A VIRTUAL CONSTRUCTION MODEL OF 4D PLANNING IN ROAD PROJECT

Similar documents
EARTHWORK PLANNING AND VISUALISATION OF TIME-LOCATION INFORMATION IN ROAD CONSTRUCTION PROJECTS

CONSTRUCTION MANAGEMENT TOOLS USING 3D-CAD, VIRTUAL REALITY, RFID, AND PHOTOGRAPHY TECHNOLOGIES

27 AN INTEGRATED DATABASE FOR REAL-TIME MANAGEMENT OF STOCKYARD "STOCKMAN": A CASE STUDY IN PRECAST CONCRETE PRODUCTS INDUSTRY

Application of 4D CAD System for Infrastructure Projects with Construction Schedules and Distance Coordinates

DEVELOPMENT AND IMPLANTATION OF SIMULATION MODELLING IN ROAD CONSTRUCTION PLANNING: THE CASE OF ROADSIM

BUILDING INFORMATION MODELLING: A FASTTRACK APPROACH OF CONSTRUCTION MANAGEMENT

SIMULATION APPROACH TO OPTIMISE STOCKYARD LAYOUT: A CASE STUDY IN PRECAST CONCRETE PRODUCTS INDUSTRY

Optimizing Construction Planning and Scheduling through Combined Virtual Prototyping Technology and Building Information Models

Dynamic 4D Space Planning Using Chronographical Modeling

VIRTUAL REALITY TECHNOLOGY TO REPRESENT CONSTRUCTION ACTIVITIES

Moonseo Park Construction Technology. 39 동 433 Phone , Fax

Estimating the Size of Temporary Facilities in Construction Site Layout Planning Using Simulation

LINEAR PROJECT SOFTWARE IMPROVING SCHEDULING OUTCOMES USING TIME LOCATION CHARTING

SCHEDULING FOR HIGH-RISE BUILDING CONSTRUCTION USING SIMULATION TECHNIQUES

4D WORKSPACE CONFLICT DETECTION AND ANALYSIS SYSTEM

Development of a sub building information model for 4D structural safety analysis during construction

Transactions on the Built Environment vol 34, 1998 WIT Press, ISSN

McKinney and Fischer. 4D Analysis of Temporary Support Kathleen McKinney 1 and Martin Fischer 2 ABSTRACT

Automated Access Planning On Construction Sites: An Expert GIS Approach

Production Scheduling System for Oil and Gas Storage and Transportation Based on GIS and SCADA Technology

Biographical Data. . Assist. Prof. Dr. Vacharapoom Benjaoran

Component-based 3D Simulation Platform for Production Planning and Process Control

The Effects of Comparative 4D Models on Schedule Development and Controls. Abstract

OPTIONEER AN INNOVATIVE APPROACH TO CONCEPT DESIGN AND REWORK AVOIDANCE FOR THE WATER INDUSTRY

A COMPARISON OF THE FORESIGHT AND STROBOSCOPE METHODS OF MODELING CONSTRUCTION PROCESSES

ADVANCED TRAVELLER INFORMATION SYSTEM FOR CHANDIGARH CITY USING GIS

Proceedings of the 2014 Winter Simulation Conference A. Tolk, S. Y. Diallo, I. O. Ryzhov, L. Yilmaz, S. Buckley, and J. A. Miller, eds.

Virtual Prototyping for Engineering Design

Computer Aided Process Planning(CAPP) By: Dhiman Johns M.E.(PIE), Thapar University, Patiala

26 STOCKYARD LAYOUT MANAGEMENT FOR PRECAST CONCRETE PRODUCTS USING SIMULATION

The smart Software Solution for Interior and Furniture Design!

White Paper. Transforming Contact Centres using Simulation-based Scenario Modelling

Computer-Aided Geometric Design of Road and Safety Evaluation Using Vehicle Simulation Model

Project Cost Estimation of National Road in Preliminary Feasibility Stage Using BIM/GIS Platform

Summary, Conclusion and Outlook

A FRAMEWORK FOR APPLICATION OF GENETIC ALGORITHM IN PRODUCTIVITY OPTIMIZATION OF HIGHWAY EQUIPMENTS USING EVOLVER SOFTWARE

Spatial decision support system for milk collection

Objectives of Project Management Framework. What are the Characteristics Of Project. Activities involved Project Management

