Power Generation from Biogas utilization at Landfill sites Norte III - Final Disposal Environmental Complex

Similar documents
Session II: Enabling waste-to-energy solutions to achieve circular Economy and boost climate action Atilio Savino

BIOGAS FROM WASTE, BUEN AYRE PLANT ARGENTINA

BIOGAS FROM WASTE, BUEN AYRE PLANT ARGENTINA

Draft Case Study for xx CDM Landfill Gas Project presented at a World Bank Workshop Page 1 of 15 FOR CASE STUDIES PRESENTED AT A WORKSHOP

CONTENT AbOuT GGE 5 PrOduCTiON Of heat ANd ElECTriCiTy 9 distribution Of utilities 11 TrAdiNG 13 ENGiNEEriNG services 15 selected realized PrOJECTs 18

Argentina: the Solid Waste Management Project Experience

Contents. Contents. Module 1 Photovoltaic panels in context of renewable technologies 1

Presentation Title ( Arial, Font size 28 ) Urban Rooftop PV Projects

Coal Mine Gas. Utilization Principles

2017- Year of Renewable Energy. ENERGY- Year 1 The beginning of the transformation

CASE STUDY OF CDM VILLA DOMINICO LANDFILL GAS PROJECT -BUENOS AIRES - ARGENTINA WORKSHOP WORLD BANK APRIL 19 TH, 2007

MIEL I Hydroelectric Power Plant

450 Compendium of Regulations & Tariff Orders Issued by Regulatory Commissions for Renewable Energy Sources in India

Investment Opportunities in Energy Sector of Montenegro

DISTRIBUTION LOSS ADJUSTMENT FACTORS ESB SUBMISSION THE COMMISSION FOR ELECTRICITY REGULATION

Biogas Fuel Source for a Renewable Future. Jan Buijk (416)

Pre-Qualification Certificate

RÍO AMOYÁ - LA ESPERANZA Hydroelectric Power Plant

Legal framework and siting strategy for future landfills in the Buenos Aires area

Renewable Generation - REFIT and Grid Connection

DIVISION OF ADMINISTRATION UTILITIES & ENERGY SERVICES. David Payne, P.E Interim Associate Director October 16, 2012

Energy optimization in cities

1. PROJECT TITLE PROCUREMENT OF GENERATORS FOR LANDFILL GAS USE FOR ENERGY AT RAMIĆI REGIONAL LANDFILL, BANJA LUKA

EEESTA Prestige Seminar 9th November 2011 London 2012 Olympic Park Delivery of a Time Critical Major Programme

Uncontrolled Document when printed. Refer to internet for latest version. Disclaimer refer

Energy Conservation Renewable Energy The Future Rutgers

ADVANCED ABSORPTION CHILLER CONVERTS TURBINE EXHAUST TO AIR CONDITIONING

2016 Conference for Clean Air Through Energy Efficiency. Overview of Energy from Landfill Gas in Texas

Energy Generation, Transmission and Distribution (GTD) Mr. André Luís Rodrigues

Operational optimisation of generation, transmission and distribution Human resource development Training of utility staff and management

Argentina PV Market New Opportunities. Marcelo Alvarez Argentina Renewable Energy Chamber

Natural gas saving opportunities in gas supply system of Iran. 22 April 2014

Key Wind Energy Terms

BASIC CONCEPTS. Yahia Baghzouz Electrical & Computer Engineering Department

Supporting and integrating RE-Electricity in Italy The GSE experience IEA DSM Task XVII Seoul, Korea, September 2008

Experience In Motion. SIHI Dry Dry Running Vacuum Pumps for General Industries

SECTORAL ROUNDTABLE. Federal Infrastructure & Public Works

Solar Thermal Energy In ARGENTINA

New GCSE 4463/02 SCIENCE A HIGHER TIER PHYSICS 1

Consulting Services for Development of the Renewable Energy Sector Training on Sustainable Development

Clean energy saving: applied research into Etna s water supply systems in Catania, Italy

Project Idea Note. Hydroelectric Project Coca Codo Sinclair

Code No: II B. Tech II Semester Regular Examinations, April/May 2009 POWER SYSTEMS I. ( Electrical & Electronics Engineering)

Grid Integration in Sri Lanka

Renewable sources of energy, dispatching priority and balancing the system, facts and options: Part I

Electric Power Systems An Overview

Outline. Introduction to Wisconsin. Barriers to Generating Electricity from. Incentives and Regulations Intended to

Sustainable Energy Development Coal Mine Methane in China

University of Illinois at Chicago

Pass Through Costs for Business Electricity Customers from 1st October 2017

6 Cost Analysis. Table 6.1 Initial System Costs

CHILLED WATER THERMAL ENERGY STORAGE NEW MEXICO

CO-GENERATION PLANT KUSHA INDUSTRY CO.

