North River Resources plc / Ticker: NRRP / Index: AIM / Sector: Mining 30 June 2014 North River Resources plc ( North River or the Company )

Similar documents
Vast Resources plc / Ticker: VAST / Index: AIM / Sector: Mining. Quarterly Production Summary & Operations Update

PEGMONT PEA HIGHLIGHTS

Ban Houayxai Project Approved operation to produce over 100,000 ounces of gold and 700,000 ounces of silver per annum

Forward Looking Statement

For personal use only

For personal use only

PFS & Maiden JORC Reserve, Nimba Iron Ore Project

A Preliminary Economic Assessment of the Hackett River Project features the following highlights:

For personal use only

CAPITAL DOWN AT TALA HAMZA

Southern Cross Goldfields Ltd

UPDATE TO BROKEN HILL MINERAL RESOURCES AND ORE RESERVES

Olympias: Highlights Q Phase 1 Retreatment. Acquired from European Goldfields in February. EIA approved. Phase 1 Retreatment began

Drilling, metallurgical test work and a new resource model add 21% to oxide gold reserves

TEMBANG PRE-FEASIBILITY STUDY DELIVERS POSITIVE OUTCOME

Confidence in Carrapateena project grows

RE: REVIEW OF THE PRAIRIE CREEK MINE SCOPING STUDY

Azure Minerals Ltd ASX Code:

SIERRA METALS REPORTS A 53.5% INCREASE IN NI COMPLIANT MINERAL RESERVES AT ITS YAURICOCHA MINE, PERU

Aeon Metals Limited HIGHLIGHTS

Koka Project Stands to be a Highly Profitable Gold Mine: Scoping Study

VALUE THROUGH GOLD BRUCEJACK PROJECT PREMIER S NATURAL RESOURCE CONFERENCE

INV METALS ANNOUNCES ROBUST PRELIMINARY FEASIBILITY STUDY AT LOMA LARGA

Carbine Tungsten Limited Mt Carbine Tungsten Project

Update on operating and development activities

Seizing Opportunity and Building Value

HORIZONTE STARTS FEASIBILITY STUDY DRILL PROGRAMME AT ARAGUAIA NICKEL PROJECT

FOR IMMEDIATE RELEASE 30 August 2018 TSX-V: AZR

ASX Release ASX Code: YTC

METATES UPDATED PEA INDICATES EXCELLENT PROJECT ECONOMICS 26,000 METRE DRILL PROGRAM UNDERWAY

Nymagee Scoping Study

Malachite Resources AGM. November For personal use only. Malachite Resources Limited

For personal use only

ASX ANNOUNCEMENT. MacPhersons Nimbus Silver Target up to 6 Million Ounces. Highlights. ASX Code: MRP. Contact Details

For personal use only

BROKEN HILL MINERAL RESOURCES AND ORE RESERVES UPDATE

Kibali Mine Development

February 2018 KURUÇAY ZINC PROJECT

T S X : R M X N Y S E. M K T : R B Y. Rubicon Begins Stockpiling Mill Feed for Projected Production Commencing Mid-2015

For personal use only

Jonathan Downes. Ironbark Zinc Limited Managing Director

Ferrex plc / Index: AIM / Epic: FRX / Sector: Mining

Emmerson Plc / Ticker: EML / Index: LSE / Sector: Mining

For personal use only

Transitioning from Explorer to Miner

For personal use only

For personal use only

ASX Announcement 1st March 2018 Balama Central Graphite Project Scoping Study shows outstanding economics

ELEMENTOS. For personal use only. Asia Tin Summit 2017 Progressing the Development of the Cleveland Project. (ASX:ELT) September 2017

ELEMENTOS LTD ASX:ELT summary

For personal use only

For personal use only

UPDATED FEASIBILITY STUDY AND FINANCIAL MODEL CONFIRMS ROBUST BUSINESS CASE FOR DEVELOPMENT OF MOUNT PEAKE VANADIUM-TITANIUM-IRON PROJECT

Study on Gonka Deposit and Taurus Extension

Updated Epanko Scoping Study

For personal use only

FIRST MAJESTIC SILVER CORP.

