TES Industrial Development SW ¼ SEC Lacombe County Outline Plan

Similar documents
2. That the Big Mountain lndustrial Park Area Structure Plan, attached hereto as Schedule A, is. 3. That Bylaw No is hereby repealed.

Yorkton Rona Commercial and Industrial development. Concept Plan and Serviceability Report

CROSSROADS NORTH AREA STRUCTURE PLAN

Stormwater Erosion Control & Post-Construction Plans (Stormwater Quality Plans)

WELCOME. Hwy 28 & Hwy 41 Major Area Structure Plan. Purpose of the Open House:

AREA STRUCTURE PLAN SW W4M CAMROSE COUNTY BYLAW ## JULY 2017(REVISED) PREPARED BY: AUSTROM CONSULTING &VICINIA PLANNING & ENGAGEMENT INC.

Debrob Investments Limited FUNCTIONAL SERVICING REPORT DRAFT PLAN OF SUBDIVISION, CITYVIEW DRIVE CITY OF GUELPH

Guidance Document for Storm Water Pollution Prevention Plan (SWPPP) Submittal. A2 Plat showing building lot numbers/boundaries and road layout/names:

GRADING, EROSION AND SEDIMENTATION CONTROL

Guidance on each of the 23 basic elements follows: Plan Index showing locations of required items: The plan index should include a list of the

Design Specifications & Requirements Manual

D EROSION AND SEDIMENT CONTROL. Table of Contents

BURNT LAKE AREA STRUCTURE PLAN

CORNERSTONE RIVER VALLEY VILLAGE FILING NO. 1 STORMWATER MANAGEMENT PLAN

SECTION 12 STANDARDS FOR CONSTRUCTION PLANS AND SPECIFICATIONS

SPRINGBANK Phase 1 Background Report

Design Specifications & Requirements Manual

DEVELOPMENT REPORT UNION PACIFIC PROPERTY SAN ANTONO INTERMODAL YARD AREA

Schedule A DISTRICT OF MAPLE RIDGE Watercourse Protection Bylaw

Willow Creek Conceptual Scheme

Standards for SWMF s. (Stormwater Management Facilities) Lacombe County s Guide to Developing Stormwater Management Facilities

CHAPTER 3. Grading Standards

DESIGN BULLETIN #16/2003 (Revised July 2007) Drainage Guidelines for Highways Under Provincial Jurisdiction in Urban Areas.

7.00 INTRODUCTION... 1

Phase II: Proposed (regulated) Impervious in disturbed area (ac) Long Lake Existing Impervious in disturbed area (ac)

PLANNED UNIT DEVELOPMENT, PLANNING APPROVAL & SUBDIVISION STAFF REPORT Date: June 4, 2015

OFFICIAL COMMUNITY PLAN. PART B.9 Fleet Street Business Park Secondary Plan

SPRINGBROOK 2017 Offsite Levies

TOWN OF MANCHESTER PLANNING AND ZONING COMMISSION Subdivision Application Minimum Submission Requirements

Nonmetallic Mining Reclamation & Operation Plan. Amendment No. 1 (Includes modifications for Wash Plant construction) DRAFT

Town of Friday Harbor PO Box 219 / Friday Harbor / WA / (360) / fax (360) /

STORMWATER MANAGEMENT REPORT DRAFT PLAN OF CITY OF GUELPH

SOUTH FLORIDA WATER MANAGEMENT DISTRICT. Question 13: Wetlands

STATE OF VERMONT PUBLIC SERVICE BOARD PREFILED TESTIMONY AND EXHIBITS OF IAN A. JEWKES

OP Council Resolution June 16, Planning and Development Services

HAMLET OF ROUND HILL AREA STRUCTURE PLAN

E. STORMWATER MANAGEMENT

Vision, Goals, Objectives, and Land Use Scenarios Welcome

ARTICLE XII RECREATIONAL VEHICLE PARK REGULATIONS

LOT GRADING GUIDELINES FOR COMMERCIAL, INDUSTRIAL, INSTITUTIONAL, MEDIUM AND HIGH DENSITY RESIDENTIAL PROPERTIES

Functional Servicing Report. Winston Park West Proposed Business Park Development Project. Infrastructure Ontario (IO) September MU1

STREET STANDARDS FOR PRIVATE ROAD/STREET. Number of Travel Lanes Width of Travel Lanes Width of Right-of-Way. Subbase - Bank Run Gravel (6" minus)

Sunset Acres Neighbourhood Area Structure Plan. RECEWED NOV 2 0 2q15 DRAFT - Submitted to: Submitted by: parloplan

Building Better Storm Water Quality

Items in this checklist identify the base requirements that are to be provided by the design professional.

