STAGING AREA MANAGER. REPORTS TO: Incident Commander Operations Section Chief

Similar documents
July 2007 ICS CHAPTER 10 LOGISTICS SECTION

Ground Support Unit. Ground Support Unit Objective

STAGING AREA MANAGER (STAM)

EMS System for Metropolitan Oklahoma City and Tulsa 2016 Medical Control Board Treatment Protocols

CHATHAM COUNTY EMERGENCY OPERATIONS PLAN STAGING AREA COORDINATION STAGING SUPPORT ANNEX D APPENDIX 1 TAB E JANUARY 2015

San Francisco Department of Public Health: Finance Section JOB ACTION SHEET COST UNIT LEADER

Unit 3: Incident Mobilization and Initial Situation Awareness STUDENT GUIDE

INCIDENT COMMAND SYSTEM MULTI-CASUALTY MEDICAL SUPPLY COORDINATOR I-MC-235. COURSE ADMINISTRATOR S GUIDE AND TRAINEE WORKBOOK Self-Paced Instruction

MODULE 1 ICS ORIENTATION

Triage and Pre-Hospital Treatment Exercise Evaluation Guide

ALL-HAZARDS DIVISION/GROUP SUPERVISOR (DIVS-AH)

Animal Control - Strike Team Leader

ALL-HAZARD FINANCE/ADMINISTRATION SECTION CHIEF

NATIONAL TRAINING CURRICULUM

2014 HURRICANE PROCEDURE MANUAL THE FOUNTAINS AT COUNTRYSIDE CONDOMINIUM ASSOCIATION, INC.

INCIDENT COMMUNICATIONS TECHNICIAN (COMT)

COURSE ADMINISTRATOR'S

Span of control is extremely important in incidents or events where safety and accountability are top priorities.

Type 3 ALL- HAZARDS LOGISTICS SECTION CHIEF (LSC3- AH)

UNIT 6: INCIDENT RESOURCE MANAGEMENT

C. Extract This document is extracted from FEMA 501, National Incident Management System. Refer to the NIMS in the event of conflicting information.

MANAGEMENT OF WILDFIRES

PART TWO LOGISTICS SECTION CONTENTS

ALL-HAZARD OPERATIONS SECTION CHIEF

ALL-HAZARD PLANNING SECTION CHIEF

BIRMINGHAM REGIONAL EMERGENCY MEDICAL SERVICES SYSTEM MASS CASUALTY INCIDENT PLAN

ALL-HAZARD LIAISON OFFICER

Central Oregon Mass Casualty Incident Field Guide

ANIMAL CASE MANAGER - UNIT LEADER

STAGING AREA MANAGER (STAM)

EPA 339 Division/Group Supervisor

Task Book Assigned To: Trainee s Name: Home Unit/Agency: Home Unit Phone Number:

Type 3 ALL-HAZARDS FINANCE/ADMINISTRATION SECTION CHIEF (FSC3-AH)

SEMS Emergency Operations Center (EOC) Course for Schools. Orange County Emergency Management Organization Schools Committee

INCIDENT COMMUNICATIONS TECHNICIAN (COMT)

Staging. SECTION/TOPIC: Command and Control REVISED DATE: APPROVED BY: Approver. These SOPs/SOGs are based on FEMA guidelines FA-197

ALL-HAZARD SAFETY OFFICER

ESF #1Transportation Roles and Responsibilities

CHATHAM COUNTY EMERGENCY OPERATIONS PLAN

ANNEX FIRE RESOURCE MANAGEMENT

Unit 4: Division/Group Management and Personnel Management STUDENT GUIDE

Official s Information

RECEPTION CENTRE OPERATIONAL GUIDELINES

PERSONNEL TIME RECORDER (PTRC)

INCIDENT CHECK-IN LIST (ICS 211)

Unit 5: Tracking Resource Status STUDENT GUIDE

CONTINUITY OF OPERATIONS (COOP) WORKSHEETS

Emergency Support Function (ESF) 5 Information and Planning (Planning Section)