PROJECT SCHEDULING & CONTROL

Analysis of Microtunnelling Using Process Simulation Module

SIMULATION AND OPTIMIZATION OF TEMPORARY ROAD NETWORK IN MASS EARTHMOVING PROJECTS

OPTIMIZING EARTHMOVING OPERATIONS USING OBJECT-ORIENTED SIMULATION. Mohamed Marzouk Osama Moselhi

The Simulation Study Of Transport System For Earth Work. Allocation Of Rock-fill Dam. XiaohangMa1, a, KeLi2, b

BIM and Concrete Formwork Repository

PLANNING CONSTRUCTION SITE LAYOUT IN THE HILLY REGIONS USING GIS

CHAPTER 1 INTRODUCTION

Schedule with Confidence

AN APPROACH TO AUTOMATIC PROJECT PLANNING

GPS-Guided Machine Control Using Autodesk Land Desktop By: Harry Ward, PE - Of: OutSource Inc.

Proceedings of the 2010 Winter Simulation Conference B. Johansson, S. Jain, J. Montoya-Torres, J. Hugan, and E. Yücesan, eds.

International Association of Certified Practicing Engineers

Chapter 2. 2 Literature review

Discrete Event Simulation: A comparative study using Empirical Modelling as a new approach.

Automated Clash Resolution of Steel Rebar in RC Beam Column Joints using BIM and GA

An Automatic Scheduling Approach: Building Information Modeling-Based Onsite Scheduling for Panelized Construction

Better Daylight and Natural Ventilation by Design

Resource-constrained project scheduling using Relationship Diagramming Method (RDM)

D2M2 USER S MANUAL USACE ERDC, March 2012

Trimble TILOS Plan with Confidence


Using BIM to Automate Information Generation for Assembling Scaffolding -A Material Management Approach

Program Evaluation and Review Technique (PERT)

Cost effective refurbishment approach to achieve energy efficient building: a primary school case study

Building Services Integration: A Technology Transfer Case Study

Project Management Concepts, Tools & Techniques

Automated Tools for Reducing Earthwork Costs

ONTIME, for creating and managing timetables

Repetitive construction processes scheduling using mixed-integer linear programming

The Development of a Low Cost approach to the Prototyping of Construction Plant

Information Technology Audit & Cyber Security

L & L Mitigation Aid for Effective Project Management System

Designing a Forest Road Network using Heuristic Optimization Techniques

Strathprints Institutional Repository

Integrated Cost Estimation Based on Information Management

IMPLEMENTATION, EVALUATION & MAINTENANCE OF MIS:

Visual-Physical Grammars

3D Modelling & Mine Planning Software. Comprehensive tools provide a competitive advantage from exploration to rehabilitation.

MERLIN Project Project

Proceedings of the 2010 Winter Simulation Conference B. Johansson, S. Jain, J. Montoya-Torres, J. Hugan, and E. Yücesan, eds.

Primavera P6 R8.3 Professional Fundamentals Training Course Outline

Simulation of construction processes considering spatial constraints of crane operations

Design Method for Concurrent PSS Development

ewater s Mission: Build a new integrated modelling capability for Australia Dr Robert Carr, 30 May 2012

PMP Course Content. Chapter 1. Introduction to PMP Objectives of PMP Requirements for PMP Exam About PMP Exam PMP Exam Syllabus.

Rapid Assessment and Planning for Infrastructure Design (RAPID) Concept Demonstration Tool

THE DEFINITION AND POTENTIAL ROLE OF SIMULATION WITHIN AN AEROSPACE COMPANY. Craig A. Murphy Terrence D. Perera

bsuite software evolution

Functional Analysis Module

A BIM ASSISTED RULE BASED APPROACH FOR CHECKING OF GREEN BUILDING DESIGN 1

Simulation Software. Chapter 3. Based on the slides provided with the textbook. Jiang Li, Ph.D. Department of Computer Science

Research on the Multidimensional Constraint Stability of Bridge Structure Modeling Based on Optimization Model

Automated Statistical Testing Suite for Software Validation

5.3 Supply Management within the MES

Energy Based Efficient Resources for Real Time Manufacturing Systems

Using BIM to Improve the Design and Construction of Bridge Projects: A Case Study of a Long-span Steel-box Arch Bridge Project

Available online at ScienceDirect. Procedia Engineering 123 (2015 ) Creative Construction Conference 2015 (CCC2015)

