Innovative Water Management Award

Similar documents
Northern Victoria Irrigation Renewal Project

INTERNATIONAL COMMISSION ON IRRIGATION AND DRAINAGE (ICID) ICID WATSAVE AWARDS WatSave Technology Award

Audit of Water Recovery: Northern Victoria Irrigation Renewal Project 2011/12

Optimal Efficiency in Gravity Water Distribution Systems

Goulburn-Murray Rural Water Corporation Submission to Price Review 2016 (Water Plan 4)

THE FIRST STAGE OF THE COLEAMBALLY WATER SMART AUSTRALIA PROJECT: BUILDING ON CICL S ADOPTION OF TOTAL CHANNEL CONTROL (TCC) TECHNOLOGIES

IRRIGATION AUSTRALIA 2009 MODERNISATION CONSTRUCTION & DESIGN LEARNINGS FROM THE FIELD

Delivery Share Review Community Meeting Outcomes

A. M Shahidi, R. Smith & M. Gillies National Centre for Engineering in Agriculture, University of Southern Queensland, Australia.

Report for Dairy Australia. Key Issues Follow up Notes Meeting with Independent Panel Inquiry into Dairying in the Lower Murray Darling Basin

Submission to the Murray Darling Basin Authority (Proposed Basin Plan)

Proposed Amendments to the Murray Darling Basin Plan. Victorian Farmers Federation Submission

Delivery Share Review. Outcomes and actions for the Goulburn-Murray Irrigation Districts

Chair Message. Murray Valley

Chairman s Comments Welcome all. My name is Charlie Gillingham and I am the newly appointed Chair, Torrumbarry Water Services Committee (WSC).

Submission to the Department of Sustainability, Environment, Water, Populations and Communities

INTERNATIONAL COTTON ADVISORY COMMITTEE. Abidjan, Ivory Coast 2 6 December 2018 AUSTRALIAN COUNTRY REPORT

Economic analysis of irrigation modernisation connection options for a dairy farm in northern Victoria

Issues Paper Drainage Tariff Strategy

Community Information Session

Goulburn-Murray Water

Dr Sarah Wheeler. Centre for Regulation and Market Analysis, School of Commerce, University of South Australia. Amsterdam.

REVIEW OF THE ECONOMICS OF THE COMMUNITY SURFACE DRAINAGE PROGRAM IN THE SHEPPARTON IRRIGATION REGION 1

A NATIONAL PLAN FOR WATER SECURITY

Water Outlook for Melbourne

IMPLEMENTING WATER REFORM IN QUEENSLAND, AUSTRALIA CASE # 24

Melbourne Water Outlook 2019

Improved irrigation through technology and community engagement

National Water Account Australian Experience. Dr Amgad Elmahdi Head of Water Resources Section - Australia

Your irrigation area water entitlements

Australia's Water Reform journey

WIMMERA-GLENELG BULK AND ENVIRONMENTAL ENTITLEMENTS OPERATIONS REVIEW Nigel Binney, Manager Assets and Planning GWMWater, Horsham, VIC, Australia

Shepparton Irrigation Region Water Supply Protection Area Groundwater Management Plan

MAKING THE MOST OF WATER RESOURCES AS FEATURED IN AUSTRALIAN CONSTRUCTION FOCUS - JUNE 2012 EDITION

Future scenarios for the southern Murray Darling Basin water market

Your irrigation area water entitlements

Session 3: Water Accounting in Australia

SUSTAINABLE WATER SOLUTIONS IN THE MCLAREN VALE WINE REGION

Response to the Murray-Darling Basin Royal Commission Report 31/01/2019

Improving whole farm and infield irrigation efficiencies using Irrimate TM tools

Submission to the Essential Services Commission on Review of Water Pricing Approach: Consultation Paper

Melbourne VIC 3124 AUSTRALIA 2 Environmental Flows Team. Melbourne Water Melbourne VIC 3002 AUSTRALIA

Network Service Plan. A requirement of the Water Charge (Infrastructure) Rules 2010 (Cth) 1 July June 2017.

