November 8, RE: Harrah s Station Square Casino Transportation Analysis Detailed Traffic Impact Study Review. Dear Mr. Rowe:

Similar documents
TRANSPORTATION IMPACT STUDIES

Traffic Impact Study Requirements

BCEO TRAFFIC IMPACT STUDY GUIDELINES

CITY OF DRAPER TRAFFIC IMPACT STUDY DESIGN GUIDELINES

MEMO DATE: February 12, SOL on Transportation Impact Study Guidelines. District Executives

Traffic Impact Analysis Guidelines. Town of Queen Creek

APPENDIX B. Public Works and Development Engineering Services Division Guidelines for Traffic Impact Studies

Traffic Impact Study Guidelines. City of Guelph

CITY OF VALLEJO PUBLIC WORKS DEPARTMENT TRAFFIC IMPACT Analysis/Study GUIDELINES

CITY OF CLOVIS Traffic Impact Study Guidelines

Transportation and Works Department The Regional Municipality of York Yonge Street Newmarket, Ontario L3Y 6Z1

GUIDE FOR THE PREPARATION OF TRAFFIC IMPACT STUDIES

Article 16 Traffic Impact Analysis

SECTION VII TRAFFIC IMPACT ANALYSIS GUIDELINES

RESOLUTION NO

CHAPTER 2: MODELING METHODOLOGY

The TIS is to be signed and sealed by a Florida Registered Professional Engineer.

HALDIMAND COUNTY DESIGN CRITERIA SECTION T TRAFFIC IMPACT STUDY GUIDELINES

Dated: January 2015 TRANSPORTATION IMPACT STUDY GUIDELINES

ALBION FLATS DEVELOPMENT EXISTING TRAFFIC CONDITIONS AND POTENTIAL IMPACTS

Guidelines for the Submission of a Transportation Study Level 2

CHAPTER 2 - TRAVEL DEMAND MODEL DEVELOPMENT

VDOT Land Use Overview. Brad Shelton, AICP Transportation and Mobility Planning Division June 2015

GUIDELINES FOR TRAFFIC IMPACT ANALYSIS (ZONING PETITIONS)

Marie A. Pantalone, P.E., PTOE, Senior Engineer

City of Menifee. Public Works Department. Traffic Impact Analysis Guidelines

TRAFFIC STUDY GUIDELINES

BUS RAPID TRANSIT CORRIDOR

A.M. Peak Hour P.M. Peak Hour Land Use Intensity Daily Total In Out Total In Out. Shopping Center 236,160 SF

CITY OF THOROLD GUIDELINES FOR TRANSPORTATION IMPACT STUDIES

Proposal for a Transportation Impact Analysis of the Castilleja School project in Palo Alto

PROJECT STUDY REPORT. Cal Poly Pomona Senior Project

City of Berkeley. Guidelines for Development of Traffic Impact Reports

Section 7 Environmental Constraints

NEPA and Design Public Hearings

DIVISION I TRAFFIC IMPACT STUDY GUIDELINES ENGINEERING STANDARDS

Town of Lexington Planning Board

Updated Traffic Impact Analysis Regulations Administrative Guidelines

Updated Traffic Impact Analysis Regulations Administrative Guidelines

TRANSPORTATION IMPACT ANALYSIS GUIDELINES FOR ENVIRONMENTAL REVIEW

Chapter 2 Transportation Element Goals, Objectives and Policies

NW La Center Road/I-5 Interchange Improvement Project (MP 16.80)

Pottstown Pike Congestion Mitigation Feasibility Study

Going Forward The Plan to Maintain & Improve Mobility Frequently Asked Questions (FAQs)

Sacramento Municipal Utility District Headquarters Building and Site Rehabilitation Project

Bonnie Doon Grade Separation

FOR INTERSTATE 81 AND ROUTE 37 INTERCHANGE FREDERICK COUNTY, VIRGINIA MILEPOST 310

TRANSPORTATION IMPACT ANALYSISGUIDELINES

CITY OF MARIANNA MUNICIPAL DEVELOPMENT DEPARTMENT Post Office Box 936 Marianna, FL (850)

Traffic Impact Analysis (TIA) POLICY

FLORIDA DEPARTMENT OF COMMUNITY AFFAIRS. General Comments

Rivers Edge Alternative Urban Areawide Review (AUAR) Traffic Study

General Guidelines for the Preparation of Traffic Impact Studies

Traffic Impact Studies

To Market, To Market. Discussion Contents. Part 1: Land Use & Infrastructure

Future Build Alternative Traffic Forecasts and Level of Service Analysis

Revenues and expenditures increase based on the tax district increase due to increases in real estate assessments in CY 2016 compared to CY 2015.