Appendix B Construction SWPPP Short Form

STANLEY FARM SUBDIVISION

ZONING ORDINANCE FOR THE ZONED UNINCORPORATED AREAS ARTICLE 1500 OF PUTNAM COUNTY, WEST VIRGINIA Page 149 ARTICLE 1500 DRAINAGE AND STORM SEWERS

Chapter 3 Dispersion BMPs

STORMWATER DISCHARGES ASSOCIATED WITH CONSTRUCTION ACTIVITY

PERMITTED USES: Within the MX Mixed Use District the following uses are permitted:

Capital Facilities Element

ARTICLE 6 EXCAVATION OF MINERAL MATERIALS

SECURE Energy Services Inc. Proposed Conklin Class II Landfill Portions of: NE W4, SE W4 and NW W4

City of Glendale Stormwater Management Plan Checklist

DISTRICT 2&42. Major Area Structure Plan. Red Deer County Planning & Development Services. Bylaw No. 2016/9

Rural Residential Development Control Plan

New Administration Building

SITE GRADING (LOT GRADING) - CITY OF TORONTO In Compliance with Sentence B of the Ontario Building Code, every site is to be graded so that w

Town of Huntsville Official Plan Section 9 Rural Area Page 104

FLORIDA STATE UNIVERSITY MASTER PLAN 9 General Infrastructure

Charter Township of Garfield Grand Traverse County

INTERMUNICIPAL DEVELOPMENT PLAN. Ponoka County / Town of Rimbey PONOKA COUNTY BYLAW NO IDP TOWN OF RIMBEY BYLAW NO. 954/19

Morton West, Dacland. Hydrology / Stormwater Management Report Permit Application

Review Zone Application for D&R Canal Commission Decision

Soil Erosion and Sedimentation Control Application Packet 2011

2010 California Green Building Standards Code. Residential and Non-Residential Development

Land Use Amendment in East Shepard Industrial (Ward 12) at multiple addresses, LOC

STANDARD GRADING AND SOIL EROSION & SEDIMENT CONTROL PLAN FOR SINGLE LOT SINGLE FAMILY RESIDENTIAL CONSTRUCTION AND MINOR EARTH DISTURBANCES

CONSTRUCTION PLANS FOR ENTERPRISE RENTAL CAR

PLANNING COMMISSION STAFF REPORT OCTOBER 8, 2009

PLANNED UNIT DEVELOPMENT & SUBDIVISION STAFF REPORT Date: July 11, 2013

Temporary Erosion and Sediment Control (TESC) Report and Stormwater Pollution Prevention Plan For Construction Activities

Appendix A Stormwater Site Plan Report Short Form

Middle Tennessee State University (MTSU) Stormwater Plan Review Checklist

TOWN OF BETHLEHEM SWPPP APPLICATION REVIEW CHECKLIST

ENGINEERING REVIEW CHECKLIST City of Mount Clemens

State of Florida Department of Community Affairs Areas of Critical State Concern Implementation Status Report Apalachicola Bay Area

CYPRESS COUNTY BYLAW 2018/07. A Bylaw of Cypress County in the Province of Alberta to adopt the Seven Persons Area Structure Plan and Area.

PART 6 GENERAL REGULATIONS

Typical Local Erosion Control Requirements (Storm Water Management Authority, Inc.)

STATE OF MINNESOTA MINNESOTA POLLUTION CONTROL AGENCY FINDINGS OF FACT

Erosion & Sedimentation Control Policy

Construction Best Management Practices Handbook BEST MANAGEMENT PRACTICES

NEW CASTLE CONSERVATION DISTRICT. through. (Name of Municipality) PLAN REVIEW APPLICATION DRAINAGE, STORMWATER MANAGEMENT, EROSION & SEDIMENT CONTROL

Stormwater Management Permit Application LESS Than One Acre. Public Works Department st Ave East Kalispell, Montana (406)

PROJECT SCOPE OF WORK CITY OF TOWN AND COUNTRY STORMWATER PROGRAM

Checklist for Joint Agency Review Stormwater Management / Erosion and Sediment Control

Cass County Soil Erosion & Sedimentation Control Program

CITY UTILITIES DESIGN STANDARDS MANUAL

Chapter 2: Selecting Best Management Practices (BMPs)

MOUNTAIN VIEW COUNTY BYLAW NO. 14/16 TO AMEND BYLAW NO. 15/1

The rezoning application and proposed transportation facility warrants consideration.

OUTDOOR STORAGE/RECREATIONAL VEHICLES

Permeability across the entire site within the General Residential Zone is a minimum of 30%.

Stormwater Management - Basic Overview for Municipal Employees

COON CREEK WATERSHED DISTRICT PERMIT REVIEW Mississippi Dr Coon Rapids, MN SQ FT Residence on 0.64 Acre Lot

Planning Considerations for Stormwater Management in Alberta. R. D. (Rick) Carnduff, M. Eng., P. Eng. February 20, 2013.