Hydro-climatic modelling workshop UNSW - MDB Water policy challenges and innovation

Evaluating the economic benefits of salinity management in irrigated agriculture

UNIVERSITY OF SOUTHERN QUEENSLAND. Faculty of Engineering and Surveying. A dissertation submitted by. Amirali Moavenshahidi

Yarra Valley Water s Pressure Management Strategy

Ricegrowers Association of Australia Inc. Inquiry into the impact of the Murray-Darling Basin Plan in Regional Australia

MELBOURNE S WATER SUPPLY IS SECURE

UrbanSAT- Urban System Analysis Tool : For delivering urban water balancing and reporting

Queensland Government s Healthy Headwaters Program (HHP)

There is potential in Tasmania to create new dairy farms by converting current grazing or cropping farms into dairy units.

Greater Shepparton. Regional Rural Land Use Strategy. Issues Paper. Greater Shepparton City Council. July, 2009

Mid-Loddon Groundwater Management Area Local Management Rules

What has Soil Got to Do with Water?

Water Accounting in Australia London Group Meeting, Denmark September 2004

The Negative Effects of Electricity Cost Increases on Sugar Cane Production in the Bundaberg Mill area. CASE STUDY

Delivery Share Review. Outcomes and actions for the Sunraysia Irrigation Districts

NSWIC NEW SOUTH WALES IRRIGATORS COUNCIL

Our smart water network in Adelaide s CBD is already having an impact, nine months after it launched.

Water Allocation Statement

25 Year GMID Asset Strategy

HEALTH PURCHASING VICTORIA STRATEGY. December 2017

South Australian Water Corporation HIGHLIGHTS

Investing in salinity management options in Victoria

A NATIONAL IRRIGATION RD&E PROGRAM FOR TASMANIA

The Coalition s Policy

Lochiel Park: Case Study of a Green Village South Australia Land Management Corporation, South Australian Government

National Farmers Federation

The Murray Darling Basin Plan. May This occasional paper provides an overview of the process of developing the Murray Darling Basin Plan.

Draft Local Management Plan - Lake Meran

Water alternatives for Adelaide (and SA)

Alternative water sources and Integrated water management

Guidelines for Implementing Total Management Planning. Asset Management. WATER LOSS MANAGEMENT Implementation Guide

Benefits of increased irrigation efficiency in the Murrumbidgee Irrigation Area

Introduction to the Murray-Darling Basin Plan

A 25 Year Strategic Plan

Irrigation system modernisation. and the demand for agricultural inputs. A report for. Regional Development Victoria and the Water Technology Cluster

Position Description

Local Management Plan Lake Meran

SA Water Strategic Plan Delivering water and wastewater services in efficient, responsive, sustainable and accountable ways

Global experience of automating irrigation systems

Integrated Water Management A Tragedy of the Commons? 8 May Stormwater Victoria Conference

1. Introduction The Local Government Association of NSW and Shires Association of NSW (the Associations) are the peak bodies for NSW Local Government.

The Coalition s Policy

Dr Sarah Wheeler. Centre for Regulation and Market Analysis, School of Commerce, University of South Australia. Geneva.

GOULBURN VALLEY WATER RESOURCE RECOVERY PRECINCT WORKING WITH LOCAL GOVERNMENT TO ACHIEVE A WIN-WIN. Darren Sharman

Sustainability Industry Reference Committee (IRC) MSS Sustainability Training Package Case for Change December 2017

Preliminary Findings Report

RAMROC SUBMISSION - GUIDE TO THE PROPOSED MURRAY DARLING BASIN PLAN

FLAGSHIPS IRRIGATION IN PERSPECTIVE. water for a healthy country. Irrigation in the Murray and Murrumbidgee Basins.

Submission in response to: New South Wales Draft Climate Change Strategic Plan and. Draft Plan to Save Energy and Money

BRIEFING TO THE INCOMING MINISTER

SUBMISSION TO THE NSW MURRAY AND LOWER DARLING WATER RESOURCE PLAN (SURFACE WATER) STATUS AND ISSUES PAPER

Compiled by Ann Tartre, Business Outreach Consultant, Climate Education Partners

FLAGSHIPS WHOLE-OF-CATCHMENT WATER AND SALT BALANCE. water for a healthy country

Chapter 1. Introduction: Victoria implementing the Murray- Darling Basin Plan

Water Issues in Australia. 17 December 2013

Delivery Share Review Summary Report. Community Discussion Paper

Submission to the Select Committee on the Murray-Darling Basin Plan

Transcription:

International Commission on Irrigation and Drainage (ICID) WATSAVE AWARDS 2012 Innovative Water Management Award ---------------------------------------------------------------------------------------------------------------- Summary of Mr. Peter McCamish s work Integrated Water Recovery (continued on next page)

