HELIOSTAR 252, 218 VERTICAL, FREE INSTALLATION

Similar documents
HELIOSTAR 252, 218 HORIZONTAL, FREE INSTALLATION

ON-ROOF ATTACHMENT FLAT COLLECTOR HELIOSTAR

Energy Systems. Heliostar 252 S4 and 218 S4 on-roof attachment. Assembly Instructions. Living full of energy

Conergy SolarFamulus II

TRAPEZOIDAL SHEET METAL RAIL LIFT/VARIO for trapezoidal sheet metal roofs

Mounting systems for solar technology

INSTALLATION INSTRUCTIONS AS 2.1 CORRUGATED ETERNIT ROOF

On-roof system Tau Installation manual

Clearly Solar. Installation Instructions. Solar Thermal Flat Plate Collector. Vertical On-roof mounting SHV

RIGID SOLAR INSTALLATION MANUAL

Radiant PV-RoofTopRac System Planning and Installation With Australia AS/NZS1170.2:2011 AMDT

Clenergy ezrack SolarRoof Code-Compliant Planning and Installation With Australia AS/NZS1170

6x5. Assembly Manual CAUTION. Sharp Edges PATENTS ARE PENDING. Building Dimensions. Approximate Size. Storage Area. Interior Dimensions

TEMPORARY EDGE PROTECTION SYSTEM DESCRIPTION CTS. Combisafe International AB

TRAPEZOIDAL SHEET METAL RAIL

ST-AK 1/12. Photovoltaic Mounting Systems. Assembly Instructions. Mounting system for roofing with trapezoidal sheet metal

Clearly Solar Solar Thermal Flat Plate Collector Installation Instructions Horizontal On-roof mounting SRH 2.3

PATENTS ARE PENDING. Building Dimensions. Exterior Dimensions Roof Edge to Roof Edge

Installation instructions. LORO-ATTIKASTAR siphonic drains

PATENTS ARE PENDING. Building Dimensions. Exterior Dimensions Roof Edge to Roof Edge

MANUAL. landscape orientation. portrait orientation. metal roof mounting system for solar panels METAL ROOF MOUNTING SYSTEM. Rev

Resysta Gold and Platinum Decking Installation Guidelines

INSTALLATION GUIDE Sika SolarMount 1 Exposition East West

PITCHED ROOF. Photovoltaic Mounting Systems. Assembly Instructions. for roofing tiles, plain tiles and slate

Radiant Solar Tripod Planning and Installation Guide V1.2 With Australia AS/NZS1170.2

Niagara / DLG-85 Shower Cabin Installation and User s guide

A EN ROUND STORAGE SILO. Ø480cm, Ø560cm, Ø640cm, Ø720cm ASSEMBLY AND USER MANUAL. ARSKAMETALLI LTD

Enjoy some peace and silence and the satisfaction of your customers by using MÜPRO s special vibration control products

PSI Compakt Seals and Wall Sleeves with Fixed / Loose Flange

NEW. Our strengths Your benefits N. Roth Flipfix Tacker system. living full of energy. Roth Energy and Sanitary Systems

K-FLEX SOLAR SYSTEM SOLAR SYSTEM

CANTILEVER RACK SPECIFICATIONS PART 1 GENERAL 1.1 SCOPE 1.2 APPROVED MANUFACTURER 1.3 REGULATORY ORGANIZATIONS AND GROUPS 1.4 QUALITY ASSURANCE

Custers. Camino CHIMNEY SCAFFOLDING ASSEMBLY AND USER S INSTRUCTIONS. Nov. 2003

Installation Instructions

ConSole. Installation instructions

INSTALLATION INSTRUCTIONS TRI-STAND East-West. energy for a better world. Mounting system for PV systems with east-west orientation on flat roofs

Mounting systems for solar technology

ROOF MOUNT KIT OWNERS MANUAL

Bridge Drainage Systems

ASSEMBLY INSTRUCTIONS RESIDENTIAL SOLUTION CROSSRAIL GROUND MOUNT SYSTEM USA

Installation Instruction for DMEGC Photovoltaic Module

Flat roof for the loading-optimized elevation (adhesive system)