For personal use only

For personal use only

930 West 1 st Street, Suite 202, North Vancouver, BC V7P 3N4. Tel: (604) Tel:

NAMIBIA RARE EARTHS FILES PRELIMINARY ECONOMIC ASSESSMENT REPORT FOR HEAVY RARE EARTH MINE AT LOFDAL

Mozambique Real Opportunity. Benchmark World Tour Sydney 21 st September

For personal use only

FURTHER GROWTH FOR BALAMARA WITH AWARD OF SIGNIFICANT NEW COAL CONCESSION AT MARIOLA

A Stable Long-Term Source of Rare Earths and Uranium Trade Mission Greenland South Korea 2016

For personal use only

ASX / MEDIA ANNOUNCEMENT 5 March 2018

QUARTERLY REPORT for the period ending 30 September 2017

Kogi Iron- Nigerian Steel Project

Shaw River Completes Acquisition of 75.5% Interest in Namibian Manganese Project

Optimisation Study Yanfolila Gold Project Mali

INNOVATIVE ENERGY EFFICIENT SOTKAMO SILVER

ABM Hits 3000 Ounce Target from Trial Mining

RESOURCE GOLD PTY. LTD.

For personal use only

Ganajur Gold Project highlights of Feasibility Study

Thalanga Project Ore Reserve and Mineral Resource Statement (as at 1 December 2017)

For personal use only

For personal use only

Nueva Esperanza Project Teterita Mineral Resource Upgrade

Garden Well Gold Deposit. Reserve Increases to 1.66 Million Ounces

Harte Gold Announces Positive PEA For the Sugar Zone Project

Pre Feasibility Study Advances the Taronga Tin Project

POSITIVE SCOPING STUDY FOR THUNDER BAY NORTH PROJECT

For personal use only

For personal use only

For personal use only

Metals Exploration PLC. Runruno Gold-Molybdenum Project. Positive Scoping / Pre-Feasibility Study Results

Geology and mineral resources of the Kylylahti Mine

Morrison Copper/Gold/Moly (Silver) Project

MINING COMMENCES AT KONONGO GOLD PROJECT

Powering Up. Tasmanian Minerals Council Forum Thursday 13 May, Launceston, Tasmania.

Market Update Southdown Magnetite Project

For personal use only

NEW CENTURY SELECTS PREFERRED HYDRAULIC MINING CONTRACTORS FOR CENTURY TAILINGS OPERATIONS

MEDIA RELEASE OCEANAGOLD ANNOUNCES COMMENCEMENT OF CONSTRUCTION AT THE DIDIPIO PROJECT IN THE PHILIPPINES

Patrick Soares President & CEO Canada s Next Base Metal Mining Camp

RENISON TAILINGS RETREATMENT PROJECT ( RENTAILS ) UPDATED DFS CONFIRMS HIGH MARGIN PROJECT

PILOT TEST WORK TRIGGERS FINAL TRANCHE OF TREMONT FINANCING

Georgian Mining Corporation / EPIC: GEO / Sector: Natural Resources

Transcription:

North River Resources plc / Ticker: NRRP / Index: AIM / Sector: Mining 30 June 2014 North River Resources plc ( North River or the Company ) Namib Project - Mine Development Plan North River is pleased to announce the completion of the Mine Development Plan ( MDP ) for its Namib Lead and Zinc Project ( the Project ) in Namibia, a copy of which can be viewed on the Company s website. The MDP demonstrates that the Project has good economics based on the current Mineral Resource. The current Mineral Resource has yet to be converted to reserves and is not adequate to complete a feasibility study compliant with JORC 2012 guidelines. Accordingly, at the Company s request, the MDP has been prepared to the same standards as a feasibility study (i.e. +/-15% of costs) based on a Mineral Inventory, incorporating both Indicated Resource and portions of the Inferred Resource, and provides a good indication of the economics of developing the mine. The MDP sets out an estimated payback on the Project for a 250 kilo tonnes (kt) per annum plant of just 1.4 years, based on a Mineral Inventory of 425 kt of Indicated Resource, and 234 kt of Inferred Resource. The MDP also includes an updated Mineral Resource statement as at March 2014, which shows a small increase over the December 2013 estimate announced previously, as shown in the table below. Drilling underground has been delayed by a series of mechanical breakdowns of the larger of the two drills. However, the resource expansion programme has now been accelerated by mobilizing a third drill. An exploration tunnel is also being excavated 150 meters below surface, under the Northern lodes, to provide additional drill pad locations. In due course the Company anticipates announcing an updated Mineral Resource, which together with this Mine Development Plan will produce a JORC compliant feasibility study. Tonnes and Grade at 1% Pb + Zn Cut-off Grade Class Area *Tonnes Density (t/m 3 ) Pb (%) Zn (%) Ag (g/t) Northern Extension 529,000 3.45 2.8 5.4 48.2 Indicated South Mine 139,000 3.45 2.0 4.3 42.4