JOB ACTION SHEET CD INFORMATION TRIAGE GROUP SUPERVISOR

PLANNING CHIEF CHECKLIST ONGOING TASKS AND CONSIDERATIONS INITIAL ASSIGNMENTS FIRST 10 MINUTES COMPLETE THESE ITEMS DEMOBILIZATION AND TEARDOWN

R49:Implementing the Incident Command System in your Organization

SANTA CRUZ CONSOLIDATED EMERGENCY COMMUNICATIONS CENTER COMMUNICATIONS MISCELLANEOUS POLICY/PROCEDURE

Annex 11 STATE LOGISTICS RESPONSE CENTER (SLRC)

On site Activities in MCI OPERATIONS MANAGEMENT

LAND SEARCH AND RESCUE RESPONSE GUIDELINES

Changes to the ATAB 6 Mass Casualty Incident Response. Draft to ATAB 6 Committee September Accepted by ATAB-6 October 27, 2015

POD Manager. Lesson 1: The Overall Picture. Objectives

San Mateo County Fire Service POLICIES AND STANDARDS MANUAL

Unit 6: Organizational Flexibility. Visual 6.1 Organizational Flexibility

COMMISSARY MANAGER (CMSY)

4/27/ NASC 1. Write It Write! Developing an Effective Winter Weather Operations Plan and Manual. Write It Right! Learning Objectives

Agency Dispatch: The agency or jurisdictional facility from which resources are sent to incidents.

POST-EARTHQUAKE TECHNICAL CLEARINGHOUSE. November Geological Survey and Office of Emergency Management INTRODUCTION

intertrax Suite Command and Mobile ICS Scenario Version

HELIBASE MANAGER FOUR OR MORE HELICOPTERS (HEB1) HELIBASE MANAGER ONE TO THREE HELICOPTERS (HEB2)

FIRE OFFICER I. STUDENT Task Book. Agency: TASK BOOK ASSIGNED TO: INDIVIDUAL S PRINTED NAME & TITLE

Type 3 ALL-HAZARDS INCIDENT COMMANDER (ICT3-AH)

Resource Accountability System Practice Document Revised FEB/2013 Page 1 of 11

TYPE 3 ALL- HAZARDS SAFETY OFFICER (SOF3- AH)

EQUIPMENT TIME RECORDER (EQTR)

CENTRAL CALIFORNIA EMERGENCY MEDICAL SERVICES A Division of the Fresno County Department of Public Health

2010 APWA North American Snow Conference 04/20/2010

CHATHAM COUNTY EMERGENCY OPERATIONS PLAN

SAN RAFAEL POST-DISASTER BUSINESS RESILIENCE KIT

Northern Berkshire County MACC General Staff Logistics Chief Standard Operating Guideline (SOG)

EMERGENCY RESPONSE PLAN

DONATIONS AND VOLUNTEER MANAGEMENT EMERGENCY SUPPORT FUNCTION (ESF #19) FORMERLLY DONATIONS MANAGEMENT

Disaster Planning Checklist for Chief Financial Officers of Healthcare Organizations

United States Coast Guard. Incident Command System. Logistics Section Chief - LSC - Job Aid

Guide for Establishing, Operating and Evaluating an Emergency Operations Centre

14. LOGISTICS SUPPORT GUIDELINES

SOUTH PORTLAND FIRE DEPARTMENT STANDARD OPERATING GUIDELINES

ROCKDALE COUNTY COMMUNICATIONS GENERAL ORDERS

Interagency Helicopter Operations Guide - February 2013 Appendix B

City of Cleveland and Northeast Ohio Strategic National Stockpile (SNS) Receipt and Distribution Plan

COLLIER COUNTY SHERIFF S OFFICE COMMUNICATIONS DIVISION COMMUNICATIONS CENTER EMERGENCY EVACUATION PLAN

ENERGY EMERGENCY SUPPORT FUNCTION (ESF #12) FORMERLLY ENERGY AND UTILITIES

UNIT 3: INCIDENT FACILITIES INCIDENT FACILITIES PURPOSE AND SCOPE OBJECTIVES TIME. After completing this unit, you should be able to:

Appendix G: Evacuation Plan and Checklists. Transportation Agreements

Developed by the Ohio Lane Closure Protocol Committee:

ALL-HAZARD INCIDENT COMMANDER

5.0 EMERGENCY MEDICAL SERVICES DISPATCH PROCEDURES

General Order G RADIO COMMUNICATIONS

Principal Security Officer (3200) Task List

FIELD OBSERVER (FOBS)

YOUR TRANSPORTATION CO.

