Engineering Hydrology Class 3

Similar documents
Engineering Hydrology. Class 16: Direct Runoff (DRO) and Unit Hydrographs

Drainage Analysis. Appendix E

Introduction to Hydrology, Part 2. Notes, Handouts

ENGN.4010 ENGINEERING CAPSTONE DESIGN Watershed Analysis. CiA

Peak discharge computation

INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN 40 C.F.R. PART PLANT YATES ASH POND B (AP-B ) GEORGIA POWER COMPANY

INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN 40 C.F.R. Part PLANT MCINTOSH ASH POND 1 GEORGIA POWER COMPANY

Rainfall, Runoff and Peak Flows: Calibration of Hydrologic Design Methods for the Kansas City Area

Module 3. Lecture 4: Introduction to unit hydrograph

Learning objectives. Upon successful completion of this lecture, the participants will be able to describe:

Runoff Hydrographs. The Unit Hydrograph Approach

IBS Site Drainage: Senior Design Project

INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN 40 C.F.R. PART PLANT DANIEL ASH POND B MISSISSIPPI POWER COMPANY

RUN-ON AND RUN-OFF CONTROL PLAN 40 C.F.R. PART PLANT DANIEL NORTH ASH MANAGEMENT UNIT MISSISSIPPI POWER COMPANY

DETENTION BASIN DESIGN USING RATIONAL HYDROGRAPHS

HYDROLOGY WORKSHEET 1 PRECIPITATION

Chapter H. Introduction to Surface Water Hydrology and Drainage for Engineering Purposes

INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN 40 C.F.R. PART PLANT YATES ASH POND 3 (AP-3) GEORGIA POWER COMPANY

INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN PLANT BARRY ASH POND ALABAMA POWER COMPANY

Engineering Bulletin 11-02

MODULE 1 RUNOFF HYDROGRAPHS WORKSHEET 1. Precipitation

INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN PLANT GREENE COUNTY ASH POND ALABMA POWER COMPANY

Stormwater Review Part 2. Rainfall and Runoff. Tom Seybert, PE and Andy Bennett, PE. Pennsylvania Surveyors Conference 2019

INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN PLANT GASTON GYPSUM POND ALABAMA POWER COMPANY

HERPIC County Storm Drainage Manual

FORT COLLINS STORMWATER CRITERIA MANUAL Hydrology Standards (Ch. 5) 1.0 Overview

Chapter 6. Hydrology. 6.0 Introduction. 6.1 Design Rainfall

Examination of PRZM5.0 Storm Rainfall Depth and Distribution Algorithms Compared to Current U.S. Storm Trends

Module 3. Lecture 6: Synthetic unit hydrograph

Activity Calculating Property Drainage

TECHNICAL MEMORANDUM. SUBJECT: Determination of watershed historic peak flow rates as the basis for detention basin design

5/11/2007. WinTR-55 for Plan Reviews Small Watershed Hydrology Overview

FAST WATER / SLOW WATER AN EVALUATION OF ESTIMATING TIME FOR STORMWATER RUNOFF

CEE3430 Engineering Hydrology

HYDROLOGIC MODELING CONSISTENCY AND SENSITIVITY TO WATERSHED SIZE

Section 2: Hydrology. Introduction. What is the Return Period? Intensity-Duration-Frequency Data. Generating a runoff hydrograph 85 Minutes

INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN 40 C.F.R. PART PLANT BOWEN ASH POND 1 (AP-1) GEORGIA POWER COMPANY

Runoff Calculations. Time of Concentration (T c or t c ) from one location to another within a watershed. Travel

Stormwater Management Impacts Resulting from the Volumetric Abstraction of Runoff from Frequent Storms per PADEP CG-1. Geoffrey A. Cerrelli 1, P.E.

Hydrology for Drainage Design. Design Considerations Use appropriate design tools for the job at hand:

APPENDIX IV. APPROVED METHODS FOR QUANTIFYING HYDROLOGIC CONDITIONS OF CONCERN (NORTH ORANGE COUNTY)

5/11/2007. WinTR-55 for Plan Reviewers Small Watershed Hydrology Hydrology Terms and Definitions

CE Hydraulics. Andrew Kennedy 168 Fitzpatrick

Cumulative Precipitation

Table of Contents. Overview... 1

Table of Contents. Overview... 1

Hydrologic Engineering Center Hydrologic Modeling System (HEC-HMS) Sunil KUMAR Director, National Water Academy

SOUTHEAST TEXAS CONTINUING EDUCATION

1. Stream Network. The most common approach to quantitatively describing stream networks was postulated by Strahler (1952).

