WILMINGTON DISTRICT US ARMY CORPS OF ENGINEERS REGULATORY DIVISION. US Army Corps of Engineers BUILDING STRONG

Similar documents
Compensatory Mitigation Regulation ( Mitigation( Rule )

THE CORPS REGULATORY AUTHORITY

Guidelines for Preparing a Compensatory Mitigation Plan

An Introduction to the Corps of Engineers Regulatory Program

THE CORPS REGULATORY AUTHORITY

U.S. Army Corps of Engineers (USACE) Galveston District

U.S. Army Corps of Engineers. Regulatory Branch Program Overview

ILF Instrument Development and Execution. The North Carolina Experience September 15, 2010

Mitigation. Sahrye Cohen. San Francisco District. January San Francisco District. Corps of Engineers BUILDING STRONG

(TXRAM) Overview and Applications Strategies. John Wooten James A. Thomas, PWS, CWB

U.S. Army Corps of Engineers, Alaska District PRECONSTRUCTION NOTIFICATION FORM

Santa Clara Valley Habitat Plan Regional General Permit #18. Training and Workshop for Co-Permittees April 5, 2016

Floodplain Jurisdiction 6/9/2014. Texas Floodplain Management Association May 29, 2014

EPA and the Corps agree that the proposed discharge can reasonably be expected to result in environmental gain or insignificant losses.

COMPENSATORY MITIGATION AND THE MITIGATION RULE. USACE, Jacksonville District

Savannah District New Mitigation Rule Requirements Individual Permit Applications

1860 Federal Register / Vol. 82, No. 4 / Friday, January 6, 2017 / Rules and Regulations

PUBLIC NOTICE. Section 404 of the Clean Water Act (33 U.S.C. 1344) Section 10 of the Rivers and Harbors Act of 1899 (33 U.S.C.

Nationwide Permit General Conditions

PUBLIC NOTICE. Mr. Jon Morris Beacon Partners, Inc 610 East Morehead Street Charlotte, North Carolina 28202

Regulatory Program Workshop 26 September 2013

COMPENSATORY MITIGATION AT A GLANCE

Nationwide Permit General Conditions

CORPS REGULATORY PROGRAM

Nationwide Permit Summary

verification will be provided to the Department of Defense Siting Clearinghouse, which will evaluate potential effects on military activities.

PUBLIC NOTICE. Attn: Mr. Bill Mumford 1312 Briar Chapel Parkway Chapel Hill, NC 27516

NATIONWIDE PERMIT 38 Cleanup of Hazardous and Toxic Waste Effective Date: March 19, 2017 (NWP Final Notice, 82 FR 4 )

NATIONWIDE PERMIT 24 Indian Tribe or State Administered Section 404 Programs Effective Date: March 19, 2017 (NWP Final Notice, 82 FR 4 )

Note 1: As of the date of the promulgation of this NWP, only New Jersey and Michigan administer their own Section 404 permit programs.

Using the Transportation Planning Process to Support the NEPA Process

Regulatory Guidance Letter 93-02

NATIONWIDE PERMIT 18 Minor Discharges Effective Date: March 19, 2017 (NWP Final Notice, 82 FR 4 )

NATIONWIDE PERMIT 33 Temporary Construction, Access, and Dewatering Effective Date: March 19, 2017 (NWP Final Notice, 82 FR 4 )

NATIONWIDE PERMIT 33 Temporary Construction, Access, and Dewatering Effective Date: March 19, 2017 (NWP Final Notice, 82 FR 4 )

IN-LIEU FEE PROGRAM PROSPECTUS

Compensatory Mitigation Plan Requirements For Permittee Responsible Mitigation Projects St. Louis District, Corps of Engineers May 2010

NATIONWIDE PERMIT 10 Mooring Buoys Effective Date: March 19, 2017 (NWP Final Notice, 82 FR 4 )

NATIONWIDE PERMIT 10 Mooring Buoys Effective Date: March 19, 2017 (NWP Final Notice, 82 FR 4 )

NATIONWIDE PERMIT 7 Outfall Structures and Associated Intake Structures Effective Date: March 19, 2017 (NWP Final Notice, 82 FR 4 )

PUBLIC NOTICE. Town of Beech Mountain Mr. Tim Holloman 503 Beech Mtn. Parkway Banner Elk, North Carolina 28604

SPN: Comment Period: September 10, 2015 to October 09, 2015

Nationwide Permit 2 - Structures in Artificial Canals Effective Date: March 19, 2017; Expiration Date: March 18, 2022 (NWP Final Notice, 82 FR 1860)

