Similar documents
GUIDELINES FOR INCEPTION REPORTS

Chart 1-1 Development Issues and the Logframe

NZAID Logical Framework Approach Guideline

Handbook Basics of Indicators, Targets and Data Sources. 11/30/2011 Produced by Poverty and Environment Initiative (PEI) Project Tajikistan-Phase 1

Ex post evaluation Zambia

Gender Mainstreaming in Project Cycle Management

How to write a logframe

How to complete a Logframe for larger projects How to complete a stakeholder analysis for larger projects... 9

Logical Framework Analysis (LFA) in Project Cycle Management. By : Dr. Mihir Maitra Consultant New Delhi

Ex Post-Evaluation Brief GUATEMALA: Rural water and basic sanitation programme IV

UNITED NATIONS RESIDENT COORDINATOR S OFFICE JOB DESCRIPTION

Participatory rural planning processes

HEALTH AND POPULATION b) Water Supply and Sanitation

Tools for Building Monitoring and Evaluation Systems in Public Works Projects

Module j:\cc69\nmm\website docs\new\pm&e core course\module 3 logic models 2\module 3 - logic models ii nov 2004.doc

TECHNICAL NOTE. The Logical Framework

Career Opportunity at CARE International in Uganda

Logical Framework and Objectively Verifiable Impact Indicators

Danish Red Cross Job Description (when the position has been filled write the name of the incumbent here)

Evaluation purpose and scope The overall purpose of the evaluation, as laid out in the ToR, is to:

Department for International Development

Report. Final Evaluation of WSBD Project - Vietnam

How Social Franchises Are Addressing Complex Problems in the Developing World

ADVANCED INTERNATIONAL TRAINING PROGRAMME. ITP Gender statistics

About CIDA - Performance - Results-based Management - The Logical Framework: Making it Results-Oriented

ADVANCED INTERNATIONAL TRAINING PROGRAMME. ITP Gender statistics

ADVANCED INTERNATIONAL TRAINING PROGRAMME. ITP Gender statistics

FICHE NO 17 C MANAGEMENT AND CONTROL SYSTEMS IMPLEMENTING ACT VERSION 1 26/09/2013. Version

Executive Board of the United Nations Development Programme and of the United Nations Population Fund

SUBJECT: Audit Report Flats Sequencing System: Production First Article Testing Readiness and Quality (Report Number DA-AR )

9. Project Cycle Management and Logical Framework: The case of the EC. By Claudio Foliti

Selected Indicators for Projects Financed by the ACP-EU Energy Facility

Logical Framework for the project

PROJECT TITLE: ENHANCING AGROFORESTRY IN FOUR PRIMARY SCHOOLS OF MARACHA DISTRICTF PROJECT CLASSIFICATION: LAND DEGRADATION AND SUSTAINABLE MANAGEMENT

Monitoring and Evaluation: A Logical Frame. Evaluating the Impact of Projects and Programs Beijing, China, April 10-14, 2006 Shahid Khandker, WBI

DARWIN INITIATIVE LOGICAL FRAMEWORK See:

International Consultant on Human Resource Management for the Ministry of Foreign Affairs and European Integration

The Logical Framework: Making it Results- Oriented

Monitoring & Evaluation Framework

Costa Rica Panama El Salvador Guatemala Nicaragua Honduras

WSSSRP II Logframe. Revised December 2015

ANNEX AR MICRO SCALE/MICRO PROGRAMME VERIFICATION REPORT TEMPLATE

Quality Control Engineer (QCE) Nepal Shelter Programme JOB DESCRIPTION NAME. LOCATION Ramechhap, Bijulikot (75%), Manthali 25%

The role of Agricultural Information in Poverty Monitoring in Malawi

Leaderdship Techniques for Senior Design

Guidelines for Participatory Village Planning For Food Security and Poverty Reduction Interventions Under the Rural Economy Advancement Programme

Indicators, Targets and Data Sources

Internal Grant Committee meeting on 3 September 2014 Agenda item no. 2

Measuring the Sustainable Development Agenda in Peru. Report Highlights

Overview of Key Issues in Rural Transport and Training Modules

Terms of Reference (ToR)

Training on Project Cycle Management for Researchers Ethiopian Academy of Sciences May 2016, Ghion Hotel, Addis Ababa

RESEARCH AND DEVELOPMENT DEPARTMENT

CONCEPT NOTE MECHANISATION INFRASTRUCTURE

On Logical framework analysis (logframes in the context of the CSO GIZ-IS Twining project )

Standard formats for terms of reference

Annex D: Terms of Reference

Water, Sanitation and Hygiene (WASH) Safety Planning Technical Toolkit for Kiribati Schools FRAMEWORK