DERIVATION AND CALIBRATION OF VOLUME-BASED RUNOFF COEFFICIENTS FOR DENVER AREA, COLORADO

Example 3. Elementary HEC-HMS Model. Purpose. Illustrate the steps to create a functioning precipitation-runoff model in HEC-HMS.

Utah State University Department of Civil and Environmental Engineering CEE 3430 Engineering Hydrology Test 2. Date: 3/31/2014

where, P i = percent imperviousness R = ratio of unconnected impervious area to the total impervious area.

Computation of excess stormflow at the basin scale. Prof. Pierluigi Claps. Dept. DIATI, Politecnico di Torino

Summary of Detention Pond Calculation Canyon Estates American Canyon, California

CVEN 339 Summer 2009 Final Exam. 120 minutes allowed. 36 Students. No curve applied to grades. Median 70.6 Mean 68.7 Std. Dev High 88 Low 24.

Estimating the 100-year Peak Flow for Ungagged Middle Creek Watershed in Northern California, USA

Run-on and Run-off Control System Plan

NRCS Hydrology methodology review Minnesota NRCS recommendation MnDOT recommendation Using Atlas 14 with HydroCAD

Q = CiA. Objectives. Approach

Detention Pond Design Considering Varying Design Storms. Receiving Water Effects of Water Pollutant Discharges

INITIAL RUN-ON AND RUN-OFF CONTROL PLAN 40 C.F.R. PART 257

CE 2031 WATER RESOURCES ENGINEERING L T P C

INITIAL INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN PLANT MCMANUS ASH POND A (AP-1) 40 CFR

The Drainage Basin System

Learn how to design inlet grates, detention basins, channels, and riprap using the FHWA Hydraulic Toolbox and WMS

Hydrologic Analysis of a Watershed-Scale Rainwater Harvesting Program. Thomas Walsh, MS, PhD Candidate University of Utah

Chapter 1 Introduction

Introduction. Keywords: Oil Palm, hydrology, HEC-HMS, HEC-RAS. a * b*

San Francisco State University Site 1 Vegetated Infiltration Basin Monitoring Report: Rainy Seasons and

What is runoff? Runoff. Runoff is often defined as the portion of rainfall, that runs over and under the soil surface toward the stream

INITIAL RUN-ON AND RUN-OFF CONTROL PLAN 40 C.F.R. PART 257

Hydrologic Calibration:

Introduction, HYDROGRAPHS

Rational Method Hydrological Calculations with Excel COURSE CONTENT

Appendix B. Storm Drain System Data

Modeling Infiltration BMPs

UNIT HYDROGRAPH AND EFFECTIVE RAINFALL S INFLUENCE OVER THE STORM RUNOFF HYDROGRAPH

Rainfall - runoff: Unit Hydrograph. Manuel Gómez Valentín E.T.S. Ing. Caminos, Canales y Puertos de Barcelona

Runoff Processes. Daene C. McKinney

CHAPTER 3 STORMWATER HYDROLOGY. Table of Contents SECTION 3.1 METHODS FOR ESTIMATING STORMWATER RUNOFF

Module 3: Rainfall and Hydrology for Construction Site Erosion Control

6/9/2014. Hydrology Options for Dynamic Modeling at the Inlet Level. Agenda. Introduction. Introduction. Typical Questions.

