Evros River flowing through Bulgaria and Greece, was also considered. The comparison results between computed and measured mean monthly values of water discharge for two large basins in Bulgaria (Elhovo / Tountza River; Plovdiv / Maritsa River), on the basis of wellknown quantitative criteria, are satisfactory. continuous hyetograph, continuous hydrograph, Evros River, transboundary basin 1. INTRODUCTION The extreme floods occurred last years in the Greek part of Evros River were the motivation for the present computational study. A time period including some extreme rainfall events (October 2004 September 2006) was selected for this study. Evros River basin is a transboundary basin which extends in three countries: Bulgaria, Greece and Turkey. The whole basin area is about 53 000 km 2. 66% of the basin area belong to Bulgaria, 28% to Turkey and 6% to Greece. Evros River length in Bulgaria (Maritsa River) is about 321 km, in Greece about 218 km, while 203 km are the natural border between Greece and Turkey. By means of the well-known hydrologic software HEC HMS (2000), continuous hydrographs at the outlets of the sub-basins of Evros River basin in Bulgaria and Greece were computed on the basis of continuous hyetographs in the sub-basins considered for the time period October 2004 September 2006. The hydrologic model used in the present study is a combination of a rainfall-runoff model and a hydrograph routing model. Additionally, it is a continuous, distributed, conceptual and deterministic model. At this point, it must be noted that the rainfall-runoff models are classified into the following categories (Nalbantis and Tsakiris 2006): (1) On the basis of the model operation in relation to the time: (a) event-based, (b) continuous time. (2) On the basis of the spatial distribution of the physical processes: (a) lumped, (b) distributed. (3) On the basis of the mathematical relationships used: (a) black-box, (b) conceptual, (c) physically-based. (4) On the basis of the uncertainty of the hydrologic sizes: (a) deterministic, (b) stochastic. Generally, by means of the above hydrologic software, the hydrograph for any cross-section of Evros River with high flood risk can be computed.

34 P. Angelidis et al. 2. SHORT DESCRIPTION OF HYDROLOGIC MODEL The hydrologic software used in this study contains four models: a rainfall excess model, a model for the transformation of rainfall excess to direct runoff hydrograph, a baseflow model and a routing model for the hydrographs. These models are briefly described in the following sections. 2.1 Rainfall Excess Model According to Soil Conservation Service method (SCS 1993), the rainfall excess is computed by the empirical relationship: hr 2 ( hr λs ) = (1) hr + (1 λ )S where: h R : rainfall excess (mm) h r : rainfall depth (mm) S : potential maximum retention (mm) λ : initial abstraction coefficient given by the ratio I a / S, where I a (mm) is the initial abstraction. I a expresses the hydrologic losses due to interception, infiltration and surface storage before runoff begins, while S expresses the hydrologic losses due to infiltration occurring after runoff begins. The coefficient λ was assumed in its original development to be equal to 0.2. In the present study, λ is also taken as equal to 0.2. Mishra et al. (2005) state that the existing SCS method with λ = 0.2 is appropriate for high rainfall data (>50.8 mm). However, the average value of λ for an experimental basin (15.18 km 2 ) in Attica (Greece) is 0.014. This value resulted on the basis of 18 storm events of various rainfall depths (Baltas et al. 2007). According to Mishra et al. (2006), I a is given by the following relationship: Ia 2 S = λ ( λ = 0. 04 ) (2) S + M where M (mm) is the antecedent soil moisture. By the above relationship, the effect of antecedent soil moisture on the initial abstraction is taken into account. The potential maximum retention is computed by the equation: S 25400 = 254 (3) CN where CN is the curve number which can be estimated as a function of land use, soil type and antecedent soil moisture conditions, using tables published by the SCS (1993). 2.2 Model for the Transformation of Rainfall Excess to Runoff Hydrograph The hydrograph of direct runoff is computed on the basis of the theory of unit hydrograph. In the dimensionless synthetic unit hydrograph of SCS (1993), discharges are expressed as a portion of the peak discharge q p and time steps as a portion of the rise time of the unit hydrograph T p. Knowing