RAPID INCIDENT SCENE CLEARANCE (RISC)

*GTA The Environment and Deployment: Tactical Risk and Spill Response Procedures

Roles & Responsibilities

LARGE QUANTITY GENERATOR (LQG) OF HAZARDOUS WASTE

Transcription:

STAGING AREA MANAGER REPORTS TO: Incident Commander Operations Section Chief POSITIONS REPORTING TO STAGING AREA MANAGER Resources Unit Leader Supply Unit Ground Support Unit Facilities Unit Leader Medical Unit Leader GENERAL RESPONSIBILITIES: The Staging Area Manager (STAM) is responsible for managing all activities within the staging area. Staging areas are locations set up at an incident where resources can be placed while awaiting a tactical assignment on a 3 minute available basis. Staging areas are managed by the Operations Section. The STAM has been identified as a position within the Incident Command System (ICS). Develop Interpersonal Relationships. The STAM position requires an individual who can influence others and guide personnel in a positive and efficient manner. The STAM must develop and emulate respect and integrity. Model Leadership: Exhibit the principles of duty. Be proficient at your job. Ensure tasks are understood, supervised, and accomplished, and allow time for feedback. Exhibit the principles of respect. Know your subordinates and look out for them. Build your team. Establish crew cohesiveness. Assign tasks to team members in accordance with their capabilities. Focus on a team result. Exhibit the principles of integrity. Know yourself and seek improvement. Seek responsibility and accept responsibility for your actions. Set the example. Continually evaluate performance. Communicate problems immediately and take corrective action. Provide training opportunities. Complete personnel performance evaluations according to agency guidelines. 9 JANUARY 2015

GENERAL PREPAREDNESS / PRE-ACTIVATION The STAM needs to have materials identified and gathered in a kit, ready to grab and go when he or she is dispatched to an incident. Familiarization with the contents of the kit will enable the STAM to function at a more efficient level when assigned to an incident. This kit will contain items necessary for a STAM to operate and should be easily transportable. Contents of the Staging Area Manager Kit. The items listed below are recommended but may or may not be required, depending on agency / organization Standard Operating Procedures. Items Needed: o ICS 211, Check-in List o ICS 213, General Message o ICS 214, Unit Log o Agency-specific forms. o Miscellaneous Items (recommended): Assorted pens pencils felt-tip markers dry-erase markers highlighters thumb tacks string tags pads of paper clipboard masking or strapping tape duct tape big envelopes surveyor flagging file system supplies hole-punch scissors. o Radio(s), Battery(s), and Battery Charger(s) o Calculator o Flashlight (extra batteries) and/or headlamp o Alarm clock o Camera o Calendar o Tape measure o Insect repellent o Local area maps o Road atlas o Shoe polish, white, water-base with applicator o Stick-on numbers 10 JANUARY 2015