Using Methane Gas to Produce Electricity and Thermal Energy

EAGLE MOUNTAIN Hydro Electric Pumped Storage Project

Study of Using Energy Storage to Mitigate the Impact of High Renewable Energy Penetration to the Grid

ABB drives in urban water cycle. Metropolitan Waterworks Authority, Bangkok

Combined Heat & Power An Overview

Biogas Technology Applications

Clean Line Energy Partners

Meet the Beneficiaries of the CDM

REPUBLIC OF UZBEKISTAN

Power System Study for Renewable Energy Interconnection in Malaysia

Grid Connection for Solar PV

DH/CHP in EU Smart Energy Cities Wroclaw, of March 2012

The 34 th Congress of Euroheat & Power

Transmission Losses Report 2015

NUCLEAR POWER CORPORATION OF INDIA LTD TECHNICAL SPECIFICATION ON SUBMERSIBLE PUMPS PAGE NO: 1 OF 4 REV NO : 0 DATA SHEET A

LONG TERM PLANNING, PRINCIPLES & PRACTICAL ANALYSES TURKISH ELECTRICITY TRANSMISSION CORPORATION

Good practice policies promoting efficient biomass use

Landfill Gas Recovery and Power Generation in Ghabawi Landfill. Amman, Jordan

Renewable Energy in South Africa Resources and Opportunities STIAS Energy Workshop 5 March2013 Stellenbosch

Below is a brief description of the main regulatory measures that affected the Company in 2010.

MADRID CALLE 30: AN URBAN TRANSFORMATION PROJECT

Sustainable Energy with Reciprocating Engines

D-1. SOUTH PEACE EAST AND WEST SOP PROJECTS PATRICK HENN, DEVELOPMENT MANAGER PRRD Board of Directors Meeting, April

The compact MWM performance package.

(2) isolated operation with standby service provided by the Company by means of a doublethrow

A CASE STUDY: ASJA S BELO HORIZONTE CDM PROJECT BRAZIL / KYOTO PROTOCOL

International Symposium on Solar Physics and Solar Eclipses (SPSE) 2006 R. Ramelli, O. M. Shalabiea, I. Saleh, and J.O. Stenflo, eds.

1. Company Background 2. Success Project Allocation 3. Solar Farm Development

CLEAN DEVELOPMENT MECHANISM PROJECT DESIGN DOCUMENT FORM (CDM-SSC-PDD) Version 03 - in effect as of: 22 December 2006 CONTENTS.

CHOPTANK ELECTRIC COOPERATIVE, INC. P.S.C. Md. No. 3 Fifth Revised Page No. 59 COGENERATION AND SMALL POWER PRODUCTION RATE SCHEDULE X

General Overview Area km2 Population-3,5 mln Situated south-east of Europe Density of population 121.9/km2 Economy- based on sevices 75% agricul

4 March 2014 Grid-Connected Photovoltaic (PV) in Indonesia and Thailand Berlin, Germany

DISTRICT HEATING SYSTEMS FROM LIGNITE FIRED POWER PLANTS TEN YEARS EXPERIENCE IN GREECE

WE Why; Wave Electricity Water Hydrogen

(b) In a 3-phase, 4-wire distribution system with 240 volts between lines and FIRSTRANKER

CEWEP Country Report 2016

2. (a) How do you classify water turbines? (b) Define and explain different efficiencies of a water turbine. [8+8]

The Utsira wind hydrogen project

Thesis Final Presentation

Advanced flexible gas engine power plants case studies

INTEGRATION OF RENEWABLE BASED GENERATION INTO SRI LANKAN GRID

SECTOR ASSESSMENT (SUMMARY): ENERGY

Implementation of UNFCCC in Armenia: ongoing activities in the context of climate change mitigation measures