European Water 31 (2010) 35 the peak discharge and the lag time t p for a rainfall excess of specific duration, the unit hydrograph can be estimated by the dimensionless synthetic unit hydrograph for the study basin. The values of q p and T p are estimated by a triangular unit hydrograph, where the recession time is equal to 1.67Tp. The area which is surrounded by the curve of the unit hydrograph must be equal to the rainfall excess of 1 cm. The peak discharge is CA q p = (4) T p where C = 2.08 A : basin area (km 2 ) T : rise time of unit hydrograph (hr) p In addition, the studied unit hydrographs in small and large basins show that the lag time of the basin, t p, is approximately equal to 0.60tc, where t c is the concentration time. The time T p is a function of the lag time t p and the duration of the rainfall excess t R : t T R p = + t p (5) 2 2.3 Exponential Recession Model The models described previously are applied on a daily time basis. The transformation of the hydrologic model used in this study from the daily time basis to a continuous (or long-term) time basis is enabled by the application of an exponential recession model (Chow et al. 1988), by which the time variation of baseflow is represented. The baseflow model is described mathematically by the following equation: bt b0 t Q = Q k (6) where: Q : baseflow at any time t bt Q b0 : initial baseflow (at time zero) k : exponential decay constant; it is defined as the ratio of the baseflow at time t to the baseflow one day earlier. According to the baseflow model, a threshold value has to be specified as a flow rate or as a ratio to the computed peak flow (Figure 1). Equation (6) is applied twice to a hydrograph: (a) to simulate the initial flow (baseflow) recession; in that case, the value Q b01 lies on the discharge axis, and (b) to simulate the total runoff recession; in that case, the value Q b02 corresponds to the point of intersection between the threshold line and the recession limb of the hydrograph (Figure 1). For the subsequent second hydrograph of Figure 1, the value Q b03 corresponds to the end of the first hydrograph, while the value Q b04 is defined as the value Q b02 in the first hydrograph.

36 P. Angelidis et al. Discharge Q b01 Initial flow Threshold Initial flow recession Q b02 Q b03 Initial flow recession Q b04 Time Figure 1. Recession with multiple runoff peaks Mishra and Singh (2004) have developed a long-term hydrologic simulation model based on a modified SCS method. The baseflow was computed as a function of the final infiltration rate. The hydrologic losses due to evapotranspiration were computed separately, because they are not included in the SCS method. Apart from that, the hydrologic losses due to evapotranspiration should be not neglected in a long-term hydrologic model. 2.4 Hydrograph routing model The division of a large basin into sub-basins renders the application of a hydrograph routing model necessary. The routing of the total hydrograph (direct runoff + baseflow) from the outlet of a sub-basin to the outlet of the whole basin is enabled by means of Muskingum Cunge model (Ponce 1989). This model is based on the widely known hydrologic routing Muskingum model, including the parameters K and x that can not be easily estimated. The basic equation of the model is given below: k + 1 k + 1 k k Q i+ 1 = CoQi + C1Qi + C2Qi + 1 (7) where Q is the total runoff discharge (direct runoff + baseflow), i designates the space step Δ x and k designates the time step Δ t. The coefficients C o, C 1 and C 2 are defined by the following equations: cλ 2x C o = 2(1 x ) + cλ cλ + 2x C 1 = 2(1 x ) + cλ 2(1 x ) cλ C 2 = 2(1 x ) + cλ K = Δx c Δt λ = (8) Δx The product c λ = c( Δt / Δx ) = C is called the Courant number and is equal to the ratio of the celerity of small waves c to the grid celerity Δ x / Δt. By equating the hydraulic physical diffusion coefficient ν = q / 2S with the numerical diffusion coefficient ν n = cδx(0.5 x ) of the numerical scheme, the value of the parameter x is obtained: 1 qo x = (1 ) (9) 2 S cδx f h o f