o Cell phone o Local telephone directory o Staple gun o Poster board o Traffic Cones o Personal Protective Equipment o Appropriate clothing for the season o Safety Shoes/boots o Protective Headgear o Gloves o High-visibility vest. ACTIVATION PHASE: When dispatched to an incident, the STAM is encouraged to follow certain guidelines and procedures. The first step to prepare to dispatch to an incident is to acquire information specific to the assignment from the local dispatch office. Information provided to the STAM should include: o Type of Incident o Location of Incident, Affected area o Incident Command (IC) Contact Information o Location of Incident Command Post (ICP) o Recommended Locations for the Staging Area from IC or Operations Section Chief (OSC) o Reporting date, time, and location, i.e., ICP o Communications Plan, Incident frequencies (if available) o Logistics Plan o Medical Plan o Transportation Plan o Special instructions o Incident or Project Name o Incident or Project Number. When on scene gather all available information necessary to accurately assess the incident; make appropriate decisions about immediate needs and actions including: o Type of incident o Planned operations o Number and locations of staging areas o Resources committed and ordered o Current incident status o Expected duration of incident o Terrain and other geographical limitations/potential issues. The STAM is responsible for attending the initial briefing and operational briefings. Certain information is specific to the STAM position, and this 11 JANUARY 2015

information may need to be passed on to other resources or supervisors. It is critical that the STAM attend these briefings and, at a minimum, obtain the following information: o Incident strategies, how staging fits in, and the location of the staging area o Assigned resources that are in place and their locations o Expected resources and estimated time of arrival o Resource contact information (radio frequency or cell phone number) o Authorized personnel who may order resources out of the staging area o Length and number of anticipated operational periods o Names and locations of key overhead (facilities, supply, ground support, and subordinate staging area personnel) o Items needed to run the staging area (toilets, drinking water, food, and personnel) o Checklist of ordering procedures, including chain of command for ordering supplies and services o Contingencies (staffing needs for 24-hour coverage, and additional STAMs or assistants). OPERATIONAL PHASE: Introduction. In order to establish an efficient staging area, a STAM must be able to assess factors and make effective decisions while coordinating with operations to ensure procedures are followed. Staging Area Coordination. o Coordinate with the Planning Section o Provide a copy of the staging area layout to the Planning Section and ensure staging areas are located on the incident action plan (IAP) maps o Obtain transportation and IAP maps o Determine availability of Status Check-In Recorder (SCKN) o Obtain a demobilization plan for staging o Obtain the incident contingency plan containing emergency procedures outlined for the staging area o Coordinate with Logistics Section o Coordinate with the Finance/Administration Unit o Determine procurement procedures and identify what resources are available locally o Establish appropriate timekeeping procedures for the staging area o Coordinate with the Safety Officer o Monitor and assess hazardous situations. o Develop measures for ensuring safety of the personnel. Document the Staging Area. o Always document the chosen site for the staging area o Take an inventory of the current condition of the staging area and any facilities 12 JANUARY 2015

o A Unit Log (ICS 214) must be completed for the operational period or for the duration of the staging area o Tip: Use a camera to take photos of the staging area to keep as backup documentation. Laying Out the Staging Area. Reference Figures 1 and 2 (Examples at end of job aid). o Remember to consider the incompatibility of certain activities. For example: Do not place sanitation facilities adjacent to the food services area Do place vehicle inspection areas in locations where they will interfere with the smooth and safe flow of traffic Consider locating parking areas as close to the exits as possible. o Designate/Establish the SCKN o Position the SCKN at or as near to the entrance as possible o This will eliminate or reduce the chances of missing any incoming equipment o Post Available Signage. Staging Areas are not camps. Therefore, facilities for sleeping, showers, and other similar long-duration needs are not provided. Posted signs for services necessary in a staging area may include instructions for: Fueling and water Mobile equipment maintenance and inspections Equipment and supply issues Food Services Sanitation Medical services Parking Security. Position Staging Area Resources. o A staging area should be grouped by functional use (Fire, Police, EMS, Public Works, etc.). o Task forces and strike teams when assembled should be positioned together as a unit. Coordinate other activity in the Staging Area. There may be other activities and functions in your staging area. This should not interfere with your operation. A helibase or helispot may occupy a portion of the area adjacent to your staging area. Coordinate the layout of your area with the helibase or helispot manager to assure the following: o Adequate separation between the two areas to minimize noise and dust levels o Ensure helicopter approach and departure routes are not over the staging area 13 JANUARY 2015