Guidelines for the Preparation of Transportation Impact Studies

CHAPTER 8 TRANSPORTATION ELEMENT

PennDOTDistrict 8 I-83 East Shore Section 1 Improvements Project. Final Design Noise Analysis & Mitigation Recommendations

DISTRICT OF NORTH VANCOUVER GUIDELINES FOR THE DEVELOPMENT OF CONSTRUCTION TRAFFIC MANAGEMENT PLANS

GEOMETRIC DESIGN CRITERIA for Non-freeway Resurfacing, Restoration, and Rehabilitation Projects

PROGRAM EXTENSION & SCOPE CHANGE REQUEST FOR SP IMPROVEMENTS AT THE INTERSECTION OF CSAH 10/TH 10/CR H IN MOUNDS VIEW

Town of Lakeshore TRANSPORTATION IMPACT STUDY GUIDELINES

Arterial Management Plan Methodology

MOSLEY STREET URBANIZATION TH

City of Tacoma TRANSPORTATION MASTER PLAN DRAFT

A+ ACADEMY HIGH SCHOOL

CRYSTAL CITY, POTOMAC YARD, AND PENTAGON CITY TAX INCREMENT FINANCING AREA

CHAPTER 5 PARALLEL PARKWAY CORRIDOR IMPROVEMENTS

PEER REVIEW FOR TRANSPORTATION ASSESSMENT ZONING APPLICATION REVIEW

APPENDIX Methodology Letter of Understanding (MLOU) and Agency Correspondence

NATIONAL WESTERN CENTER

DRAFT MEMORANDUM DATE: 10/06/2017

Jim Alexander Director of Design and Engineering, Southwest Light Rail Transit Project

Chapter 5 Transportation Draft

Torbram Road Improvements From Queen Street East to Bovaird Drive

TRANSPORTATION IMPACT ANALYSIS GUIDELINES. bicycling MEMO APPENDICES

APPENDIX B. Excerpts from the October 2002 Conceptual Alternatives Report

The Folded Interchange: An Unconventional Design for the Reconstruction of Cloverleaf Interchanges

TOWN OF MOORESVILLE TRANSPORTATION IMPACT ANALYSIS PROCEDURES MANUAL TOWN OF MOORESVILLE, NORTH CAROLINA

Woodburn Interchange Project Transportation Technical Report

VEHICLES MILES TRAVELED (VMT) TRAFFIC IMPACT METRIC

South Boston. Transportation Plan. Transportation Planning Division. Virginia Department of Transportation

CITY OF LETHBRIDGE TRAFFIC IMPACT STUDY GUIDELINES

5.0 PRELIMINARY ENVIRONMENTAL REVIEW

MEMORANDUM. Date: July 14, 2006 Project #: To: US 97 & US 20 Refinement Plan Steering Committee

FINAL. Sound Transit Long-Range Plan Update Issue Paper S.6: Potential Tacoma Link Extension - East. Prepared for: Sound Transit

Chapter Five: Transportation

Project Initiation Form

MEMORANDUM: INITIAL CONCEPTS SUMMARY

CITY OF LYNDEN TRAFFIC IMPACT ANALYSIS REQUIREMENTS

Naim Rasheed, NYCDOT Shakil Ahmed, NYCDOT Luigi Casinelli, HDR. July 18, 2012 ITE Technical Conference

Chapter 5 - Transportation

PINELLAS COUNTY MOBILITY PLAN SUMMARY REPORT

FLORIDA DEPARTMENT OF TRANSPORTATION PROCEDURE DEVELOPMENT OF THE

TRANSPORTATION IMPACT ANALYSIS GUIDELINES

Clair-Maltby. Mobility Study Work Plan. Prepared by: BA Group. Transform. Connect. Community.

SECTION 5. Existing Conditions TRANSPORTATION NETWORK TRANSPORTATION

Reconstruction Project Update

Transcription:

November 8, 2006 Mr. Glenn Rowe, P.E. Pennsylvania Department of Transportation Bureau of Highway Safety and Traffic Engineering Commonwealth Keystone Building 400 North Street, 6 th Floor Harrisburg, PA 17105 RE: Harrah s Station Square Casino Transportation Analysis Detailed Traffic Impact Study Review Dear Mr. Rowe: McCormick Taylor, Inc. has completed its detailed review of the traffic study submitted for the proposed Harrah s Station Square Casino, located in the City of Pittsburgh. The material reviewed consisted of the following: o Harrah s Station Square Casino Transportation Analysis, prepared by DKS Associates and GAI Consultants, dated December 2005. o Letter prepared by GAI Consultants dated October 12, 2006, responding to the Initial Review Comments, dated September 7, 2006. This detailed review builds upon our initial review, dated September 7, 2006. Consistent with our approved scope of work McCormick Taylor conducted a project site visit; evaluated the technical elements of the traffic analysis; assessed the feasibility of constructing the various transportation improvements proposed in the study; and contacted the PennDOT District office and municipal representatives. Project Summary The project site is located north of Carson Street (PA Route 837), along the southwest bank of the Monongahela River within the City of Pittsburgh, Allegheny County. The project is proposed to be developed in a manner complimentarily to the existing Station Square entertainment center. The Harrah s Station Square Casino and related parking facilities are proposed to be located on the portion of Station Square that is currently occupied by the west parking lots and the Amphitheatre. Access to the gaming facility will be obtained via seven driveways, six along Carson Street (four existing and two new) and one existing driveway along Smithfield Street. The Harrah s Station Square Casino will be developed as a Class II gaming facility, inside the urban boundaries within PennDOT District 11-0.

The transportation analysis assumed the proposed gaming facility would include the following new uses: o 4,000 slot machines (3,000 at opening, another 1,000 added later) o Restaurants o Retail space o 3,100 parking spaces within two parking facilities (creating 1,815 new parking spaces at Station Square) The following principal uses currently exist at Station Square: o 400-room hotel and conference center, o 269,400 square feet of restaurant, entertainment, service, and retail space among multiple buildings, o 423,000 square feet of office space among multiple buildings, o 90,000 square feet of Amphitheatre space and support facilities, and o 3,785 parking spaces in surface lots and multi-level parking garages. The following existing uses would be removed from the site: o Amphitheatre, and o Surface parking lots at the west end of the site The study also notes that the Overall Master Plan Concept for the Station Square site proposes a mixed use, dense, walk-able urban environment with a mix of employment, civic and housing facilities. The concept includes the later replacement of the East Warehouse Building to include residential development. The plan notes the construction of 1,530 residential units and 50,000 square feet of neighborhood retail space. However, these uses were not considered in this study. PennDOT and Municipal Coordination McCormick Taylor contacted Cheryl Moon-Sirianni, PennDOT District 11-0 Assistant District Engineer for Design. Ms. Moon-Sirianni indicated that while PennDOT was very interested in the gaming projects no formal submissions had been made to the District. Further conversations with Jeff Karr ADE Maintenance and Bill Lester Permits Manager indicated that initial conversations had taken place with the applicant but only with regards to traffic impact requirements. McCormick Taylor contacted Sidney Kaikai, Transportation Planner at Pittsburgh s Department of City Planning. Mr. Kaikai indicated that the Department had completed an in-house review, available for download on the Department s website, of the proposals for all three gaming sites in Pittsburgh. Mr. Kaikai also noted the following specific items regarding the Harrah s Station Square plan: City of Pittsburgh, Allegheny County Page 2 of 9

Site Visit o The Department had serious reservations about the completeness of the Station Square traffic study, which was returned to the applicant to be expanded and reworked. The Department understands that the applicant would be submitting a revised study at a future date. o Vehicular access to the site is considered a concern as all traffic will be required to use the local street system. o The Department evaluated the impacts of the Harrah s Casino development but not the impacts of the Phase 2 residential, office, and retail development. o The preliminary alignment of the Hi-Speed Maglev track would impact the Phase 2 development. o There are several site design concerns, including the integration of riverside access and pedestrian access to adjacent bridges. It is not clear how these connections would be made. McCormick Taylor visited the location of the proposed gaming facility and the study area addressed within the applicant s impact study. The following observations were made as part of the site visit: o Most of the traffic signal installations in the study area appeared to be in good condition. o Some of the study area intersections appear to have recently been reconstructed. o A wide range of travel modes and facilities converge near Station Square including: busways, light-rail, incline-rail, HOV, and pedestrian trails. o Significant pedestrian activity associated with the existing Station Square development was observed within the site and along Carson Street. o The existing Station Square access driveways provide minimal area for the queuing of vehicles accessing the site. o Potential widening improvements to Carson Street may be constrained by Mount Washington to the south and/or existing development to the north. o Insufficient information was Station Square Access at Arlington Street available to adequately assess the potential impacts of proposed improvements to existing utilities; however transportation improvements within urban locations such as the proposed site typically require extensive utility coordination and relocation. City of Pittsburgh, Allegheny County Page 3 of 9

