Interstate 66 Widening from. RFQ Information Meeting. January 4, 2012 Christiana Briganti-Dunn, P.E. District Project Manager

Similar documents
I-64/ Route 15 (Zion Crossroads) RFQ Information Meeting

Route 7 Truck Climbing Lane. RFQ Information Meeting

Gloucester Parkway Extension RFQ Information Meeting

I-64 Capacity Improvements Segment III RFQ Information Meeting

Odd Fellows Road Interchange at US Route 29/460 and Road Improvements UPC # RFQ Information Meeting

I-95 Southbound CD Lanes Rappahannock River Crossing Stafford County/ City of Fredericksburg, Virginia. RFQ Information Meeting - November 9, 2016

I-81 Exit 114 Bridge Replacement Project RFQ Information Meeting

RFQ Information Meeting

Park and Ride Lot at I-66/Route 15 Interchange UPC Pre-Proposal Meeting

Design-Build Overview Alternate Project Delivery Office. Jeff Roby, P.E., DBIA Design-Build Program Manager Alternate Project Delivery Office

395 Express Lanes Project Design-Build Procurement Industry Outreach. March 23, 2016

Project Information Meeting

RFP QUESTIONS AND ANSWERS PARK AND RIDE LOT AT I-66/ROUTE 15 INTERCHANGE VDOT PROJECT PR CONTRACT ID C DB99 August 817, 2017

ALTERNATIVE PROJECT DELIVERY DIVISION

Route 29 Solutions. September 11, 2014 Rt. 29 Project Delivery Advisory Panel Meeting

I-64 Widening and Route 623 Interchange Improvements

Pre-proposal Meeting

NOTICE TO DESIGN PROFESSIONALS / CONTRACTORS REQUEST FOR LETTERS OF INTEREST S.R. 408/ S.R. 417 INTERCHANGE IMPROVEMENTS PHASE 2 PROJECT NO.

APPROACHES AND BRIDGE OVER TYE RIVER (RTE. 29 NBL) RFP QUESTIONS AND ANSWERS-REVISION 2

CLA /10.54, PID Project Description:

Interstate 66 Widening

FREQUENTLY ASKED QUESTION FOR VDOT DESIGN-BUILD PROJECTS. June 1, 2013

PRE-REQUEST FOR PROPOSAL (RFP) MEETING GENERAL ENGINEERING CONSULTANT (GEC) FOR I-2/I-69C INTERCHANGE PHARR DISTRICT

I-64 Pavement Rehabilitation. I-264 Pavement Rehabilitation

PROFESSIONAL SERVICES BULLETIN 17-2 ADDENDUM 1

WELCOME. Public Meeting for I-35 / I-44 Interchange. October 6, 2015

I-64 Capacity Improvements Segment I Financial Plan Annual Update

VDOT. Virginia Department of Transportation REQUEST FOR PROPOSALS A DESIGN-BUILD PROJECT. Route 29 Bridge over Little Rocky Run

I-64 Capacity Improvements Segment I Financial Plan Annual Update December 1, 2017

I-64 Pavement Rehabilitation

Route 3 Widening. letter of submittal. original

VDOT Major Projects Update

Rt. 29 Solutions Project Delivery Advisory Panel. February 18, 2016

NEW MARKET HEIGHTS PHASE OF THE VIRGINIA CAPITAL TRAIL PROJECT RFP QUESTIONS AND ANSWERS

Cleveland Opportunity Corridor Project Section 3. Subcontractor Informational Meeting August 12, 2016

VDOT DESIGN-BUILD PROGRAM

GDOT s Design-Build Program Past, Present and Future

Cedrick T. Fulton President. Solicitation RK-23C. Design-Build Services for New Harlem River Drive Connector Ramp

ALTERNATIVE PROJECT DELIVERY DIVISION PROGRAM UPDATE

FOR INTERSTATE 81 AND ROUTE 37 INTERCHANGE FREDERICK COUNTY, VIRGINIA MILEPOST 310

I-64 Capacity Improvements Segment II Financial Plan Annual Update October 30, 2017

Design-Build Selmon West Extension

Any discussions or marketing activities related to this specific project.