DLB-23 Shower Enclosure Installation and User s guide

EXIRA EXPOSED PIPE SHOWER INSTALLATION

ifix INSTALLATION MANUAL PV flat roof installation system Version

ETALLODOMI S.A. Head Office: 12, Kastorias str Athens GREECE. Main Warehouse: 49, Agiou Orous str. GREECE

Outer Skin Kit & Flue: IB600, IB850, IB1100 Installation Manual

Mounting systems for solar technology

ROOF MOUNT KIT OWNERS MANUAL

00MK-MA0160-EN00. Mounting System ASSEMBLY INSTRUCTIONS. Little Plan and Little Plan Light systems, for corrugated sheet metal roof

MATHIS WALL-MOUNT FAUCET

Mounting instructions

RAPID-EPS PATENT PENDING

Rack-in-a-BoxTM INSTALLATION MANUAL

Note. Floor beams can also be made from wooden beams put through the holes in the longitudinal beam and boards nailed to it.

Universal Elevator Mount Owners Manual

Radiant PV-Solar Tripod System Planning and Installation With Australia AS/NZS1170.2:2011 AMDT

SECURE. UNIVERSAL. MOUNTING. Tilt Kit Installation Manual

MANUAL. portrait set-up. landscape set-up. ClickFit Evo mounting system for sloping roofs with roof tiles for solar panels

Modular Scaffolding MEKA 48

Solar products. Schüco mounting system MSE 210 flat roof

Installation instructions

GROUND MOUNT INSTALLATION MANUAL

V 2.0 ASSEMBLY GUIDE. TS Platform Scale Series 2

THE INSTALLING INSTRUCTION FOR CONCEALED TANK

RAPID Column Formwork For the highest requirements on concrete surfaces and edge formation. Product Brochure Issue 10/2017

SAFETECH 3.2K ST v1.0. User s manual. Opale-Parachutes.com. Please read this manual before first use.

ConSole, ConSole+ Flat-roof mounting system for PV-modules and -laminates. From visions to solutions

Mounting systems for solar technology

LSA-PLUS Series 2. Connection and Disconnection Modules and Accessories. 1 st Edition

SECTION SECTIONAL OVERHEAD DOORS

SolarStyl BIPV New Building Integrated Photovoltaic System August V13 Page 0

Infinity - Century Combination Installation Instructions Gelcoat & Solid Surface Bathware

PV Mounting System 2703 SERIES 200 UL GROUND MOUNT SYSTEM. SnapNrack Residential PV Mounting Systems Code Compliant Installation Manual

Installation manual. For the competent person. Installation manual. aurotherm exclusive VTK 570/2, VTK 1140/2 GB, IE

PRODUCTS ALU STEEL PLASTIC DIAMOND. transparent facade systems

Mounting System MCG 1.1 Membrane-Connected Glass. System description

Mounting instructions. novotegra for trapezoidal metal - roof parallel

Viega Eco Plus WC corner element. Instructions for Use. Viega Eco Plus from 07/2007. en_int

installation instructions English

ACO Marine. ACO Scuppers - ACO Channels ACO Drainage Systems for Shipbuilding and Offshore Installations

Assembly and users manual. Pallet racking Alfa

Mounting systems for solar technology

MODULAR ENCLOSURES FOR TRANSFORMER SUBSTATIONS

Installation Guide. IMPORTANT: Read all sections before starting. For the most up-to-date information, visit our website: leadvisioninternational.

adjustable fusion shower pan on wood joists installation guide

W E I N S P I R E W O R K

SAFETECH 4.9K ST60-X v1.0. User s manual. Opale-Parachutes.com. Please read this manual before first use.

