Subcontracting of Project Stock

Similar documents
Purchasing Discount in Kind

Batch Management with Multiple Units of Measurement

Approved Manufacturer Part List (AMPL)

Guidelines: Activating Source Inspection for Externally Procured Parts

Batch Specific UOM Inventory Management: Stock Keeping with Dynamic Conversion Factor

Stock Transfer between Storage Locations of the Same Plant

Guidelines for Creating a QM Certificate for Delivery in Product Lifecycle Management

Collaboration of Production Process with Contract Manufacturers in Hi-Tech Industries

Customer Field for SRM SC Web Dynpro Application

Procedure for Transferring Documents from Financial Accounting to Controlling

Automatic Packaging in SNC A Case Study

Purchase Order Settings in SAP SRM

Leveraging SAP for Outsourcing and Collaboration Scenarios in High-Tech Industry

Creating Marketing Project Report through Report Painter

How to Perform Benefits Checks using Participation Monitor

SAP Business Workflow: Identify Transport Request for Workflow

Invoicing Plan Enhancement in Purchase Order

Using the Switch Document for Change of Supplier Process (Utility Industry)

Travel Management: Posting of Expenses to Different GL Accounts based on the Kind of Travel (Domestic or International)

Transporting the Appraisal Templates in Performance Management

SAP CRM/BW - Business Partner Enhancement and BW Extraction

Active Ingredient Management and Batch Balancing

White Paper: Master Data Syndication from SAP NW MDM to Backend SAP & Non-SAP Application via SAP NW PI

SAP Sustainability Performance Management v1.0 (Part 3)

Transportation Chain-Shipping Cost Calculation for Multi leg with Different Vendors in SAP

Efficient Monitoring Techniques Do You Want Something Better than RSPCM?

FI Enhancement Technique How-To-Guide on the Usage of Business Transaction Events (BTE)

Quality Based Invoice

Establishing RFC Connection between Data Stage SAP BW

Reporting Data in Alternate Unit of Measure in BI 7.0

APO: Characteristics Based Forecasting

Automatic Rework Order using Reason of Variance Key

Customizing Materials Management Processes in SAP. ERP Operations

Dynamic Daily Work Schedule Based on Clock Times

SNP: CTM Concepts, Demand Prioritization and Supply Categorization

Management of Global Employees

How to Restart a Failed Process Chain if Repeat Option is not Applicable

A basic knowledge of ERP concepts will help you in understanding the concepts of SAP Material Management System described in this tutorial.

Setup Matrix Generation in a Complex Manufacturing Environment

Inspection Process for Inventory and Consumable Material

Integrating SAP BW with Microsoft BI Using Open Hub Technology

Complete Guide to Learn Organizational Plan & Role Resolution in Workflow

GOA Contracts Price Validation Functionality

1. Make this setting: SPRO > Materials Management > Inventory Management and Physical Inventory > Goods Receipt > For GR-Based IV, Reversal of GR

Demand Release and Forecast Consumption Consumption in APO SNP

SAP MM - PROCUREMENT CYCLE

SUGMAYA END USER DOCUMENT FOR MATERIAL MANAGEMENT PURCHASE ORDER FOR PROJECTS

Pricing in SAP CRM E-Commerce Product Catalog

Independent Multiple Samples in Supply Chain Management

Setting up Organizational Plan

Stock Transfer from a plant to another plant in SAP Intra Company and Cross-Company Codes

Solution Manager Service Desk Support Team Creation

Impact Analysis of Technical Upgrade from SAP for Insurance Collections/Disbursements (FS-CD) 4.7 to ECC 6.0

Decommissioning of NLS Implementation for SAP BI

SAP Upgrade Delta Document SD Module

Working with the New GL Migration Cockpit

How to Update the Currencies and Unit of Measurements from ECC Source System to BI System by Automatically and Manually

Optimizing Inventory using Product Interchangeability in SAP APO

Calculating the Ageing of the Materials

Integrating MDM with BI - Part 1

Analysis Process Designer (APD): Part - 1

SRM Org Structure Part 2 Tools, Tables and Reports

Using Customer Exit Variables in BW/BI Reports: Part - 9

Product Allocation Strategy Based on Marketing Strategy

SAP ECC 6.0 DEMO OF Service PO - API

Integration of Multiple Campaigns Functionality of SAP CRM 2007 to ECC 5.0 or lower

How to Repair Master/Transaction Data Load Error Due to trfc Stuck

Guideline to Map Calibration Process in SAP PM and QM Module

How to Load Data into Planning Book from Flat File

Like Modeling and Life Cycle Planning A Case Study

Installation Guide: Open Text Archiving and Document Access for SAP Solutions (DocuLink Component)

PCM Implementation for BW

SAP Technical Upgrade Project

Promote Standardized Solution in SAP Environment

The author is working as a Technical Analyst in Infosys Technologies Limited.