European Water 31 (2010) 37 where: c : small wave celerity q : reference discharge per unit width (from the inlet hydrograph) o S f : energy slope By using Equation (9), the parameter x is computed by means of the physical characteristics of the routing stream ( Δ x, S f, c, q o ). Generally, in the Muskingum-Cunge model, the parameters K and x are determined from the hydraulic characteristics of the stream considered, while, in the Muskingum model, they are determined from previous discharge measurements. Additionally, Muskingum-Cunge model considers the flow in a grid net, while Muskingum model considers stream reaches, and the parameters obtain mean values of the hydraulic sizes in the stream reaches. 3. MODEL APPLICATION TO EVROS RIVER BASIN For the application of the hydrologic model described above to Evros River basin, the Bulgarian part of Evros (Maritsa) River basin was divided into 27 sub-basins and the Greek part into 13 subbasins. Apart from that, the basin of Tountza River, which is a tributary of Evros River flowing through Bulgaria and Turkey, was divided into three sub-basins. Finally, the basin of Erythropotamos River, which is a tributary of Evros River flowing through Bulgaria and Greece, was also considered (Figure 2). In the Bulgarian part of Evros River basin there are some dams, whose basins were neglected in the present study (Figure 2, shaded areas). The basin of Erginis River, which flows through Turkey, was also neglected, because it discharges its waters into the lower part of Evros River basin (Figure 2, shaded area). Tountza Elhovo / Tountza River Maritsa Plovdiv / Maritsa River Arda GR1 Erythropotamos GR13 GR2 GR3 GR4 GR6 GR7 GR8 GR9 GR5 Erginis GR11 GR10 GR12 Figure 2. Sub-basins of Evros River basin in Greece and Bulgaria The system of the sub-basins and the routing reaches of the hydrographs, according to the software HEC HMS, is depicted in Figure 3.

38 P. Angelidis et al. Figure 3. System of sub-basins and routing reaches according to the software HEC HMS The mean altitude of Evros River basin in Bulgaria (Maritsa River) is 579 m and the mean bed slope 0.73%, while the altitude of Evros River in Greece varies between 0 m and 62.2 m. The geologic structure of Evros River basin in Greece consists of two basic units: (a) Thracian mass, (b) a geosyncline. The geologic structure of Evros River basin in Bulgaria (Maritsa River) consists of five basic units: (a) karstic basin of Malko Belovo, (b) karstic basin of Perushtitsa Ognianovo, (c) karstic basin of Luki Hnoiva, (d) karstic basin of Velingrad, (e) karstificated limestones of Upper Triassic. The following parameters of the whole hydrologic model were determined for each sub-basin separately: area, curve number, concentration time, main stream length, main stream bed slope, main stream width, Manning coefficient. Two sensitive parameters, concerning the computation of a hydrograph on an event basis, are the curve number (CN) and the concentration time. For the determination of CN in each sub-basin, soil and vegetation maps were used (Mystakidis 2008). The concetration time t c (hr) for each sub-basin was computed by the subsequent formula (in Neitsch et al. 2002): 0.75 0.62Ln t c = (10) 0.125 0.375 A s where: L : main stream length (km) n : Manning coefficient (s/m 1/3 ) A : sub-basin area (km 2 ) s : main stream bed slope (-) Daily rainfall depths of 17 stations in Bulgaria and 12 stations in Greece (Evros District), for the time period October 2004 September 2006, were used in this study. The representative rainfall