Performance Evaluation of Road Over Bridge Using Primavera

PROCESS ACCOMPANYING SIMULATION A GENERAL APPROACH FOR THE CONTINUOUS OPTIMIZATION OF MANUFACTURING SCHEDULES IN ELECTRONICS PRODUCTION

DEADLOCK AVOIDANCE AND RE-ROUTING OF AUTOMATED GUIDED VEHICLES (AGVS) IN FLEXIBLE MANUFACTURING SYSTEMS (FMS)

SIMULATION APPLICATIONS IN CONSTRUCTION SITE LAYOUT PLANNING

Transcription:

A VIRTUAL CONSTRUCTION MODEL OF 4D PLANNING IN ROAD PROJECT R. K. Shah 1, N. Dawood 2, J. Dean 3 and S. Castro 4 1 Ph. D. Candidate, School of Science and Technology, University of Teesside, Middlesbrough, TS1 3BA, UK, Tel/Fax: +44 1642 342494 2 Professor, School of Science and Technology, University of Teesside, UK 3 Project Development Officer, Centre for Construction Innovation Research, University of Teesside, Middlesbrough, TS1 3BA, UK, 4 Director, Mota-Engil International Construction Company, Portugal Construction managers require innovative techniques to assist them in producing accurate planning tasks such as resource allocation and costing of activities because of unique characteristics of road construction industry. Visualisation technologies have potential to improve communications and coordination amongst the project stakeholders and to optimise onsite productivity through visual simulation of construction process and innovative planning approach. This research study introduces a framework of a 4D planning model for automatic generation of earthwork progress profiles and production cost profiles of a road section, and visualisation of the construction process throughout earthwork operations. The framework is designed and developed by integrating road design data, quantities of cut and fill sections, variable productivity data, algorithms for modelling terrain, and a road profile visualiser. The research details the model to recognise the framework outlined above and it generates progress profiles, cost histogram and a time location plan automatically for the earthwork activity. The model is validated with a real life case study in a road project and was found that the model to be beneficial in generating the terrain surfaces of progress, weekly cost profiles and a time location plan during the construction operations. The model is incorporated with the variable productivity data and soil characteristics for analysing with what if scenarios. The 4D planning model should assist to project planners and construction managers in producing efficient construction scheduling and resource planning. Keywords: earthwork planning, 4D planning model, time location plan, productivity, visualisation. INTRODUCTION Since the construction industry has unique characteristics, construction managers are under pressure to improve site productivity and reduce production cost. As a result, they require innovative techniques to assist them in producing accurate planning tasks such as scheduling, resource allocation and cost optimisation. The current planning, scheduling and controlling practices in the construction industry are in need of substantial enhancement in quality and efficiency. Retik et al. (1990) explored the potential application of computer graphics to construction scheduling to represent the schedule of construction progress in terms of graphical images at any date. Visualisation was recognised as one of the most 1 r.k.shah@tees.ac.uk Shah, R.K., Dawood, N., Dean, J. and Castro, S. (2009) A virtual construction model of 4d planning in road project. In: Dainty, A. (Ed) Procs 25th Annual ARCOM Conference, 7-9 September 2009, Nottingham, UK, Association of Researchers in Construction Management, 1091-1100. 1091