Nationwide Permit General Conditions

Nationwide Permit General Conditions

Nationwide Permit 34 - Cranberry Production Activities Effective Date: March 19, 2017; Expiration Date: March 18, 2022 (NWP Final Notice, 82 FR 1860)

NATIONWIDE PERMIT 31 Maintenance of Existing Flood Control Facilities Effective Date: March 19, 2017 (NWP Final Notice, 82 FR 4 )

NATIONWIDE PERMIT 11 Temporary Recreational Structures Effective Date: March 19, 2017 (NWP Final Notice, 82 FR 4 )

NATIONWIDE PERMIT 11 Temporary Recreational Structures Effective Date: March 19, 2017 (NWP Final Notice, 82 FR 4 )

NATIONWIDE PERMIT 11 Temporary Recreational Structures Effective Date: March 19, 2017 (NWP Final Notice, 82 FR 4 )

A. Nationwide Permit General Conditions

G. New York District Regional General Conditions A-F (applicable to all NWPs)

EXHIBIT B. Service Areas. Aquatic Resource Service Area. Vernal Pool Service Area. Service Area Narrative

Nationwide Permit 44 - Mining Activities Effective Date: March 19, 2017; Expiration Date: March 18, 2022 (NWP Final Notice, 82 FR 1860)

NATIONWIDE PERMIT 39 Commercial and Institutional Developments Effective Date: March 19, 2017 (NWP Final Notice, 82 FR 4 )

NATIONWIDE PERMIT 39 Commercial and Institutional Developments Effective Date: March 19, 2017 (NWP Final Notice, 82 FR 4 )

PUBLIC NOTICE. Mr. H. Dean Green 3907 West Wendover Avenue Greensboro, North Carolina 27409

A. Nationwide Permit General Conditions

Instructions for the South Pacific Division Nationwide Permit Pre- Construction Notification (PCN):

Nationwide Permit 19 - Minor Dredging Effective Date: March 19, 2017; Expiration Date: March 18, 2022 (NWP Final Notice, 82 FR 1860)

Public Notice. US Army Corps of Engineers Fort Worth District. Applicant: Mill Branch Stream Mitigation Bank. Permit Application No.

P U B L I C N O T I C E. CHARLESTON DISTRICT, CORPS OF ENGINEERS 69A Hagood Avenue Charleston, South Carolina

NATIONWIDE PERMIT GENERAL CONDITIONS

Nationwide Permit 22 - Removal of Vessels Effective Date: March 19, 2017; Expiration Date: March 18, 2022 (NWP Final Notice, 82 FR 1860)

Navigating the U.S. Army Corps of Engineers Regulatory Process

Nationwide Permit 3 - Maintenance Effective Date: March 19, 2017; Expiration Date: March 18, 2022 (NWP Final Notice, 82 FR 1860)

Nationwide Permit 8 - Oil and Gas Structures on the Outer Continental Shelf

US Army Corps of Engineers. Permitting Process. Chad Konickson. Chief, Southwest Section St. Paul District Regulatory Branch.

U.S. Army Corps of Engineers (USACE) Portland District

Nationwide Permit 4 - Fish and Wildlife Harvesting, Enhancement, and Attraction Devices and Activities

The Southeast Alaska Watershed Coalition Mitigation Fund Prospectus. In Lieu Fee Compensatory Mitigation Program

NATIONWIDE PERMITS FOR THE STATE OF OHIO

U.S. Army Corps of Engineers Regulatory Program

Nationwide Permit 40 - Agricultural Activities Effective Date: March 19, 2017; Expiration Date: March 18, 2022 (NWP Final Notice, 82 FR 1860)

(a) No material is placed in excess of the minimum needed for erosion protection;

Nationwide Permit 29 - Residential Developments Effective Date: March 19, 2017; Expiration Date: March 18, 2022 (NWP Final Notice, 82 FR 1860)

NATIONWIDE PERMIT 52 Water-Based Renewable Energy Generation Pilot Projects Effective Date: March 19, 2017 (NWP Final Notice, 82 FR 4 )

Section 404 Program Assumption

COASTAL SHORE PROTECTION WITH LIVING SHORELINES

REVISIONS SHEET. DATE DESCRIPTION NOTES NO Initial Version

NATIONWIDE PERMIT 3 Maintenance Effective Date: March 19, 2017 (NWP Final Notice, 82 FR 4 )

Version: About the MOA Potential Q s and A s for EPA/Army Alaska Wetland Mitigation MOA 1. What does the MOA do (what does it not do)? o The n

