MEKONG SITE VISIT TO LAOS FIRST TWO MAINSTREAM DAM PROJECTS. Letters from the EXECUTIVE SUMMARY OF THE SECOND LETTERS FROM THE MEKONG ISSUE BRIEF

Similar documents
The LMB Sustainable Hydropower Development Strategy. Regional Power Trade Coordination Committee 24 Nay Pyi Taw, 20 June 2018

Technical Workshop: Xayaburi HPP

Broad aims of the SEA. SEA SUMMARY OVERVIEW REGIONAL MITIGATION ASSESSMENT WORKSHOP Ho Chi Minh City June The context for the SEA

Comments on CNR s report for the Government of Laos on the Xayaburi Dam June 2012

Technical Workshop. Xayaburi HPP

Comments on Don Sahong Dam s 2013 Environmental Impact Assessment

Implementation of Previous PNPCA Processes and Lessons Learnt

ICEM and MRC - SEA of hydropower on mainstream Mekong River 1

Key messages. RCC/ FiA Don Sahong Workshop, Phnom Penh 16 June Carl Middleton, International Rivers 1. A Brief History of Mekong mainstream dams

Xayaburi Hydropower Project

I C E M - I n ternat i o n a l C e n tre fo r E n v i ro n m e n t a l Manage m e n t

Content of Presentation

COMMENTS BY LAO PDR ON THE MRCS TECHNICAL REVIEW REPORT OF THE PROPOSED XAYABURI DAM PROJECT

Technical Review of Pak Beng Hydropower Project Water Quality, Aquatic Ecology and Fisheries

MRC's role in relation to planning and implementation of mainstream dams and its strategic assessment framework

SUMMARY 2013 EDITION

Profiles of 12 proposed Mainstream developments in the LMB

The Mekong River Commission s Initiative for Sustainable Hydropower. Oslo, Norway 4-6 September Presented by: Voradeth Phonekeo

Some aspects of the sediment transit on the Mekong river in relation with hydropower development

MRC Guidelines and Tools for Sustainability Development of Hydropower SHDS, PDG, PNPCA, and Future Updates

Basin-wide Strategy for Sustainable Hydropower Development for the Lower Mekong Basin

Geopolitical benefits of transboundary water cooperation. The Mekong River Basin Case

PROMOTING A FAIR BALANCE ON MEKONG S SHARED WATER. Te Navuth (Mr.) Secretary General, Cambodia National Mekong Committee

FISHERIES IMPACTS AVOIDANCE AND MITIGATION

MEKONG RIVER COMMISSION

Impacts of mainstream dams on fisheries and mitigation options - Current status of knowledge

Review and Update Sustainable Hydropower

ICEM and MRC - SEA of hydropower on mainstream Mekong River 1

The Role of the Mekong River Commission (MRC) in Conflict Management. SATIT PHIROMCHAI Mekong River Commission Secretariat

Ranking significance of impacts 7/13/2010. SEA OVERVIEW OF CONCLUSIONS REGIONAL MITIGATION ASSESSMENT WORKSHOP Ho Chi Minh City June 2010

Xayaburi Hydroelectric Power Project

Economic, Environmental and Social Impacts of Hydropower Development in the Lower Mekong Basin

Review of Existing Knowledge on the Effectiveness and Economics of Fish-Friendly Turbines

Equitable and Low-Carbon Society: Aspiration and Strategies for Southeast Asia

Trans-boundary Flood Issue in Lower Mekong River Basin

ENVIRONMENT ASSESSMENT TOOLS FOR IMPROVING THE SUSTAINABILITY OF DEVELOPMENT IN THE MEKONG REGION

MRC SEA FOR HYDROPOWER ON THE MEKONG MAINSTREAM INCEPTION REPORT VOL II MAINSTREAM PROJECT PROFILE SUMMARIES 23 OCTOBER 2009

Prior Consultation. for the proposed Don Sahong Hydropower Project Mekong River. Draft Final Technical Assessment Report

TRANSBOUNDARY DIALOGUE

Mekong River Commission

M RC S EA FOR H YD ROPOW E R O N TH E M E KO NG M AI NS T R EAM INCEPTION REPORT VOL II MAINSTREAM PROJECT PROFILE SUMMARIES 23 OCTOBER 2009