Technical Review of the Traffic Study The applicant provided limited materials in response to the initial September 7, 2006 review. As such, the previous comments are generally considered outstanding. It should be noted that the applicant indicated that a revised study addressing the previous comments will be submitted in mid-november; however that timeframe will not permit the study to be considered as part of this review. Comments presented in italics were noted by the applicant as to be addressed within the pending revised study. Approach 1. It would be appropriate for the engineer preparing this analysis to have stamped and signed the report. The applicant has indicated that the pending revised study will be stamped and sealed by a licensed engineer. 2. The analysis included an evaluation of two peak periods: the weekday evening and Saturday late-evening. The applicant has indicated that the pending revised study will be include a third evaluation period: Friday evening. 3. The analysis did not address impacts to the intersection(s) of Carson Street and the West End Bridge (West End Circle). The evaluation of the operation of these intersections is considered appropriate. The applicant has indicated that the pending revised study will include an evaluation of this intersection. Data Collection 4. All intersections, except for the entrance to the Wabash Tunnel, were counted manually. The applicant has indicated that the pending revised study will include counts of this intersection. 5. The study did not include manual turning movement traffic count data within the technical appendix. Trip Generation 6. Due to the lack of available data in ITE Trip Generation regarding gaming facilities, the trip generation estimates for the gaming facility were based upon patronage and employment figures provided by Harrah s. However, no documentation of these figures and assumptions is included in the technical appendix. 7. When comparing trip generation estimates for the gaming component of the three Pittsburgh gaming sites, the trip generation for Harrah s Station Square Casino is significantly lower than that for the other gaming sites. Factors that may be contributing to the assumed lower trip generation may include: - The significant percentage of patrons assumed to utilize nonautomotive modes of travel: 30 percent of patrons and 50 percent of employees. The applicant has indicated that the pending revised study will include revised mode splits. City of Pittsburgh, Allegheny County Page 4 of 9

- The low percentage of daily patrons assumed to arrive during the peak period: 5.9 percent of the daily patrons during the evening peak hour. - The assumed vehicle occupancy of 2.5 persons per vehicle for patrons and 1.1 persons per vehicle for employees. - The significant 20% reduction assumed for interaction between gaming patrons and the existing Station Square uses. The applicant has indicated that the pending revised study will include revised capture assumptions accounting for the significantly larger generation from the gaming site. 8. The overall concept plan for Harrah s Station Square Casino includes retail, restaurant and hotel uses ( Phase 2 ) not accounted for in the project trip generation. Analytical Approach 9. Verification of the base peak hour volumes and related factors utilized in the analysis could not be completed as the manual turning movement traffic count data were not provided. 10. The lane configuration and geometry of the intersections appear to be modeled appropriately for existing conditions; however several improvements proposed to mitigate traffic impacts which are noted in the body of the study do not appear to have been incorporated into the build condition models (i.e. additional Carson Street left turn lane at the Main Access). 11. Based on the information provided it appears that the signal phasing operations at the traffic signals appear to be modeled appropriately in Synchro, with the following exceptions: - Numerous reports included phases noted as having been modeled with phasing conflicts; however the reporting format (HCM) used by the applicant did not provide sufficient information to verify the validity of these errors. - Phase the green time allocated to selected phases at several signalized intersections is below the seven second minimum typically required by PennDOT. It should be noted that this may be a result of the reporting format (HCM) used by the applicant and not necessarily an error in the modeling. 12. The capacity analysis utilizes the maximum permissible peak hour factor (1.00) without supporting justification. The applicant has indicated that the factors were derived from the counted volumes; however factors of 1.00 indicate a perfectly balanced traffic flow over an entire hour and are not typically encountered with such frequency. The use of a higher than appropriate peak hour factor can significantly influence the results of the capacity analysis. City of Pittsburgh, Allegheny County Page 5 of 9

13. This study does not include an evaluation of future conditions 10 years after the project build out, which is typically required by PennDOT for a highway occupancy permit (HOP) submission. The applicant has indicated that the pending revised study will include the 10 year build out analysis. 14. The analysis did not provide an evaluation of vehicle queuing and determinations regarding the adequacy of existing and/or proposed turn lane lengths. The applicant has indicated that the pending revised study will include queuing analyses. 15. The analysis does not address the issues associated with potential staging of parking during facility construction, specifically how the removal of the West Lot will be addressed. Evaluation of the Recommended Improvements McCormick Taylor evaluated the recommended roadway improvements identified in the Harrah s Station Square Casino Transportation Analysis. The mitigations measures proposed were reviewed for completeness and adequacy in serving the anticipated additional traffic volumes. 16. The proposed mitigation includes widening the existing east access driveway at Arlington Avenue and Carson Street to provide dual left turn lanes and an exclusive right turn lane; however the intersection is still projected to operate with a deficient level of service E for two of the movements. Additionally the existing elevated Arlington Street and Carson Street rail lines and associated structures will increase the complexity of any potential improvements. 17. The proposed improvements to the intersection of Commerce Street and Carson Street include modifying the traffic signal to operate with inefficient split-phasing. Improvement alternatives which permit concurrent signal phasing (i.e. without the shared through/left-turn lane) should be explored. 18. The analysis recommends a traffic signal at the new Carson Street egress; however, supporting signal warrant analyses are not provided in the technical appendix. The applicant has indicated that the pending revised study will include signal warranty analyses. City of Pittsburgh, Allegheny County Page 6 of 9