Shah, Dawood, Dean and Castro important tools for achieving this goal. Williams (1996) designed a demand-driven 4D model for the generation of a graphical construction plan based on simulation, visualisation and communication. In a large-scale project, a visual representation of the schedule can be extended to monitoring not only construction progress, but also all the auxiliary activities, including onsite plant and equipment (Adjei-Kumi et al., 1996). Similarly, McKinney et al. (1998) demonstrated the capability of 4D-CAD models to identify construction problems prior to their actual occurrence. Andrej, Branko and Danijel (1999) introduced a new level of support to engineers throughout the product life cycle in order to deal with a platform independent language for 3D visualisation and product modelling using roads as an example. The failure of traditional techniques such as bar charts and the critical path method (CPM) to provide the information pertaining to the spatial aspects of a construction project have motivated the research effort to incorporate visualisation into project scheduling and progress control (Koo and Fischer, 2000). Zhang et al. (2000) further developed a 3D visualisation model with schedule data at the level of construction components. Kamat and Martinez (2001) presented a 3D visualisation model depicting the entire process of a typical construction activity. Dawood et al. (2002) developed an integrated database to act as information resource base for 4D/Virtual Reality construction process simulation. The work has been applied to a building project in the UK. Kamat and Martinez (2003) described a general-purpose visualisation system that can generate accurate 3D objects of construction operations and the resulting products. Dawood et al. (2005) introduced innovative visual planning tools aiming to assist construction planners to make accurate and informed planning decisions of the spatial aspect of activity during the execution of construction projects and concluded that the visual planning tools need to be practical and communicative. As discussed above, several research efforts can find in the visualisation of the construction process applied to building construction projects, however, there have been limited research studies in the area of infrastructure construction projects. Liapi (2003) focused on the use of visualisation during construction of highway projects to facilitate collaborative decision making on construction scheduling and traffic planning, however, the visualisation of construction schedule for the intermediate stages of the construction process neglected. Castro and Dawood (2005) developed the RoadSim simulator, which is a construction site knowledge-based construction simulation system. It is applicable to produce a master construction schedule in a road project based on simulated productivity of road activities considering with available resources including different sets of equipment and site working conditions. Kang et al. (2008) suggested an approach to simulate 4DCAD models for the movement of earthwork activity for the intermediate stage of the construction process in civil engineering projects using morphing techniques and realisation of construction progress in graphical images. The model developed in 3DCAD environment at a fixed productivity of earthwork activities at different stages during construction operations and linked it with construction schedule. It concludes that previous research efforts did not integrate the variable production rate, which always depends on resource availability and site conditions for the development of 4DCAD model. The key issue faced in road construction site is variable productivity from one day to another due to the special characteristics of the 1092

Virtual construction model road construction industry; such as fluctuation in daily weather conditions, working conditions in open sky, resource unavailability on time and other unpredictable factors. The study focuses on addressing the above issues by designing and developing a new system, called 4D planning model (4DPM). The model is integrated with the variable production rate of earthwork activity throughout road construction operations. This paper introduces an innovative methodology for the development of 4D planning model that consist of 4D modelling and automatic generation of a time location plan for the earthwork construction processes in road construction projects. The model generates 3D terrain surfaces of road profiles automatically at the intermediate stages during the earthwork operations. The model is intended to assist in improving the site communications of road construction planning and scheduling information, and to produce efficient construction scheduling and resource planning. The remainder of this paper introduces a conceptual framework and details of the prototype. FRAMEWORK OF A 4D PLANNING MODEL (4DPM) The general specification of framework of a prototype of 4D planning model is outlined in figure 1. The framework integrates road design data, sectional quantities of cut and fill, productivity models, algorithms for terrain modelling and a road visualiser. The model assists in generating visual terrain surfaces of road progress automatically throughout the earthwork operations. The next section describes in detail the input, process and output of the 4D planning model. Knowledge Base Construction operational rules and Site Information Input Sectional earthwork quantity of cut/fill sections along a road Road Design Data: L- section and X-section Productivity Data provided by RoadSim Process Data Generation Module Visualisation Module Cost Profile Module Time Location Module Output 4D Terrain Surfaces of Progress Profiles Weekly cost profile Time Location Chart Possible Site Access Points / Working Lengths of Construction Zones Input Figure 1 Framework specification of a 4D planning model (4DPM) The sectional quantities of cut/fill of earthwork activity along a road section, productivity of the activity and construction site knowledge base are key components of the framework. The sectional cut/fill quantities are calculated using road design data including L-sections and X-sections at required intervals of chainage. The 1093