Cabin Specifications:

Shower Column SHCM Installation Guide

SECTION ARCHITECTURAL ORNAMENTAL HANDRAILS AND RAILINGS Summit tm Modular Railing System

OWNER S MANUAL SERIES MDS-96-BK, SM, DR

NORTH HARRIS COUNTY REGIONAL WATER AUTHORITY PIPE HANGERS, Section PIPE HANGERS, SUPPORTS, AND RESTRAINTS

Blast Resistant Enhanced Curtain Wall. Reference Brand: Sapa Building System Elegance 85PF GENERAL DESCRIPTION PERFORMANCE

Mounting System MCG 3.0 Membrane-Connected Glass. System description

SECTION ROOF SPECIALTIES

Modular Scaffold MEKA 48

Chapter 73. Articles of iron or steel

DESCRIPTION SAFETY: WARNINGS ORDERING INFORMATION T01-B INSTALLATION INSTRUCTIONS DROP-IN AND FREESTANDING BATH K-11343T / K-11344T

Assembly Instructions

Transcription:

HELIOSTAR 252, 218 VERTICAL, FREE INSTALLATION INSTRUCTION MANUAL ENERGY AND SANITARY SYSTEMS

Installation requirements General requirements The free-standing installation set is to be used or installing Roth Heliostar 252 and 218 flat collectors outdoors, on flat roofs and/or on flat inclined roofs. Safety information Static requirements Potential adjustment and lightning protection Installation of sensor Read these installation instructions carefully before beginning installation and comply with the safety instructions contained therein. Applicable industrial safety regulations and the rules of technology are to be observed, particularly when working on roofs. Because of statics considerations, please contact the Roth hotline for situations subject to snow pressures of Zone 4 and above and for installation sites that exceed 600 m above sea level. Important: It is possible that the collectors cannot be completely emptied with this installation version. Consequently, the solar installation may not be filled with anything other than The person who erects the unit is solely responsible for sufficient anchoring of the collectors outdoors or on roofs, particularly where there are strong winds. The weight specifications contained in the present installation instructions for weighing the unit down are to be expressly understood as not covered by any guarantee on the part of the manufacturer! The metallic pipelines of the solar circuit are to be connected with the main potential equalisation rail by means of a green/yellow wire of a minimum of 16 mm2 Cu (H07 V or R). If a lightning protection installation is present, then the collectors can also be linked to it. Earthing can also otherwise take The sensor is to be mounted in the last flooded collector on the side of the leader (hot outlet). The rubber sleeve is to be removed for this purpose, the sensor is to be threaded through and the rock wool in the interior of the collector is to be pushed a little to the side. Then apply some heat conducting paste to the sensor and insert it as far as possible into the immersion sleeve. To complete the process, push the rubber sleeve back in until water/antifreeze mixtures, which means that it is absolutely necessary to top up with antifreeze, including after pressure or function tests! Important: When storing the collectors prior to installation, make sure that they are neither left outdoors nor stored lying on their glass surfaces and/or uncovered, because otherwise moisture could make its way into the ventilation holes located in the frame. When installing the collector connections, make sure that they are annealed. For that reason, always press hard when tightening the 1/2 thread connection! Non-compliance with this instruction could lead to damage to the collector! Roth assumes no liability whatsoever in cases of damage. The warranty in accordance with the conditions of guarantee that apply to the material supplied by Roth remains unaffected by this. The pertinent standards and guidelines apply, in particular DIN 1055-T4 in terms of minimum weight loads with various building heights. place by means of a ground rod. The earth cable is to be laid outdoors against the house. The earthing bar is also to be connected with the main potential equalisation rail through the use of a wire with the same cross-section. the counter lip engages with the collector frame. A cable with a cross-section of 2 x 0.75 mm 2 is sufficient for extending the sensor cable up to 50 m, beyond which a cross-section of 2 x 1.5 mm 2 is to be used. It is expedient to protect the connected control unit and the sensor against overvoltage by lengthening the collector sensor to include an overvoltage protection casing (optional) immediately after the collector. Overview of tools For installing you need the following tools: Electric drill with 12 mm rock drill bit Open-ended spanner 17 / 19 Pipe wrench Folding ruler 2