Nationwide Permit Summary

ACTIVITIES AUTHORIZED BY 2017 NATIONWIDE PERMIT WITHIN THE STATE OF NEW YORK Expiration March 18, 2022

NATIONWIDE PERMIT 13 Bank Stabilization Effective Date: March 19, 2017 (NWP Final Notice, 82 FR 4 )

Environmental and Stormwater Management Breakout Session #1

12501-SPD REGULATORY PROGRAM STANDARD OPERATING PROCEDURE FOR DETERMINATION OF MITIGATION RATIOS South Pacific Division

Public Notice. US Army Corps of Engineers Memphis District. NOTICE DATE: September 25, EXPIRATION DATE: October 25, 2018

PUBLIC NOTICE. c/o Mr. Kenneth Fuller 925 Penderlea Highway Burgaw, North Carolina 28425

(a) The cultivation of a nonindigenous species unless that species has been previously cultivated in the waterbody;

USING A WATERSHED APPROACH TO MANAGE RESOURCES WITHIN JURISDICTION OF THE US ARMY CORPS OF ENGINEERS, SAVANNAH DISTRICT REGULATORY PROGRAM

G. New York District Regional General Conditions A-F (applicable to all NWPs)

U.S. Army Corps of Engineers Regulatory Program Our Mission, Authority, Jurisdiction, and Permitting

NATIONWIDE PERMIT CONDITIONS. The following General Conditions must be followed in order for any authorization by a NWP to be valid:

Nationwide Permit Summary

ENVIRONMENTAL AUTHORIZATIONS FOR FEDERAL NAVIGATION AND PROJECTS

G. New York District Regional General Conditions A-F (applicable to all NWPs)

G. New York District Regional General Conditions A-F (applicable to all NWPs)

ACTIVITIES AUTHORIZED BY 2017 NATIONWIDE PERMIT WITHIN THE STATE OF NEW YORK Expiration March 18, 2022

Nationwide Permit 52 - Water-Based Renewable Energy Generation Pilot Projects

Transcription:

WILMINGTON DISTRICT US ARMY CORPS OF ENGINEERS REGULATORY DIVISION US Army Corps of Engineers

Organization The Wilmington District Regulatory Division consists of 4 field offices in Wilmington, Washington, Raleigh and Asheville. The Regulatory Division has approximately 51 employees and an annual budget of $7.1M. Raleigh Field Office Asheville Field Office Washington Field Office Wilmington Field Office / Regulatory Division Office

Authorities Rivers and Harbors Act of 1899 Section 10 of the Rivers and Harbors Act of 1899 gives the authority to the Corps to ensure that there are no obstructions to the navigable waters of the United States. Regulated activities include construction of piers, jetties, and weirs; dredging projects; and other such projects Clean Water Act (1972) Purpose is to restore and maintain the chemical, physical, and biological integrity of the Nations waters. Regulated activities include discharges of dredged or fill material into waters, including streams and wetlands, of the United States.

Permit Types Individual or Standard Permit - Requires 30- day Public Notice and opportunity for public comment Coordination with the review agencies Typically for impacts greater than 0.5 ac of wetlands or 300lf of stream Nationwide and General Permits Re-Issued by Congress every 5 years A total of 52 activity specific permits Primarily limited to impacts <0.5 ac. of wetlands and <300 lf of stream Mitigation can be required in either case 4

Other Program Requirements The Regulatory Division, in making permit decisions, must not only follow the procedures of the Rivers and Harbors Act and the Clean Water Act but must also ensure compliance with many other Laws including: Section 103 of the MPRSA Section 401, Clean Water Act Section 7, Endangered Species Act Coastal Zone Management Act National Environmental Policy Act (NEPA) Fish and Wildlife Coordination Act Section 106, National Historic Preservation Act

Mitigation Three options available to the public Permittee Responsible, Banks, In-Lieu-Fee program Corps does not dictate the source applicants make proposal and Corps determines if it is adequate to offset permitted adverse impacts Determined on a permit by permit basis most impacts require some form of compensatory mitigation 6

Mitigation Basic Requirements Not actually cause more harm to the environment! Typically performed during or prior to the regulated activity (ILF may be an exception) Must be preserved in perpetuity Must be In-Kind unless otherwise approved Must be performed within the same 8-HUC unless otherwise approved 7