HYDROPOWER DEVELOPMENT IN THE MEKONG BASIN

The ADB/ World Bank/ MRC Mekong Water Resources Assistance Strategy (MWRAS): Justifying large water infrastructure with transboundary impacts

MRC stakeholder engagement

Xayaburi Dam: How Laos Violated the 1995 Mekong Agreement

1 Consultancy Summary

CEPF Final Project Completion Report. Protecting the Mekong River s Critical Ecosystem and Biodiversity from Hydropower Development

Mekong River Commission

Swindling the Mekong:

Identifying and Valuing the Benefits: the Experience of Mekong River Basin

Trends and long-term outlook for the Mekong region

Coupling SWAT with land cover and hydropower models for sustainable development in the Mekong Basin

MEKONG RIVER COMMISSION. Concept Note Final Draft Version

Mekong Climate Change and Adaptation Initiative and the Mekong River Commission

Langcan Mekong Cooperation and the Future of the Mekong River Introduction

The Mekong River Commission s state of knowledge and state of governance with respect to Mekong mainstream dams

THE FIRST MEKONG RIVER COMMISSION SUMMIT Hua Hin, Thailand

From Upstream to Downstream:

The First Mekong River Commission Summit 2010

The Council Study. Sustainable Management and Development of the Mekong River Including Impacts of Mainstream Hydropower Projects

Transboundary Cooperation Workshop # January 2010, Vientiane. Sharing of Benefits in Transboundary Water Resources Management

Chapter 3: Fish Passage on Mainstream Dams

Mekong Climate Change and Adaptation Initiative of the Mekong River Commission

INTEGRATING WATER AND CLIMATE DIPLOMACY IN THE MEKONG RIVER BASIN

Presentation Transboundary water cooperation in Mekong Countries, key issues, challenges and intervention to address

Siem Reap Declaration

Siem Reap Declaration

Siem Reap Declaration

Internal review at Lao PDR level before PNPCA

Mekong River Commission

PRIOR CONSULTATION PROJECT REVIEW REPORT

BACK TO FUTURE PAST? Cooperation Challenges and Opportunities in Hydropower and Water Resources Development in the Mekong

PAKLAY HYDROPOWER PROJECT

Joint Environmental Monitoring (JEM)

SCOPING AND PLANNING OF THE ASSESSMENT OF BASIN-WIDE DEVELOPMENT SCENARIOS

Avoidance, Enhancement and Mitigation Avoidance measures Enhancement measures Mitigation measures. Review and collect existing data

Review and Update of the MRC Design Guidance for Proposed Mainstream Dams of the Lower Mekong Basin

The Living Mekong Programme Goal :

Mekong, hydropower and climate change: Reflection from community-based research towards sustainable livelihood

Downstream Flow Regimes

VIETNAM ENGAGEMENT IN TRANSBOUNDARY WATER COOPERATION IN MEKONG RIVER BASIN

Case Presentation: Law for Benefit sharing on hydropower projects in Viet Nam - & - Linking national benefit sharing to Transboundary benefit sharing

Study on the Impacts of Mainstream Hydropower on the Mekong River

Nam Theun 2. TNC workshop April 2014

Negotiating Flows in the Mekong

Climate Change and Adaptation Initiative: balanced top-down and bottom-up approaches

and Action Plan Mekong Climate Change Adaptation Strategy

Public Participation in Transboundary EIA in the Mekong Region. MPE Webinar Series AECEN Secretariat/Mekong Partnership for the Environment

Lancang Jiang To The Mekong Delta: Questions of Dams, Development Impact And Integrity

Heng Suthy, Regional Coordinator for CS, MRCS Regional Stakeholder Forum on Council Study 22 Feb 2017, Luang Prabang, Lao PDR

USING CUMULATIVE IMPACT ASSESSMENT AND SUSTAINABILITY TOOLS FOR RIVER BASIN MANAGEMENT Peter John Meynell Chiang Mai, 11 March 2011

PRoACC2. (First Draft) Research Proposal. Risk Perception and Livelihoods under Climate Change. in the Mekong Cambodia. Royal University of Phnom Penh

Governing the water-energy nexus related to hydropower on international rivers: what role for river basin and regional energy organizations?