Materials list Pos. Material-No. Description Quantity 1 1125005701 C-profile 36 x 30 x 1900 mm F3 2 2 1150002871 SKT-screw M10 x 30 DIN 933 galvanised 8 3 1150002874 SKT-screw M10 x 60 DIN 933 galvanised 6 4 1150002840 SKT-nut M10 DIN 985 (EN ISO 10511) galvanised 10 5 1150002840 SKT-nut M10 DIN 934 galvanised 4 6 1150006885 U-washer 10,5 mm DIN 125 galvanised 14 7 1150006896 U-profile 25 x 10 x 25 mm Alu 14 8 1150002928 SKT-wood screw 8 x 60 DIN 571 galvanised 8 9 1150007862 Plug S12 x 60 8 10 1125005411 Installation rail vertical L: 1205 mm 4 11 1150007739 Attachment clamp single 4 12 1150007946 Installation instruction free installation Heliostar 1 13 1150006895 T-piece 60 x 60 x 6 mm l: 40 mm 4 14 1155000551 Packing 1 Attachment free installation vertical basic set H Pos. Material-No. Description Quantity 1 1125005701 C-profile 36 x 30 x 1900 mm F3 1 2 1150002871 SKT-screw M10 x 30 DIN 933 galvanised 2 3 1150002874 SKT-screw M10 x 60 DIN 933 galvanised 3 4 1150002840 SKT-nut M10 DIN 985 (EN ISO 10511) galvanised 5 5 1150006885 U-washer 10,5 mm DIN 125 galvanised 5 6 1150006896 U-profile 25 x 10 x 25 mm Alu 5 7 1150006884 SKT-screw M12 x 20 DIN 933 galvanised 4 8 1150002841 SKT-nut M12 DIN 934 galvanised 4 9 1150006886 U-washer 13 mm DIN125 galvanised 4 10 1150002928 SKT- wood screw 8 x 60 DIN 571 galvanised 4 11 1150007862 Plug S12 x 60 4 12 1125005411 Installation rail vertical L: 1205 mm 3 13 1125005192 U-connection profile 25 x 25 x 3 mm l: 130 mm Al 2 14 1150007740 Attachment clamp double 2-fach 2 15 1150006892 Stainless steel corrugated hose L: 300 mm 1/2 1 16 1150007946 Installation instruction free installation Heliostar 1 17 1150006895 T-piece 60 x 60 x 6 mm l: 40 mm 2 18 1155000551 Packing 1 Attachment free installation vertical extension set H 3

Ground anchoring System variants: With concrete pedestal Minimum weight load in accordance with DIN 1055-4: Up to 8 m building height 75 kg/m 2 collector surface. Up to 20 m building height 127 kg/m 2 collector surface. Distance to the edge of the roof at least 2 m. Installation steps 1. M10 x 60er screw to be fixed with U-profile in the installation rail. 1 2. Attach with washer and nut to vertical installation rail. (Insert until end of long whole) 2 3. Important: vertical installation rail must be inserted until it creates one level (see red line in the picture). 3 4

4 4. Now we created a triangle for the side. The delivered T-pieces will be installed as shown below. Installation steps 5 5. M10 x 30 screw to be inserted in the U-profile and through the boring above in the T-piece. It is softly fixed with washer and nut. 6 6. The prepared connection is inserted in the installation rail and afterwards fixed. This procedure is carried out on the lower end of the vertical and slope rail. 7 7. This procedure is carried out for the installation of the second triangle. 5

Installation steps 8. The installation of both horizontal rails (above and below) is carried out as follows: Important: For the installation of horizontal rails you will find pre-installed holes. In the upper area of the shown installation rails there are 2 holes, the upper holes are to position the horizontal rail for the installation of the Heliostar 252, the holes below are for the installation of the Heliostar 218. 8 < for Heliostar 252 < for Heliostar 218 9. The horizontal rails are inserted with M10 x 60 screws in the U-profile and completely pushed in the installation rail. 9 10. The distance of the outer edge slope rail compared to outer edge horizontal rail should be 75 mm. 10 75 11. After the upper horizontal rail is fixed, the rail below will be mounted the same way. 11 6