Fixing Sales Prices of Merchandise on par with Competitors

AcTouch.com Cloud based ERP solution for MSME s

Materials Management

UWL Configuration for Opening Web Dynpro ABAP Application for Appraisal Document in EHP4

Migration of DIR (Document Info Record) with Attachments - DMS

SAP Business Process Management Base Configurations

Reading Sample. Introduction Product Cost Planning. Contents. Index. The Author. First-hand knowledge.

Welcome to the topic on purchasing items.

Welcome to the procurement process topic.

Chapter 5 Purchase Order to Payment

Welcome to the course on the working process across branch companies.

Create Physical Inventory Documents

SAP for Insurance Part 1

Related to Process Type in BI 7.0: Decision between Multiple Alternatives

Browse the Book. Purchase Requisitions. Table of Contents. Index. The Authors

Control Copy No: TRF/P2P/1.2.4/01

Once you have completed this topic, you will be able to create and verify opening balances for Business Partners.

SAP BW - Dynamic Call Customer Exit Variables Using Same Exit

Which of the following are subareas of the People Integration subcomponent of SAP NetWeaver?

2. Which of the following statements is true when configuring a group chart of accounts?

SAP BusinessObjects Rapid Marts Overview - 1

Using Customer Exit Variables in BW/BI Reports: Part - 5

Four Methods for Planning Data Validation in BPC70NW

Control Copy No: TRF/P2P/1.1/01

SAP BW - Virtual Characteristic Exit (RSR00002)

Transcription:

Applies to: SAP ECC 6.0 For more information, visit the Enterprise Resource Planning homepage Summary This document shall help P2P consultants in the area of Subcontracting of Project Stock (special stock) in various industries in India. It is prepared to suits for Indian Subcontracting Business Scenarios. It explains how to transfer Project stock to Subcontracting Vendor, generation of subcontracting challan and further processes has been explained in a simple and understandable way. Author: Appala Raju. P Company: Larsen & Toubro Infotech Ltd., Created on: 01 September 2009 Author Bio P. AppalaRaju is now an employee of Larsen & Toubro Infotech Ltd. He has total 10 years of experience, out of which near about 2 years experience in the area of SAP Consulting in Procure to Pay process. He has worked various business segments like Procurement, Design & Drawing and Plant maintenance in Engineering and Process sectors as part of Domain experience. 2009 SAP AG 1

Table of Contents Introduction... 3 Subcontracting... 3 Standard Subcontracting Process... 3 Subcontracting of Project Stock... 3 Difficulties involved in Subcontracting of Project Stock... 3 Flow chart... 4 Steps to fallow in SAP & Transaction codes... 5 Business Cycle (Detail step by step processes)... 6 Create materials (Part-A, Part-B & Sub-Assembly)... 6 Create BOM (Optional)... 8 Maintain CIN Master data... 9 Create PR with A/c assignment Q & Item cat "L"... 9 Create Info record with info category subcontracting (Optional)... 10 Create PO with reference to PR (A/c assignment Q & Item cat "L")... 11 Release PO (if release strategy exists)... 12 Define new storage location for Subcontracting Vendor... 12 Maintain Movement type group for Subcontracting... 12 Transfer posting components to SC vendor with 311+Q... 13 Check the stock with SC vendor using Tcode MMBE (not with ME2O)... 14 Create Subcontracting challan with ref. to material document... 14 Print out of subcontracting challan... 16 Receive final product against subcontracting PO with 101 movement type... 16 Reconciliation of challan... 17 Complete the challan... 18 Check status of challan... 19 Related Content... 20 Disclaimer and Liability Notice... 21 2009 SAP AG 2

Introduction Subcontracting Subcontracting process involves sending raw materials/components to a vendor for specific manufacturing processes/assembly and receiving the value-added finished material back into inventory Standard Subcontracting Process In Standard Subcontracting process, transfer of goods to Subcontracting vendor using movement type 541 with respect to subcontracting Purchase order Subcontracting of Project Stock Material procured for project purpose, sending this project stock to a vendor for specific manufacturing process/assembly and receiving the value added finished material back to project Subcontracting of Project Stock (Special Stock) is different from normal subcontracting process; it is not possible to transfer goods using movement type 541+Q Difficulties involved in Subcontracting of Project Stock In standard SAP, it is not possible to use 541+Q (Q refers to Project Stock) to transfer Project stock to subcontracting vendor. So, it is recommended to create new storage location to each subcontracting vendor & use 311+Q movement type, based on this it is possible to monitor stock at subcontracting vendor. Name/description of storage location should be same as subcontracting vendor for easy identification. In standard SAP, it allows only 541 material documents to create subcontracting challan but here it is required to create challan with respect to 311+ Q material documents. It is possible after doing required configuration (add the required movement type 311+Q in configuration) 2009 SAP AG 3

Flow chart Available Project Stock Create PO with Item category L & A/c assignment Q Define New Storage location to Subcontracting vendor Transfer goods to Subcontracting Vendor with movement type 311+Q Create Subcontracting Challan with referent to material document Receive finished material from subcontracting vendor 2009 SAP AG 4