Associated Event : SDG 6 on Water and Sanitation

Report of the Mekong River Commission **

Mekong 2 Rio International Conference on Transboundary River Basin Management. Conference Brief

Chapter 11: Recommendations. Chapter 11 DIADROMOUS FISH HABITAT CONSERVATION AND RESTORATION RECOMMENDATIONS AND/OR REQUIREMENTS

10 Project Cost Estimation

Update MRC s Preliminary Design Guidance (PDG)

Power Surge. The small country of Laos is undergoing some big changes. As it tries to become the battery of Southeast.

Transcription:

Letters from the MEKONG SITE VISIT TO LAOS FIRST TWO MAINSTREAM DAM PROJECTS EXECUTIVE SUMMARY OF THE SECOND LETTERS FROM THE MEKONG ISSUE BRIEF by Richard Cronin and Courtney Weatherby JANUARY 2015 1

ENVIRONMENTAL GROUPS AND THE GOVERNMENTS OF VIETNAM AND CAMBODIA VOCIFEROUSLY OPPOSE THE PROJECTS BECAUSE OF CONCERNS ABOUT THEIR IMPACTS ON FISHERIES AND SEDIMENT.

INTRODUCTION This executive summary of the second Letters from the Mekong issue brief examines the current status of mitigation efforts at Laos Xayaburi and Don Sahong dam projects on the mainstream of the lower Mekong River. These two controversial projects have become the focal point of discussion between various stakeholders. Environmental groups and the governments of Vietnam and Cambodia vociferously oppose the projects because of concerns about their impacts on fisheries and sediment. The high level of dependency on the river and its bounty make the Mekong a vital contributor to food security and regional stability, and this strengthens critics concerns about the impact of dams. On the other hand, Laos is counting on income from exporting electricity to promote domestic development, while Thailand s energy planners are trying to diversify energy supply to improve energy security and meet growing demand. The Mekong s high hydropower potential in Laos makes the river a vital player in both these goals. The Stimson Center s Mekong Policy Project promotes much-needed dialogue between various stakeholders on a basin-wide basis that fully and fairly accounts for the trade-offs between energy, food and water in the Mekong basin. Stimson s approach is pragmatic, recognizing that all economic modernization and development initiatives have costs and that some mainstream dams will inevitably be built. The main questions are how many and which ones. Stimson seeks to generate discussion about approaches that involve a full-scale, comprehensive calculation of trade-offs and an examination of the way that costs and benefits could be fairly shared by all stakeholders. This dialogue requires engagement with all stakeholders on the basis of adequacy and full transparency of data. Much dialogue on these issues has been polarized by the lack of effective communication and a lack of publicly shared and comprehensively analyzed data. In order to deepen understanding of the steps that Laos and the dam developers have taken to mitigate the impacts of mainstream projects, Senior Associate Richard Cronin and Research Associate Courtney Weatherby traveled to Thailand and Laos from December 11 20, 2014, to meet with local civil society members, conduct site visits of the Xayaburi and Don Sahong projects, engage with developers and consultants, and speak with Lao officials. ON THE COVER: Panorama of Xayaburi dam construction first stage to mid-stream. LEFT: Research Associate Courtney Weatherby discusses concerns about impacts with Xayaburi Power Company engineer. STIMSON CENTER 3