I-70 East Webinar for Subcontractors. April 14, 2015

Construction Division Update Upcoming Work. Greg Henion, P.E. Deputy State Construction Engineer

TRANSFORM 66 Outside the Beltway Project Update March 2018

REQUEST FOR QUALIFICATIONS

Route 29 Solutions. October 23, 2014 Rt. 29 Project Delivery Advisory Panel Meeting

I-65/I-70 North Split Interchange Reconstruction Project Frequently Asked Questions

CD COPY. January 10, Request For Qualifications A Design-Build Project. Route 208 Courthouse Road Spotsylvania Courthouse Phase I

Active Traffic Management in Michigan. Patrick Johnson, P.E. HNTB Michigan Inc.

May 26, Required Attendance Yes_X_ No MEMORANDUM. Mr. Don Silies Attn: Mr. John Jacobs. Salvija Hofheimer. Project Showing

Design-Build and Design-Bid-Build

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Project Descriptions ($ millions)

Reconstruction Project Update

DESIGN BUILD LA 318 INTERCHANGE FUTURE I-49 SOUTH

Interstate 64 Capacity Improvements Segment I

295 Project Showing Meeting Minutes

PROFESSIONAL SERVICES BULLETIN 18-2 ADDENDUM 2

Project Team. D6 South Miami-Dade Resident Engineer Erik Padron, P.E. D6 Construction Project Manager Dari Vorce

MDX PROCUREMENT/CONTRACT NO.: RFP MDX WORK PROGRAM NO.:

DRAFT AIR QUALITY TECHNICAL MEMORANDUM

TASK 1 Interchange Justification for US 52 in Lawrence County, Ohio

2009 Louisiana Transportation Conference February 9, 2009 Session 9. LA DOTD s Design-Build Procurement For the I-12 Widening Project

NEPA and Design Public Hearings

Presented By: Debbie Hunt Florida Department of Transportation District Seven Director of Transportation Development October 16, 2013

ADDENDUM NO. 1. Date: January 11, for. RFQ for Design-Build Entity, Health Center/ Concession Project at Irvine Valley College. BID No.

Request for Proposal Golden Glades Multimodal Transportation Facility July 31, 2017 Table of Contents I. Introduction A. Design-Build Responsibi

I-95 Corridor Study Phase II Highway Element

Request for Proposals Final with Addendum 3

Solicitation HH-89. Design/Build for Rehabilitation of Skewbacks, Viaduct Piers and Lower Level North Abutment at the Henry Hudson Bridge

I-395 Reconstruction MDX SR Improvements I-95 Concrete Pavement Reconstruction

Fairfax Transportation Committee I-66 Multimodal Improvements Inside the Beltway. January 20, 2015

Page 1 of 2 AMENDMENT - REQUEST FOR QUALIFICATIONS (RFQ)

SH 183 Managed Lanes Project RFQ Q & A MATRIX #2. (June 4, 2013)

NOTICE OF REQUEST FOR QUALIFICATIONS (RFQ) 18-1 ENVIRONMENTAL AND ENGINEERING ON-CALL SERVICES

MEMORANDUM: INITIAL CONCEPTS SUMMARY

I-64 Peninsula Shoulder Usage Evaluation. Eric Stringfield VDOT Hampton Roads Transportation Planning April 3, 2013

ENGINEERING SERVICES Phase III Construction Engineering Services for the Benedictine Parkway Improvement Project

I-395 HOV Ramp at Seminary Road From: Sanger Avenue To: Seminary Road. with I-395 NB Auxiliary Lane Extension From: Duke Street To: Sanger Avenue

BID RESULTS FOR THE CTB

DRAFT SCOPE 1.0 General Requirements

SCOPE OF SERVICES. Consultant Engineering and Inspection Services. Interstate 85/385 Interchange Improvements Greenville County.

