PROJECT FEASIBILITY REPORT

Similar documents
PRE FEASIBILITY REPORT

Pre-Feasibility Report For

PRE-FEASIBILITY REPORT

PRE FEASIBILITY REPORT

PRE-FEASIBILITY REPORT

Proposed Project of Halcyon Labs Pvt Ltd D-2/CH : 335,336,337, GIDC-Dahej-2, DIst: Bharuch, Gujarat Ramans Enviro Services Pvt Ltd Ahmedabad

M/S. Dain Colour Chem

PRE FEASIBILITY REPORT

PRE-FEASIBILITY REPORT

PRE-FEASIBILITY REPORT

(B) PREFEASIBILITY REPORT OF EXISTING BLACK TRAP PROJECT OF

PRE FEASIBILITY REPORT

PREFEASIBILITY REPORT

EXISTING PROJECT FOR ORDINARY SAND MINING

PRE-FEASIBILITY REPORT

PRE FEASIBILITY REPORT

PRE FEASIBILTY REPORT

PRE-FEASIBILITY REPORT. for

Pre-Feasibility Report

STONE QUARRY Survey No. : 57/5, Village : Dhadhade, Tehsil: Vikramgad, District Thane, Maharashtra Area (2.0 Ha)

PRE FEASIBILITY REPORT FOR ENVIRONMENT CLEARANCES

PROPOSED BULK DRUG & BULK DRUG INTERMEDIATES MANUFACTURING UNIT

PREFEASIBILITY REPORT

PREFEASIBILITY REPORT OF EXISTING SILICA SAND MINING PROJECT OF MANGUBEN KANTILAL THAKKAR

PRE-FEASIBILITY REPORT FOR ORDINARY SAND

M/s. SAL STEEL LTD Survey no.245/p, Village:-Bharapar, Taluka:- Gandhidham, District:-Kutch, Gujarat.

PRE-FEASIBILITY REPORT

PRE FEASIBILITY REPORT

1.0 EXECUTIVE SUMMARY

PRE-FEASIBILITY REPORT. 1. SUMMARY Kudeli Brick Earth Quarry Name of Company / Mine Owner Smt. Premawati Location 744, 760/1, 760/4, 750/1, 750/2

EXECUTIVE SUMMARY. Kumardeipur Sand Quarry Cum ' 13.3" N to 20 44' 20.7"N Longitude " E to 85 35'27.5 "E

PROJECT PRE-FEASIBILITY REPORT. For

PRE FEASIBILITY REPORT FOR. Silica Sand Beneficiation Plant

PRE FEASIBILITY REPORT

Shri Hari Dyes & Chemicals Plot No.: 439/1,417, Phase No. II, GIDC Estate, Vatva , Ahmedabad

ANNEXURES. 1 Google image showing proposed project site. 3 Manufacturing process details. 4 Details of hazardous waste management

EXECUTIVE SUMMARY 1.0 PROJECT DESCRIPTION 1.1 INTRODUCTION

PRE-FEASIBILITY REPORT

Limestone Mining Project (Area: ha) at Near Village: Bhod, Taluka Ranavav, District Porbandar (Gujarat) Pre-feasibility Report

Pre- Feasibility RepoRt

PRE-FEASIBILITY REPORT. Name of Company / Mine Owner Shri Jayant Kumar Choudhary Location

MODIFIED QUARRYING PLAN FOR "SHINGATALOOR SAND MINING BLOCK-2" EXTENT Acres (4.86 Ha) IN TUNGABHADRA RIVER BED ADJ ACENT TO SY.

PRE-FEASIBILITY REPORT OF SAND QUARRY

Pre-Feasibility Report. for. Educational Institute Allen Career Institute-Supath

Table 1.1: The Salient Features of the Project Proposed Quartz Mine Of M/s. Viswanadha Stone Crusher & 16 others

PRE FEASIBILITY REPORT

Check list for construction Project of EC [Category 8(a)]:

PRE FEASIBILITY REPORT

PRE FEASIBILITY REPORT

PRE FEASIBILITY REPORT. Company of production capacity: 14,40,000 CFT/ Year located at Khasra No near Village:

Environment Consultant:

PRE FEASIBILITY REPORT PROPOSED CONSCTRUCTION BUILDING PROJECT GUJARAT HOUSING BOARD

UNSATURATED POLYESTER RESIN

2. PRE-FEASIBILITY REPORT

PRE FEASIBILITY REPORT OF KUMHARI STONE MINE, LESSEE M/s VINOD KUMAR JAIN VILLAGE KUMHARI, P.O. BASIA, P.S. BASIA, DIST. - GUMLA, JHARKHAND

Plot No. 2-D1, Obadenahalli, 3 rd Phase KIADB Industrial Area, Doddaballapur taluk, Bangalore Rural District , Karnataka State.