Site Visit to Laos First Two Mainstream Dam Projects MAIN FINDINGS As of mid-december 2014, the Xayaburi dam is a little more than 40 percent complete: the spillway, navigation lock, and the intermediate block that divides the river in two are all nearing completion, and the developer plans to build a coffer dam to divert the river through the spillway toward the end of January 2015. Main concerns about the Xayaburi project are about its potential impact on migratory fish species and the trapping of nutrient rich sediment in the reservoir. More broadly, critics have focused on the fact that the Mekong River Commission s consultation discussions for the Xayaburi dam took place after the dam had been fully designed, and failed to fully engage with members of all stakeholder groups. Serious and widespread criticism of the Xayaburi dam s original design for fish passages and sediment flushing has led to some major changes and innovations. Our visit included meeting with the project s lead engineer, a relocation site officer, and a project manager from Poyry (the main consultant for the project). According to the Poyry representative, parent company CH Karnchang has spent $200 million on fish research and passage redesign alone more than any other major project globally. The lead engineer noted that the changes required substantial modifications to the powerhouse and the dam structure. Xayaburi Power Company Ltd s work includes: Switching 4 of 11 gates in the spillway to low-level outlets designed to more easily flush sediment through the dam. Using radial gates for the spillway, which can be lifted to release silt once it builds up. Researching and recording fish species, size, volume of migration, and ability to swim upstream in different flow velocities in order to have better data for the fish passage redesign. Changing the length of the fish passage to 500 meters and including switchbacks to decrease the gradient of the climb. Widening the channel from 10 to 15 meters to allow for a larger fish mass. Adding multiple entry points to the fish ladder. Each entry will have a different flow velocity, which will attract different species of fish to the most suitable entrance. Incorporating a fish-lift system that will work like a navigation lock to assist fish as they climb the fish passage. Introducing a bypass system so that adult fish and fry will be able to avoid the turbines when they migrate back downstream after spawning. The Don Sahong project is at an earlier stage than Xayaburi: downstream governments, nongovernmental organizations, and local civil society groups continue to call for the suspension or cancellation of the project as the consultation process has not yet ended and construction has not yet begun. Our visit to the Don Sahong site included meetings with the fisheries research team and site visits to nearby channels of the river that are being modified to help fish find alternate migration routes. Our guide indicated that Mega First hopes to begin construction at the end of 2015, although this timeline could 4 CRONIN & WEATHERBY

Executive Summary Of The Second Letters From the Mekong Issue Brief change depending on the outcome of consultations and diplomatic engagement. Our visit determined that: Site preparations for the road that will connect the Don Sahong project to nearby islands and the mainland are ongoing. Mega First s fisheries research team has already engaged in in-depth fish tagging and study, with daily monitoring along five channels to identify the species, sizes and ages of fish migrating upstream. Early research indicates that at this point in time, at least three channels (Hou Sahong, Hou Sadam, and Hou Xang Pheuak) are available year-round to migrating fish. One fisheries expert indicated that the team believes this has always been the case; however, it may be a recent development due to releases from upstream dams during the last two dry seasons. Research indicates that at least some species of fish have shown adaptability and will continue searching for a passage upstream when the first passage they try is obstructed. The team intends to begin camera and sonar monitoring of fish passageways to track seasonal migration patterns in January 2015. This will continue for at least two years. The team is testing sonar and light warnings that would help direct fish away from the turbines and guide them toward the best channels for migration. The fisheries research team is working with 60 local fishermen in the Si Phan Don area to keep daily logs of their fish catches, improve fisheries management and limit the use of destructive fish-catching techniques. ABOVE: Director Cronin and Research Associate Weatherby meet with Don Sahong fisheries researchers to examine results. STIMSON CENTER 5