2010 Annual Programme Twinning Fiche KS 10 IB AG 02 Veterinary and Food Safety

Servacius B. Likwelile EXECUTIVE DIRECTOR Tanzania Social Action Fund (TASAF) Dar es Salaam, TANZANIA October 1-5, 2007

Monitoring and Evaluation Guidance Note

Planning and Monitoring in Results-based Management of Projects and Programmes

United Nations Development Programme (September 2014)

BUSINESS NAME. Owner s Name

REVISED TERMS OF REFERENCE

PROCEDURE AND TOOLS FOR EVALUABILITY REVIEW OF ILO PROJECTS OVER US$5 MILLION

APPENDIX E. Methodology for Participatory Assessments (MPA)

Country programme document for Bahrain ( )

Intervention Objective verifiable indicators Sources of verification Assumptions

Sustainable Sanitation and Hygiene for All Programme (SSH4A) in Nghe An Province. Terms of Reference

INTEGRATED COASTAL MANAGEMENT ACTION PLAN

COCOA LIFE COTE D IVOIRE NEEDS ASSESSMENT. Executive summary

STANDARD SUMMARY PROJECT FICHE

SWA Results Framework. Vision. Vision: Sanitation, hygiene and water for all, always and everywhere Success indicators

25 working days (5 working days for Home-Based)

INTEGRATED COASTAL MANAGEMENT ACTION PLAN

2010 Annual Programme Project Fiche 8 Veterinary and Food Safety

Human Development/Poverty Reduction and Economic Management. Findings

USE GUIDELINES PERCENT WITHIN TOLERANCE (PWT) FOR BITUMINOUS PAVEMENT ACCEPTANCE

Baseline Survey WASH Telethon Project

Ex post evaluation Armenia

EngTech Qualifying Report

Call for Expressions of Interest. Midterm Evaluation

Successful Implementation of Public Private Partnership Model for Water Supply and Sanitation in Nepal. Himalaya Gautam

Hygiene promotion How effective is it? How much does it cost?

What do customers and consumers expect from more sustainable products

Logframe Kenya Country Programme ( )

SCOPE OF WORK FOR THE DESIGN OF ISUKU IWACU s MONITORING, EVALUATION AND LEARNING DATABASE

Call for Expression of Interest

PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: AB5158 Project Name

What will we do?

SECTOR ASSESSMENT (SUMMARY): WATER SUPPLY AND OTHER MUNICIPAL INFRASTRUCTURE AND SERVICES

Technical and Vocational Education & Training (TVET) Reform Project. Phase 1 Workplan (Dec 2007 Dec 2009)

Project cycle management Engineering and cooperation for global development LESSON - 1

TERMS OF REFERENCE FOR REVIEW OF CPAP OUTCOME KEN 44

Indicative content of evaluation final reports Draft, Jérémie Toubkiss, Evaluation Office, NYHQ (updated 4 February 2016)

Sri Lanka: National Water Resources Authority

Il Project Cycle Management :A Technical Guide The Logical Framework Approach

CONSULTATION, PARTICIPATION AND COMMUNICATIONS PLAN

Section 2. GUIDANCE NOTE ON HOW TO DO STAKEHOLDER ANALYSIS OF AID PROJECTS AND PROGRAMMES. July 1995

Transcription:

Annex 2: Examples of LFA matrixes LFA stands for Logical Framework Approach. For further information on this methodology, see Danida s LFA handbook on: http://amg.um.dk/en/menu/technicalguidelines/logicalframeworkapproach/logicalframeworkapproach.htm Generally, the logical framework, or logframe, contains one development objective and a maximum of three immediate objectives. In complicated cases, a level of intermediate objective may be inserted in the logframe between the levels of development objective and immediate objective. Ensuring that activities and outputs materialise is generally the responsibility of programme implementers, whereas reaching the immediate and development objectives is only partly within their control. A range of external factors such as the general economic and political development in the country, the weather, world-market trends, etc. usually play an equal or larger role in determining whether objectives are reached. Normally, the column target is not part of the logframe. However, in the context of monitoring and using indicators, it is important to distinguish between objective, indicator and target. Often, these three elements are confused. Note that the link between the various levels is based on the stated assumptions. The inputs provided will give rise to the planned activities only to the extent that the assumptions underlying the link between these two levels prove valid. The risks in this regard could be listed in the same manner. It is important also to monitor the assumptions. History shows that their failure to hold true may be the main reason why a project or programme disappoints.