REQUIRED INFORMATION Please check the following boxes that apply to your lot or parcel and complete the other requested information.

Legal Description Part of the Southwest Quarter of the Southeast Quarter of Section 17, Decoria Township

Transcription:

TES Industrial Development Lacombe County Outline Plan 112849297 June 2012 am v:\1128\active\112849297\07_reports_studies\rpt_tes_20120508.doc i

Table of Contents 1.0 INTRODUCTION... 1 1.1 PURPOSE... 1 1.2 PLAN AREA... 1 1.3 RELEVANT PLANNING DOCUMENTS... 4 2.0 SITE CONTEXT & DEVELOPMENT CONSIDERATIONS... 6 2.1 TOPOGRAPHY... 6 2.2 VEGETATION AND WETLANDS... 6 2.3 SURROUNDING DEVELOPMENT... 6 2.4 EXISTING TRANSPORTATION... 9 3.0 DEVELOPMENT OBJECTIVES & PRINCIPLES...10 4.0 PLANNING CONCEPT...11 4.1 OVERALL...11 4.2 BUSINESS INDUSTRIAL DISTRICT (I-BI)...14 4.3 OPEN SPACE...14 4.4 STORMWATER MANAGEMENT FACILITY (SWMF)...14 5.0 TRANSPORTATION...16 5.1 TRANSPORTATION...16 5.1.1 Industrial Subdivision Roads...16 6.0 ENGINEERING PLAN...19 6.1 SITE GRADING...19 6.2 STORMWATER MANAGEMENT...19 FIGURE 8 21 6.3 WASTEWATER DISPOSAL...22 6.4 WATER SUPPLY...22 6.5 LOT SERVICES...24 6.6 FIRE SAFETY...24 7.0 IMPLEMENTATION AND PHASING...25 7.1 DEVELOPMENT PHASING...25 7.2 SITE DEVELOPMENT GUIDELINES...25 am v:\1128\active\112849297\07_reports_studies\rpt_tes_20120508.doc ii

1.0 Introduction 1.1 PURPOSE The purpose of the TES Industrial Outline Plan is to describe the land use framework and development objectives for SW¼ Sec 28-39-27-W4 as shown Figure 1.0 Location Plan. This report has been prepared by Stantec Consulting Ltd. on behalf of TES Investments Ltd. The Developer is committed to creating a high quality, attractive, and successful business park while carefully considering the opportunities and constraints of the area. The proposed development is an extension of the existing Aspelund Industrial Park development and will incorporate similar land uses. 1.2 PLAN AREA Located within Lacombe County, the TES Industrial Development area is comprised of 58.87 hectares (145.48 acres) as shown on Figure 2.0 Legal, and is defined by the following boundaries: North Boundary Undeveloped agricultural land West Boundary Range Road 274 East Boundary Aspelund Industrial Park South Boundary Agricultural land, Aspelund Road am v:\1128\active\112849297\07_reports_studies\rpt_tes_20120508.doc 1

RANGE ROAD 274 PLAN AREA HIGHWAY QE2 TOWN OF BLACKFALDS ASPELUND ROAD N.W. 1/4 Sec. 28, Twp. 39, Rge. 27, W.4M. RANGE ROAD 274 S.W. 1/4 Sec. 28, Twp. 39, Rge. 27, W.4M. ASPELUND ROAD LEGEND Plan Boundary Lacombe County Boundary FIGURE 1.0 LOCATION CALGARY, ALBERTA DRAWN BY: SAS CHECKED BY: GL SCALE: NTS PROJECT #: 112849297 600-4808 Ross Street Red Deer, AB T4N1X5 Ph:(403) 341-3320 Fx:(403) 342-0969

N.W. 1/4 Sec. 28, Twp. 39, Rge. 27, W.4M. 807.9 RANGE ROAD 274 798.0 S.W. 1/4 Sec. 28, Twp. 39, Rge. 27, W.4M. Area = 58.87ha. (145.48 Ac.) 741.7 ASPELUND INDUSTRIAL ROAD 213.4 268.2 179.6 115.9 54.9 60.1 R=218.6 42.5 49.7 R=180.7 116.9 ASPELUND ROAD LEGEND Plan Boundary FIGURE 2.0 LEGAL CALGARY, ALBERTA DRAWN BY: SAS CHECKED BY: GL SCALE: 1:5000 PROJECT #: 112849297 600-4808 Ross Street Red Deer, AB T4N1X5 Ph:(403) 341-3320 Fx:(403) 342-0969