International Commission on Irrigation and Drainage (ICID) WATSAVE AWARDS 2012 Category: WatSave Innovative Water Management Award Title: Integrated water recovery provides regional growth for Northern Victoria, Australia

Contents Describe the innovation... 3 Describe how the innovation saves water... 4 How are water savings achieved... 6 Describe the scope for further expansion of the innovation... 7 Roll of individual nominee... 7 Peter McCamish (Chair) NVIRP... 7 Appendix 1: Photo Gallery... 8 ii

Describe the innovation The Victorian Government owned Northern Victoria Irrigation Renewal Project (NVIRP) and Rubicon Systems Australia are delivering a world first, large scale irrigation modernisation project in the Goulburn Murray Irrigation District (GMID), Victoria, Australia: a region that is responsible for approximately 25 per cent of the state s agricultural production. The project delivery model and new technology being implemented throughout the region is drawing attention from around the world as an example of how different levels of government can work together to overcome challenges such as reduced water availability, aging irrigation assets and the need to increase productivity. With the state of Victoria heavily dependent on the GMID s AUD $1.45 billion per year dairy and agricultural industries, the NVIRP project was initiated to improve the region s inefficient irrigation network, capture transmission water lost to the system and share these water savings between irrigators, and the environment. NVIRP is also an enabling project, providing a modernised irrigation system that offers improved levels of service to its customers who can leverage further on farm efficiencies and increased productivity and profitability. The 6 300 km irrigation channel network has been in operation for around 100 years and inefficiencies were compounded by record low rainfalls and long term drought. NVIRP is responsible for planning, designing and delivering a program of works to implement works including new irrigation technology developed by Rubicon Systems Australia, including innovative regulator gates such as FlumeGates TM and a Total Channel Control (TCC ) system. This technology is being installed throughout the extensive irrigation channel network and adjacent farms and enables unprecedented water delivery, measurement and management accuracy as well as a fully automated process to deliver water and monitor water use. The modernised system is also providing water to irrigator s near on demand and at higher and consistent flow rates facilitating increased opportunities to optimise on farm water use efficiency and productivity. Full automation of the majority of the system is also reducing the carbon footprint of the scheme as the multiple daily adjustments of regulator gates and meters associated with a manual system are largely no longer required. This reduces significantly the vehicle travel requirements over such an extensive system. The project is being delivered with the cooperation of multiple stakeholders including three tiers of government. NVIRP is both the name of the project and the state owned entity operated by the Victorian Government to deliver the project. NVIRP is working closely with local governments and the local government water authority (Goulburn Murray Water) to deliver the project on the ground to produce the water savings and is also working closely with the Australian Commonwealth Government, which has last year committed over AUD $1 billion to the project (total project value AUD $2 billion). 3

Capital works are predominately delivered in the winter of each year when the irrigation system is non operational. This works program is the culmination of extensive planning and design to undertake a program of modernisation works within a three month period. To date. NVIRP has led the installation of over 2716 Rubicon gates and major control structures, as well as the installation of 117 km of channel lining and decommissioning of over 1000 metered outlets. As well, removing largely redundant assets assists in reducing system water losses, increases operational efficiency and reduces ongoing operations and maintenance costs increasing the overall affordability of the scheme for current and future generations of irrigators. The program has already shown evidence (see Figure 1) of achieving water savings through the reduction of irrigation channel seepage and leakage, meter error and inefficient operation and exceeded savings targets in its first independent audit in 2009. Visitors have travelled to view the project from all over Australia and the world. International visitors have commented on the advanced nature of the irrigation technology and how they hope to develop similar systems in their home countries. Visitors are also intrigued about the level of cooperation achieved between three tiers of government and other key stakeholders that is enabling the delivery of this very significant project which to date is the world s largest irrigation modernisation project. Describe how the innovation saves water To meet the objectives of planning, designing and delivering this two stage AUD $2 billion project successfully NVIRP is required to: implement water distribution and delivery efficiency improvements in generating an estimated average of 429 gigalitres (GL) of annual water savings by 2017 18 with an agreed budget of AUD $2 billion. Having achieved so far109 gigalitres per year (long term average) to date, the project remains on target to meet this ambitious target deliver an improved standard and efficiency of a water delivery services with modernised connections to a central arterial delivery system; and provide a catalyst for economic development and productivity within the region. From 2008 to now, water savings have been mainly realised from the main trunk backbone works, where around 3000 km of main channel have been modernised with automatic SCADA controlled regulators, new mag meters and a small amount of channel remediation works. The installation of the automatic gates (Appendix 1, Figure 2) on the backbone channels has significantly reduced outfall losses or end of channel escape losses (Appendix 1, Figure 3) and provided better customer service delivery. Improved metering to customers on the 4