European Water 31 (2010) 39 depth for each sub-basin was estimated by the Thiessen polygons method. For the place Elhovo / Tountza River, at the outlet of sub-basin T35 (Figure 2), to which a basin area of 4658 km 2 corresponds, measurements of mean daily discharge were available for the time period October 2004 September 2006. Measured mean daily discharge values for the same time period were also available for the place Plovdiv / Maritsa River located at the junction K4 (Figure 2). A basin area of 5177 km 2, including the sub-basins E1, E2, E3, E4, E6, E8, E9, E12 and E15, corresponds to the place Plovdiv / Maritsa River (Figure 2). 4. COMPUTATIONAL RESULTS The computations were performed on a daily time basis. In Figures 4 and 5, the computed and measured hydrographs for the places Elhovo / Tountza River and Plovdiv / Maritsa River, respectively, are given. Both figures refer to the time period October 2004 September 2006, while the given discharge values are mean monthly values resulting from mean daily discharge values. 120 100 Discharge (m 3 /s) 80 60 40 20 0 15/10/2004 14/11/2004 15/12/2004 14/1/2005 14/2/2005 16/3/2005 16/4/2005 16/5/2005 16/6/2005 16/7/2005 16/8/2005 15/9/2005 16/10/2005 15/11/2005 16/12/2005 15/1/2006 15/2/2006 17/3/2006 17/4/2006 17/5/2006 17/6/2006 17/7/2006 17/8/2006 measured computed Figure 4. Hydrograph at the outlet of sub-basin T35 (Elhovo / Tountza River, Bulgaria) 250 200 Discharge (m 3 /s) 150 100 50 0 15/10/2004 14/11/2004 15/12/2004 14/1/2005 14/2/2005 16/3/2005 16/4/2005 16/5/2005 16/6/2005 16/7/2005 16/8/2005 15/9/2005 16/10/2005 15/11/2005 16/12/2005 15/1/2006 15/2/2006 17/3/2006 17/4/2006 17/5/2006 17/6/2006 17/7/2006 17/8/2006 measured computed Figure 5. Hydrograph at the junction K4 (Plovdiv / Maritsa River, Bulgaria)

40 P. Angelidis et al. For the comparison between computed and measured discharge values, the following criteria are used: (a) correlation coefficient, (b) efficiency (Nash and Sutcliffe 1970), and (c) relative error. In Figures 6 and 7, the linear regression line between computed and measured mean monthly discharge values for the places Elhovo / Tountza River and Plovdiv / Maritsa River, respectively, are given. The correlation coefficient, R, obtains the values 0.91 and 0.70, respectively. Computed discharge (m 3 /s) 100 90 80 70 60 50 40 30 20 10 0 y = 0.772x + 5.654 R² = 0.824 0 20 40 60 80 100 120 Measured discharge (m 3 /s) Figure 6. Linear regression line between computed and measured discharge values (Elhovo / Tountza River) 140 Computed discharge (m 3 /s) 120 100 80 60 40 20 0 y = 0.344x + 40.88 R² = 0.492 0 50 100 150 200 250 Measured discharge (m 3 /s) Figure 7. Linear regression line between computed and measured discharge values (Plovdiv / Maritsa River) The efficiency (%) is expressed as (Nash and Sutcliffe 1970) efficiency = [1 RV / IV ] x100 (11) where RV is the remaining variance and IV is the initial variance. RV and IV are given by the following equations: n i= 1 2 mi Qci ) n RV = ( Q IV = ( Q Q ) (12) i= 1 where Q mi : measured mean monthly discharge for the i th month (m 3 /s) Q ci : computed mean monthly discharge for the ith month (m 3 /s) Q m : measured overall mean monthly discharge (m 3 /s) mi m