1.3 RELEVANT PLANNING DOCUMENTS Located within Lacombe County, the TES Industrial Development area is comprised of 58.87 hectares (145.48 acres) as shown on Figure 2.0 Legal, and is defined by the following boundaries The following relevant documents have been reviewed and referenced in preparation of this Outline Plan report: Lacombe County. Lacombe County Municipal Development Plan. 2007. Outlining the broad policies for guiding growth and changes in the County, the Municipal Development Plan (MDP) has classified the TES Industrial Development area as agricultural district. The Plan Area is adjacent to an industrial district and identified as a logical extension of industrial development within the County. Lacombe County. Lacombe County Land Use Bylaw. 2007. The Lacombe County Land Use Bylaw (LUB) shows the TES Industrial Development Plan Area on Schedule C: Lacombe County Land Use Bylaw No 1056/07 NE-21-39- 27-W4M. Within this figure, the Plan Area is not identified as having a particular land use designation. The concept shown within this Outline Plan has been developed to conform to the Land Use Bylaw in regards to land use and regulations. Lacombe County. Highway 2 West Area Structure Plan. 2012 The Highway 2 West ASP lays out the overall land use framework and location of major amenities and transportation routes located between Lacombe and Blackfalds west of Highway QE2. Lacombe County. Lacombe County Operations Standards Manual. 2006. The Standards Manual lays out the County s standards regarding subdivision design, servicing, and construction approval processes. Roadway cross-sections for use within this subdivision have been based off those within the Manual to ensure large scaled vehicles will be able to easily access the area. Stantec Consulting Ltd. TES Industrial Development Wetland Assessment. January 2012. The TES Wetland Assessment was conducted to provide an accurate inventory and evaluation of wetlands and wetland communities within the proposed development area. Soils, surface hydrology, vegetation, wildlife, and habitats present were included in the assessment. am v:\1128\active\112849297\07_reports_studies\rpt_tes_20120508.doc 4

Newalta Corporation TES Industrial Phase 1 Environmental Site Assessment. November 2011. The Phase 1 Environmental Site Assessment was completed to review the current conditions based on regulatory records, site inspection and information provided. Stantec Consulting Ltd. TES Industrial Development Traffic Impact Assessment. May 2012. A traffic impact assessment was completed for the Plan Area in 2012. Parkland Geo. TES Industrial Development Geotechnical Report. February 2012. A geotechnical report was completed for the Plan Area in 2011. Stantec Consulting Ltd. TES Industrial Wildlife Assessment. 2012. A Wildlife Assessment is being completed for the Plan Area in 2012. am v:\1128\active\112849297\07_reports_studies\rpt_tes_20120508.doc 5

2.0 Site Context & Development Considerations 2.1 TOPOGRAPHY As shown in Figure 3.0 Existing Conditions, the site topography shows a moderate slope from the southwest and southeast corners into the wetlands along the central north boundary. Elevations range from 887.0m to 878.0m for a total relief of 9.0m. The Plan Area is bare agricultural land with wetlands along the central north region. 2.2 VEGETATION AND WETLANDS In 2011, a Wetland Assessment was conducted for the TES Industrial Development Plan Area to examine the existing conditions of the property with regards to soil, hydrology, vegetation, wildlife, and habitat. Six wetlands were identified ranging from Class II to Class VII throughout the Plan as shown on Figure 4.0 Wetland Assessment. 2.3 SURROUNDING DEVELOPMENT The Plan Area is largely surrounded by agricultural and industrial lands which do not present constraints to the layout of the Plan Area. The available information does not indicate any intensive livestock operation, or current or historical oil and gas facilities, in close proximity to the Plan Area. The Aspelund Industrial Park located east of the Plan Area has proven successful in attracting intended business uses and generating positive growth in Lacombe County. The location of the TES Industrial Park is a logical extension of industrial uses and infrastructure. The existing residential acreage located south of the Plan Area has been considered during the creation of the Concept Plan in order to minimize any possible negative impacts there may be on the residence. am v:\1128\active\112849297\07_reports_studies\rpt_tes_20120508.doc 6

LEGEND Existing Trees Existing Wetlands Plan Boundary Contours FIGURE 3.0 EXISTING CONDITIONS CALGARY, ALBERTA DRAWN BY: SAS CHECKED BY: GL SCALE: 1:5000 PROJECT #: 112849297 600-4808 Ross Street Red Deer, AB T4N1X5 Ph:(403) 341-3320 Fx:(403) 342-0969