Shah, Dawood, Dean and Castro productivity of the earthwork activity, which is produced by the RoadSim simulator, is a key input of the model. This is based on available resources, equipment sets and site working conditions. This is incorporated with the model to determine the total duration of the earthwork operations. The soil characteristics along the working road section, types of available equipment set for a selected activity, haulage distance of soil, working conditions and all other factors including weather conditions that control productivity was incorporated within the RoadSim simulator Additionally, the construction knowledge base assists in identifying the possible location and numbers of site access points, methods of construction for different types of soils, selection of equipment set for a particular activity and soil characteristics. The site operational knowledge base assists in establishing sequential relationships amongst listed activities during the construction operations. The following section describes and demonstrates the process of a detailed schedule development including the information flow diagram. Process The process of the framework includes four modules: data generation module and visualisation module, a cost profile module and a time location module. The data module processes the input data to produce a detailed schedule and to generate the coordinate data of terrain surfaces based on the production rate i.e. on the weekly basis in this study. The visualisation module processes the coordinate data produced by the data generation module, and converts it into terrain surfaces of the road progress profile in a regular triangular grid. The cost profile module generates weekly cost profiles/histograms and the time location module generates a time location chart of the earthwork operations in road projects. Details of coordinate data generation are presented in the following sections. Coordinate data generation algorithms In this section, a set of algorithms has been developed to automate the generation of terrains of earthwork activities at different stages of the construction process. This depends on quadratic equations, which determine progress for earthwork activity. A flow diagram of the arithmetical algorithms, which use for the calculation of weekly coordinate data of terrain surfaces, is presented in figure 2. Figure 2 describes the sequences for the height calculation of cutting and filling sections using the algorithms presented in Equations 2 and 3. According to the construction site knowledge base, the top section of cut/fill section is first selected to start the excavation operation and excavate horizontally at the rate of production based on available resources is considered in the study. The remaining volume profile at the excavated section along the road is determined by reducing the rate of production for the specified period, for example daily or weekly. The flow diagram shows that main initial inputs are sectional quantities of earthwork at each station along a road section. Productivity produced by the RoadSim knowledge base simulator is used to calculate the duration of earthwork activity. The site access points are another key input in the selection of a working length of a road section. After selecting a working length, Vmax (maximum volume) is identified by the data generation module and it is considered as a starting point for excavation or backfill processes. Progress will continue in both directions from the identified Vmax station to satisfy the weekly productivity. Vr (remaining quantity) of the selected stations is determined after progressing of week one and the Vr is considered as working quantities for the next week. The number of stations within working lengths 1094

Virtual construction model is selected by algorithms to satisfy the weekly productivity and achieve weeklytargeted quantity. Start Total Earthwork Quantity (m3) Duration of activity in week Productivity (P) = m3/week (Provided by RoadSim) Select week No Input Length (X) of working sections Select No of section with defined length= X Read value of selected sections along length (X) and Identify Vmax., Vu (upper) VL (lower) next to Vmax Calculate Vr.(remaining volume) = (Vmax-P)/ No of sections selected Check Vr > Vu or VL Yes Select Vr and replace the value for next week at same section Select next upper/lower section having Vu/VL next to Vmax and calculate Vr again as below: Vr = (Vmax+Vu/VL-P)/No of selected sections Check Vr =< Vu or VL Yes Select Vr and replace the same value at all selected sections for next week 1) Do calculation of revised Vr and check until Vr> Vu or VL 2) If Vr<=p, replace Vr for next week and stop calculation Calculate progress height using selected Vr and mathematical formula on weekly basis and move for next week Repeat the above steps for next selected section for cutting/filling activity Repeat the progress height calculation at each week until finish earthwork End Figure 2 Flow diagrams of coordinate data generation algorithms. Similarly, after calculating the remaining volume at the selection section, the progress height at the remaining sections is determined using equations 2 or 3, depending upon the type of road cross-sections. This process is repeated to achieve the final design level of the road section shown in L-profiles of the road. The production rate determines the duration of the selected sections. Similarly, the next working section of cutting and filling is selected, considering optimal allocation of soil mass and the process repeats until the completion of the earthwork operations. The following section describes the details of the derivation of the mathematical formula for the calculation of height in the earthwork construction process. Development of visualisation model In order to generate the terrain surfaces of road profiles throughout the construction operation in a road project, a typical earthwork activity that includes from cut to fill sections or spoil at the dumpsite is proposed to demonstrate the model and visualise the automatic-generated road surface profiles. The terrain surfaces are the 1095