19. The report notes that, at the intersection of Carson Street and Smithfield Street, a pedestrian overpass across Carson Street will be constructed. In addition to improvements at this intersection, pedestrian accommodations should be adequately addressed at each of Carson Street and Smithfield Street the signalized intersection. This includes proper delineation, ADA accommodations, adequate crossing times, and pedestrian indications. The investigation of pedestrian count down timers may also be appropriate. 20. The mitigation plan assumes the interconnection of the six traffic signals along Carson Street within the study area and programmed to operate as a system providing coordinated progressive traffic movements. 21. The report discusses the implementation of an internal traffic management plan, the utilization of ITS technologies and the establishment of a transportation management center. The use of these mitigation measures will require the long-term participation and financial support of local and state agencies. 22. Except as noted above, it appears that the proposed improvements adequately mitigate the project impacts based on the results presented in the analysis. It should be noted that the omissions in the capacity analysis (as noted above) may be influencing the reported results and the analyzed operation of the intersection. Additionally the inclusion of the evaluation of the 2018 design year may identify additional deficiencies requiring mitigation. Highway Occupancy Permit Issues McCormick Taylor evaluated issues that may impede the issuance of a PennDOT Highway Occupancy Permit (HOP). This investigation included preliminary assessments of apparent issues associated with right-of-way, existing structures, utility conflicts, and the constructability of the roadway improvements suggested in the study. It should be noted that PennDOT District 11-0, without having been provided any materials submitted by the applicant, was unable to provide comments regarding potential permitting issues. o This study does not include an evaluation of future conditions 10 years after the project build-out date, which is typically required by PennDOT for a highway occupancy permit (HOP) submission. o The need to address the 10 year analysis as well as the various inconsistencies in the analysis (i.e. Peak Hour Factors) may result in additional mitigation requirements that will impact the HOP process. City of Pittsburgh, Allegheny County Page 7 of 9

Conclusions o Potential widening improvements to Carson Street may be constrained by Mount Washington to the south and/or existing development to the north. Where widening is proposed, the acquisition of new right-of-way Carson Street Constraints and need for retaining walls on the Mount Washington side of Carson Street should be considered. o Insufficient information was available to adequately assess the potential impacts of proposed improvements to existing utilities. However, transportation improvements within urban locations such as the proposed site typically require extensive utility coordination and relocation. Based on our review there are still issues that have not been addressed by the information submitted by the applicant. Further consideration of the project impacts would benefit from the applicant: o Revising the traffic analysis to address previously noted technical deficiencies including expanding the study area; utilizing trip generation assumptions consistent with other urban applications; and revising capacity analyses to eliminate the use of inappropriate factors. o Coordinating with the City and PennDOT District to establish appropriate limits, implementation criteria and funding mechanisms for the proposed Intelligent Transportation Systems (ITS) and Traffic Management Center (TMC). o Developing a coordinated traffic signal timing plan for Carson Street that includes provisions to minimize queuing at site accesses. o Advancing the design of the improvements to the intersection of Carson Street and Smithfield Street, including verification that sufficient right-of-way is available and that existing facilities do not present insurmountable constraints. o Coordinating with utility providers to assess potential relocation impacts associated with roadway improvements. o Coordinating with transit service providers to ensure the provision of integrated service to the proposed facility consistent with the anticipated hours of operation. o Developing improvements to ensure integrated pedestrian accessibility with adjacent, complimentary uses. City of Pittsburgh, Allegheny County Page 8 of 9

I trust that this review will assist PennDOT and the Pennsylvania Gaming Control Board in their evaluation of this application. I am available if you have any questions regarding this review. Very truly yours, McCORMICK TAYLOR, INC. Albert Federico, P.E., PTOE Senior Traffic Engineer cc: Paul Resch, PA Gaming Control Board Paul Archibald, McCormick Taylor City of Pittsburgh, Allegheny County Page 9 of 9