INTRODUCTION POWER GENERATION FROM LANDFILL GAS AT KENTUCKY PLANT

Problem specification

97 MW of Cat coal seam methane power in New South Wales, Australia

Lakeshore Looks to the Future with Renewable Energy

Transcription:

Power Generation from Biogas utilization at Landfill sites Norte III - Final Disposal Environmental Complex METROPOLITAN AREA OF BUENOS AIRES ARGENTINA Marcelo E Rosso Washington - March 2016

CEAMSE (Coordinación Ecológica Área Metropolitana SE) is responsible for the treatment and disposal of urban solid waste generated in the metropolitan area of Buenos Aires (AMBA). CEAMSE is a government-owned, inter-jurisdictional company. Our partners are the Government of the Province of Buenos Aires and the Government of the City of Buenos Aires. Currently, it renders its services to 42 municipalities, with a population of approximately 15,700,000 inhabitants, and the generation of about 18,100 tons of urban solid waste per day (or 470.000 tons monthly). Ceamse is not responsible for the collection of waste as this is handled by each municipality. Once the waste is collected, it is then transported to one of the Transfer Stations operated by CEAMSE or directly to one of the sanitary landfills, for treatment or disposal. Demographic Data 35% of Argentina's population 40% of the industries 40% of the country's waste

METROPOLITAN AREA OF BUENOS AIRES Area of influence City of Buenos Aires 42 municipalities Waste reception 18.100 t/day Surface 8,800 km 2 Approximate population 15,700,000 inhabitants Demographic Data 35% of Argentina's population 40% of the industries 40% of the country's waste

Incoming Waste at CEAMSE Origin and Historical Development since 1977

SWM - Metropolitan Area of Buenos Aires

SWM - Metropolitan Area of Buenos Aires

SWM - Metropolitan Area of Buenos Aires

SWM - Metropolitan Area of Buenos Aires

Power Generation from Biogas utilization at Landfill sites Norte III - Final Disposal Environmental Complex

Location of Norte III - Final Disposal Environmental Complex The Norte III environmental complex is to be found in the municipalities of San Martin, San Miguel and Tigre (Campo de Mayo) in the province of Buenos Aires.

THE GENREM PROGRAM Program for Awarding Supply Contracts for those with Renewable Energy Sources These projects were implemented via public tender, by ENARSA in 2010 for the generation of upto 20MW of electicity from Biogas. The aim of this tender was to encourage the development of power generation from renewable sources and to strengthen the sustainable development of renewable energy throughout Argentina. The implementation of these projects have contributed towards the objective of National Law N 26.190 and its regualatory decree N 562/09, for the use of renewable energy sources. This regulation establishes that within 10 years, i.e. by 2016, 8% of electricity should be supplied from renewable energy sources. In exchange for the investment made by winning companies, ENARSA would buy this energy at a USD rate for a period of between 8 and 14 years.

FLOW PROCESS CHART

NIIIC PROJECT CENTRAL BUEN AYRE

DETAILS OF EXTRACTION WELLS Number of Wells: 273 (RI=25m c/u) Location: as previously shown Depth: 15 metres Extraction gas pipes: Ø=250 mm. of PEAD Filler Material: broken stones, earth and bentonite Secondary Lateral Pipes: 3 Head of pipe.

LAYOUT - CENTRAL BUEN AYRE

DETAILS OF SUCTION EQUIPMENT AND BIOGAS DRIVERS The Biogas suction system consists of 3 blowers, each with a 250 HP capacity, that carry out the suction and drive process for the Biogas utilization system. Capacity: 6500 Nm 3 /h per unit. Multistage type Centrifugal Blowers. Variable speed drives to optimize energy consumption and evenly regulate suction in the module.

DETAILS OF BIOGAS TREATMENT Cooling system, Separation and Filtration With a 99% efficiency rate, it consists of: A cyclone which separates particles and drops of liquid > 15µ A dehumidifier/filter that eliminates liquid particles and solid > 0.3-0.8 µ. Siloxanes Removal System With a 95% efficiency rate, it consists of a special resin filter which absorbs the siloxanes.