o Separate routes for ground traffic to the helibase, helispot, and staging area. Maintain an Efficient Staging Area. o Operating a staging area requires diligence by the STAM to ensure that resources can check in and get the services and support they require quickly and effectively. All equipment should be in the best possible condition to perform their task and be available to respond immediately if requested. The purpose of a staging area is to expedite the moving of resources from the staging area to a tactical assignment o Coordinate with OSC or Branch Director o Notify the OSC when the staging area is fully operational o Brief the OSC on anticipated capabilities and possible problems or shortages within the staging area o Determine which resources cannot respond to a dispatch request within 3 minutes o Report resource status changes to the OSC o Check in resources upon arrival o Establish the location for check-in with SCKN, and provide the necessary facilities and equipment o Ensure that resources checking into the staging area have checked into the incident first before receiving an assignment o Ensure equipment has been inspected, if applicable o Identify resource status and availability o Identify special capabilities of the resources identified, including additional personnel qualifications. Provide a briefing for incoming resources and discuss: o Staging area rules o Restricted areas o Procedures for staging, dispatching, check-out, and status change o Refueling procedures o Rotation of assigned resources for feeding, personal needs, etc. o Established crew standby areas o Safety concerns. Set up a resource tracking system: o Determine the number and names of resources already assigned to the staging area o Compile an inventory list of resources onsite or enroute o Ensure tracking system is dynamic and flexible o List special capabilities and pay status of assigned resources (e.g., 4x4 or foam) for better use of resources o Make resource accessibility known to operations personnel 14 JANUARY 2015

o Verify the times resources were assigned to the staging area by maintaining a log book or ICS 214, Unit Log, showing arrival and departure times for all resources assigned to the staging area o Establish a system of accountability for equipment used in the staging area. Items checked out to the resources must be checked back in before the resources are released. Set up a resource dispatch system. Establish dispatch procedures based upon orders from OSC. Set up a notification system for assignments: o Public address system o Messenger o Radio callout o Ensure radio frequencies are compatible among the resources (ICS 205, Incident Radio Communication Plan) o Brief departing / assigned personnel on: Duration of assignment Reporting location Transportation and travel route Probable assignment Field supervisor to contact Radio frequency Specific information from requester. o Notify the OSC or Resource Unit Leader of departing resources or other status change, and document it on the ICS 214, Unit Log o Assess dispatch procedures, adjust if necessary, and document any changes. Establish vehicle traffic patterns and assign parking: o Ensure safe traffic flow routes are established (ingress and egress) o Set up signs showing traffic flow for personnel and vehicles o Ensure road surface is suitable for type of vehicle o Arrange for adequate clearance for maneuvering vehicles o Avoid mixing heavy equipment and transports with smaller vehicles o Assign parking areas for agency and privately owned vehicles o Allow for rapid departure. Establish a bulletin board, and post procedures for the staging area and a copy of the IAP for each operational period. Maintain control over resources: o Communicate only with supervisors regarding resource control issues that may arise o Correct deficiencies immediately o Delegate work to the resources as needed, depending on span of control o Ensure resources have maintained a state of readiness. 15 JANUARY 2015

Order supplies. o Establish Communications Procedures for ordering (communicate using a radio, telephone, or a runner): o Maintain informal contacts with key staging area personnel o Order supplies and services as needed by documenting orders on an ICS 213, General Message form; process order(s) through the proper chain of command established by your supervisor o If resupply of equipment or personnel is done at the staging area, ensure documentation is complete using the ICS 213. Establish Security. o Coordinate with the Security Manager if one is available o Reassess security needs based on operational periods o Manage security problems. Develop Staging Area Situation Map: o Map the staging area, indicating the approach and departure (ingress and egress) routes o Give a copy, to Planning Section, Logistics Section, and logistics personnel, especially Ground Support o Post the map on bulletin boards in base and camp. Take precautions for any hazardous materials that are in the staging area: o Ensure safe handling of hazardous materials o Dispense fuel and hazardous materials carefully o Use absorbent materials as required by local protocol. See OSC, Logistics Section Chief (LSC), or Resource Advisor o Coordinate with Ground Support Unit Leader (GSUL) concerning handling of hazardous materials o Rope or flag off areas where hazardous materials or safety hazards are present. Coordinate with GSUL concerning: o Vehicle repairs o Parking for personnel not assigned to the staging area o Parking for out-of-service personnel (Park vehicles in designated area). Ensure there is a system in place for submitting of administrative paperwork, such as: o Equipment/Damage Reports o Time Reports o Unit/Activity Logs o Fuel receipts o Others. 16 JANUARY 2015