Shah, Dawood, Dean and Castro combination of the 3D (2D plus height) of terrain surfaces and time, which is derived from productivity data, is considered as the 4 th dimension in the 4D model. The visualisation engine has been developed using programming language: visual C++ and DirectX. The input of the visualisation engine is the weekly coordinate data generated by the data generation module using innovative methodologies based on the mathematical model, and the generated data is saved as a text file. The x coordinate is considered as length along L- section and y coordinate along width of the along X- section of the road. The origin is considered at (0, 0). The Z-coordinate of the model is considered as the height of the road surface profiles on the weekly basis. The scale used to develop the visualisation model is different for each x, y and z- axis. For the X -axis, the length of load is presented in 1:25, the Y-axis in 1: 10 where width of road is presented, and the Z-axis is presented as 1: 1 for the altitude of the terrain surface. The changes in height of progress that is linked with the productivity of the activity show the realisation of surface changes in a visual image of the terrain profiles of the road. The visualisation model has a capability to render the surface in both solid and mesh format. The following section describes a real life case study the demonstration of the developed 4D planning model. DEMONSTRATION OF THE 4D PLANNING MODEL (4DPM) Case Study Development A real life case study involving 1.5 km of road section of lot no. 3 road project in Portugal was selected and demonstrated the model for earthwork activity of cut to fill or spoil. For this purpose, actual road design parameters and geometric data of the L - section and the X-section is considered, and the sectional quantity of earthwork is calculated assuming the typical trapezoidal sections at 25 m intervals along the selected length of road section. The maximum point of cut/fill section is identified where construction operations start first as per existing practice and construction site knowledge. The height is calculated using Equation no 2, which was discussed and derived by Shah et al. (2008). In this case, the height is presented as Z- coordinate whereas at X direction is along the road and the Y direction is the cross section. The road surface is presented in terms of height in mesh form. The productivity of the selected activity is the key variable to identify the next surfaces/layers in the construction progress. The next surface/road profile can be developed based on remaining sectional quantity after progress of earthwork equivalent to the weekly production rate. The operations are repeated for the next economical stretch of length where the cutting and filling operations take place and profiles is generated automatically for the rest of the road length. Graphical Representation of Road Profiles generated by the 4DPM The terrain surface of road profiles that are generated on a weekly basis throughout the construction period of earthwork operation in the road project were based on the available productivity of earthwork. The virtual terrain surfaces generated by the model of earthwork construction operations in the road project on the weekly basis are presented in figures 3 and 4. 1096

Virtual construction model Figure 3 shows road progress profiles generated during earthwork operations and location of transforming the earthwork quantity from the cutting to filling section. Showing Cut to Fill Figure 4 shows a virtual terrain surface of the road progress profile generated by the model at the end of week 4. The figures 3 and 4 are the representation of earthwork scheduling information in order to communicate the optimum allocation of weekly earthwork quantities between cut and fill sections of a road project. The colour index shows the depth of filling and height of cutting of a particular week. The earthwork quantities allocation could be changed according to site access points for required resources and equipment by simulating with what if scenarios for different alternative route and soil characteristics along the road section so that site productivity can be improved and the production cost of earthwork can be reduced. Weekly Cost Histogram generated by the 4DPM The developed 4D planning model has the additional capability to generate weekly production cost profiles at each chainage (station number) along a road section throughout the earthwork construction operations. Using the real life case study as described above, the generated cost profile is presented in figure 5. The generated production cost profiles are integrated with the productivity data of the earthwork activity. Any variation in productivity data due to soil characteristics, selection of equipment types and site constraints along the road section have the dynamic impact on the production cost profiles that assists the planner to control and manage budget cost during the planning and construction stages of road projects. 1097

Shah, Dawood, Dean and Castro Figure 5 Snap shot of automatic generated weekly cost histogram. Time Location Chart (plan) generated by the 4D Model: The developed model has additional capability to generate time location chart as a construction planning and scheduling for a road section throughout the earthwork construction operations. The time location plan is produced by designing an algorithm and integrating it with the output of the model: coordinates of starting and ending location with corresponding time in week of earthwork activities. Using a real life case study as described above, the automatic generated time location chart/plan is presented in figure 6. The number of weeks required for a cutting or filling section is represented by week numbers such as w1f (filling at week 1), w1c (cutting at week 1) and so on as shown in the index. The coordinate of starting and ending station of activity is also represented in terms of location and time (m, wk) as shown in figure 6. The automatic generated time location plan has capability to integrate with variable productivity data of earthwork activity. Any variation in the productivity data due to soil characteristics, selection of equipment types, site constrains along the road section have dynamic impact on time location construction plan that assists the planner to control the progress and monitor production cost during planning and construction stage of road projects. Automatic generated time location plan is shown in figure 6 below. Figure 6 shows the automatic generated time location plan in a road project. 1098