PRE-FEASIBILITY REPORT

Pre-feasibility Report

PREFEASIBILITY REPORT FOR BRICK EARTH MINE

For TOR New. 1. Basic Information of the Project:

M/S. Ever Shine Décor P. Ltd.

PRE FEASIBILITY REPORT

Details of the proposed project as presented before the committee are tabulated below:

PRE-FEASIBILITY REPORT PROPOSED PROJECT FOR MANUFACTURING OF DYES INTERMEDIATES. OF M/s. UMIYA CHEM INTERMEDIATES

M/s. Lakeland Chemicals (India) Ltd.

2. PRE-FEASIBILITY REPORT

PREFEASIBILITY REPORT OF EXISTING BENTONITE PROJECT OF

EXECUTIVE SUMMARY. (Approved Consultant)

LG POLYMERS INDIA PVT. LTD. SY. NO.S 29 TO 45, 83/1 AND 83/3, RR VENKATAPURAM VILLAGE, PENDURTI MANDAL, VISAKHAPATNAM DISTRICT, ANDHRA PRADESH

PRE-FEASIBILITY REPORT FOR M/s FIXEM CEMENT PRIVATE LIMITED

Pre-Feasibility Report for Girgita Limestone Mine of M/s KJS Cements Ltd.)

Pre- FEASIBILITY REPORT

FOR PROPOSED NEW UNIT

RESINS & ALLIED CHEMICALS INDUSTRIES (BOMBAY) PVT. LTD.

PRE FEASIBILITY REPORT. M/s. Riddhi Dyechem Industries

SEIAA KARNATAKA CHECK LIST FOR BUILDING & CONSTRUCTION PROJECTS

PRE-FEASIBILITY REPORT FOR M/s FIXEM CEMENT PRIVATE LIMITED

LIST OF ANNEXURE. Details of products and raw materials and storage facility for the same. Details of water consumption and wastewater generation

PRE- FEASIBILITY REPORT FOR PROPOSED ORDINARY EARTH EXCAVATION PROJECT (94.59 ARES) of Shri Saji Sebastian, Madeckal House, Kizhakambalam P.

PRE FEASIBILTY REPORT MANUFACTURING OF ORGANIC PIGMENT M/S PRINCE CHEMICALS

Pre-Feasibility Report

INSPIRE INDUSTRIES PVT. LTD.

Tehsil: Bap, District: Jodhpur, Rajasthan by RIICO Limited

PRE FEASIBILITY REPORT PROPOSED CONSCTRUCTION BUILDING PROJECT

Pre-Feasibility Report

BALAJI AMINES LIMITED

PRE-FEASIBILITY REPORT

For TOR New Projects. Mo. no. : Contact no. and ID of the Applicant

1. PRE-FEASIBILITY REPORT

Table 1.1 : Salient features of the project. Sy. No. 379/1, Perecherla Village, Medikonduru Mandal, Guntur District, Andhra Pradesh.

PRE- FEASIBILITY REPORT

SRI K. RAVI SHANKAR SURVEY NO.100, ODULAPALLI VILLAGE, TALPULA MANDAL, ANANTHAPURAMU DISTRICT, ANDHRA PRADESH

PRE - FEASIBILITY REPORT. M/s. S. R. CHEMICALS

PRE FEASIBILITY REPORT

S No. Compliance Compliance Status A. Specific Conditions:

10 PF Resin (liquid) PF Resin (powder) Silver refining Hexamine Hardener Hexamine Tablet

Report on Damage Assessment and. Remediation Plan and Natural & Community Augmentation Plan

STATE EXPERT APPRAISAL COMMITTEE GOVERNMENT OF PUNJAB (Office of the Secretary) Vatavaran Bhawan, Nabha Road, Patiala

Dilipbhai D. Patel. BLOCK NO. 43, F.P. NO. 45,O.P NO. 40 T.P.S. No- 17 (PUNA), Ta: SURAT CITY, DIST: SURAT

Table 1.1: The Salient Features of the Project. Proposed Quartz Mine Of Sri. Syed Masthan Basha

Transcription:

PROJECT FEASIBILITY REPORT FOR OBTAINING PRIOR ENVIRONMENT CLEARANCE For PROPOSED CHEMICAL MANUFACTURING UNIT From M/s. MORADIA BROTHERS CHEM PVT LTD LOCATED AT: Block No.: 45, JalBhumi Industrial Estate, Olpad-Sayan Road, Vill.:Atodara, Tal.: Olpad, Dist.: Surat 394 130