N.W. 1/4 Sec. 28, Twp. 39, Rge. 27, W.4M. WETLAND 5 (0.40 ha.) WETLAND 3 (1.37 ha.) WETLAND 4 (0.14 ha.) WETLAND 2 (2.37 ha.) RANGE ROAD 274 WETLAND 6 (0.09 ha.) WETLAND 1 (0.66 ha.) ASPELUND ROAD LEGEND Wetland Class II - Temporary Pond Wetland Class III - Seasonal Pond Wetland Class IV - Semi-Permanent Pond Wetland Class V - Permanent Pond Wetland Class VII - Fen Plan Boundary FIGURE 4.0 WETLAND CLASSIFICATION CALGARY, ALBERTA DRAWN BY: SAS CHECKED BY: GL SCALE: 1:5000 PROJECT #: 112849297 600-4808 Ross Street Red Deer, AB T4N1X5 Ph:(403) 341-3320 Fx:(403) 342-0969

2.4 EXISTING TRANSPORTATION Access to the property will be via the existing Aspelund Industrial Park, from the east; and the existing service road for Aspelund Road, from the south. There will also be a west access point located along Range Road 274. Within the Highway 2 West Area Structure Plan, Range Road 247 is identified to become a paved road in the future. The Plan Area s proximity to Highway QE2 will provide the development with good opportunities for accessibility and visibility from the Highway. am v:\1128\active\112849297\07_reports_studies\rpt_tes_20120508.doc 9

3.0 Development Objectives & Principles The conceptual and preliminary planning of the TES Industrial Development concept has incorporated the following objectives and principles: Develop a Plan consistent with the general intent and purpose of the Highway 2 West Area Structure Plan and the Lacombe County Land Use Bylaw. Provide a framework to deliver a high quality, comprehensively planned, industrial development by defining the general concept and layout of the subdivision, linkages, servicing designs, and development staging. Ensure that the implementation of the development plan takes place on an orderly phased basis. Encourage the development of a variety of compatible businesses and uses while satisfying specific requirements and demands of the market for industrial land in the area. Protect existing natural features where possible by best fitting the development to the existing topography and features of the area. Encourage the design of visually attractive landscaping, building form, façade treatments, etc. Provide a logical, safe, and efficient transportation system within the Plan Area that is suitable to current needs and future demands. Identify issues and concerns of stakeholders and neighbouring residents to address them in a reasonable manner. Use the TES Industrial development to enhance the visual appeal of the Highway QE2 corridor. am v:\1128\active\112849297\07_reports_studies\rpt_tes_20120508.doc 10

4.0 Planning Concept 4.1 OVERALL The development concept for the TES Industrial Development has been prepared in response to current and anticipated industrial/commercial market trends in the region. An analysis of these trends, and response to direct requests from potential lot purchasers, assisted in shaping the Concept Plan with respect to roadway layout, lot size, and orientation. The overall design for the TES Industrial Development is shown in Figure 5.0 Concept Plan and Figure 6.0 Concept Plan with Aerial. The concept features a simple and logical layout that has proven successful with industrial developments. By providing large lots in sequence, potential lot purchasers will be able to easily expand their operations by purchasing multiple lots. The roadways within the Plan Area have been designed to accommodate large commercial and industrial vehicles that are anticipated to frequent the area which is further described within Section 5.1 Transportation. The land use statistics and industrial units are represented in Table 1.0 - Land Use Allocation. Table 1: Land Use Allocation Land Use Area (ha) % of GDA Lots Gross Plan Area 58.87 Storm Water Management Facility (SWMF) 3.47 Environmental Reserve 2.23 Gross Developable Area 53.17 100.00% Business Industrial District (I-BI) 36.86 69.33% 18 Municipal Reserve (MR) 5.32 10.00% Public Utility Lot (PUL) 4.34 8.16% Roadways 6.65 12.51% am v:\1128\active\112849297\07_reports_studies\rpt_tes_20120508.doc 11

N.W. 1/4 Sec. 28, Twp. 39, Rge. 27, W.4M. 3 Ac. 12.7 Ac. 4 Ac. 4 Ac. 4.5 Ac. 8 Ac. 17.4 Ac. RANGE ROAD 274 3 Ac. 7.6 Ac. 0.8 Ac. 2.3 Ac. 3 Ac. 5 Ac. 3 Ac. 5 Ac. 5 Ac. 4.2 Ac. 4 Ac. 3 Ac. 5 Ac. ASPELUND ROAD LEGEND Business Industrial District (I-BI) Municipal Reserve (MR) Public Utility Lot (PUL) Roadway Plan Boundary Graveled Trail Picnic/Seating Node FIGURE 5.0 CONCEPT PLAN CALGARY, ALBERTA DRAWN BY: SAS CHECKED BY: GL SCALE: 1:5000 PROJECT #: 112849297 600-4808 Ross Street Red Deer, AB T4N1X5 Ph:(403) 341-3320 Fx:(403) 342-0969