Virtual construction model Further study In future, the 4D planning model will be integrated with UC/Win Road to enrich the visualisation capability of whole road projects in a virtual environment including surrounding topography. Furthermore, a module will be developed to communicate generated weekly surfaces of progress profiles information with other programme through LandXML format. CONCLUSION The paper has introduced an innovative methodology for the development of a prototype of 4D planning model to visualise earthwork construction process throughout earthwork construction operations. The developed model is useful to generate terrain surfaces according to variable productivity data and at a particular time considering it 4 th dimensions, derived from the productivity of earthwork activities. This is considered as an innovative approach for 4D modelling of earthwork process in comparison to 4DCAD technology where variation of earthwork productivity due to the lack of integration functionalities with site conditions and soil characteristics with the existing 4DCAD models. The model generates visual representation of construction progress, weekly cost profiles and a time location chart of construction plan for earthwork activities. The model has capability in interfacing with user-defined variables including variable productivity data and site access points according to topographical constraints, which is considered as the key achievement of the research study. The model assists project planners and construction managers to analyse what-if scenarios with soil characteristics and resource constraint through the visual simulation in construction scheduling and resource planning processes. The paper concludes that the 4D planning model introduced by the research is practical for earthwork construction management. The model will facilitate a logical decision-making process for construction scheduling and resources planning tasks in improving site productivity and reducing the production cost of earthwork operations in road projects. ACKNOWLEDGEMENTS The present research was supported by Centre for Construction Innovation and Research (CCIR), University of Teesside, UK and Portugal based International Construction Company, MOTA-ENGIL. Sincere appreciation is given to the sponsor from authors. REFERENCES Adjei-Kumi, T., and Retik, A. and Shapira, A. (1996), Integrating on site tasks into planning and scheduling of construction projects., Proc., shaping theory and practice, managing the construction project and managing risk: Int. Symp. on organisation and management of construction, D.A. Langford and A. Retik., eds., E and FN Spon, Glasgow, U.K., 283-292. Andrej, T., Branko, K. and Danijel, R.(1999), Fast 3D Visualisation of Road Product Models, Proceedings of the 1999 International Conference on Information, Visualisation, pp, 572, 1999. Castro, S. and Dawood, N. (2005), RoadSim: A Road Construction Knowledge-Based Simulation System, Proceedings of the CIB W102 Conference, 2005, Lisbon, Portugal. 1099

Shah, Dawood, Dean and Castro Dawood N., Eknarine S., Mallasi, Z. and Hobbs B. (2002) Development of an integrated information resource base for 4D/VR construction processes simulation, Automation in Construction, 12, 123-131. Dawood N., Scott D., Eknarine S. and Mallasi, Z. (2005), The virtual construction site (VIRCON) tools: an industrial evaluation, IT Con, 10, 43-54. Kamat, V., and Martinez, J., (2001), Visualising Simulated Construction Operations in 3D, Journal Computing Civil Engineering, 15(4), 329-337. Kang, L. S., Moon, H. S., Moon, S. J., and Kim, C. H., (2008), 4D System for Visualisation Scheduling progress of Horizontal Construction project Including Earth work, Proceedings of the CONVAR Conference 2008, 21-22 October, Kula Lumpur, Malaysia. Koo, B. and Fischer, M. (2000), Feasibility study of 4D CAD in commercial construction, Journal of Cont. Eng. and Management, 126(4), 251-260. Liapi A. K. (2003), 4D visualisation of highway construction projects, Proceedings of the 7th International Conference on Information Visualisation (IV 03), 1093-9547/03 2003 IEEE. McKinney, K., and Fischer, M. (1998), Generating, evaluating, and visualising construction schedules with CAD tools, Automation in Construction, 7(6), 433-447. Retik A., Warszawaski A, and Banai A. (1990) The use of computer graphics as a scheduling tool, Building and Environment, 25(2), 132-142. Shah R K, Dawood N and Castro S (2008), Automatic Generation of Progress Profiles for Earthwork Operations using 4D Visualisation Model, Electronic Journal of Information Technology in Construction, 13, 491-506. Williams, M. (1996), Graphical simulation for project planning: 4D-planner, Proc., 3rd Congress on Computing in Civil Eng., ASCE, New York, 404-409. Zhang, J. P., Anson, M., and Wang, Q. (2000) A new 4D management approach to construction planning and site space utilisation, Proc., 8th Int. Conf. on Computing in Civil and Building Engineering, ASCE, Reston, Va., 15-22. 1100