Georgia s Unified Stormwater Sizing Criteria The Old, the New, and the Misunderstood

Introduction to HEC HMS. Daene C. McKinney

Overview of NRCS (SCS) TR-20 By Dr. R.M. Ragan

Culvert Sizing procedures for the 100-Year Peak Flow

Appendix F. Flow Duration Basin Design Guidance

Section 500 Rainfall Table of Contents

MIDAS CREEK PROJECT. FINAL DESIGN REPORT SKR Hydrotech 4/11/2012

Sunset Circle Vegetated Swale and Infiltration Basin System Monitoring Report: Rainy Seasons and

WMS Tools For Computing Hydrologic Modeling Parameters

APPENDIX E APPENDIX E ESTIMATING RUNOFF FOR SMALL WATERSHEDS

ENVIRONMENTAL ENGINEERING LAND SURVEYING

ENGINEERING HYDROLOGY

APPENDIX E ESTIMATING RUNOFF FROM SMALL WATERSHEDS

Modeling the Hydrologic Impacts of Control Structures Utilizing LiDAR, ICPR, and GIS Technologies

SECTION IV WATERSHED TECHNICAL ANALYSIS

SAN GORGONIO PASS CAMPUS - PHASE I

International Journal of Scientific & Engineering Research, Volume 5, Issue 7, July-2014 ISSN Sruthy Nattuvetty Manoharan

Transcription:

Engineering Hydrology Class 3 Topics and Goals: I.Develop s (estimate precipitation) II.Develop simple constant intensity design storm III.Develop SCS design storm Ocean

s Why do we want to derive the? Convolve the Design with the unit hydrograph (transfer function) to predict a runoff hydrograph (output function). Design storms are convolved with a Unit Hydrograph (think of it as a transfer function ) to make real-time predictions of ultimate discharge. Such predictions are essential for effective engineering design for detention basins, drainage systems, etc.

s Peak Discharge Predicting peak discharge is of particular interest!!

s The simplest design storm is a constant intensity design storm: The time of concentration, or t c, is generally defined as the time required for a drop of water to travel from the most hydrologically remote point in the subcatchment to the point of collection. We ll study this later (week 8)!

s The simplest design storm is a constant intensity design storm: The time of concentration, or t c, is generally defined as the time required for a drop of water to travel from the most hydrologically remote point in the subcatchment to the point of collection. We ll study this later (week 8)!

s The simplest design storm is a constant intensity design storm, composed as follows: (1)Read the IDF to determine rain intensity (2) Assume that the time of concentration of the watershed is the duration of peak intensity of the storm. (3)Plot the resulting hyetograph.

s : Check out NOAA Atlas 14 (IDF Data Server) Intensity Duration - Frequency

s

s The average intensity for 24 hr and 5-yr return period is ~0.3 in/hr

s : Example Example: For Tallahassee watershed, (1) The design standard specifies a 10-year return period for design, (2) The watershed time of concentration is 22 minutes. From the Bedient et al. text, Chapter 6 (Tallahassee IDF):

s : Example The average intensity for a 22 minute duration and 10-yr return period is ~5.5 in/hr

s : Example Example: For Tallahassee watershed, (1) The design standard specifies a 10-year return period for design, (2) The watershed time of concentration is 22 minutes. From Figure 6-5 in your reading packet (Tallahassee IDF): The average intensity for a 22 minute duration and 10-yr return period is ~5.5 in/hr; which yields a storm volume of 2.01 inches

s : Example Example: For Tallahassee watershed, (1) The design standard specifies a 10-year return period for design, (2) The watershed time of concentration is 22 minutes. The average intensity for a 22 minute duration and 10-yr return period is ~5.5 in/hr; which yields a storm volume of 2.01 inches [5.5 in/hr X (22 / 60)]

s SCS 4 dimensionless rainfall distributions (as determined by the SCS); valid for areas < 400 mi 2, durations up to 24 hr, and frequencies of 1 yr to 100 yr

s SCS 4 dimensionless rainfall distributions (as determined by the SCS); valid for areas < 400 mi 2, durations up to 24 hr, and frequencies of 1 yr to 100 yr Fraction of 24-hr Rainfall 1.0 0.8 0.5 0.3 0 IA I III II 0 4.0 8.0 12.0 16.0 20.0 24.0 Time (hr)

s SCS 4 dimensionless rainfall distributions (as determined by the SCS); valid for areas < 400 mi 2, durations up to 24 hr, and frequencies of 1 yr to 100 yr Incremental Fraction Rainfall 0.40 0.30 0.20 0.10 0 II I III IA 0 6 12 18 24 Time (hr)

s : In Sum Intensity Duration - Frequency Constant-Intensity Check out NOAA Atlas 14 (IDF Data Server) http://dipper.nws.noaa.gov/hdsc/pfds/