N.W. 1/4 Sec. 28, Twp. 39, Rge. 27, W.4M. 3 Ac. 12.7 Ac. 4 Ac. 4 Ac. 4.5 Ac. 8 Ac. 17.4 Ac. RANGE ROAD 274 3 Ac. 7.6 Ac. 0.8 Ac. 2.3 Ac. 3 Ac. 5 Ac. 3 Ac. 5 Ac. 5 Ac. 4.2 Ac. 4 Ac. 3 Ac. 5 Ac. ASPELUND ROAD LEGEND Business Industrial District (I-BI) Municipal Reserve (MR) Public Utility Lot (PUL) Roadway Plan Boundary Graveled Trail Picnic/Seating Node FIGURE 6.0 CONCEPT PLAN WITH AERIAL CALGARY, ALBERTA DRAWN BY: SAS CHECKED BY: GL SCALE: 1:5000 PROJECT #: 112849297 600-4808 Ross Street Red Deer, AB T4N1X5 Ph:(403) 341-3320 Fx:(403) 342-0969

4.2 BUSINESS INDUSTRIAL DISTRICT (I-BI) The purpose of the Business Industrial District land use is to provide for a range of commercial and industrial uses, some of which may have outdoor storage or work activities. This District has been used within the TES Industrial Development to accommodate both commercial and industrial uses on lots sized 0.93 ha to 7.04 ha. In total,18 lots have been located within the Plan Area. By utilizing I-BI, lots have been designed to function as single sites and also as lots that can be combined if businesses would like to expand their operation or storage facilities. As shown on Figure 5.0 Concept Plan, lots have been configured and sized to suit the anticipated needs of prospective lot occupants. 4.3 OPEN SPACE A large open space is located in the northern portion of the Plan area. This open space is envisioned to be developed as a naturalized open space that will offer passive recreation opportunities to those working within the TES Industrial Development while preserving the pond s ecological attributes. A 30m wide Environmental Reserve surrounding the existing wetlands, a 6m wide Municipal Reserve surrounding the stormwater management facility and a 5.32 ha Municipal Reserve make up the open space system as shown on Figure 5.0 Concept Plan Possible recreation amenities to be located within the MR area may include: a trail system, seating benches, or picnic tables. The specific programing of the area will be completed during the detailed design portion of the development in consultation with Lacombe County. 4.4 STORMWATER MANAGEMENT FACILITY (SWMF) As mentioned in Section 4.3 Open Space, a 5.60 ha stormwater management facility has been located within the north central portion of the Plan Area. The location of this facility is based on the existing conditions and the information provided within the TES Industrial Development Wetland Assessment (2011). The Wetland Assessment identifies several wetlands within the Plan Area as described within Section 2.2 Wetland Assessment. A setback has been provided surrounding the existing wetlands to act as a protective buffer and also provide open space for passive recreation. am v:\1128\active\112849297\07_reports_studies\rpt_tes_20120508.doc 14

This SWMF will be in the form of a wet pond and will provide a central naturalize open space within the development. This facility is further detailed in Section 6.2 Stormwater Management. am v:\1128\active\112849297\07_reports_studies\rpt_tes_20120508.doc 15

5.0 Transportation 5.1 TRANSPORTATION As shown on Figure 7.0 Roadways, the proposed transportation system within the Plan Area has been designed as a simple network of local roadways that will provide connectivity within and surrounding the TES Industrial Development. The network will also accommodate large sized commercial or industrial vehicles. A connection to the future development on the quarter section bordering north is also provided. To facilitate connections to surrounding areas, the transportation network has been designed to provide access to nearby major roadways as well as a connection to the existing industrial park to the east and future to the north of the Plan Area. A Traffic Impact Assessment (TIA) has been completed to take into consideration the existing and future roadways and connections and how they would affect and be affected by future development within the Plan Area. Based on the TIA, the initial development would not warrant any upgrades to the Service Road or Range Road 274 intersection with Aspelund Road. At the 2022 horizon, the intersection at Aspelund Road/Range Road 274 will require to be upgraded to a Type IV intersection and traffic signals/intersection illumination at the Aspelund Road/Site Access intersection. At the 2032 horizon, number of additional considerations will be required in regards to the storage bay lengths at both intersections along Aspelund Road as noted in the TIA. 5.1.1 Industrial Subdivision Roads All roadways within the Plan Area have been planned to provide access throughout the development and to individual lots. As shown on Figure 7.1 Transportation Detail, the roads will be constructed in accordance with the Industrial Subdivision Road standards set out within the Lacombe County Operations Standards Manual. All Industrial Subdivision roadways will have a 30.48m right-of-way and an 8.50m finished road top with grassed ditches on both sides. Industrial turning radii s have also been considered within the design of the transportation network to ensure large vehicles will be able to easily maneuver throughout and access areas of the Plan Area. am v:\1128\active\112849297\07_reports_studies\rpt_tes_20120508.doc 16