Site Visit to Laos First Two Mainstream Dam Projects ASSESSMENT Our site visits were very productive and addressed a number of important questions about each project, but also reaffirmed our concerns about the performance of the dams and their transboundary impacts. To date, no proposed project has undergone either a transboundary or cumulative impact assessment that would account for its influence beyond the immediate project area or the potential damage to fisheries or livelihoods downstream. Moreover, while an individual project s impacts may be mitigated, the most serious threat to the river is the cumulative impact of the 11 proposed dams on the mainstream and the numerous dams built on tributaries. It is vital to optimize trade-offs among energy, food, and other uses of the river s water on a basin-wide scale, so that the impacts and benefits are shared fairly among all riparian countries and do not increase regional tension as Laos moves forward with projects that are potentially very harmful to the downstream countries as well as to Lao communities themselves. Given this, we recommend that: Fisheries near the Don Sahong dam must be studied in more detail before construction begins. Data collected thus far will help establish a baseline and provide useful information for mitigation efforts on the part of Mega First, but if the project begins in late 2015 there will still be only one dry season during which comprehensive data was taken. Given yearly fluctuations in water levels, the changing impacts on water flow due to upstream dams in China and northern Laos, and other factors that vary annually, it is important that more data be collected before developers make any major changes to the river. Data needs to be gathered and made publicly available earlier on in the planning and consultation process. In the case of both Xayaburi and Don Sahong, the developers have gathered information on fish species, migration habits, and volume of fish during migration, yet only limited amounts of data have been made publicly available. In many cases, the lack of previous data means that questions asked by concerned stakeholders regarding items such as the ability of fish to find and use fish passages, navigate reservoirs upstream from dams, etc. are not answerable without the data gathered by developers. Making this data publicly available to all stakeholders will help address miscommunication issues and allow for real dialogue based on shared baselines. Discussing these concerns earlier in the process could lead to better decision-making about the project and a better agreement phase of the MRC s PNPCA protocol. The prior consultation phase of the MRC s review protocol must occur prior to the beginning of site preparations and must provide opportunities to address specific concerns earlier in the process. Xayaburi s redesign was costly partly because major parts of the project needed to be redesigned relatively late in the process. To date, the developers and Laos have presented a full project design and begun preparation work for the dam site before the project was even brought to the MRC for consultation, which is the first opportunity that neighboring countries and other stakeholders have to register concerns. This seems counterproductive, particularly given that it would be easier and cheaper to incorporate necessary mitigation components into the original design, and is a major factor in the loss of trust in the consultation process. 6 CRONIN & WEATHERBY

Executive Summary Of The Second Letters From the Mekong Issue Brief Laos needs to work with neighboring countries, developers, and ODA development partners to perform a comprehensive cumulative environmental impact assessment (EIA). Even if an individual project meets international best standards, there are major challenges to ensuring that these standards will continue to be met on a basinwide scale once more dams are built. A high-level contact within Laos Ministry of Energy and Mines has indicated that Laos plans to do a cumulative EIA for the proposed project at Pak Beng. In order for this EIA to adequately address the concerns of all stakeholders, it s vital that riparian countries clearly define their expectations. For example: What is a cumulative EIA going to include? When in the process does it need to take place? Will a cumulative EIA take into account all proposed projects, or only those currently under construction? All countries planning to build dams should negotiate a broader, scientifically-based Mekong Standard for transboundary EIAs and eventually standards for maximum acceptable transboundary impact. Thus far, no project s EIA has accounted for the possibly significant transboundary impacts even the Don Sahong project, which is only two kilometers north of Laos border with Cambodia is only examining the mitigation of impacts at the local level in Laos. At the moment an agreed-upon standard for the entire Lower Mekong Basin remains visionary, but a bottom-up approach based on national EIAs that meet common standards is the most feasible path to arrive at a regional baseline. Laos should prioritize requesting multilateral banks and bilateral donors to support the design and construction of a national north-south electric power grid. Such a grid would not only obviate Laos current need to sell power to Thailand at a low price in the north and buy power at a higher price from Thailand s southern provinces, but would also facilitate power-trading with Cambodia and Vietnam. This would give Laos significant returns as well as give Cambodia an alternative to moving forward with the Stung Treng and Sambor Rapids projects, which are the highest-impact dams currently under consideration. A grid would ultimately support optimization of the energy-food security-water trade-offs on a basin-wide scale. ABOVE: Panorama of Xayaburi dam site. STIMSON CENTER 7

Site Visit to Laos First Two Mainstream Dam Projects LETTERS FROM THE MEKONG This is the executive summary from the second in the Letters from the Mekong series of issue briefs from the Mekong Policy Project, a long-term initiative at the Stimson Center that focuses on alternative solutions to transboundary environmental and food security and regional stability impacts arising from proposed hydropower dams on the mainstream and major tributaries of the Lower Mekong River. The Mekong Policy Project seeks to promote further awareness about these impacts and the need for a more coordinated development strategy among regional actors, policy-makers in riparian countries, donor governments to the MRC, and civil society actors. Letters from the Mekong will be published following each research trip that the Southeast Asia team makes to the region and will examine changing trends for hydropower development and perceptions among regional actors. 8 1211 Connecticut Avenue NW, 8th Floor Washington, DC 20036 202.223.5956 www.stimson.org Copyright Stimson 2015 CRONIN & WEATHERBY