Mitigation The cost of compensatory mitigation credits is determined by the sponsor of a mitigation bank or in-lieu fee program. Section 332.8(o)(5)(ii) [ 230.98(o)(5)(ii)] requires in-lieu fee programs to use full cost accounting methods, so that the cost per unit credit includes the expected costs associated with the restoration, establishment, enhancement, and/or preservation of aquatic resources in the service area. This provision is intended to ensure that in-lieu fee programs develop realistic price schedules, while still leaving determination of credit prices to the program sponsor, rather than the Corps. 8

Service Areas Defined in the 2008 Mitigation Rule as the geographic area within which impacts can be mitigated at a specific mitigation bank or an (ILF) lieu fee program, as designated in its instrument The Wilmington District currently uses the 8-digit HUC as the basis for defining Service Areas for Mitigation Banks and EEP. Service Areas boundaries may be modified based on other factors 9

Considerations: Service Areas Ensure lost aquatic functions are compensated reasonably near the impacts Ecoregion Stream Temperature Regime (Cold, Cool, Warm) Watershed Planning allows mitigation that is developed within a watershed to be located to best compensate for the both the needs of the watershed and the type of functions lost through issuance of permits 10

Service Areas Economics larger service areas could result in mitigation being provided far from impact sites, especially if land prices vary considerably across the watershed. Site Availability small watersheds or watersheds with limited mitigation opportunities may justify expanded service areas Exceptions to the 8 digit HUC can be made on a case-by-case basis. Exceptions are a part of every banking instrument 11

NC EEP Has provided mitigation to the public and private sector since 2003* WRP provided mitigation from 1998 to 2003 In-Lieu Fee Instrument was approved in 2010 to comply with (new) Federal mitigation rule Agreement is now between DENR and USACE, NC DOT is no longer a signatory agency 12

NC EEP Mitigation type, location, specific timeframes, and watershed approach allowed the District to make assurances that NC DOT projects would not be held up due to mitigation concerns. Since its inception, no NC DOT projects have been delayed due to mitigation Approximately 2,000 DA permits with a compensatory mitigation requirement have been satisfied by the EEP. 13

NC EEP Important Program characteristics Advance mitigation for NC DOT projects Watershed approach (an ILF requirement) Provides mitigation for the regulated public in all 54 8-digit HUCs We believe this is an important service to the regulated public of North Carolina 14

404 Program Transfer to the States (40 CFR Part 233) Under Section 404(g) of the Clean Water Act, Congress gave the States/Tribes the authority to administer individual and general permit program for the discharge of dredged or fill material into waters within their jurisdiction under State law or under an interstate compact. EPA has final approval authority for program transfer of CWA Section 404 jurisdiction and will coordinate with the Corps, the U.S. Fish and Wildlife Service and the National Marine Fisheries Service during the process. While States may impose more stringent requirements, they may not impose any less stringent requirements for any purpose. 15

404 Program Transfer to the States The State must show that their program would cover all waters they are eligible to assume, that it would regulate at least the same activities, that it would provide for sufficient public participation, that it would ensure compliance with the Section 404(b)(1) guidelines, and that it would have adequate enforcement authority. Corps retains 404 authority in navigable waters and wetlands adjacent to those waters. There are only two States that currently have assumed the CWA Section 404 authority, Michigan and New Jersey. 16

Partnerships Merger Process established between USACE, NC DOT, NC DENR, and FHWA Integrates NEPA and 404 requirements to facilitate transportation planning In-Lieu-Fee Agreement between USACE and NC DENR Model program, provides advanced mitigation for most NC DOT impacts and provides compensatory mitigation to the private sector in all 54 8-digit HUCs 17

Civil Works Construction Cost Index System System Purpose is to inflate current construction cost estimates into the future or to inflate past construction estimates to present day or future costs. Indexes are found in Appendix A of Engineer Manual (EM) 1110-2-1304. Past Indexes are based on historical data. Future or projected indexes are based on current annual Office of Management & Budget (OMB) inflation factors. Future factors are revised semi-annually by OMB and in the EM. Reliability of future factors becomes less with length of forecast. 18

Civil Works Construction Cost Index System Actual material, equipment and labor costs are used in developing the historical Indexes Cost data is obtained from Federal Government Agencies and civilian organizations that track construction related costs see the EM for detailed discussion 19

Conclusions The Wilmington District is proud of the relationship it has with NC DOT and NC DENR Regardless of state assumption, the Corps will always retain permit authority in tidal waters, navigable waters, and wetlands adjacent to those waters The committee should carefully consider any recommendation(s) that could potentially conflict with the Corps statutory requirements under the Clean Water Act 20

U.S. Army Corps of Engineers Wilmington District