Steps to fallow in SAP & Transaction codes Create materials (Part-A, Part-B & Assembly) MM01 Create BOM (Optional) CS01 Maintain CIN Master data J1ID Create PR with A/c assignment Q & Item cat "L" ME51N Create Info record with info category subcontracting (Optional) - ME11 Create PO with reference to PR (A/c assignment Q & Item cat "L") ME21N Release PO (if release strategy exists) ME28 Define new storage location for Subcontracting Vendor S PRO Maintain Movement type group for Subcontracting - SPRO Transfer posting components to SC vendor with 311+Q MB1B Check the stock with SC vendor using Tcode MMBE (not with ME2O) - MMBE Create Subcontracting challan with ref to material document J1IF01 Print out of subcontracting challan J1IF11 Receive final product against subcontracting PO with 101 movement type MIGO_GR Reconciliation of challan J1IFQ Complete the challan J1IF13 Check status of challan J1IF12 2009 SAP AG 5

Business Cycle (Detail step by step processes) Create materials (Part-A, Part-B & Sub-Assembly) Views: Basic 1 & 2, Purchasing & Accounting 1 PART-A, PART-B Material Type: ROH Sub-Assembly Material Type: HALB PART-A 2009 SAP AG 6

PART-B 2009 SAP AG 7

Sub-Assembly Create BOM (Optional) Enter components and qunatity then click on save icon 2009 SAP AG 8

Maintain CIN Master data - Maintain material - chapter ID combination to the components and semi finished product & select Subcontract check box to components alone. - Maintain access able value to the components - Maintain CENVAT Determination Create PR with A/c assignment Q & Item cat "L" 2009 SAP AG 9

Create Info record with info category subcontracting (Optional) 2009 SAP AG 10

Create PO with reference to PR (A/c assignment Q & Item cat "L") Note: If the info record is maintained, it gets copy into the PO Click on Components icon in Material Data tab to view the components which are maintained in BOM If the BOM is not maintained, components can be entered manually. 2009 SAP AG 11

Release PO (if release strategy exists) Define new storage location for Subcontracting Vendor Path: IMG Enterprise Strucutre Definition Materials Management Maintain Storage location Maintain Movement type group for Subcontracting Path: IMG Logistics General Tax on Goods Movements India Business Transactions Subcontracting Maintain Movement Type Groups Maintain movement type 311+Q against Movement type Group (ex: 0002) Path: IMG Logistics General Tax on Goods Movements India Business Transactions Subcontracting Subcontracting Attributes Maintain Movement type Group (ex: 0002) in column Movement Type group for Issue for the required Excise group combination. 2009 SAP AG 12

Transfer posting components to SC vendor with 311+Q Prerequisites: PART-A & PART-B Project stock should be exists 2009 SAP AG 13

Check the stock with SC vendor using Tcode MMBE (not with ME2O) Create Subcontracting challan with ref. to material document A document that is used to issue and track subcontracting work, it allows to make sure that all the materials have sent to the subcontractor for processing are returned 2009 SAP AG 14

2009 SAP AG 15

Print out of subcontracting challan Select check box Print immediately then save Receive final product against subcontracting PO with 101 movement type Enter the storage location for componets, system itself proposes movement type 543 to the components Take the optioin Refer Subcontracting Challn under Excise Invoice tab & click the icon below to enter subcontracting challan number 2009 SAP AG 16

Reconciliation of challan Once a subcontractor has processed your materials and returned them to you, you match the items in the challan against those that have been returned. 2009 SAP AG 17

Complete the challan You use this function to close a challan completely after all the materials have been accounted for. If a challan's return date has elapsed, and thus your right to the CENVAT credit, you use it to reverse the excise credit or, should your subcontractor return the goods subsequently, to re credit the excise credit. 2009 SAP AG 18

Check status of challan FAQ s: Question: Why it is not possible to transfer project stock to subcontractor vendor using movement type 541+Q? Answer: In Standard SAP, special indicator Q is not provided with movement type 541 2. Question: Is it possible to refer material document created using movement type 311+Q for creating subcontracting challan? Answer : Yes, it is possible. It is required to do configuration settings. 2009 SAP AG 19

Related Content Reference 1 https://forums.sdn.sap.com/thread.jspa?messageid=7653551 Reference 2 https://forums.sdn.sap.com/thread.jspa?messageid=8030330 Reference 3 https://forums.sdn.sap.com/thread.jspa?messageid=8055654 For more information, visit the Enterprise Resource Planning homepage 2009 SAP AG 20

Disclaimer and Liability Notice This document may discuss sample coding or other information that does not include SAP official interfaces and therefore is not supported by SAP. Changes made based on this information are not supported and can be overwritten during an upgrade. SAP will not be held liable for any damages caused by using or misusing the information, code or methods suggested in this document, and anyone using these methods does so at his/her own risk. SAP offers no guarantees and assumes no responsibility or liability of any type with respect to the content of this technical article or code sample, including any liability resulting from incompatibility between the content within this document and the materials and services offered by SAP. You agree that you will not hold, or seek to hold, SAP responsible or liable with respect to the content of this document. 2009 SAP AG 21