European Water 31 (2010) 41 The efficiency for the hydrographs at the place Elhovo / Tountza River obtains the value 81.5%, while for the hydrographs at the place Plovdiv / Maritsa River obtains the value 36%. The relative error (%) is expressed as Qmi Qci relative error = x100 (13) Qmi The relative error for the hydrographs at the place Elhovo / Tountza River varies between the values -94% and 58%, while for the hydrographs at the place Plovdiv / Maritsa River varies between the values -85% and 55%. The arithmetic values of the criteria mentioned above, concerning the comparison between computed and measured mean monthly values of discharge for both large basins in Bulgaria, are satisfactory with the exception of the arithmetic value of efficiency at the place Plovdiv / Maritsa River. If the following facts are taken into account: that the area of both basins considered is large (4658 km 2 and 5177 km 2, respectively) and, cosequently, the routing times of the sub-basin hydrographs are long, that the estimate of some model parameters (e.g. initial abstraction coefficient) is approximative, that the existing experience originates mostly from the application of the hydrologic model, used in the present study, to relatively small basins, then the arithmetic values of the error criteria are encouraging for the simulation of the rainfallrunoff processes in large basins. It is worth mentioning that the arithmetic values of efficiency and correlation coefficient for the place Elhovo / Tountza River are higher than the respective values for the place Plovdiv / Maritsa River, although the basin corresponding to the place Elhovo / Tountza River was not divided into sub-basins. It would be more reasonable to simulate the hydrologic phenomena in a large basin on an annual time basis. In the case of large basins, a comparison between computed and measured cumulative hydrologic sizes, e.g. runoff volume, on a long time basis would be more reliable. 5. CONCLUSIONS The computation of continuous hydrographs in the transboundary basin of Evros River (Bulgaria, Greece and Turkey), due to continuous hyetographs of the time period October 2004 September 2006, was enabled by means of the hydrologic software HEC-HMS. The results of the comparison between computed and measured mean monthly discharge values, on the basis of well-known quantitative criteria, for two large basins in Bulgaria are encouraging. It is believed that the comparison between computed and measured discharges, in a large basin, for individual rainfall events cannot be satisfactory, because of the long routing times of the subbasin hydrographs. REFERENCES Baltas E.A., Dervos N.A. and Mimikou M.A., 2007. Technical Note: Determination of the SCS initial abstraction ratio in an experimental watershed in Greece. Hydrology and Earth System Sciences; 11: 1825-1829. Chow V.T., Maidment D.R. and Mays L., 1988. Applied Hydrology. McGraw-Hill Book Company, New York. Mishra S.K. and Singh V.P., 2004. Long-term hydrological simulation based on the Soil Conservation Service curve number. Hydrological Processes; 18: 1291-1313. Mishra S.K., Jain M.K., Bhunya P.K. and Singh V.P., 2005. Field Applicability of the SCS-CN-Based Mishra-Singh General Model and its Variants. Water Resources Management; 19: 37-62.

42 P. Angelidis et al. Mishra S.K., Sahu R.K., Eldho T.I. and Jain M.K., 2006. A generalized relation between initial abstraction and potential maximum retention in SCS-CN-based model. International Journal of River Basin Management; 4(4): 245-253. Mystakidis G., 2008. Computation of hydrographs in Evros River basin. Postgraduate Diploma Thesis, Department of Civil Engineering, Democritus University of Thrace, Xanthi, Greece (in Greek). Nalbantis I. and Tsakiris G., 2006. Water Resources: Surface Water Potential. Chapter 2 in Hydraulic Works, Design and Management, Vol. II: Reclamation Works, edited by G. Tsakiris, Symmetria Editions, Athens, pp. 45-75 (in Greek). Nash J.E. and Sutcliffe J.V., 1970. River flow forecasting through conceptual models, Part I-A discussion of principles. Journal of Hydrology; 10: 282-290. Neitsch S.L., Arnold J.G., Kiniry J.R., Williams J.R. and King K.W., 2002. Soil and Water Assessment Tool. Theoretical Documentation, Version 2000. Grassland, Soil and Water Research Laboratory, Agricultural Research Service; Blackland Research Center, Texas Agricultural Experiment Station, Temple, Texas. Ponce V.M., 1989. Engineering Hydrology: Principles and Practices. Prentice Hall. SCS (Soil Conservation Service), 1993. Hydrology. National Engineering Handbook, Supplement A, Section 4, Chapter 10, USDA, Washington DC, USA. US Army Corps of Engineers, Hydrologic Engineering Center, 2000. Modelling Channel Flow with HEC-HMS. Chapter 8 in Hydrologic Modelling System HEC-HMS, Technical Reference Manual.