1. EXECUTIVE SUMMARY M/s. Moradia Brothers Chem Pvt. Ltd has proposed to manufacture the product Sodium benzoate at Block No.: 45, JalBhumi Industrial Estate, Olpad-Sayan Road, Vill.: Atodara, Tal.: Olpad, Dist.: Surat 394 130. Unit has proposed manufacturing of synthetic organic chemical activity. Distance of interstate boundary is 84.76Km from project site. Therefore, project falls under category B of schedule 5(f), as per the EIA Notification, September 2006 of MoEF, New Delhi, as per amended on dated: 25 th June-2014-S.O. 1599(E), we are cover under the same i.e Schedule 5(f), Category-B. Therefore, it requires prior Environment Clearance. There is no forest/wild life sanctuary/eco sensitive area present within 10 Km area from the project site. The proposed unit will be developed in an industrial estate. The land is already Non- Agriculture. The Proposed project activity will be developed as per plan lay out shown in Annexure 2 of EC Application in industrial park. The project will not cause any permanent or temporary change to land use, land cover or topography including increase in intensity of land use (with respect to local land use plan). The cost for proposed plan will be Rs. 40 lacs. Unit will apply for electric connection of 75 KVA to DGVCL. For proposed activity, water required for domestic & industrial purpose will be sourced from Bore well. Domestic effluent will be disposed in to Septic tank/soak pit system. No industrial effluent will be generated from process. No solid hazardous waste will be generated from manufacturing process. Hazardous waste generated from the other industrial activity will be stored in a separate hazardous waste storage area and then it will be disposed by selling to register re-cyclers/rerefiners/reused. Proper safety measures will be undertaken during storage, handling and use of hazardous substance. Fire hydrants, Hose reel &Portable Fire Extinguishers will be provided at key location. Total area of project site is 463.7m 2. The proposed green belt area is 143.7 m 2. During operation phase 8 to 10 people (men) will be required. [2]

2. INTRODUCTION OF PROJECT / BACKGROUND INFORMATION 2.1 IDENTIFICATION OF PROJECT AND PROJECT PROPONENT Unit is located in Village Atodara. The Atodara is a Village in Olpad Taluka in Surat District of Gujarat State, India. It is located 18.12 KM towards N from District head quarters Surat, & 209.92 KM from State capital Gandhinagar. List of product to be manufactured is as under; LIST OF PRODUCT Sr. Quantity Name of Product No. (MT/Month) 1. Sodium Benzoate 100 PROJECT PROPONENT M/s. Moradia Brothers Chem Pvt Ltd is a Pvt. Ltd. Firm. Mr. Suresh T. Moradia is the Director of the company. 2.2 NATURE OF THE PROJECT M/s. Moradia Brothers Chem Pvt. Ltd is a small scale unit. It falls under the category of synthetic organic chemical industry. 2.3 NEED FOR THE PROJECT M/s. Moradia Brothers Chem Pvt. Ltd. will be set up plan for Sodium benzoate to several industries. There is real need of sodium benzoate in a food industry, where it is used as a food additive. 2.4 EMPLOYMENT GENERATION (DIRECT & INDIRECT) DUE TO THE PROJECT Due to the project, employment will be increased. The unit will hire local people from the nearby villages. People will get direct & indirect employment due to the project activity. Unit will hire 8-10 employees- (men). [3]

3. PROJECT DESCRIPTION 3.1 TYPE OF PROJECT The unit has proposed to manufacture synthetic organic chemical. 3.2 LOCATION The site is located at about 21 19'46.08"N latitude and 72 47'30.76"E longitude. LOCATION OF THE PROJECT 3.3 DETAILS OF ALTERNATE SITES Proposed project is identically located in an industrial park having all adequate infrastructure available. Therefore, no alternate site is considered for the proposed project. 3.4 SIZE / MAGNITUDE OF OPERATION Proposed project activity will be carried out on Block No.: 45, JalBhumi Industrial Estate, Olpad- Sayan Road, Vill.: Atodara, Tal.: Olpad, Dist.: Surat 394 130. [4]