Logframe 1: Water and sanitation (Programme phase 2005-2010) Indicators Targets Means of verification Assumptions Development objective: Improved health situation especially among the poor Immediate objectives: 1. Water supply sustainably improved 2. Sanitation condition sustainably improved Outputs: 1.1 Wells constructed in all villages in target area 1.2 Water User Groups (WUG) established 1.3 Private well artisans trained and certified 2.1 Promotion pit latrines constructed in all villages in target area 2.2 Private pit latrin artisans trained and certified Activities: 1.1.1 Identify sites for well construction 1.1.2 Develop participatory construction methodology 1.1.3 Supervise construction 1.2.1 Develop guidelines for WUG 1.2.2 Election of Water User Group members 1.3.1 Develop training curriculum for well entrepreneurs 1.3.2 Identify artisans trainees 2.1.1 Identify sites for promotion latrines 2.1.2 Test and develop construction methodology further 2.2.1 Develop curriculum for pit latrine construction training 2.2.2 Identify pit latrine artisan trainees Inputs: A. GoX and community manpower B. Funds from GoX and GoD C. Local construction materials (sand, stones, hard wood, water) No. of people with water borne diseases 1. No. of people with access to clean water 2. No. of people with access to pit latrines 1.1 No. of wells constructed 1.2 No. of WUG 1.3 No. of entrepreneurs certified 2.1 No. of pit latrines 2.2 No. of entrepreneurs 1.1.1 No. of sites 1.1.2 Methodology approved 1.1.3 No. of sites supervised 1.2.1 Guidelines approved 1.2.2 No. of members 1.3.1 Curricula approved 1.3.2 No. identified 2.1.1 No. of sites 2.1.2 Methodology approved 2.2.1 Curriculum approved 2.2.2 No. of trainees A. Man power B. Funds on time C. Materials availed by community on time Reduced by 20% by 2020 1. 1 mill. by 2015 2. 750.000 by 2015 1.1. 5000 by 2010 1.2. 1000 by 2010 1.3. 100 by 2008 2.1. 5000 by 2010 2.2. 100 by 2008 1.1.1. 5500 by 2007 1.1.2. 1 by 2006 1.1.3. 5000 by 2010 1.2.1. 1 by 2006 1.2.2. 10.000 by 2007 1.3.1. 1 by 2006 1.3.2. 125 by 2006 2.1.1. 5500 by 2006 2.1.2. 1 by 2006 2.2.1. 1 by 2006 2.2.2. 125 by 2006 A. GoX: 1.000 man hours; Community: 100.000 man hours B. 10 mill. DKK and 100 mill. local $ C. No delays due to lack of material National health statistics 1. National statistics combined with spot tests 2. National statistics combined with spot tests 1.1 WUG completion reports 1.2 Minutes from WUG meetings 1.3 Training reports with participants signatures 2.1 WUG completion reports 2.2 Training reports with participants signatures 1.1.1 Site reports and spot checks 1.1.2 Approval (minutes or report) 1.1.3 Supervision reports 1.2.1 Approval (minutes or report) 1.2.2 District progress reports 1.3.1 Approval (minutes or report) 1.3.2 District progress reports 2.1.1 District progress reports 2.1.2 Approval (minutes or report) 2.2.1 Approval (minutes or report) 2.2.2 District progress reports A. Semi-annual programme reports B. Financial statements and semi-annual programme reports C. District progress reports Well-maintained wells supply the majority of the target group with 100% of their drinking water. The community can afford paying local artisans to repair existing and build new wells. The well and pit latrine siting process is not influenced by local power holders. The construction supervision is effective and construction quality is therefore not compromised. The community is willing to cost share. Qualified GoX manpower available