Northern Extension 253,000 3.45 1.8 7.2 39.0 Inferred South Mine 7,000 3.45 2.2 3.5 53.4 Total 928,000 3.45 2.4 5.7 44.9 * Tonnages have been rounded to the nearest 1,000t to reflect an estimate As announced previously, the completion of the feasibility study had also been delayed by lock-cycle metallurgical testing, which most accurately simulates the plant process. This work has now been completed. A Zinc recovery of 78% was attained at a grade of 51% and Lead recovery of 82% was attained at a grade of 54%. Highlights of the MDP Based on 660 kt of ore mined based on the current estimate of life of mine, the cash flow model generated the following (after tax) financial statistics: Pre-Production Capex USD Million 25.2 Revenue USD Million 93. 8 Cash Outflow USD Million 75.2 Net Cash Flow USD Million 18.6 NPV8% USD Million 12.4 IRR % 38 Payback Years 1.4 Pre-Production Capital Cost Estimate Capital Item USD Million Process Plant 14.540 EPCM 2.687 Contingency (12%) 2.055 Ventilation 0.385 Mining infrastructure 3.998 Mine development 1.559 Total 25.224

Project Development The Project s location benefits from ready access to existing infrastructure, which means the mine can be constructed with a low capital cost. The Company hopes to make further reductions in both the Capex and time-lines for the Project. Ore will be accessed via the two existing declines. High-grade ore is ready to be mined with minimal capital development required. The mine will be developed and ore extracted using hand held techniques, with simple technologies being utilized to keep both capital and operating costs down. Southern Africa in general has a long and successful history of mining using hand held equipment. A skilled, low cost workforce with the necessary expertise is readily available. The MDP illustrates mining and processing a total of 250 kt of lead, zinc and silver bearing ore per annum. Due to the nature of the ore and host rocks, the process plant flow sheet has been designed with simplicity in mind. The flow sheet consists of single stage crushing, followed by a 450kW ball mill, feeding into a sequential lead and zinc flotation circuit. No thickening of the concentrates is required, with the flotation circuit feeding directly into the filters. The concentrates will be transported 70km by road or rail to Namibia s main port of Walvis Bay for export. The port facility has a bulk concentrate ship loading facility available. A tailings dam, constructed at the site in the mid-1990s, will be refurbished at minimal cost. The dam has been designed to accommodate 1.5 million tonnes of tailings material, equivalent to around seven years life of mine. Minor refurbishment is required to the existing 22kV power line, which connects the operation to the national grid. Water supply is available from the local water authority. A new small diameter 7km water line will be installed. No camp is required, as the workforce will be housed in the local town of Swakopmund, 30km from the operation from where staff will be transported to site by bus. The towns of Swakopmund and nearby Walvis Bay are already servicing multiple mining operations (Husab, Langer Heinrich, Rossing). In addition, the port of Walvis Bay is utilized for the import and export of all supplies and products, for the majority of mines in Namibia. All the necessary services for the Project are well catered for.

The Resource expansion programme is being accelerated. The Project currently has three diamond drills operating on site. Drilling is targeting the deeper untested zones beneath the Southern and Northern lodes, which, the Directors believe, show potential to add to overall Resources. The Company s smaller Kempe drill is being used for converting existing Inferred Resources to a higher resource classification. Following the completion of the scheduled drilling in progress, an updated Mineral Resource will be estimated. North River is confident that significant increases to its Resources will be forthcoming. These increases will further enhance the economics of the Project. A copy of the full Mine Development Plan has been posted on the Company s website: www.northriverresources.com, under operations and then Namib Lead Zinc. The home page of the website also has a virtual site visit video which provides a project overview. The files located on the website consist of following documents Mine Development Plan Snowden Group Underground Mining Summary Geotechnical Study Ventilation Study Mining Infrastructure and Utilities Financial Analysis Appendices Processing Study Tenova Bateman. Volume 1 Study Documents NRR Opportunity Statement Martin French Managing Director of North River Resources said, The Mine Development Plan is a Feasibility Study standard document with the exception that it does not include reserves. Much of the inferred resources used in the MDP s Mineral Inventory, are currently being drilled with the objective of up-grading them to indicated resources, which can then be converted into reserves and hence a full Feasibility Study. The 1.4 year payback provides a good indication the Namib project can quickly become profitable. It provides encouraging economics, especially if the mine life can be extended over time with deeper drilling and near-mine exploration.

Planning is well advanced to bring Namib back into production and the Company is now turning its focus to project funding. **ENDS** For further information please visit www.northriverresources.com or contact: Martin French North River Resources Plc Tel: +44 (0) 20 7930 6966 Andrew Emmott Ritchie Balmer Strand Hanson Limited Tel: +44 (0) 20 7409 3494 Will Slack Pareto Securities Limited Tel: +44 (0) 20 7786 4370 Andrew Monk Andrew Raca VSA Capital Limited Tel: +44 (0) 20 3005 5000 Susie Geliher Elisabeth Cowell St Brides Media & Finance Ltd Tel: +44 (0) 20 7236 1177