12 12. Finished installation of the below horizontal Installation steps rail. 13 13. To be sure that both horizontal rails have the same distance you have to find out the diagonal distance. 14 14. After finishing of the holding rack, you have to fix it on the bottom. For doing that, you have to mark on each T-piece two boreholes. You have to move the rack aside and the boreholes have to be made by a 12 mm rock drill. Following the 12 mm plugs have to be inserted in the holes, the rack has to be posed on the boreholes and it has to be fixed on the bottom with the 8 x 60 mm wood-screws. 15 15. If the rack is fixed on the bottom, the solarpanel Heliostar has to be applied on the rack. 7

Installation steps 16. The solar-panel will be fixed by lateral attachment clamps on the rack (4 lateral attachment clamps for the first solar-panel). 16 17. The lateral attachment clamps have to be fixed by M10 x 30 screw, u-washer and nut in the lateral long hole of the horizontal rail. 17 18. Finished lateral rack. 18 All explained steps up to now are useful for the fixing of one solar-panel Heliostar in vertical position by using the Roth Basic Set. If you want to install more then one solar-panel Heliostar in line, you have to substitute on one side of the rack the lateral attachment clamps by the double attachment clamps. You ll find these double attachment clamps in the Roth Extension Set. Below you find the procedure for the installation of the extension set. 8

19 19. Both M12 x 20 screws have to be inserted in Installation steps the connection rails for the upper and below horizontal rail as shown on the photo. 20 20. On the opposite side the u-washer and nut have to be inserted and have to be tightened easily by hand. 21 21. The connection rails have to be inserted on half Into the rail and have to be tightened. 21 9

Installation steps 22. The attachment cramp double has to be attached on the upper and below rail. 22 23. Depending on the number of solar-panels Heliostar to install, you have to assemble the next triangle as explained at the beginning. 23 24. The upper and below horizontal rail has to be attached and to be fixed. 24 25. The repetition of this procedure depends on the number of solar-panels Heliostar. 25 10

26 26. The first and the last solar-panel Heliostar Installation steps has to be fixed with the attachment clamp sideways. 27 27. Remove the cable lead at the return of the collector field and slide it over the cable of the temperature sensor: temperature insert sensor into the immersion sleeve as far as possible and remount the cable lead in the collector. 28 28. The collectors are connected with one another by means of the short corrugated tube. Gasket rings and insulation are included. No ventilation of the corrugated tube is not required at this point. 11

Industrial safety instructions and regulations of technology Frutiger Bold, 9 pt. Frutiger Bold, 9 pt. Installation on roofs: DIN 18338 tilers and roof sealing work, DIN 18339 plumbing, DIN 18451 scaffold work Connection of thermal solar installations: DIN 4757 part 1 and 3 Electrical connections: VDE 0100 installation of electronic equipment, VDE 0185 general information with regard to lightning protection installation, VDE 0190 main potential adjustment of electronic installations, DIN 18382 electronic cables in houses Detailed information referring to prevention of accidents can be found at Accident Prevention and Insurance Association. Use ladder appropriate Use ladder only for a height difference up to 5 m. Lean and secure in an angle of 65-75. Exit must be topped by a minimum of 1 m. Security of not falling of the roof In case of falling height > 3m on roofs with a slope between 20 and 60, it is required to provide corresponding security for falling protection (VBG 37, 8). The vertical distance from the working place to the roof scaffold or alternatively the roof protection wall should not exceed 5 m. For protection it is also possible to use a safety line. Security hooks must be installed above the user on a sustainable component. Do not use ladder hooks. Security of falling parts Protect roads and working places below against falling or upsetting components. These areas must be marked and blocked. Information can also be obtained from the Roth hotline: Tel. +49 (0) 64 66 / 9 22-2 66 Frutiger Bold, 9 pt. ROTH WERKE GMBH Am Seerain 2 35232 Dautphetal Telefon +49 (0) 64 66/9 22-0 Telefax +49 (0) 64 66/9 22-1 00 Hotline +49 (0) 64 66/9 22-2 66 E-Mail service@roth-werke.de www.roth-werke.de Subject to technical modifications.