backbone is allowing better management of water and reducing losses occurring at customer outlets e.g. leakage around outlets structures and unauthorised use. In future years more savings will be realised by decommissioning about 3000 km of smaller spur channels (reducing evaporation, seepage and leakage losses) and reconnecting customers back across to the backbone channel, through alternative supply mechanisms than open channels such as using large pipes and or pumps funded by NVIRP. Already considerable effort towards achieving the Government s objectives for the program has been made. See Figure 1 below. Figure 1: Stage 1 & 2 Water Recovery GL/ yr LTCE Water Recovery 500 450 400 350 300 250 200 150 100 50 0 Total Stage 1 & 2 Audited and Forecast Water Recovery GL/ yr Long Term Average 2008 2009 2010 2011 2012 2013 Year 2014 2015 2016 2017 2018 Audited Forecast 5

How are water savings achieved NVIRP has the target of delivering 429 GL/yr LTCE of water savings by the 2017 18 irrigation season.the majority of water savings realised to date have been associated with three activities or programmes: reduction in outfall losses achieved through the automation of old channel regulator structures mainly in the Central Goulburn 5 9 and Rochester irrigation areas replacement and rationalisation of customer service point (old meters and open outlets) on the backbone across the NVIRP Stage 1 work areas. This reduces leakage through and around outlets as well as the metering errors associated with old meter and open outlets. some channel remediation works to reduce channel leakage and seepage in the Central Goulburn 5 9 area. Rationalisation or decommissioning of spurs (non backbone) channels and the reconnection of customers to a modernised backbone outlet within the Connections Programme has begun and will continue to 2017 18. Water savings generated by the NVIRP project are in turn being independently audited in conformance with a Technical Manual which itself has established world s best practice in terms of providing a methodology for reliably quantifying water savings as a result of specific works and measures. NVIRP also works closely with partnering agencies such as the Goulburn Broken Catchment Management Authority to support other water savings projects such as on farm efficiency programs which leverage off the benefits of a modernised distribution system. Irrigation modernisation works over the ten year program will reduce system water losses and generate savings to benefit both the environment and consumptive water users. Channels with high seepage and/or leakage rates are identified through a range of techniques: through soil maps, sandy soils, prior streams aerial maps Goulburn Murray Water leakage history (system operator) geophysics field walks and operator knowledge Losses and savings are then verified through pondage tests. Following this identification, and in some instances plastic lining (HDPE) or clay remodelling as part of the remediation (Appendix 1, Figures 4 and 5). 6

Describe the scope for further expansion of the innovation The technology to save water and the lessons learnt over the four years of the project can be transported into catchment areas and irrigation regions throughout Australia and more broadly around the world. The Murray Darling Basin Authority under its current draft Basin Plan has indicated that there is a widely held view that we need to change the way we manage the Basin. It is understood that infrastructure improvements to gain water savings will also enable new investment to be made in agriculture and other industries across the Basin. As many international visitors have seen, some of the water savings strategies and modernisation works being implemented by NVIRP are appropriate and could be applied in irrigation systems across the world. Roll of individual nominee Peter McCamish (Chair) NVIRP Peter has significant knowledge of the Goulburn Valley horticultural industry, as he has been part of this industry for 34 years. He is also a Director of SD Reid Holdings, a Tasmanian Australia cherry grower and exporter. As well he is a currently a Director of Water for Rivers, former Director of SPC Ardmona Limited and former member of the Shepparton Irrigation Implementation Committee and Food Bowl Modernisation Project Steering Committee. Peter chairs the NVIRP Board of five Directors which is a skills based board. He has been a member of this Board since its inception in January 2008 and was instrumental in developing the overall concept and subsequent representations to Government to attract the necessary funds. He also played a pivotal role in the community consultation processes supporting the roll out of the project. 7

Append dix 1: Photo Galleryy Figure 2: Newly installed channel re egulator strucctures A example of o an old outffall structure Figure 3: An 8

Figure 4: Example E of ch hannel lining being underttaken as part of NVIRP mo odernisation w works A view of channel liningg works in progress Figure 5: Ariel 9

10