3.5 PROJECT DESCRIPTION WITH PROCESS DETAILS 1. MANUFACTURING PROCESS OF SODIUM BENZOATE Charge Water, Caustic Soda/ Caustic lye & Benzoic acid into reactor Vessel (SS 316L). Heat it up to 90 o C Adjust the ph to neutral. Transfer the mass/solution into storage tank. The material sends for drying/packing. BATCH PROCES DIAGRAM REACTOR VESSEL DRYER Evaporated In Dryer PACKING CHEMICAL REACTION FOR SODIUM BENZOATE 90 O C COOH + NaOH COONa + H 2 O COONa -H 2 O PRODUCT BENZOIC ACID + SODIUM HYDROXIDE DRYING (SODIUM BENZOATE) PER BATCH WATER BALANCE FOR SODIUM BENZOATE DETAIL QUANTITY (KL/BATCH) Fresh Water Consumption 1.0 Waste Water Generation NIL PER DAY WATER BALANCE FOR SODIUM BENZOATE (TWO BATCH) DETAIL QUANTITY (KL/DAY) Fresh Water Consumption 2.0 Waste Water Generation NIL [5]

3.6 RAW MATERIAL WITH REQUIRED QUANTITY, SOURCE, MARKETING AREA OF FINAL PRODUCTS, MODE OF TRANSPORT OF RAW MATERIAL AND FINISHED PRODUCT For Product and Raw material with required quantity, please refer Annexure 4 of EC application. For source of raw materials, supply of final product, their handling-management & mode of transportation, please refer Annexure 8 of EC application. 3.7 RESOURCE OPTIMIZATION / RECYCLING AND REUSE Used oil will be reused as lubricant for the machinery 3.8 AVAILABILITY OF WATER, ITS SOURCE, ENERGY / POWER REQUIREMENT AND SOURCE Energy / Power Requirement & Its Source Electric power requirement for proposed project is 75 KVA, which will be procured from Dakshin Gujarat Vij Company Ltd. (DGVCL). Source of Water: Bore well (Water Depth: 20 25 Mtr.) The water consumption & generation at the different usages, please refer Annexure 5 of EC Application. Disposal of Wastewater: 1. Domestic effluent will be disposed in to Septic tank / Soak pit system. 2. The quantity of trade effluent generated will be NIL (A) Quantity of Solid Waste to be Generated & Its Management / Disposal: No Hazardous waste will be generated from the process. Hazardous waste generated from other industrial activity (Please refer Annexure 7) will be stored in a separate hazardous waste storage area and it will be disposed by selling to the register re-cyclers/re-finer/reused. The municipal solid wastes generated during operation phase will be disposed to bin of Industrial park. [6]

4. SITE ANALYSIS 4.1 CONNECTIVITY The project site is well connected with all infrastructures like National Highway, Railway, Airport, telephone, internet, fax, post, etc. Nearest town Olpad is located 4.07 Km in W direction. Nearest village Atodra village is located 0.52 Km in N direction from the project site. Nearest city, district headquarters Surat is located 18.19 Km in SSE direction from the project site. National Highway No. 228 is located 4.12 Km in W direction &State Highway No. 1676 is located 0.23 Km in S direction from the project site. Nearest railway station Sayan is located 10.15 km in SSE direction Nearest airport Surat is located 24 km in SW direction from the project site. 4.2 LAND FORM, LAND USE AND LAND OWNERSHIP The proposed unit will be developed in an industrial estate. The land is already Non- Agriculture. The Proposed project activity will be developed as per plan lay out shown in Annexure 2 of EC Application in industrial park. The proposed project will not cause any permanent or temporary change to land use. 4.3 TOPOGRAPHY The Project area is plain and flat surface with elevation 32 m above MSL. However, in the NE part, the elevation is in the range of 30-31 m above MSL & in the SW part, the elevation in the range of 31-32 m above MSL. The general slope of the area is from NE to SW. In the buffer zone towards NE, E & SE, the elevation rises to 32 m and above MSL & towards S, SW & W the elevation descend to 30 m above MSL 4.4 EXISTING LAND USE PATTERN, SHORTEST DISTANCE FROM THE PERIPHERY OF THE PROJECT TO PERIPHERY OF THE FOREST, NATIONAL PARK, WILD LIFE SANCTUARY, ECO SENSITIVE AREA, WATER BODIES (DISTANCE FROM THE HFL OF THE RIVER), CRZ The land is non agriculture. The project site is located in an industrial Estate. There shall be no forest, wild life sanctuary, eco sensitive area within 10 km from the project site. The details of water bodies and nearest park are mentioned below: Tapi River is 8.3 Km in S direction. Arabian Sea: 22.55 Km in W Vansda National Park is 103.20 Km in SE direction. Purna Wildlife Sanctuary is 104.79Km in SE direction. [7]

Dandi Eco-Sensitive Zone is 49.02 Km in S Direction. Canal: 8.83 Km in S direction from the project site. 4.5 SOIL CLASSIFICATION Soil in the study area is primarily black & Silty clay in nature. 4.6 SOCIAL INFRASTRUCTURE AVAILABLE The proposed project is located in an industrial Estate. Industrial Estate authority will provide power supply, water supply, pucca road, telephone & other communication network & drainage network in the area. Skilled & unskilled manpower are available within area. Ambulance and emergency fire & medical service available round the clock. [8]