City of Fort Smith and Frontier Metropolitan Planning Organization Request for Qualifications City of Fort Smith Traffic and Truck Study

REQUEST FOR QUALIFICATIONS

LOCATION AND DESIGN DIVISION

ADDENDUM #2 RFQ Red Line BRT Design Services. All vendors are to accept the information contained herein as the official response of IPTC.

October 19, 2017 Shailendra G. Patel, PE, DBIA Division Administrator, Alternative Project Delivery

Review of Construction Costs and Time Schedules for Virginia Highway Projects

Constructability Guidelines

City of Fort Smith and Frontier Metropolitan Planning Organization Request for Qualifications City of Fort Smith Traffic and Truck Study

ADDENDUM NO. 1. Re: Expression of Interest for RFP CB-18

I-40 in Oklahoma County from MM 167 to MM 173

Alternative Project Delivery Division Consultant Procurement

Conclusions & Lessons Learned

Oklahoma Department of Transportation Environmental Programs Division Office Fax

I-90 Smart Road: Operational Features. October 18th, 2017 Scott Lee, P.E., TIMS Project Manager, Parsons Amarpal Matharu, P.E.

SCOPE 1.0 General Requirements

Alabama State Port Authority Automotive RO/RO Terminal Wharf Rehabilitation Package. Addendum #1 Date: January 9, 2019

Transcription:

Interstate 66 Widening from Gainesville to Haymarket RFQ Information Meeting January 4, 2012 Christiana Briganti-Dunn, P.E. District Project Manager John C. Daoulas, P.E. APD Project Manager and POC

Introduction Project Overview RFQ Information Package RFQ Summary Questions / Answers 2

Project Location: Prince William County From: 1.2 mi. West of Rt. 15, Haymarket To: 0.2 mi. West of Rt. 29, Gainesville ill 3

Project Overview (Section 2.1) Interstate 66 (3.59 mi.) Widen to include one 12 HOV lane (+ 2 buffer) and one 12 general purpose lane in each direction SOV lane to add/drop at Route 15 Interchange Ramps HOV to extend westbound past Route 15 On-Ramp Merge HOV to begin eastbound just west of Route 15 Add 17 wide shoulders, 12 paved + 5 graded on both sides Mill/Overlay Mainline with Pavement Build-Up Sound Barriers and Retaining Walls Signs & Sign Structures, Lighting, Pavement Markings, High Tension Cable Guardrail Drainage Structures, SWM Facilities ITS/ATM Components: CCTV Cameras, DMS, Vehicle Detection, Fiber Optic, and Power Supply 4

Project Overview (Section 2.1) I-66 Westbound Off-Ramp Widen ramp to provide left-turn, tu shared left-through, t and right- turn lanes Signal Modifications required at Ramp Junction Old Carolina Rd and Catharpin Rd Overpasses Demolish & Replace Bridges Each New Bridge to include Two Travel Lanes and a Shared Use Path Environmental Permitting To be performed by Design/Builder (NOT thru IACM process) Right of Way Acquisition R/W and Easement Acquisitions No Displacements/Relocations 5

Project Overview (Section 2.1) Utility Relocations, Adjustments & Coordination Transportation Management Plan Federal Oversight Coordination with other Projects: Interstate 66 Tier I Environmental Impact Study Interstate 66 Active Traffic Management (ATM) Interstate 66 & Rt. 15 Interchange Improvements Route 29 & Linton Hall Road Interchange Construction 6

Project Layout Extend WB HOV lane; Signing; Fiber Optic (to MM 39.9) Widen Ramp; Modify Signal; WB SOV lane drops at ramp Reconstruct Old Carolina Rd Bridge; Retaining Walls; Utility Relocations EB HOV lane add just west of Route 15 EB SOV lane add at Ramp Merge Reconstruct Catharpin Rd Bridge; Retaining Walls; Utility Relocations Mill/Overlay & Restriping to ultimate configuration; Fiber Optic (to MM 42.2) Widen Mainline; Mill/Pavement Build-Up; CCTV cameras, DMS, Vehicle Detection, Fiber Optic, and Power Supply; Signs & Sign Structures, Guardrail; Drainage; SWM Facilities; Sound Barriers 7