DEMOBILIZATION / DEACTIVATION PHASE It is the STAM's responsibility to properly demobilize equipment and supplies located within the staging area, perform evaluations, and close out the staging area. Proper rehabilitation of the staging area to its pre-incident condition falls under the scope of the STAM. Demobilize the Staging Area. Notify your supervisor that you are closing the staging area and moving the staging area resources. Operations is responsible for notifying the other sections (e.g., Logistics, Planning, etc.). Notify staged resources: o Ensure resources are in a state of readiness before moving or releasing them o Inform staged resources of the new incident assignment, and location, or if they are being released to the home unit. o Inform staged resources of timeframes, travel routes, etc. Rehabilitate the staging area to pre-incident condition (remove signs and barriers, and clean up the area): Inspect area and make recommendations to the Planning Section Chief if further rehabilitation is necessary. Arrange for final inspection with the property owner, LSC, claims manager, or Procurement Unit Leader. Confirm and obtain instructions from OSC to demobilize fire resources. Use the ICS 221, Check Out/Demobilization form, to assist in proper demobilization procedures. Coordinate with Logistics regarding intended demobilization: o Supply caches o Facilities o Ground support (movement of resources to a different location) o Emergency medical support o Evaluating assigned staging area personnel. Complete appropriate evaluation forms which may include: ICS 224, Crew Performance Rating form, and/or ICS 226, Individual Performance Rating, for staging area personnel and submit copies to the Documentation Unit. Follow the demobilization process when you (the STAM) are released from the incident: Obtain your release information from your supervisor. Obtain the ICS 221, Demobilization Checkout form, from the Planning Section. Debrief with your supervisor and receive your signed performance appraisal. Check out with each section indicated on the ICS 221. Submit completed ICS 221 to the Documentation Unit in the Planning Section. Close Out the Staging Area. At some point during the incident, the staging area will have served its function. Closing the staging area may occur well before the 17 JANUARY 2015

demobilization process takes place. If most of the incoming resources have arrived and have been assigned incident tasks, the staging areas may be closed. The staging area will be closed or moved at the direction of the OSC. The basic tasks involved in closing out the staging area are: o Closing the staging area should be an orderly, planned process. The equipment, supplies, and personnel that have been brought to the area must be returned to their proper sources or released o The heavy equipment should be released to the Equipment Manager or the GSUL. All communications equipment on hand should be returned to the Communications Unit. If resources in the staging area are being released from the incident, equipment should be collected and receipts for incident-provided equipment should be issued o Coordinate with the Supply and Communications Unit to arrange for the return of equipment and get a receipt o All receipts for issued equipment should be given to the responsible unit. Rehabilitate the Staging Area Location. An effort should be made to restore the area where the staging area is located to its pre-incident condition. Each agency has standards and procedures to accomplish this. Generally, to rehabilitate the area, do the following: o Determine the pre-incident condition as a baseline from which to work. o Review notes and Unit Logs for pre-incident status o Inventory and report damage to the Logistics and Finance chiefs. o Ensure repair of minor damage to fixed facilities to agency standards; notify the Facilities Unit Leader (FACL) o Ensure removal of litter and debris; notify the FACL. o Request the owner of the property be present for the final inspection. If contractual agreements have been made, recommend someone from the Finance Section accompany the inspection o Last, assemble and forward all records to your supervisor. 18 JANUARY 2015

Figure 1. Small Staging Area (Example) 19 JANUARY 2015

Figure 2. Large Staging Area (Example) 20 JANUARY 2015