5. PLANING BRIEF 5.1 PLANNING CONCEPT The unit has proposed to manufacture Sodium Benzoate. Proposed project activity will be carried out at Block No.: 45, Jal Bhumi Industrial Estate, Olpad-Sayan Road, Vill.:Atodara, Tal.: Olpad, Dist.: Surat, State.: Gujarat. The Proposed project activity will be carried out in 463.7 m 2 unit area. All the basic facilities like tap water, sanitation & drinking water, canteen & first aid box will be provided within the premises. The project site is well connected with the road, railway and airport. Finished product and raw materials will be transported through road. There is no requirement for the development of other road or railway. 5.2 POPULATION PROJECTION During operation phase 8-10 people-direct (men), 5.3 LAND USE PLANNING LAND AREA BIFURCATION Sr. No. Title Area (m 2 ) GROUND FLOOR 1. Finished product section (Packing& Storage) 47.41 2. Raw Material Storage Area 24.75 3. Hazardous Waste Storage Area 10 4. Office 15.51 5. Open/Road 120 6. Process Area 102.33 7. Green Belt 143.7 TOTAL AREA 463.7 [9]

5.4 ASSESSMENT OF INFRASTRUCTURE DEMAND (PHYSICAL & SOCIAL) The project is located in an industrial Estate. Industrial Estate Authority will provide power supply, water supply, pucca road, telephone & other communication network & drainage network in the area. Skilled & unskilled manpower are available within area. Ambulance and emergency fire & medical service available round the clock. Local people will be hired for new products and they will be trained within unit. Thus, no social infrastructure will require. 5.5 AMENITIES / FACILITIES All the basic facilities like tap water, sanitation & drinking water, canteen will be provided within premises. First aid box, free medicines & doctor service (on call basis)will be provided. Adequate PPE s will be provided to all workers. [10]

6. PROPOSED INFRASTRUCTURE The breakup of the land area is mentioned in the below table: 1. Industrial Area Total Area 463.7 m 2 2. Residential Area Residential area is located 520 m in N direction. Green Belt Proposed 143.7 m 2 4. Social Infrastructure Social infrastructure available within 10-15 km from project site. 5. Connectivity National Highway No. 228 is located 4.12 Km in W direction& State Highway No. 1676 is located 0.15 Km in S direction. Nearest railway station Sayan railway station is located 10.15 Km in SSW direction. Nearest Airport Surat Airport 24.0 Km in SW direction. 6. Drinking Water Management Source of water for domestic & industrial purpose is from Bore Well. 7. Sewerage System Domestic effluent will be disposed in to existing Septic tank / Soak pit system. No Industrial effluent will be generated/ discharged. 8. Industrial Waste Management 9. Solid Waste Management 10. Power Requirement & Supply / Source Discarded Containers/Bags Collection, Storage, Decontamination and Disposal by selling to registered re-cyclers approved by GPCB/CPCB. Used Oil Collection, Storage, Transportation, Disposal by selling to Registered Re-refiners approved by GPCB/CPCB. MSW disposed to bin of nearby Olpad Nagar palika. Source: Dakshin Gujarat Vij Company Ltd. (Oplad) Proposed power requirement: 75 KVA [11]

7. REHABILITATION AND RESETTLEMENT (R & R) PLAN The project is located within an Industrial Estate therefore no Rehabilitation & Resettlement (R & R) plan is involved in proposed project. 8. PROJECT SCHEDULE & COST ESTIMATES 8.1 LIKELY DATE TO START OF CONSTRUCTION AND LIKELY DATE OF COMPLETION Production of proposed product will be started after getting Environment Clearance (SEAC) and CTE/CC&A from the GPCB. 8.2 PROJECT COST ESTIMATION Proposed cost for the plant: - 40 laces. 9. ANALYSIS OF PROPOSAL 9.1 FINANCIAL AND SOCIAL BENEFITS WITH SPECIAL EMPHASIS ON THE BENEFIT TO THE LOCAL PEOPLE INCLUDING TRIBAL POPULATION, IF ANY, IN THE AREA Project is located in an industrial park. Therefore, No R & R plan involved in proposed project. Due to proposed project, it is expected that employment will increase for people who reside nearby project area. Approx. 10 men will get employment directly. Due to increase in raw material and product transportation activity, indirect employment will generate. As local people will get job, quality of living will be increase. Due to green belt development, aesthetic value of local environment will improve. [12]