8 Typical Section Interstate 66 Widening

Bridge Sequence of Construction Old Carolina Road Bridge VDOT will permit full closure of Old Carolina Road Bridge during its demolition and reconstruction. Existing traffic to be detoured to alternate routes. Not to be reconstructed simultaneously with Catharpin Road Bridge. 9

Bridge Sequence of Construction Catharpin Road Bridge Maintain one NB lane on Catharpin Rd Bridge during bridge demolition and reconstruction. Detour SB traffic to alternate routes. 10

11 Bridge Sequence of Construction Catharpin Road Bridge

Project Features Roadway Widening/Pavement Build-Up Bridge Reconstruction/ Replacement 12 Ramp Widening Signal Modifications

Project Features NEPA Categorical Exclusion / Sound Barriers Traffic Management Plan 13 RW Acquisition Utility Relocations

RFQ Information Package Includes all Items listed in Section 2.8 Available through purchase of a CD obtained through VDOT Scheduling and Contract Division (Order Form Attachment 2.8) Important Considerations Information Purposes only Subject to Change (updated regulations, specifications, conditions, design updates, etc.) Critical Infrastructure Information/Sensitive Security Information ( CII/SSI ) Multi-Purpose Non-Disclosure Agreement Form in order to obtain As-Builts of Existing Bridges 14

RFQ Summary VDOT POC John C. Daoulas, P.E. Alternate Project Delivery Office 1401 East Broad Street Richmond, Virginia 23219 Phone: (804) 371-6787 Fax: (804) 786-7221 E-mail: john.daoulas@vdot.virginia.gov Two-Phase Best Value Procurement Short-List 3 Highest Ranked Teams Anticipated Scope of Work Outlined Section 2.2 Estimated Contract Value - $58,000,000, 15

Request for Qualifications (RFQ) Anticipated Schedule (Section 2.5) RFQ Questions to VDOT 01/18/12 VDOT Response to Questions 01/27/12 Qualifications Submission Date 02/13/12 Notification of Shortlist 04/30/12 RFP Release Date 05/07/12 Technical Proposals Due 07/30/12 Price Proposals Due 08/27/12 Anticipated Award Date 11/16/12 16

Form C-78 (Attachment 2.10) Watch VDOT s Design-Build RFQ website for responses to RFQ questions and Addendums http://www.virginiadot.org/business /request-for-qualifications.asp f If VDOT issues an addendum, a revised C-78 form will be included with the addendum Sign, date and include with SOQ 17

Contents of Statements of Qualifications Letter of Submittal (Section 3.2) POC, Prequalification, Debarment, Surety, SCC, DPOR 13% DBE Goal Offeror s Team Structure (Section 3.3) Key Personnel Org Chart and Narrative Clear separation between QA & QC Production Forces Experience of Offeror s Team (Section 3.4) Lead Contractor Work History Form Lead Designer Work History Form Project Risks (Section 3.5) Identify 3 Critical Project Risks 18

Evaluation Criteria (Section 4) Offeror s Team Structure 40% Experience of Offeror s Team 30% Project Risks 30% Total 100% Scoring Range Application Numerical score based on a 1-10 10 scale Evaluation Criteria included for each submittal requirement Design-Build Evaluation Guidelines, Oct. 2011 (On VDOT S DB Website) 19

QA/QC Minimum Requirements Update Better Clarify Design and Construction QA/QC Requirements Inclusion of IA and IVST into Minimum Requirements QA/QC Table 105.4 Inspection, Sampling and Testing Table 105.5 Better correlation between QA/QC Guide and DB and P3 Contracts Updated Guide completed prior to RFP release Roles and Responsibilities remain unchanged 20

RFQ Questions (Section 6.0) All questions and request for clarifications shall be submitted in writing. Deadline for submittal is January 18, 2011. Responses will be posted on VDOT s RFQ website on January 27, 2011. 21

22 Questions?