N.W. 1/4 Sec. 28, Twp. 39, Rge. 27, W.4M. RANGE ROAD 274 ASPELUND ROAD LEGEND Industrial Subdivision Road (30.48m) Plan Boundary FIGURE 7.0 ROADWAYS CALGARY, ALBERTA DRAWN BY: SAS CHECKED BY: GL SCALE: 1:5000 PROJECT #: 112849297 600-4808 Ross Street Red Deer, AB T4N1X5 Ph:(403) 341-3320 Fx:(403) 342-0969

30.48m Industrial Subdivision Roadway FIGURE 7.1 TRANSPORTATION DETAIL CALGARY, ALBERTA DRAWN BY: SAS CHECKED BY: GL SCALE: NTS PROJECT #: 112849297 600-4808 Ross Street Red Deer, AB T4N1X5 Ph:(403) 341-3320 Fx:(403) 342-0969 May 2012

6.0 Engineering Plan 6.1 SITE GRADING A grading plan for the site will be designed to suit a drainage plan and provide suitable lot grades for the proposed land uses. The general grading concept will drain the majority of the site to the collector roadways. The drainage from the site will be conveyed by ditches and culverts along the roadways to the southern tip of the storm pond where a sedimentation forebay will collect silt before it enters the wetland. The developable area of the site will be stripped of topsoil in preparation for site grading. A stockpile will be created likely at the southwest side of the existing wetland and will be used as a source of material to complete landscaping of the lots as they develop. The remaining excess topsoil will be hauled and disposed of at an offsite location. The existing drainage pattern on the subject property is generally from the outer limits of the property to the existing wetland that is located in the north central portion of the site. Where possible, the existing contour of the land will be matched in order to maintain some existing vegetation. This will be balanced with the need to re-grade the development in order to direct all stormwater to the storm ponds sedimentation forebay before flowing to the existing wetland and ultimately to the north. Each of the lots will be graded generally level to meet the needs of the future business that will occupy them. The site grades established for this development will be set in order to achieve an overall earth balance in order to avoid hauling away excess material and eliminate the need to import material. There are a few low areas that will be filled in to prevent water from ponding in locations other than the designated storm pond. During site grading operations, silt fencing will be installed along the boundary of the existing wetland to prevent silt erosion due to grading activities from entering the wetland. 6.2 STORMWATER MANAGEMENT A centralized Storm Water Management Facility (SWMF) will be used to control the stormwater runoff from this site. The location of the SWMF is shown in Figure 8.0 Storm Servicing. The SWMF will be constructed within the existing wetland; this will ensure that wetland is maintained as none of the exiting drainage will be directed away from it ensuring that it will not dry up. Stormwater runoff will be filtered through one of four separate sedimentation forebays to control any sedimentation and contaminates from entering the wetland itself. The SWMF will be sized am v:\1128\active\112849297\07_reports_studies\rpt_tes_20120508.doc 19

to accommodate a 1:100 year storm event. In order to have adequate storage for this size of event two of the existing wetlands will be interconnected and increased in size. Through Best Management Practices, as directed by Alberta Environment Initiatives, this SWMF will not only control runoff but will also provide stormwater treatment before naturally discharging to the north. All stormwater from the proposed development will be routed first to this facility where the stormwater will be detained to pre-development rates before naturally discharging to the north. A separate stormwater management report has been prepared for this project which is available under separate cover. am v:\1128\active\112849297\07_reports_studies\rpt_tes_20120508.doc 20

N.W. 1/4 Sec. 28, Twp. 39, Rge. 27, W.4M. RANGE ROAD 274 ASPELUND ROAD LEGEND Major Overland Drainage FIGURE 8.0 STORM SERVICING Drainage Swale Plan Boundary Public Utility Lot (PUL) Sedimentation Forebay CALGARY, ALBERTA DRAWN BY: SAS CHECKED BY: GL SCALE: 1:5000 PROJECT #: 112849297 600-4808 Ross Street Red Deer, AB T4N1X5 Ph:(403) 341-3320 Fx:(403) 342-0969