Logframe 2: Agriculture (Programme phase 2004 2008) Indicators Targets Means of verification Assumptions Development objective: Standard of living of the target population sustainably improved Immediate objectives: 1. Famine management improved 2. Management capacity of middle and top level managers in MoA increased 3. Organisational systems and procedures improved Outputs: 1.1 Early warning system database established 1.2 Procedures for collecting early warning data produced 2.1 MoA officers trained in modern management (communication, feedback, conflict management, facilitation) 2.2 Exchange visits to other relevant ministries conducted A. Proportion of population below $1 per day (MDG indicator 1) B. Agriculture generated income per head pr year disaggregated by gender C. Type of housing inproved e.g. from straw to tin roof (proxy indicator) D. Average no. of days pr year with inadequate food 1.a Potential famine situations acted on timely by MoA 1.b No. of large scale famine situations 2.a Form of meetings (from monologue to dialogue) 2.b Transparent decision making 2.c Staff turnover on middel and top level 3.a Monthly computerised financial reports 3.b Computerised monitoring reports 3.c Quality assurance: No. of user-complaints to MoA A. 10% by 2030 B. Men: 500 U$ by 2030. Women: 450 U$ by 2030 C. 50% of all houses tin/tile roofed by 2030 D. 5 by 2030 1.a All situations by 2020 1.b Reduced with 50% by 2020 2.a 90% of all meetings are dialogue oriented by 2010 2.b 80% employees assess decision making as transparent by 2010 2.c Reduced by 30% by 2010 3.a 12 timely quality reports pr yr by 2009 3.b 4 timely quality reports pr yr by 2009 3.c Reduced with 40% by 2009 A. National statistics B. Sample survey in 5 districts C. Sample survey in 5 districts D. Sample survey in 5 districts 1.a Feedback systems based on key farmers reports 1.b As above 2.a Survey among employees + observations 2.b Check budgets 2.c Survey among employees + observations 2.d Personnel rooster 3.a Check reports 3.b Check reports 3.c Check complaints register 1.1 Early warning reports based on new 1.1 One approval by 2007 1.1 Check approval database approved 1.2 Procedures approved 1.2 One approval by 2007 1.2 Check approval 2.1a No. Trained 2.1b Quality of training 2.2a No. of participants 2.2b No. of trips 2.1a 30 top and mid level managers by 2007 2.1b Minimum 80% of all participants rate training as satisfactory and useful 2.2a 30 top and mid level managers by 07 2.2b 3 by primo 2007 2.1a Training reports 2.1b Training evaluation reports 2.2a Training reports 2.2b Training eval. reports Improved management of MoA HQ will lead to improved extension, plant protection and other user services Structural reforms will not reduce the no. of government officers to a level which makes it impossible to perform routine activities and at the same time develop the organisation

2.3 On site facilitation and coaching of managers done 2.4 Analysis of organisational capacity gaps cum baseline survey completed 3.1 MoA officers trained in various professional issues (e.g. word processing) 3.2 Organisational structures and procedures analysed 3.3 Financial, monitoring and quality assurance systems updated Activities (examples): 1.1.1 Identify most suitable early warning system 1.1.2 Identify programmer 1.1.3 Programming & testing Inputs: A. GoX manpower B. Funds from GoX & GoD Indicators Targets Means of verification Assumptions 2.3 No. of consultations by external consultant 2.3 40 by primo 2008 2.3 Advisor/consultant reports or advisor 2.4 Analysis/baseline report approved 2.4 One approval by ultimo 2006 2.4 Check quality of report 3.1a No. Trained 3.1b Quality of training 3.1a All relevant officers by 2008 3.1b Minimum 80% of all participants rate training as satisfactory and useful 3.1a Training reports 3.1b Training evaluation reports 3.2 Report containing the analysis approved 3.2 One approval by ultimo 2006 3.2 Check report 3.3a Computerised financial system approved 3.3b Computerised monitoring system approved 3.3c Quality assuance system described and tested 1.1.1 Proposal approved 1.1.2 Programmer contract approved 1.1.3 Test programme approved A. Manpower available on time B. Funds available as scheduled 3.3a One approval by ultimo 2007 3.3b One approval by ultimo 2007 3.3c One test report by mid 2007 1.1.1 One approval by mid 2006 1.1.2 One approval by mid 2006 1.1.3 One approval by ultimo 2006 A. GoX: 1.000 man hours in the whole programme period B. 5 mill. DKK and 50 mill. local $ 3.3a Check system and approval 3.3b As above 3.3c Check test report 1.1.1 Check approval 1.1.2 Check approval 1.1.3 Check approval A. Semi-annual programme reports B. Financial statements and semi-annual programme reports Local quality programmer is available MoA is committed to prioritise these activities - thus making manpower available on time

Annex 3. Alignment: how global, national, and sector indicators are (ideally) linked MDG Indicators xxx xxxxxx xxxxx xxx Xxxxxxxx xxxx PRSP Indicators Xxxxxx xxxxxxx x xxx x xx Xxxxxx x xxx xxxxxx Xxxxxxx Sector Plan indicators xxxx xxxxxxx xxxxxx xx xxxxxx x xxx Sector Plan indicators xxxx xxxxxxx xxxxxx xx xxxxxx x xxx SPS Indicators xxxx xxxxx xx xxx SPS Indicators xxxx xxxx xx VPA Indicators xx xx x The figure shows the ideal indicator hierarchy. In principle, the Millennium Development Goals (MDG) provide the overall framework. All MDG indicators should therefore be included in the PRSP list of indicators. The PRSP is likely to include a number of additional indicators, especially in fields not covered directly by the MDGs. All the PRSP indicators should in turn be included in the various Sector Plans or Strategies prepared by line ministries. The sector plans add indicators required for the ministries planning and management processes. The Sector Programme Support (SPS) Document uses a subset of the indicators in the ministry s Sector Plan. Finally, the VPA indicators should consist of a subset of the SPSD indicators.

6