ELECTRIC ENERGY GENERATION Brand Name Caterpillar The priority of the captured biogas is to fuel the motor generators. Energy is produced by the coupling of 6 (six) motor-generators, achieving a combined production capable of generating 11,796 Mwe of electric power, and providing an effective output of 10 MW of renewable energy to the National Grid. Model Installed Power G3520 C DM 8647 1,966 MWe Phases 3 Frequency Speed Biogas Consumption (100%) The set of motor-generators have an annual availability of more than 85%, with an electrical output of 38%. 50 Hz 1500 rpm 841 Nm 3 /h Generation of low voltage (400 V), which subsequently rises to 13,2 kv.

ELECTRIC ENERGY GENERATION Powerhouse Electricity Motor-generators Control Board: Measurement, Input and Output Cells

ELECTRIC TRANSMISSION SYSTEM (ELECTRIC CABLE-DUCTS) The power generated is transported (approximately 7.2kms) via a medium voltage underground cable (13.2 kv) to a substation of EDENOR located in Tres de Febrero (substation Rotonda), which is connected to the national grid. The transmission system consists of two double 185 mm² ternary cables that permits each one to carry a maximum of 10 MW enabling an alternating power flow. Fibre optic communication links and protections run in parallel. Major construction work in three sites were carried out in order to lay the cables: Crossing the Reconquista river and the Güemes stream Crossing Buen Ayre highway Crossing the National Highway N 8

ELECTRIC CABLE-DUCTS LINKING CA NIII AND ROTONDA EDENOR

RELEVANT DETAILS OF CENTRAL BUEN AYRE Main Suppliers: -Caterpillar (Finning): Powerhouse (motogeneradores), John Zink, Edenor Investment: $ 136,352,000 (U$ 30,300,000) MDL Project Period: 10 years Number of CER s: 6,043,349 Maximum flow of captured biogas: 13.100 Nm³/h (año 2013) Number of vertical extraction wells: 273

Construction period of the Biogas Thermal Power Plant: 13 months Power generation period: 14 years Power Capacity: 11.796 MW (6 CAT G3520C x 1.966 MW) Annual availability of motors: 85 % Distance covered of Electrical Wire Ducts: 7.2 kms. Type: Underground RELEVANT DETAILS OF CENTRAL BUEN AYRE Tension: 13.2 kv (Medium Voltage)

RELEVANT DETAILS OF CENTRAL BUEN AYRE Interconnection with SADI: Substation Rotonda Edenor Contracted Energy Limit: 1,211,070 MWh Tariff (fixed price in USD): U$D124 per MWh Ability to generate energy for: 20,000 households Savings equivilent to: 22,000,000 m³ of natural gas TOTAL ACCUMULATED ENEGRY GENERATED TO DATE 237.810.894 KW

PROJECT FOR THE DEGASSING AND ELECTRICAL POWER GENERATION AT MODULE NIIIA CDM 2785 Norte IIIc Rio Reconquista Norte IIIb 3410 Metros 7 MW of Installed Power 5 MW For Dispatch Norte III

RELEVANT DETAILS OF MULTIAMBIENTE DEL PLATA S.A. Main Suppliers: -Biotecnogas Srl ItaliaJ, Edenor. Investment: USD$ 1.2 millon per installed Mw. MDL Project Period: 10 years Number of CER s: 260.339 año Maximum Flow of captured biogas: 3,000 Nm³/h (año 2013) Number of vertical extraction wells: 250

Construction period of the Biogas Thermal Power Plant: 5 months Power generation period: 8 years Power Capacity: 5 GE Jenbacher x 1420 kw Annual availability of motors: 8,000 hours Distance covered with Electrical Wire Ducts : 7.2 kms. Type: Underground RELEVANT DETAILS OF MULTIAMBIENTE DEL PLATA S.A. Tension: 13.2 kv (Medium Voltage)

RELEVANT DETAILS OF MULTIAMBIENTE DEL PLATA S.A. Interconnection with SADI: Substation Rotonda Edenor Contracted Energy Limit: 250.000 MWh Tariff (fixed price in US):D$ USD$ 120 per MWh Ability to generate energy for: 10,000 households TOTAL ACCUMULATED ENERGY GENRATED TO DATE: 111,116,734 KWh

CONSTRUCTION OF POWER GENERATION FACILITIES System Reliablility Test - Tuesday 29th May @18.35 hrs First Dispatch SADI Saturday 19th May @ 14.31 hrs.

Thank You! Marcelo E. Rosso Email: mrosso@ceamse.gov.ar New Technologies and Environmental Control Manager at CEAMSE