6.3 WASTEWATER DISPOSAL Currently, there is no existing sanitary collection system in place for this development to connect to. However, in the future it is anticipated that a sanitary pipe system will be extended from the Town of Blackfalds to connect to this and adjacent developed areas. This future waste water line will be noted in a Deferred Service Agreement and caveated on all property titles. Until this occurs, a communal tank will be utilized which will be located at the south east corner of the existing wetland. The sanitary pipe system will be sized using the Lacombe County Operations Standards Manual. The holding tanks will be sized based on the volume of the water license volume that is allowed each year for the quarter section and also a minimum of 3 days of storage. The sewage will be hauled to the Town of Blackfalds Waste Water Treatment Facility on a schedule determined by how often sewage can be dumped into their facility; this will also be taken into account when sizing the holding tanks. The holding tank site has been established within the southeast portion of the wetland. The site has been sized based off previous sites with similar situations. The final size of the site will be established once the holding tank requirements have be established. When sizing the site, consideration for a future pump station and connection to a sanitary force main that extends to a Sewage Treatment plant will be taken into account. The wastewater management plan for the Plan Area is shown on Figure 9.0 Sanitary Servicing. Along with the servicing consideration for the development, a 10m PUL has been dedicated along the south and west boundary of the Plan Area to accommodate a future regional/municipal water and wastewater line. 6.4 WATER SUPPLY Similar to the wastewater system, there is currently no existing municipal water system to connect to. However, some point in the future, the Lacombe County also anticipates that a water distribution system line will be extended from the Town of Blackfalds to service this development. This future water line will be noted in a Deferred Service Agreement and caveated on all property titles. For the interim, a communal well will be dug to service this development and designed to meet all water treatment requirements dictated by Alberta Environment. Water will then be distributed to each of the individual lots via a communal water pipe system. The water distribution plan for the Plan Area is shown on Figure 10.0 Water Servicing. Along with the servicing consideration for the development, a 10m PUL has been dedicated along the south and west boundary of the Plan Area to accommodate a future regional/municipal water and wastewater line. am v:\1128\active\112849297\07_reports_studies\rpt_tes_20120508.doc 22

N.W. 1/4 Sec. 28, Twp. 39, Rge. 27, W.4M. RANGE ROAD 274 s ASPELUND ROAD LEGEND s Sanitary Servicing Flow Direction/Manhole Septic Holding Tank Plan Boundary FIGURE 9.0 SANITARY SERVICING CALGARY, ALBERTA DRAWN BY: SAS CHECKED BY: GL SCALE: 1:5000 PROJECT #: 112849297 600-4808 Ross Street Red Deer, AB T4N1X5 Ph:(403) 341-3320 Fx:(403) 342-0969

N.W. 1/4 Sec. 28, Twp. 39, Rge. 27, W.4M. RANGE ROAD 274 ASPELUND ROAD LEGEND Water Servicing Communal Well Dry Fire Hydrant Plan Boundary FIGURE 10.0 WATER SERVICING RED DEER, AB DRAWN BY: SAS CHECKED BY: GL SCALE: 1:5000 PROJECT #: 112849297 600-4808 Ross Street Red Deer, AB T4N1X5 Ph:(403) 341-3320 Fx:(403) 342-0969

6.5 LOT SERVICES Each lot will be serviced with sanitary, water, gas, and power services. Sanitary services to each lot will be located within a 200mm sanitary service with an inspection manhole at each service location. The gas and power serviced will be provided based on each individual lot owner s requirements. 6.6 FIRE SAFETY The development will include fire safety measures outlined in the Lacombe County s Operations Standards Manual. A dry hydrant will be located at the south end of the Storm Water Management Facility to enable the development access to water in the event of an emergency. Once the water distribution system line is extended from the Town of Blackfalds, full fire flow will be provided. am v:\1128\active\112849297\07_reports_studies\rpt_tes_20120508.doc 24

7.0 Implementation and Phasing 7.1 DEVELOPMENT PHASING Development phasing will consist of two phases as shown in Figure 11.0 Phasing. Phase 1 is located in the eastern portion of the Plan Area as services will be extended into the Plan Area from the existing industrial development to the east. Phase 1 will also incorporate the development of the stormwater management facility, any community amenities and the dedication of the required Municipal Reserve for the entire parcel. Future Phasing has been shown within the western portion of the Plan Area and will be developed along a timeline dictated by market demand. 7.2 SITE DEVELOPMENT GUIDELINES Site Development Guidelines will be prepared for the TES Industrial Development to facilitate the creation of a comprehensive and consistent subdivision. This document will include topics such as screening, landscape, signs, access, buildings and up keep. The Developer will ensure that all lot owners will comply with the requirements of the Site Development Guidelines. am v:\1128\active\112849297\07_reports_studies\rpt_tes_20120508.doc 25

N.W. 1/4 Sec. 28, Twp. 39, Rge. 27, W.4M. RANGE ROAD 274 ASPELUND ROAD LEGEND Phase Boundary Plan Boundary FIGURE 11.0 PHASING CALGARY, ALBERTA DRAWN BY: SAS CHECKED BY: GL SCALE: 1:5000 PROJECT #: 112849297 600-4808 Ross Street Red Deer, AB T4N1X5 Ph:(403) 341-3320 Fx:(403) 342-0969